CN103993690A - Patch stone curtain wall installation method - Google Patents

Patch stone curtain wall installation method Download PDF

Info

Publication number
CN103993690A
CN103993690A CN201410226735.6A CN201410226735A CN103993690A CN 103993690 A CN103993690 A CN 103993690A CN 201410226735 A CN201410226735 A CN 201410226735A CN 103993690 A CN103993690 A CN 103993690A
Authority
CN
China
Prior art keywords
patch stone
stainless steel
pin
patch
crossbeam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410226735.6A
Other languages
Chinese (zh)
Inventor
程照
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Gemstone Energy Technology Co Ltd
Original Assignee
Ningbo Gemstone Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Gemstone Energy Technology Co Ltd filed Critical Ningbo Gemstone Energy Technology Co Ltd
Priority to CN201410226735.6A priority Critical patent/CN103993690A/en
Publication of CN103993690A publication Critical patent/CN103993690A/en
Pending legal-status Critical Current

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The invention discloses a patch stone curtain wall installation method which includes the following steps of (S1) measuring and drawing installation position lines of a transverse framework and a vertical framework, (S2) pre-burying a support, (S3) installing an upright column and then installing a beam, (S4) selecting patch stone, stainless steel pins and stainless steel connection plates, (S5) drilling pin holes used for installing the stainless steel pins in four side edges of the patch stone according to design requirements, (S6) when the first layer of the patch stone is installed, attaching the stainless steel pins to the bottom of the patch stone, (S7) when the second layer and above of the patch stone are installed, aligning the stainless steel pins to the pin holes in the bottom of the patch stone, inserting the stainless steel pins into the pin holes, and then installing the upper connection plate, (S8) gluing seams between the stainless steel pins and the hole walls of the pin holes of the patch stone, and (S9) embedding foam bars in seams between two pieces of vertically adjacent patch stone, and then filling the seams and the foam bars with caulk compounds. The installation method is quick in construction process, prevents the patch stone from being uneven, and enables firmness of the patch stone to be good.

Description

A kind of patch stone curtain wall mounting method
Technical field
The present invention relates to a kind of patch stone curtain wall mounting method.
Background technology
At present the applicant's earlier application the utility model patent of a patch stone, it comprises from upper facestock layer, main material layer, middle material layer, substrate layer and the substrate layer of comprising downwards successively, wherein said facestock layer is clear finish material, described main material layer is the imitative colorful high molecular polymer of stone, described middle material layer is synthetic resin, described substrate layer is synthetic resin, and described substrate layer is composite sheet material; The cross section of the patch stone of above-mentioned each layer of composition is square.Adopt the processing technology of composite wood that above-mentioned sandwich construction is combined into an overall structure, be used for decorative exterior wall, there is quality easily in allocation and transportation construction, and incrust, safer, environmental protection, be easy to the advantage of renewal and reform.It approaches with high-grade marble, lithotome etc. in appearance, is 1/3 left and right of stone material in weight, is 1/4 left and right of stone material in price, is that a kind of height of can building is decorated the quality novel energy-saving construction material of energy-conserving and environment-protective again.
At present in the time that patch stone is installed, the general cementing agent that adopts is installed to patch stone on metope, cause like this construction speed slow, and the thickness of cementing agent is wayward, after installation, easily there is patch stone out-of-flatness, or occur hollow, be that patch stone is not adjacent to metope, thus the normal bonding of impact fastness.
Summary of the invention
The technical problem to be solved in the present invention is, provide a kind of construction speed very fast, avoid patch stone to occur out-of-flatness, make the patch stone curtain wall mounting method that patch stone fastness is good.
Technical scheme of the present invention is, a kind of patch stone curtain wall mounting method with following structure is provided, and comprises the following steps:
S1: on curtain wall according to design master drawing and vertical, center, absolute altitude reference line, the installation site line of the top slat iron of measuring and paint out, perpendicular skeleton;
S2: by each the control line that setting-out is complete, embedded bracket is installed, general position dimensional errors is at ± 20mm, absolute altitude allowable variation ± 10mm;
S3: choose aluminium alloy extrusions or shaped steel as column and crossbeam, column is first installed crossbeam is installed again; Installation process: the column installation site line of establishing by survey is first installed the column of same facade by two ends, then by the order of logical line, middle standing pillar is installed, and is first fixed on embedded bracket by bundle of lines corner brace, then column is fixed by bolt and corner brace; Column installs and each crossbeam position line is caused on column with spirit level afterwards, and then crossbeam is installed, and crossbeam is vertical with column, and crossbeam is bolted with column or is connected by corner brace;
S4: choosing area is the patch stone in 0.8~1 square, diameter is the stainless steel pin that 5~6mm and length are 20~30mm, width is the stainless steel junction plate that 40mm and thickness are 4mm;
S5: first bore the pin-and-hole for stainless steel pin is installed by designing requirement at four sides of patch stone, the hole depth of pin-and-hole is 22~33mm, and aperture is 7~8mm;
S6: when first floor patch stone is installed, first stainless steel pin is adhered to the bottom of patch stone with glue, the stainless steel pin again these being clung injects in the pin-and-hole of bottom connecting plate, adjust by each control line behind the position and surface finish of patch stone, take off patch stone, by bottom connecting plate and crossbeam fixation, then patch stone is relay and got back on junction plate; The junction plate that fixing patch stone top is installed, is finally inserted into stainless steel pin in the pin-and-hole on patch stone top by the pin control of junction plate, and stainless steel pin inserts 1/2nd, and junction plate top exposes 1/2nd; Encapsulating between the pin-and-hole hole wall of stainless steel pin and patch stone, adjusts after the verticality and planeness of patch stone, by top junction plate fixation;
S7: when the second layer and above patch stone are installed, the stainless steel pin first exposing on lower floor's patch stone top applies glue, aims at stainless steel pin by the pin-and-hole of patch stone bottom and vertically inserts, and adjusts verticality and planeness, then top junction plate is installed.
S8: the gap gluing between stainless steel pin and patch stone pin-and-hole hole wall;
S9: gap between upper and lower two adjacent patch stones embeds foam rods, then gap and foam rods are filled up with caulk compound, and flush with patch stone outer wall.
Described junction plate and crossbeam are bolted, and described bolt is fixed from bottom through hole and the bolt of corner brace and crossbeam.
Described crossbeam be L-type just now, its bottom surface is for fixing with junction plate and corner brace, side is positioned at the inner side of junction plate and offsets with junction plate.
Adopt after above step, method of the present invention compared with prior art has the following advantages: by step S1 to S9, from being scoring to, crossbeam and column are installed, the installation site that can ensure patch stone is accurate, then patch stone is connected on crossbeam by bearing pin, greatly reduces like this construction period, also can ensure the planarization of the patch stone between adjacent, because the distance between bearing pin and patch stone external surface equates, also can ensure being adjacent to of patch stone and curtain wall also to have ensured patch stone fastness; After being to install in the gap gluing between stainless steel pin and patch stone pin-and-hole hole wall, gap between upper and lower two adjacent patch stones embedding foam rods, with caulk compound, gap and foam rods are filled up again, and and patch stone outer wall flush so equal bonding strength that can ensure between adjacent patch stone.
As improvement, described junction plate and crossbeam are bolted, and described bolt is fixed from bottom through hole and the bolt of corner brace and crossbeam, and handled easily personnel screw nut from above, convenient adjustment and locking.
As improvement, described crossbeam be L-type just now, its bottom surface is for fixing with junction plate and corner brace, side is positioned at the inner side of junction plate and offsets with junction plate, located lateral can be carried out to junction plate in the side of crossbeam.
Detailed description of the invention
According to specific embodiment, the invention will be further described below.
A kind of patch stone curtain wall mounting method of the present invention, comprises the following steps:
S1: on curtain wall according to design master drawing and vertical, center, absolute altitude reference line, the installation site line of the top slat iron of measuring and paint out, perpendicular skeleton;
S2: by each the control line that setting-out is complete, embedded bracket is installed, general position dimensional errors is at ± 20mm, absolute altitude allowable variation ± 10mm;
S3: choose aluminium alloy extrusions or shaped steel as column and crossbeam, column is first installed crossbeam is installed again; Installation process: the column installation site line of establishing by survey is first installed the column of same facade by two ends, then by the order of logical line, middle standing pillar is installed, and is first fixed on embedded bracket by bundle of lines corner brace, then column is fixed by bolt and corner brace; Column installs and each crossbeam position line is caused on column with spirit level afterwards, and then crossbeam is installed, and crossbeam is vertical with column, and crossbeam is bolted with column or is connected by corner brace;
S4: choosing area is the patch stone in 0.8~1 square, diameter is the stainless steel pin that 5~6mm and length are 20~30mm, width is the stainless steel junction plate that 40mm and thickness are 4mm;
S5: first bore the pin-and-hole for stainless steel pin is installed by designing requirement at four sides of patch stone, the hole depth of pin-and-hole is 22~33mm, and aperture is 7~8mm;
S6: when first floor patch stone is installed, first stainless steel pin is adhered to the bottom of patch stone with glue, the stainless steel pin again these being clung injects in the pin-and-hole of bottom connecting plate, adjust by each control line behind the position and surface finish of patch stone, take off patch stone, by bottom connecting plate and crossbeam fixation, then patch stone is relay and got back on junction plate; The junction plate that fixing patch stone top is installed, is finally inserted into stainless steel pin in the pin-and-hole on patch stone top by the pin control of junction plate, and stainless steel pin inserts 1/2nd, and junction plate top exposes 1/2nd; Encapsulating between the pin-and-hole hole wall of stainless steel pin and patch stone, adjusts after the verticality and planeness of patch stone, by top junction plate fixation;
S7: when the second layer and above patch stone are installed, the stainless steel pin first exposing on lower floor's patch stone top applies glue, aims at stainless steel pin by the pin-and-hole of patch stone bottom and vertically inserts, and adjusts verticality and planeness, then top junction plate is installed.
S8: the gap gluing between stainless steel pin and patch stone pin-and-hole hole wall;
S9: gap between upper and lower two adjacent patch stones embeds foam rods, then gap and foam rods are filled up with caulk compound, and flush with patch stone outer wall.
Described junction plate and crossbeam are bolted, and described bolt is fixed from bottom through hole and the bolt of corner brace and crossbeam.
Described crossbeam be L-type just now, its bottom surface is for fixing with junction plate and corner brace, side is positioned at the inner side of junction plate and offsets with junction plate.

Claims (3)

1. a patch stone curtain wall mounting method, is characterized in that: comprise the following steps:
S1: on curtain wall according to design master drawing and vertical, center, absolute altitude reference line, the installation site line of the top slat iron of measuring and paint out, perpendicular skeleton;
S2: by each the control line that setting-out is complete, embedded bracket is installed, general position dimensional errors is at ± 20mm, absolute altitude allowable variation ± 10mm;
S3: choose aluminium alloy extrusions or shaped steel as column and crossbeam, column is first installed crossbeam is installed again; Installation process: the column installation site line of establishing by survey is first installed the column of same facade by two ends, then by the order of logical line, middle standing pillar is installed, and is first fixed on embedded bracket by bundle of lines corner brace, then column is fixed by bolt and corner brace; Column installs and each crossbeam position line is caused on column with spirit level afterwards, and then crossbeam is installed, and crossbeam is vertical with column, and crossbeam is bolted with column or is connected by corner brace;
S4: choosing area is the patch stone in 0.8~1 square, diameter is the stainless steel pin that 5~6mm and length are 20~30mm, width is the stainless steel junction plate that 40mm and thickness are 4mm;
S5: first bore the pin-and-hole for stainless steel pin is installed by designing requirement at four sides of patch stone, the hole depth of pin-and-hole is 22~33mm, and aperture is 7~8mm;
S6: when first floor patch stone is installed, first stainless steel pin is adhered to the bottom of patch stone with glue, the stainless steel pin again these being clung injects in the pin-and-hole of bottom connecting plate, adjust by each control line behind the position and surface finish of patch stone, take off patch stone, by bottom connecting plate and crossbeam fixation, then patch stone is relay and got back on junction plate; The junction plate that fixing patch stone top is installed, is finally inserted into stainless steel pin in the pin-and-hole on patch stone top by the pin control of junction plate, and stainless steel pin inserts 1/2nd, and junction plate top exposes 1/2nd; Encapsulating between the pin-and-hole hole wall of stainless steel pin and patch stone, adjusts after the verticality and planeness of patch stone, by top junction plate fixation;
S7: when the second layer and above patch stone are installed, the stainless steel pin first exposing on lower floor's patch stone top applies glue, aims at stainless steel pin by the pin-and-hole of patch stone bottom and vertically inserts, and adjusts verticality and planeness, then top junction plate is installed.
S8: the gap gluing between stainless steel pin and patch stone pin-and-hole hole wall;
S9: gap between upper and lower two adjacent patch stones embeds foam rods, then gap and foam rods are filled up with caulk compound, and flush with patch stone outer wall.
2. patch stone curtain wall mounting method according to claim 1, is characterized in that: described junction plate and crossbeam are bolted, and described bolt is fixed from bottom through hole and the bolt of corner brace and crossbeam.
3. patch stone curtain wall mounting method according to claim 1, is characterized in that: described crossbeam be L-type just now, its bottom surface is for fixing with junction plate and corner brace, side is positioned at the inner side of junction plate and offsets with junction plate.
CN201410226735.6A 2014-05-24 2014-05-24 Patch stone curtain wall installation method Pending CN103993690A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410226735.6A CN103993690A (en) 2014-05-24 2014-05-24 Patch stone curtain wall installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410226735.6A CN103993690A (en) 2014-05-24 2014-05-24 Patch stone curtain wall installation method

Publications (1)

Publication Number Publication Date
CN103993690A true CN103993690A (en) 2014-08-20

Family

ID=51308005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410226735.6A Pending CN103993690A (en) 2014-05-24 2014-05-24 Patch stone curtain wall installation method

Country Status (1)

Country Link
CN (1) CN103993690A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111088893A (en) * 2020-01-02 2020-05-01 蒋昌俊 Construction process for installing, drawing and positioning building curtain wall
CN114135073A (en) * 2021-12-31 2022-03-04 浙江久石工研建材科技有限公司 Flexible patch stone construction process

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2198338Y (en) * 1994-09-07 1995-05-24 北京环娜美建筑工程有限公司 Fixing structure for dry connecting stone material
CN101585205A (en) * 2009-05-07 2009-11-25 河南泰宏房屋营造有限公司 Method for producing and mounting moulded concrete anaglyph unit plate
KR20120009739A (en) * 2010-07-21 2012-02-02 주식회사 해담은창 Curtain wall using stone surface member and curtain wall construction method therewith
CN102864890A (en) * 2012-09-03 2013-01-09 宁波华宝石节能建材有限公司 Paster stone as well as making method and construction method of paster stone

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2198338Y (en) * 1994-09-07 1995-05-24 北京环娜美建筑工程有限公司 Fixing structure for dry connecting stone material
CN101585205A (en) * 2009-05-07 2009-11-25 河南泰宏房屋营造有限公司 Method for producing and mounting moulded concrete anaglyph unit plate
KR20120009739A (en) * 2010-07-21 2012-02-02 주식회사 해담은창 Curtain wall using stone surface member and curtain wall construction method therewith
CN102864890A (en) * 2012-09-03 2013-01-09 宁波华宝石节能建材有限公司 Paster stone as well as making method and construction method of paster stone

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
李栋,李伙穆: "《建筑装饰装修施工技术》", 30 June 2013, 厦门集大印刷厂印刷 *
李继业: "《建筑节能工程施工》", 29 February 2012, 化学工业出版社 *
栾海明: "《建筑装饰装修工程》", 31 March 2013, 中国铁道出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111088893A (en) * 2020-01-02 2020-05-01 蒋昌俊 Construction process for installing, drawing and positioning building curtain wall
CN114135073A (en) * 2021-12-31 2022-03-04 浙江久石工研建材科技有限公司 Flexible patch stone construction process

Similar Documents

Publication Publication Date Title
CN101824895B (en) Drily hung vitrolite wall surface decoration system and construction method thereof
CN102003056B (en) Wall connecting part of insertion type integrated insulation board and application method thereof
KR20120015064A (en) Method for constructing outer wall of concrete with integrated finishing pannel having joint hole
CN109853800B (en) Assembled low-energy-consumption curtain wall system and construction method thereof
CN102465606A (en) Installation and construction process of curtain wall aluminum composite panel
CN103993690A (en) Patch stone curtain wall installation method
CN101858133B (en) Wall connecting piece of plug-in type low-carbon heat preservation energy-saving board
CN103758355B (en) Concealed frame glass curtain wall double glazing is without auxiliary frame installation method
CN102287034B (en) Special-shaped rail and construction method thereof
CN201738538U (en) Wall connecting piece of plug-in type low-carbon heat-insulation energy-saving plate
CN202520153U (en) Door and window steel sub-frame installation and construction structure
CN103015656B (en) Component type exterior wall heat insulating decorative board and preparation method thereof and exterior wall mounting method
CN108457444B (en) Outer wall PU decorative structure and construction method thereof
CN201901995U (en) Wall body connecting member of insert-connection type heat insulating integrated board
CN103981948B (en) One kind is removable, detachable prefabricated house
CN102493620A (en) Through long folded fastener type wall body connecting piece of heat insulation integrated plate and mounting method thereof
CN201424797Y (en) Wood keel overhead wooden floor mounting base layer
CN106088579A (en) The erection method of reinforced concrete wall template
KR20190078792A (en) Multi system bracket
CN115182496A (en) Transverse-through and vertical-breaking type multi-element combined curtain wall system and construction method thereof
CN104871865B (en) It is capable of the greening wall system of fast assembling-disassembling
CN201225001Y (en) Composite die for casting building frame
CN204252494U (en) Reduce deviation building structure
CN104278807B (en) The front installation method and digital production method of decorating outer wall of building component and the component
CN114135115A (en) Construction method for connecting EPS (expandable polystyrene) component on outer wall body of color steel plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20140820

RJ01 Rejection of invention patent application after publication