CN102465606A - Installation and construction process of curtain wall aluminum composite panel - Google Patents

Installation and construction process of curtain wall aluminum composite panel Download PDF

Info

Publication number
CN102465606A
CN102465606A CN2010105363357A CN201010536335A CN102465606A CN 102465606 A CN102465606 A CN 102465606A CN 2010105363357 A CN2010105363357 A CN 2010105363357A CN 201010536335 A CN201010536335 A CN 201010536335A CN 102465606 A CN102465606 A CN 102465606A
Authority
CN
China
Prior art keywords
curtain wall
skeleton
connector
aluminium
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010105363357A
Other languages
Chinese (zh)
Inventor
王殿营
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN2010105363357A priority Critical patent/CN102465606A/en
Publication of CN102465606A publication Critical patent/CN102465606A/en
Pending legal-status Critical Current

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses an installation and construction process of a curtain wall aluminum composite panel, which comprises the following steps: measuring and setting out; installing connecting pieces; installing a skeleton; installing a fire-proof material; installing an aluminum plate; and handling a curtain wall shell nosing. The invention has the beneficial effects that: a curtain wall installed by using the method disclosed by the invention has a smooth surface, good weather resistance and stable quality.

Description

The construction technique of curtain wall aluminium-plastic panel
Technical field
The present invention relates to a kind of architectural construction technology, specifically is a kind of construction technique of curtain wall aluminium-plastic panel.
Background technology
Aluminiumplastic composite panel is through chemically treated application aluminium sheet, belongs to a kind of new decorative material for building.The aluminium-plastic panel exterior wall has obtained using widely in the building curtain wall industry of China and development rapidly since late nineteen eighties the early 1990s in last century gets into China, for the variation of China's building curtain wall product and architectural style contributes.Yet aluminium-plastic panel curtain wall mounting technique standard in China is still unsound, causes aluminium-plastic panel curtain wall quality unstable.
Summary of the invention
For improving the installation quality of aluminium-plastic panel exterior wall, the present invention provides a kind of construction technique of exterior wall aluminium-plastic panel.
The present invention realizes with following technical scheme: a kind of construction technique of curtain wall aluminium-plastic panel, and concrete steps are:
(1) measures unwrapping wire
1), on agent structure, draws the installation site line of support framework according to axis on the agent structure and absolute altitude line;
2) all built-in fittings are got, and its size of repetition measurement;
3) in time check the correctness that unwrapping wire guarantees curtain wall verticality and support framework.
(2) connector member: the welding of the built-in fitting on connector and the agent structure is fixing;
(3) skeleton is installed
1) by the snap the line position column is fixed on the connector; , floor height higher exterior wall aluminum facade skeleton column big to area must weigh down with measuring apparatus and line and measure, and proofread and correct its position, and be vertical and smooth to guarantee the skeleton montant;
2) precalculated position that the connector and the pad at crossbeam two ends is installed in column, seam is tight;
(4) fire proofing material is installed: adopt the anti-guncotton of high-quality, will prevent that guncotton fixes with galvanized steel plain sheet, anti-guncotton is sealed on the room between floor and the metal sheet continuously, form fire belt one, must not there be the space centre.
(5) aluminium sheet is installed
1) measures unwrapping wire: with rivet or bolt aluminium alloy plate facing block-by-block is fixed on the shaped steel skeleton by working drawing; Gap 8~10mm between plate and the plate is so that the adjustment alignment error;
2) disposable plates seam: with cleaning agent with metal sheet and frame table face clean after, lay weather strip or weather proof adhesive tape immediately in the slit between aluminium sheet, the weather proofing sealant that reinjects can not have space or bubble.;
(6) handling curtain wall closes up: utilize metal sheet with wallboard end and the capping of keel position..
The invention has the beneficial effects as follows: with the curtain wall that method of the present invention is installed, surfacing, good weatherability, steady quality.
The specific embodiment
Embodiment 1
Measure unwrapping wire
1), is bound on the agent structure exactly by the installation site line of designing requirement with support framework according to axis on the agent structure and absolute altitude line.
2) all built-in fittings are got, and its size of repetition measurement.
Should control the distribution error when 3) measuring unwrapping wire, be not the accumulation of error.
4) the measurement unwrapping wire should be not more than under the level Four situation at wind-force and carry out.Should in time check behind the unwrapping wire, to guarantee the correctness of curtain wall verticality and stud.
2, connector member
The welding of built-in fitting on connector and the agent structure is fixing.When not burying embedded iron parts underground on the agent structure, can on agent structure, punch and install expansion bolt and be connected ironware and fix.
3, skeleton is installed
The column that 1) will pass through antirust processing like clockwork by the snap the line position is with welding or be bolted on the connector.Should examine at any time during installation that absolute altitude and position of center line are big to area, the higher exterior wall aluminum facade skeleton column of floor height, must weigh down measurement, proofread and correct its position with measuring apparatus and line, vertical and smooth with assurance skeleton montant.Column is installed the absolute altitude deviation should be greater than 3mm, and deviation should be greater than 2mm before and after the axis, and left-right deviation should be greater than 3mm; Adjacent two root post absolute altitude deviations should be greater than 3mm, should be with the maximum absolute altitude deviation of layer column greater than 5mm, and adjacent two upright very range deviation should be greater than 2mm.
2) precalculated position that the connector and the pad at crossbeam two ends is installed in column, and should install firmly, its seam should be tight; The horizontal departure of adjacent two crossbeams should be greater than 1mm.A same layer absolute altitude deviation: should be when a width of cloth width of curtain wall is less than or equal to 35m greater than 5mm; When a width of cloth width of curtain wall during greater than 35m, should be greater than 7mm.
4, fire proofing material is installed
Should adopt high-quality to prevent guncotton, the anti-fire phase will reach the requirement of relevant department.To prevent that guncotton fixes with galvanized steel plain sheet.Anti-guncotton is sealed on the room between floor and the metal sheet continuously, forms fire belt one, must not there be the space centre.
5, aluminium sheet is installed
1, measures unwrapping wire
Aluminium alloy plate facing block-by-block is fixed on the shaped steel skeleton with rivet or bolt by working drawing.Stay seam 10~15mm between plate and the plate, so that the adjustment alignment error.When metal sheet is installed, about, deviation up and down should be greater than 1.5mm.
6, disposable plates seam
With cleaning agent with metal sheet and frame table face clean after, lay weather strip or weather proof adhesive tape immediately in the slit between aluminium sheet earlier, the materials such as silicone weather resistant fluid sealant that reinject, injecting glue is full, and space or bubble can not be arranged.
7, handling curtain wall closes up
Close up and handle metal sheet capable of using wallboard end and the capping of keel position.

Claims (1)

1. the construction technique of a curtain wall aluminium-plastic panel, concrete steps are:
(1) measures unwrapping wire
1), on agent structure, draws the installation site line of support framework according to axis on the agent structure and absolute altitude line;
2) all built-in fittings are got, and its size of repetition measurement;
3) in time check the correctness that unwrapping wire guarantees curtain wall verticality and support framework.
(2) connector member: the welding of the built-in fitting on connector and the agent structure is fixing;
(3) skeleton is installed
1) by the snap the line position column is fixed on the connector; , floor height higher exterior wall aluminum facade skeleton column big to area must weigh down with measuring apparatus and line and measure, and proofread and correct its position, and be vertical and smooth to guarantee the skeleton montant;
2) precalculated position that the connector and the pad at crossbeam two ends is installed in column, seam is tight;
(4) fire proofing material is installed: adopt the anti-guncotton of high-quality, will prevent that guncotton fixes with galvanized steel plain sheet, anti-guncotton is sealed on the room between floor and the metal sheet continuously, form fire belt one, must not there be the space centre.
(5) aluminium sheet is installed
1) measures unwrapping wire: with rivet or bolt aluminium alloy plate facing block-by-block is fixed on the shaped steel skeleton by working drawing; Gap 8~10mm between plate and the plate is so that the adjustment alignment error;
2) disposable plates seam: with cleaning agent with metal sheet and frame table face clean after, lay weather strip or weather proof adhesive tape immediately in the slit between aluminium sheet, the weather proofing sealant that reinjects can not have space or bubble.;
(6) handling curtain wall closes up: utilize metal sheet with wallboard end and the capping of keel position..
CN2010105363357A 2010-11-01 2010-11-01 Installation and construction process of curtain wall aluminum composite panel Pending CN102465606A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010105363357A CN102465606A (en) 2010-11-01 2010-11-01 Installation and construction process of curtain wall aluminum composite panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010105363357A CN102465606A (en) 2010-11-01 2010-11-01 Installation and construction process of curtain wall aluminum composite panel

Publications (1)

Publication Number Publication Date
CN102465606A true CN102465606A (en) 2012-05-23

Family

ID=46069691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010105363357A Pending CN102465606A (en) 2010-11-01 2010-11-01 Installation and construction process of curtain wall aluminum composite panel

Country Status (1)

Country Link
CN (1) CN102465606A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147517A (en) * 2013-02-01 2013-06-12 龙驰幕墙工程有限公司 Clip-shaped sealing structure and construction method
CN103321435A (en) * 2013-06-21 2013-09-25 江苏华顶建设工程股份有限公司 Construction method for mounting metal decorative panels
CN103774853A (en) * 2014-01-08 2014-05-07 永升建设集团有限公司 Installation construction method for curtain wall with hyperbolic metal veneer
CN104060839A (en) * 2014-06-19 2014-09-24 中国五冶集团有限公司 Construction control method special for steel-structure vertical keels of metal curtain wall of large gymnasium
CN104196186A (en) * 2014-09-02 2014-12-10 上海中建八局装饰有限责任公司 Manufacturing method and structure of modeling wall
CN105780942A (en) * 2016-05-20 2016-07-20 山东雅百特科技有限公司 Roof aluminum single board and vertical-face glass curtain wall edge closing structure and manufacturing method thereof
CN106149935A (en) * 2016-08-23 2016-11-23 中建八局第二建设有限公司 Open cladding hollow ceramic plate curtain wall construction method
CN106760560A (en) * 2017-03-30 2017-05-31 青岛新华友建工集团股份有限公司 Complicated arc list construction of Pyramid engineering method
CN108867955A (en) * 2018-08-24 2018-11-23 中冶建工集团有限公司 A kind of metal curtain wall structure and its installation method
CN109113240A (en) * 2018-10-24 2019-01-01 如皋市规划建筑设计院有限公司 A kind of anti-pollution aluminum facade and mounting process
CN111005565A (en) * 2019-12-25 2020-04-14 武艳灵 Mounting and positioning construction method for building wall decoration curtain wall

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103147517B (en) * 2013-02-01 2015-11-25 龙驰幕墙工程有限公司 Clip-shaped sealing structure and construction method
CN103147517A (en) * 2013-02-01 2013-06-12 龙驰幕墙工程有限公司 Clip-shaped sealing structure and construction method
CN103321435A (en) * 2013-06-21 2013-09-25 江苏华顶建设工程股份有限公司 Construction method for mounting metal decorative panels
CN103774853A (en) * 2014-01-08 2014-05-07 永升建设集团有限公司 Installation construction method for curtain wall with hyperbolic metal veneer
CN104060839A (en) * 2014-06-19 2014-09-24 中国五冶集团有限公司 Construction control method special for steel-structure vertical keels of metal curtain wall of large gymnasium
CN104060839B (en) * 2014-06-19 2016-05-25 中国五冶集团有限公司 Be exclusively used in large stadium metal curtain wall steel construction vertical keel construction control method
CN104196186A (en) * 2014-09-02 2014-12-10 上海中建八局装饰有限责任公司 Manufacturing method and structure of modeling wall
CN105780942B (en) * 2016-05-20 2018-12-04 山东雅百特科技有限公司 A kind of roofing aluminum veneer and facade glass curtain wall receive side structure
CN105780942A (en) * 2016-05-20 2016-07-20 山东雅百特科技有限公司 Roof aluminum single board and vertical-face glass curtain wall edge closing structure and manufacturing method thereof
CN106149935A (en) * 2016-08-23 2016-11-23 中建八局第二建设有限公司 Open cladding hollow ceramic plate curtain wall construction method
CN106760560A (en) * 2017-03-30 2017-05-31 青岛新华友建工集团股份有限公司 Complicated arc list construction of Pyramid engineering method
CN106760560B (en) * 2017-03-30 2019-05-28 青岛新华友建工集团股份有限公司 Complicated arc list construction of Pyramid engineering method
CN108867955A (en) * 2018-08-24 2018-11-23 中冶建工集团有限公司 A kind of metal curtain wall structure and its installation method
CN109113240A (en) * 2018-10-24 2019-01-01 如皋市规划建筑设计院有限公司 A kind of anti-pollution aluminum facade and mounting process
CN111005565A (en) * 2019-12-25 2020-04-14 武艳灵 Mounting and positioning construction method for building wall decoration curtain wall
CN111005565B (en) * 2019-12-25 2021-08-27 广东珠江工程总承包有限公司 Mounting and positioning construction method for building wall decoration curtain wall

Similar Documents

Publication Publication Date Title
CN102465606A (en) Installation and construction process of curtain wall aluminum composite panel
CN101575889B (en) Multi-curved surface overhung copper plate curtain wall and construction method thereof
CN105421818A (en) Embedded steel structure assembling residence
CN103758265A (en) Rack type GRC curtain wall with irregular vertical face and mounting method thereof
CN108000689B (en) Combined template for concrete member with window frame, pouring method of combined template and concrete member
CN111561074B (en) Light ultrahigh sound-insulation fireproof steel partition wall and construction method thereof
CN110306704B (en) Hollow aluminum plate and glass composite curtain wall structure and mounting method thereof
CN101555767B (en) Window body component of composite heat insulating wall body and construction method thereof
CN205296893U (en) Embedded steel construction assembly house
CN211523693U (en) Vertical lines curtain system of cell cube aluminum plate
CN102493620B (en) Through long folded fastener type wall body connecting piece of heat insulation integrated plate and mounting method thereof
CN114934673B (en) Construction method of glass curtain wall of wood structure system
CN107035042A (en) A kind of imitative stone curtain wall system and its construction method
CN110965684A (en) Small cell body aluminum plate vertical line curtain wall system and installation method thereof
CN111119368A (en) Construction method for externally-hung metal rock wool sandwich board of autoclaved sand aerated concrete wallboard
CN110821013A (en) Assembled design metal curtain wall structure
CN203403669U (en) Horizontally-structural formwork system
CN103015656B (en) Component type exterior wall heat insulating decorative board and preparation method thereof and exterior wall mounting method
CN211523694U (en) Vertical lines curtain steelframe system of cell cube aluminum plate
EP3015620B1 (en) Panel for the enclosure and external thermal insulation of façades and roofs, and the installation procedure
CN211774890U (en) Corner flying wing unit plate component
CN209891506U (en) Wind pressure resistant aluminum plate and glass mixed curtain wall
CN113605581A (en) Unit plate glass curtain wall roof and construction method thereof
CN220790256U (en) Fair-faced concrete hanging plate curtain wall structure
CN106049783B (en) A kind of steel plate bag column system of anticollision

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120523