CN102465606A - Installation and construction process of curtain wall aluminum composite panel - Google Patents
Installation and construction process of curtain wall aluminum composite panel Download PDFInfo
- Publication number
- CN102465606A CN102465606A CN2010105363357A CN201010536335A CN102465606A CN 102465606 A CN102465606 A CN 102465606A CN 2010105363357 A CN2010105363357 A CN 2010105363357A CN 201010536335 A CN201010536335 A CN 201010536335A CN 102465606 A CN102465606 A CN 102465606A
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- skeleton
- connector
- aluminium
- line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
- Building Environments (AREA)
Abstract
The invention discloses an installation and construction process of a curtain wall aluminum composite panel, which comprises the following steps: measuring and setting out; installing connecting pieces; installing a skeleton; installing a fire-proof material; installing an aluminum plate; and handling a curtain wall shell nosing. The invention has the beneficial effects that: a curtain wall installed by using the method disclosed by the invention has a smooth surface, good weather resistance and stable quality.
Description
Technical field
The present invention relates to a kind of architectural construction technology, specifically is a kind of construction technique of curtain wall aluminium-plastic panel.
Background technology
Aluminiumplastic composite panel is through chemically treated application aluminium sheet, belongs to a kind of new decorative material for building.The aluminium-plastic panel exterior wall has obtained using widely in the building curtain wall industry of China and development rapidly since late nineteen eighties the early 1990s in last century gets into China, for the variation of China's building curtain wall product and architectural style contributes.Yet aluminium-plastic panel curtain wall mounting technique standard in China is still unsound, causes aluminium-plastic panel curtain wall quality unstable.
Summary of the invention
For improving the installation quality of aluminium-plastic panel exterior wall, the present invention provides a kind of construction technique of exterior wall aluminium-plastic panel.
The present invention realizes with following technical scheme: a kind of construction technique of curtain wall aluminium-plastic panel, and concrete steps are:
(1) measures unwrapping wire
1), on agent structure, draws the installation site line of support framework according to axis on the agent structure and absolute altitude line;
2) all built-in fittings are got, and its size of repetition measurement;
3) in time check the correctness that unwrapping wire guarantees curtain wall verticality and support framework.
(2) connector member: the welding of the built-in fitting on connector and the agent structure is fixing;
(3) skeleton is installed
1) by the snap the line position column is fixed on the connector; , floor height higher exterior wall aluminum facade skeleton column big to area must weigh down with measuring apparatus and line and measure, and proofread and correct its position, and be vertical and smooth to guarantee the skeleton montant;
2) precalculated position that the connector and the pad at crossbeam two ends is installed in column, seam is tight;
(4) fire proofing material is installed: adopt the anti-guncotton of high-quality, will prevent that guncotton fixes with galvanized steel plain sheet, anti-guncotton is sealed on the room between floor and the metal sheet continuously, form fire belt one, must not there be the space centre.
(5) aluminium sheet is installed
1) measures unwrapping wire: with rivet or bolt aluminium alloy plate facing block-by-block is fixed on the shaped steel skeleton by working drawing; Gap 8~10mm between plate and the plate is so that the adjustment alignment error;
2) disposable plates seam: with cleaning agent with metal sheet and frame table face clean after, lay weather strip or weather proof adhesive tape immediately in the slit between aluminium sheet, the weather proofing sealant that reinjects can not have space or bubble.;
(6) handling curtain wall closes up: utilize metal sheet with wallboard end and the capping of keel position..
The invention has the beneficial effects as follows: with the curtain wall that method of the present invention is installed, surfacing, good weatherability, steady quality.
The specific embodiment
Embodiment 1
Measure unwrapping wire
1), is bound on the agent structure exactly by the installation site line of designing requirement with support framework according to axis on the agent structure and absolute altitude line.
2) all built-in fittings are got, and its size of repetition measurement.
Should control the distribution error when 3) measuring unwrapping wire, be not the accumulation of error.
4) the measurement unwrapping wire should be not more than under the level Four situation at wind-force and carry out.Should in time check behind the unwrapping wire, to guarantee the correctness of curtain wall verticality and stud.
2, connector member
The welding of built-in fitting on connector and the agent structure is fixing.When not burying embedded iron parts underground on the agent structure, can on agent structure, punch and install expansion bolt and be connected ironware and fix.
3, skeleton is installed
The column that 1) will pass through antirust processing like clockwork by the snap the line position is with welding or be bolted on the connector.Should examine at any time during installation that absolute altitude and position of center line are big to area, the higher exterior wall aluminum facade skeleton column of floor height, must weigh down measurement, proofread and correct its position with measuring apparatus and line, vertical and smooth with assurance skeleton montant.Column is installed the absolute altitude deviation should be greater than 3mm, and deviation should be greater than 2mm before and after the axis, and left-right deviation should be greater than 3mm; Adjacent two root post absolute altitude deviations should be greater than 3mm, should be with the maximum absolute altitude deviation of layer column greater than 5mm, and adjacent two upright very range deviation should be greater than 2mm.
2) precalculated position that the connector and the pad at crossbeam two ends is installed in column, and should install firmly, its seam should be tight; The horizontal departure of adjacent two crossbeams should be greater than 1mm.A same layer absolute altitude deviation: should be when a width of cloth width of curtain wall is less than or equal to 35m greater than 5mm; When a width of cloth width of curtain wall during greater than 35m, should be greater than 7mm.
4, fire proofing material is installed
Should adopt high-quality to prevent guncotton, the anti-fire phase will reach the requirement of relevant department.To prevent that guncotton fixes with galvanized steel plain sheet.Anti-guncotton is sealed on the room between floor and the metal sheet continuously, forms fire belt one, must not there be the space centre.
5, aluminium sheet is installed
1, measures unwrapping wire
Aluminium alloy plate facing block-by-block is fixed on the shaped steel skeleton with rivet or bolt by working drawing.Stay seam 10~15mm between plate and the plate, so that the adjustment alignment error.When metal sheet is installed, about, deviation up and down should be greater than 1.5mm.
6, disposable plates seam
With cleaning agent with metal sheet and frame table face clean after, lay weather strip or weather proof adhesive tape immediately in the slit between aluminium sheet earlier, the materials such as silicone weather resistant fluid sealant that reinject, injecting glue is full, and space or bubble can not be arranged.
7, handling curtain wall closes up
Close up and handle metal sheet capable of using wallboard end and the capping of keel position.
Claims (1)
1. the construction technique of a curtain wall aluminium-plastic panel, concrete steps are:
(1) measures unwrapping wire
1), on agent structure, draws the installation site line of support framework according to axis on the agent structure and absolute altitude line;
2) all built-in fittings are got, and its size of repetition measurement;
3) in time check the correctness that unwrapping wire guarantees curtain wall verticality and support framework.
(2) connector member: the welding of the built-in fitting on connector and the agent structure is fixing;
(3) skeleton is installed
1) by the snap the line position column is fixed on the connector; , floor height higher exterior wall aluminum facade skeleton column big to area must weigh down with measuring apparatus and line and measure, and proofread and correct its position, and be vertical and smooth to guarantee the skeleton montant;
2) precalculated position that the connector and the pad at crossbeam two ends is installed in column, seam is tight;
(4) fire proofing material is installed: adopt the anti-guncotton of high-quality, will prevent that guncotton fixes with galvanized steel plain sheet, anti-guncotton is sealed on the room between floor and the metal sheet continuously, form fire belt one, must not there be the space centre.
(5) aluminium sheet is installed
1) measures unwrapping wire: with rivet or bolt aluminium alloy plate facing block-by-block is fixed on the shaped steel skeleton by working drawing; Gap 8~10mm between plate and the plate is so that the adjustment alignment error;
2) disposable plates seam: with cleaning agent with metal sheet and frame table face clean after, lay weather strip or weather proof adhesive tape immediately in the slit between aluminium sheet, the weather proofing sealant that reinjects can not have space or bubble.;
(6) handling curtain wall closes up: utilize metal sheet with wallboard end and the capping of keel position..
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105363357A CN102465606A (en) | 2010-11-01 | 2010-11-01 | Installation and construction process of curtain wall aluminum composite panel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2010105363357A CN102465606A (en) | 2010-11-01 | 2010-11-01 | Installation and construction process of curtain wall aluminum composite panel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102465606A true CN102465606A (en) | 2012-05-23 |
Family
ID=46069691
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2010105363357A Pending CN102465606A (en) | 2010-11-01 | 2010-11-01 | Installation and construction process of curtain wall aluminum composite panel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102465606A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103147517A (en) * | 2013-02-01 | 2013-06-12 | 龙驰幕墙工程有限公司 | Clip-shaped sealing structure and construction method |
CN103321435A (en) * | 2013-06-21 | 2013-09-25 | 江苏华顶建设工程股份有限公司 | Construction method for mounting metal decorative panels |
CN103774853A (en) * | 2014-01-08 | 2014-05-07 | 永升建设集团有限公司 | Installation construction method for curtain wall with hyperbolic metal veneer |
CN104060839A (en) * | 2014-06-19 | 2014-09-24 | 中国五冶集团有限公司 | Construction control method special for steel-structure vertical keels of metal curtain wall of large gymnasium |
CN104196186A (en) * | 2014-09-02 | 2014-12-10 | 上海中建八局装饰有限责任公司 | Manufacturing method and structure of modeling wall |
CN105780942A (en) * | 2016-05-20 | 2016-07-20 | 山东雅百特科技有限公司 | Roof aluminum single board and vertical-face glass curtain wall edge closing structure and manufacturing method thereof |
CN106149935A (en) * | 2016-08-23 | 2016-11-23 | 中建八局第二建设有限公司 | Open cladding hollow ceramic plate curtain wall construction method |
CN106760560A (en) * | 2017-03-30 | 2017-05-31 | 青岛新华友建工集团股份有限公司 | Complicated arc list construction of Pyramid engineering method |
CN108867955A (en) * | 2018-08-24 | 2018-11-23 | 中冶建工集团有限公司 | A kind of metal curtain wall structure and its installation method |
CN109113240A (en) * | 2018-10-24 | 2019-01-01 | 如皋市规划建筑设计院有限公司 | A kind of anti-pollution aluminum facade and mounting process |
CN111005565A (en) * | 2019-12-25 | 2020-04-14 | 武艳灵 | Mounting and positioning construction method for building wall decoration curtain wall |
-
2010
- 2010-11-01 CN CN2010105363357A patent/CN102465606A/en active Pending
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103147517B (en) * | 2013-02-01 | 2015-11-25 | 龙驰幕墙工程有限公司 | Clip-shaped sealing structure and construction method |
CN103147517A (en) * | 2013-02-01 | 2013-06-12 | 龙驰幕墙工程有限公司 | Clip-shaped sealing structure and construction method |
CN103321435A (en) * | 2013-06-21 | 2013-09-25 | 江苏华顶建设工程股份有限公司 | Construction method for mounting metal decorative panels |
CN103774853A (en) * | 2014-01-08 | 2014-05-07 | 永升建设集团有限公司 | Installation construction method for curtain wall with hyperbolic metal veneer |
CN104060839A (en) * | 2014-06-19 | 2014-09-24 | 中国五冶集团有限公司 | Construction control method special for steel-structure vertical keels of metal curtain wall of large gymnasium |
CN104060839B (en) * | 2014-06-19 | 2016-05-25 | 中国五冶集团有限公司 | Be exclusively used in large stadium metal curtain wall steel construction vertical keel construction control method |
CN104196186A (en) * | 2014-09-02 | 2014-12-10 | 上海中建八局装饰有限责任公司 | Manufacturing method and structure of modeling wall |
CN105780942B (en) * | 2016-05-20 | 2018-12-04 | 山东雅百特科技有限公司 | A kind of roofing aluminum veneer and facade glass curtain wall receive side structure |
CN105780942A (en) * | 2016-05-20 | 2016-07-20 | 山东雅百特科技有限公司 | Roof aluminum single board and vertical-face glass curtain wall edge closing structure and manufacturing method thereof |
CN106149935A (en) * | 2016-08-23 | 2016-11-23 | 中建八局第二建设有限公司 | Open cladding hollow ceramic plate curtain wall construction method |
CN106760560A (en) * | 2017-03-30 | 2017-05-31 | 青岛新华友建工集团股份有限公司 | Complicated arc list construction of Pyramid engineering method |
CN106760560B (en) * | 2017-03-30 | 2019-05-28 | 青岛新华友建工集团股份有限公司 | Complicated arc list construction of Pyramid engineering method |
CN108867955A (en) * | 2018-08-24 | 2018-11-23 | 中冶建工集团有限公司 | A kind of metal curtain wall structure and its installation method |
CN109113240A (en) * | 2018-10-24 | 2019-01-01 | 如皋市规划建筑设计院有限公司 | A kind of anti-pollution aluminum facade and mounting process |
CN111005565A (en) * | 2019-12-25 | 2020-04-14 | 武艳灵 | Mounting and positioning construction method for building wall decoration curtain wall |
CN111005565B (en) * | 2019-12-25 | 2021-08-27 | 广东珠江工程总承包有限公司 | Mounting and positioning construction method for building wall decoration curtain wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102465606A (en) | Installation and construction process of curtain wall aluminum composite panel | |
CN101575889B (en) | Multi-curved surface overhung copper plate curtain wall and construction method thereof | |
CN103726597B (en) | Adopt the frame type cell curtain wall of auxiliary mounting deck and profile of tooth corner brace and profile of tooth bearing | |
CN110158826B (en) | Construction method of large-span special-shaped steel keel glass curtain wall | |
CN105421818A (en) | Embedded steel structure assembling residence | |
CN103758265A (en) | Rack type GRC curtain wall with irregular vertical face and mounting method thereof | |
CN211523693U (en) | Vertical lines curtain system of cell cube aluminum plate | |
CN108000689B (en) | Combined template for concrete member with window frame, pouring method of combined template and concrete member | |
CN110306704B (en) | Hollow aluminum plate and glass composite curtain wall structure and mounting method thereof | |
CN111561074A (en) | Light ultrahigh sound-insulation fireproof steel partition wall and construction method thereof | |
CN101555767B (en) | Window body component of composite heat insulating wall body and construction method thereof | |
CN205296893U (en) | Embedded steel construction assembly house | |
CN102493620B (en) | Through long folded fastener type wall body connecting piece of heat insulation integrated plate and mounting method thereof | |
CN114934673B (en) | Construction method of glass curtain wall of wood structure system | |
CN107035042A (en) | Stone-imitated curtain wall system and construction method thereof | |
CN110965684A (en) | Small cell body aluminum plate vertical line curtain wall system and installation method thereof | |
CN115095062B (en) | Installation method of internally-buckled externally-installed curtain wall profile | |
CN110821013A (en) | Assembled design metal curtain wall structure | |
CN203403669U (en) | Horizontally-structural formwork system | |
CN103015656B (en) | Component type exterior wall heat insulating decorative board and preparation method thereof and exterior wall mounting method | |
CN211523694U (en) | Vertical lines curtain steelframe system of cell cube aluminum plate | |
EP3015620B1 (en) | Panel for the enclosure and external thermal insulation of façades and roofs, and the installation procedure | |
CN211774890U (en) | Corner flying wing unit plate component | |
CN113605581A (en) | Unit plate glass curtain wall roof and construction method thereof | |
CN205742663U (en) | Component type exposed frame glass curtain wall system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120523 |