Summary of the invention
The construction method that the object of this invention is to provide a kind of underwater concrete cushion cap.The present invention constructs quick and convenient, saves material, and bearing capacity of pile foundation is strong, and the cushion cap coefficient of stability is high.
For solving the problems of the technologies described above, the technical solution used in the present invention is as follows:
A construction method for underwater concrete cushion cap, step is as follows:
The first step: four DN250-DN450 steel pipes are to four jiaos of distributions of 20 * 40m rectangle, and directly pre-buried to precalculated position by hydraulic vibration driver, then extract four water and mud in steel pipe, to concrete perfusion in steel pipe to steel pipe mid-height, in steel pipe, central axis plugs spacer bars, spacer bars is I level or II grade reinforcing steel, then to continuing concrete perfusion in steel pipe to itself and the contour after coagulation of steel pipe;
Second step: prepare rectangular build cement cushion cap matrix, four jiaos of described rectangular build cement cushion cap matrixs are provided with the stake hole with steel pipe matched in clearance, the side of setting firmly, cushion cap matrix top build reinforcing cage, the reinforcing bar that reinforcing cage is 15-22mm by diameter is made, then by water under cushion cap matrix and make a hole and steel pipe matched in clearance;
The 3rd step: water under box section is placed in to cushion cap matrix top, and four steel pipes are inserted in box section, in the box section of finding time after water, the spacer bars in steel pipe is crooked and insert it into reinforcing cage inside, by both contact position cross welds;
The 4th step: the rectangle sideline forming along four steel pipes, on cushion cap matrix, beat anchor hole, hole depth 1.5-2.0m, spacing 30cm-45cm, then inserts anchor pole grouting, and the length of anchor pole above cushion cap is higher than reinforcing cage, then to concrete perfusion in reinforcing cage, and in the supporting of the outside use of anchor pole retaining-plate, treat that the concrete setting of retaining-plate inside, to predetermined strength, removes retaining-plate and box section.
Preferably, described rectangle cement matrix upper surface is provided with the groove with box section tube wall matched in clearance, in the 3rd step, box section tube wall is coordinated with the groove of cement matrix upper surface.
Preferably, the retaining-plate of use is wood based panel or steel plate.
Compared with prior art, tool has the following advantages in the present invention:
1) quick construction of the present invention, wherein the reinforcing cage of cushion cap matrix and top thereof can be prepared on land, beats the process of building and carries out simultaneously, time and labour saving with pile foundation;
2) construction area of the present invention is little, and the workload of drawing water is little, improves efficiency of construction, the reduction of erection time.
The specific embodiment
Embodiment 1:
When said process carries out, the cushion cap matrix of preparing on-site rectangle cement, in the casting process of cushion cap matrix, its four jiaos leave with steel pipe matched in clearance stake hole, cushion cap matrix top sets firmly square reinforcing cage, the reinforcing bar that reinforcing cage is 15mm by diameter is made, after concrete setting in steel pipe, by water under cushion cap matrix and make a hole and steel pipe matched in clearance;
By water under box section, be placed in cushion cap matrix top and with cushion cap matrix on cell body matched in clearance, and four steel pipes are inserted in box section, find time after the interior water of box section, spacer bars in steel pipe is crooked and insert it into reinforcing cage inside, by both contact position cross welds, then the rectangle sideline forming along four steel pipes, at cushion cap matrix, beat anchor hole, the rectangle sideline forming along four steel pipes, on cushion cap matrix, beat anchor hole, hole depth 1.5m, spacing 30cm, then insert anchor pole grouting, the length of anchor pole above cushion cap is higher than reinforcing cage, then to concrete perfusion in reinforcing cage, and in the supporting of the outside use of anchor pole steel retaining-plate, treat that the concrete setting of retaining-plate inside is to predetermined strength, remove steel retaining-plate, and use hydraulic vibration driver that box section is extracted.
Embodiment 2
Four DN450 steel pipes are to four jiaos of distributions of 20 * 40m rectangle, and directly pre-buried to precalculated position by hydraulic vibration driver, then extract four water and mud in steel pipe, in steel pipe, central axis plugs spacer bars, spacer bars is II grade reinforcing steel, then to continuing concrete perfusion in steel pipe to itself and the contour after coagulation of steel pipe.
When said process carries out, the cushion cap matrix of preparing on-site rectangle cement, in the casting process of cushion cap matrix, its four jiaos leave with steel pipe matched in clearance stake hole, cushion cap matrix top sets firmly square reinforcing cage, the reinforcing bar that reinforcing cage is 22mm by diameter is made, after concrete setting in steel pipe, by water under cushion cap matrix and make a hole and steel pipe matched in clearance;
By water under box section, be placed in cushion cap matrix top and with cushion cap matrix on cell body matched in clearance, and four steel pipes are inserted in box section, find time after the interior water of box section, spacer bars in steel pipe is crooked and insert it into reinforcing cage inside, by both contact position cross welds, then the rectangle sideline forming along four steel pipes, at cushion cap matrix, beat anchor hole, the rectangle sideline forming along four steel pipes, on cushion cap matrix, beat anchor hole, hole depth 2.0m, spacing 45cm, then insert anchor pole grouting, the length of anchor pole above cushion cap is higher than reinforcing cage, then to concrete perfusion in reinforcing cage, and in the wooden retaining-plate supporting of the outside use of anchor pole, treat that the concrete setting of retaining-plate inside is to predetermined strength, remove wooden retaining-plate, and use hydraulic vibration driver that box section is extracted.
Embodiment 3
Four DN400 steel pipes are to four jiaos of distributions of 20 * 40m rectangle, and directly pre-buried to precalculated position by hydraulic vibration driver, then extract four water and mud in steel pipe, in steel pipe, central axis plugs spacer bars, spacer bars is I grade reinforcing steel, then to continuing concrete perfusion in steel pipe to itself and the contour after coagulation of steel pipe.
When said process carries out, the cushion cap matrix of preparing on-site rectangle cement, in the casting process of cushion cap matrix, its four jiaos leave with steel pipe matched in clearance stake hole, cushion cap matrix top sets firmly square reinforcing cage, the reinforcing bar that reinforcing cage is 20mm by diameter is made, after concrete setting in steel pipe, by water under cushion cap matrix and make a hole and steel pipe matched in clearance;
By water under box section, be placed in cushion cap matrix top and with cushion cap matrix on cell body matched in clearance, and four steel pipes are inserted in box section, find time after the interior water of box section, spacer bars in steel pipe is crooked and insert it into reinforcing cage inside, by both contact position cross welds, then the rectangle sideline forming along four steel pipes, at cushion cap matrix, beat anchor hole, the rectangle sideline forming along four steel pipes, on cushion cap matrix, beat anchor hole, hole depth 1.8m, spacing 40cm, then insert anchor pole grouting, the length of anchor pole above cushion cap is higher than reinforcing cage, then to concrete perfusion in reinforcing cage, and in the supporting of the outside use of anchor pole steel retaining-plate, treat that the concrete setting of retaining-plate inside is to predetermined strength, remove steel retaining-plate, and use hydraulic vibration driver that box section is extracted.
More than show and described basic principle of the present invention and principal character and advantage of the present invention.The technician of the industry should understand; the present invention is not restricted to the described embodiments; that in above-described embodiment and manual, describes just illustrates principle of the present invention; without departing from the spirit and scope of the present invention; the present invention also has various changes and modifications, and these changes and improvements all fall in the claimed scope of the invention.The claimed scope of the present invention is defined by appending claims and equivalent thereof.