CN103993532A CN201410239014.9A CN201410239014A CN103993532A CN 103993532 A CN103993532 A CN 103993532A CN 201410239014 A CN201410239014 A CN 201410239014A CN 103993532 A CN103993532 A CN 103993532A
Authority
CN
China
Prior art keywords
construction method
saponification slag
ground
saponification
slag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410239014.9A
Other languages
Chinese (zh)
Inventor
王克勤
翟征秋
周凯
杨春雨
蒋效华
王增山
殷少军
刘松
王涛
崔志海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbor Tianjin Harbour Affairs Group Co ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
Harbor Tianjin Harbour Affairs Group Co ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbor Tianjin Harbour Affairs Group Co ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical Harbor Tianjin Harbour Affairs Group Co ltd
Priority to CN201410239014.9A priority Critical patent/CN103993532A/en
Publication of CN103993532A publication Critical patent/CN103993532A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The invention relates to a construction method of a saponified slag foundation. The construction method is simple and direct, and high in economic benefit. By adopting the construction method, the construction of the saponified slag foundation having the optimum performance is realized through control of simple coefficients of saponified slag and original soil, so that the saponified slag foundation which can be stable for a long term is formed.

Description

A kind of construction method of saponification slag ground
Technical field
The invention belongs to the construction technology of road foundation, be specifically related to a kind of construction method using saponification slag and native mixture as the saponification slag ground of foundation material.
Background technology
Saponification slag is that factory's calcium carbide is the byproduct of raw material production chemical product, and it generally discharges by water law, enters draining pond by flow regime, is plastic state after draining, digs out and deposits or be directly discharged into storage ash, large area natural-dehydration.The raw material chemical composition of producing calcium carbide, main component is Ca, with Ca (OH) 2and CaCO 3mixed form exists, and noxious material arsenic As in impurity, cyanogen CN content are lower than the pollution control criterion of GB12502-90 national regulation.Saponification slag and sulfide lime are basically identical in nature, all exist taking Cao, MgO as main component, and through field laboratory's repeated detection, content is between 40~58%.Saponification slag has good activity, and soil is had to good bonding capacity, can form intensity, and the intensity of the saponification dregs of doses can meet the index that the lime stabilized soil in the technical specification of stockyard requires.But because the plasticity of saponification slag is stronger, cannot realize comparatively stable mixed soil base, limit its increment and used.
Summary of the invention
The invention provides the construction method of the saponification slag ground that a kind of form of construction work is simple and direct, economic benefit is high, it is by the simple parameter control to saponification slag and original soil, realize the construction of optimum performance saponification slag ground and made, can form saponification slag ground steady in a long-term.
The technical solution adopted in the present invention is as follows:
A construction method for saponification slag ground, is characterized in that described construction method comprises:
Carry out degree of mixing experiment, saponification slag is mixed with ground original soil, and measure saponification slag and add volume hit solidity under at least two numerical value, according to the best mixed volume ratio that hits solidity and draw saponification slag of measuring;
Ground original soil is carried out to water content control, then mix than adding saponification dregs according to best mixed volume;
Mixed saponification slag and original soil are rolled, make its surfacing;
Saponification slag after maintenance rolls and the mixture humidity of original soil are carried out ground maintenance.
In detailed description of the invention, described construction method further comprises:
Measure saponification slag and add volume hit solidity under 5% and 8% two numerical value, and measure degree of compaction numerical value and the optimum humidity value of at least two precompressed thickness value.
In one embodiment, described construction method further comprises:
Ground original soil is carried out at least tedding of 1m thickness, control water content between 5-10%.
In one embodiment, described construction method further comprises:
Described rolling comprises that vibratory roller carries out full wheel dislocation and rolls, and then adopts three-roll road roller to carry out 1/2nd wrong wheels and rolls.
In one embodiment, described construction method further comprises:
Saponification slag after rolling and former earth mixtures are carried out to vertical excision the in end of length direction, then carry out end with the second width construction and again mix and roll.
In the time of construction, the humidity control of construction place original soil can or be carried out having tedded of interim roadbed by excavation gutter.The degree of depth general control tedding is at 1m, and the water content general control of original soil is below 10%.Due to the various influence factors of mixing between different rendzinases and different ground original soil, therefore need to carry out prior degree of mixing experiment, by the various parametric measurements of the mixture of different numerical value mixture accumulated amounts between saponification slag and ground original soil, the best mixed volume that can obtain saponification slag and ground original soil than and optimum humidity, and the numerical value such as optimum thickness.This numerical value can ensure the quality control of construction in later period effectively.
Beneficial effect of the present invention is, the construction method of this saponification slag ground is simple and direct, economic benefit is high, it,, by the simple parameter control to saponification slag and original soil, has been realized the construction of optimum performance saponification slag ground and has made, and can form saponification slag ground steady in a long-term.
Below in conjunction with detailed description of the invention, the present invention is further elaborated.
Detailed description of the invention
Adopt the saponification slag of water law discharge to carry out the construction of saponification slag ground, the humidity of this saponification slag is controlled within 10%.First carry out the sampling of saponification slag, carry out degree of mixing experiment, saponification slag is mixed with ground original soil, and measure saponification slag and add volume and hit solidity in 5% and 8% time, according to the best mixed volume ratio that hits solidity and draw saponification slag of measuring; Than the mixing of carrying out saponification slag and ground original soil, then carry out compactness test and the optimum humidity test after compacting by 30cm and two kinds of thickness of 50cm according to best mixed volume.
Excavate gutter in a side of ground to be onstructed and carry out draining, then treat construction ground and ted, ted thickness more than 1m, reduce original soil water content in 10%.
By test gained best mixed volume than the mixing of carrying out saponification slag and ground original soil, then the water content of controlling saponification slag and former earth mixtures optimum humidity ± when 1-2%, adopt the above vibratory roller of 18t and 15t-18t three-roll road roller to roll, while rolling, follow the principle of " weigh after fast after first slow, first light, from low to high ".While rolling, first roll with vibratory roller, roll to adopt and put on method of principal axes, full wheel dislocation, overlaps 15~20 centimetres, shakes and presses 6~8 times by this method, use the wrong wheel of three-roll road roller low speed 1/2 instead and roll 2~3 times, eliminate wheelmark, reach surfacing, bright and clean, edge is straight.
While carrying out next section of construction, take overlapping mode, when first paragraph rolls, should exceed sideline 50-100cm, in the time of the second width construction, this part is is again mixed and stirred and rolled.
Finally maintain, between defects liability period, be mainly keep its humidity, can adopt watering method controlled humidity, and between defects liability period close traffic.

Claims (5)

1. a construction method for saponification slag ground, is characterized in that described construction method comprises:
Carry out degree of mixing experiment, saponification slag is mixed with ground original soil, and measure saponification slag and add volume hit solidity under at least two numerical value, according to the best mixed volume ratio that hits solidity and draw saponification slag of measuring;
Ground original soil is carried out to water content control, then mix than adding saponification dregs according to best mixed volume;
Mixed saponification slag and original soil are rolled, make its surfacing;
Saponification slag after maintenance rolls and the mixture humidity of original soil are carried out ground maintenance.
2. the construction method of saponification slag ground according to claim 1, is characterized in that described construction method further comprises:
Measure saponification slag and add volume hit solidity under 5% and 8% two numerical value, and measure degree of compaction numerical value and the optimum humidity value of at least two precompressed thickness value.
3. the construction method of saponification slag ground according to claim 1, is characterized in that described construction method further comprises:
Ground original soil is carried out at least tedding of 1m thickness, control water content between 5-10%.
4. the construction method of saponification slag ground according to claim 1, is characterized in that described construction method further comprises:
Described rolling comprises that vibratory roller carries out full wheel dislocation and rolls, and then adopts three-roll road roller to carry out 1/2nd wrong wheels and rolls.
5. the construction method of saponification slag ground according to claim 1, is characterized in that described construction method further comprises:
Saponification slag after rolling and former earth mixtures are carried out to vertical excision the in end of length direction, then carry out end with the second width construction and again mix and roll.
CN201410239014.9A 2014-06-03 2014-06-03 Construction method of saponified slag foundation Pending CN103993532A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410239014.9A CN103993532A (en) 2014-06-03 2014-06-03 Construction method of saponified slag foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410239014.9A CN103993532A (en) 2014-06-03 2014-06-03 Construction method of saponified slag foundation

Publications (1)

Publication Number Publication Date
CN103993532A true CN103993532A (en) 2014-08-20

Family

ID=51307849

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410239014.9A Pending CN103993532A (en) 2014-06-03 2014-06-03 Construction method of saponified slag foundation

Country Status (1)

Country Link
CN (1) CN103993532A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109317509A (en) * 2018-11-15 2019-02-12 山鑫科陶科技(北京)股份有限公司 Utilize the method and improvement soil of saponification slag repairing polluted soil
CN109322297A (en) * 2018-11-15 2019-02-12 秦震 Method and the modified soil body using the saponification slag modification soft base soil body

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101503871A (en) * 2009-03-19 2009-08-12 中铁十一局集团有限公司 Dry-method construction method for drift-sand roadbed
CN103061226A (en) * 2013-01-06 2013-04-24 中国建筑第六工程局有限公司 Structure and construction method for temporarily reinforcing soft soil foundation
CN103614955A (en) * 2013-11-25 2014-03-05 中国电力工程顾问集团西南电力设计院 Treatment method for soft soil foundation construction road

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101503871A (en) * 2009-03-19 2009-08-12 中铁十一局集团有限公司 Dry-method construction method for drift-sand roadbed
CN103061226A (en) * 2013-01-06 2013-04-24 中国建筑第六工程局有限公司 Structure and construction method for temporarily reinforcing soft soil foundation
CN103614955A (en) * 2013-11-25 2014-03-05 中国电力工程顾问集团西南电力设计院 Treatment method for soft soil foundation construction road

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
马洪福: "皂化渣稳定土施工工艺", 《内蒙古公路与运输》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109317509A (en) * 2018-11-15 2019-02-12 山鑫科陶科技(北京)股份有限公司 Utilize the method and improvement soil of saponification slag repairing polluted soil
CN109322297A (en) * 2018-11-15 2019-02-12 秦震 Method and the modified soil body using the saponification slag modification soft base soil body

Similar Documents

Publication Publication Date Title
CN106192660B (en) The construction method of Highway Pavement Structures
CN103882855B (en) Expansive soil modified cement and filling construction method
CN107059573A (en) A kind of construction method solidified by the use of the soil body as road steady layer of water
CN203546678U (en) Asphalt concrete core-wall rockfill dam structure
CN104404920B (en) A kind of trapezoidal ecological frame irrigation canals and ditches
CN101974898B (en) Roller compacted concrete cushion changing and filling method
CN109503052A (en) Raw celluar concrete of a plant and preparation method and application
CN111535322B (en) Distorted concrete construction method with bottom grouting
CN105884226A (en) Resource-converting utilization method for municipal refuse incinerator slag
CN103993532A (en) Construction method of saponified slag foundation
CN105369721A (en) Cement-stabilized coral reef sand construction process
CN108035219A (en) A kind of instrument of the flat pervious concrete of essence
CN105369706B (en) Using the road pavement technique of cement stabilizing tailing rubble
CN102493402B (en) Insertion type vibration rolling construction method of asphalt concrete core of earth and rockfill dam
RU2010108582A (en) COMPOSITION OF PRIMARY CONCRETE MIX, GROUND CONCRETE BASIS OF ROAD CLOTHING, METHOD OF ITS DEVICE
CN112251235A (en) Preparation method of steel slag-based curing agent and treatment system and method of Cd-polluted soil
CN103422407A (en) Construction process using cement diatomite to stabilize desert sand mixture to build Niger desert road
RU2495181C1 (en) Method to erect road surfacing
CN107447617A (en) A kind of dust-proof curing process of temporary construction road
CN109761566A (en) A kind of environmentally friendly ecological afforestation concrete and its construction method
CN111535323A (en) Full-section quasi-tertiary matching long-age roller compacted concrete construction method
CN209710968U (en) A kind of organic paddy rice ecological green belt
CN206512674U (en) The barrier wall structure that ecology is combined with hard phase
CN106746827B (en) A kind of method of modifying of dry method desliming tail mud and its application
CN108033807A (en) A kind of construction method based on the cementitious material of iron tailings in highway high roadbed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140820

WD01 Invention patent application deemed withdrawn after publication