CN206512674U - The barrier wall structure that ecology is combined with hard phase - Google Patents
The barrier wall structure that ecology is combined with hard phase Download PDFInfo
- Publication number
- CN206512674U CN206512674U CN201720200314.5U CN201720200314U CN206512674U CN 206512674 U CN206512674 U CN 206512674U CN 201720200314 U CN201720200314 U CN 201720200314U CN 206512674 U CN206512674 U CN 206512674U
- Authority
- CN
- China
- Prior art keywords
- wall structure
- barrier wall
- combined
- hard phase
- layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000004888 barrier function Effects 0.000 title claims abstract description 20
- 239000004567 concrete Substances 0.000 claims abstract description 43
- 239000004575 stone Substances 0.000 claims abstract description 23
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 18
- 239000004744 fabric Substances 0.000 claims abstract description 14
- 239000002689 soil Substances 0.000 claims description 20
- 239000011150 reinforced concrete Substances 0.000 claims description 18
- 238000003780 insertion Methods 0.000 claims description 7
- 230000037431 insertion Effects 0.000 claims description 7
- 239000007787 solid Substances 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 5
- 230000008901 benefit Effects 0.000 abstract description 3
- 230000002262 irrigation Effects 0.000 abstract 1
- 238000003973 irrigation Methods 0.000 abstract 1
- 239000000463 material Substances 0.000 description 5
- 230000009286 beneficial effect Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 239000011230 binding agent Substances 0.000 description 2
- 230000006378 damage Effects 0.000 description 2
- 230000003628 erosive effect Effects 0.000 description 2
- 230000012010 growth Effects 0.000 description 2
- 230000008635 plant growth Effects 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 238000000746 purification Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 230000010412 perfusion Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000000758 substrate Substances 0.000 description 1
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses the barrier wall structure that a kind of ecology is combined with hard phase; belong to barrier wall structure technical field; aim to provide the barrier wall structure that a kind of ecology is combined with hard phase; with can preserve the ecological environment; the advantage of barricade intensity effect can be met again; its drip irrigation device is the position that the concrete bodies are arranged on below river course ordinary water level; the concrete bodies upper end is provided with ecological block barricade body; the ecological block barricade body is provided with graded broken stone layer away from the side in river course, and the graded broken stone layer is wrapped with geotechnological layer of cloth.
Description
Technical field
The utility model is related to barrier wall structure technical field, the barricade knot that more particularly to a kind of ecology is combined with hard phase
Structure.
Background technology
In city river improvement, it usually needs barricade is set at Channel slope position, to prevent being acted in current scour
Under cause the substrate of river course two sides to be caved in, cause road interrupt, building damage etc. serious consequence.
Publication No. CN205348098U Chinese patent discloses a kind of barrier wall structure for river course, the barrier wall structure
The the first barricade main body formed is set including being stacked at least through gabion, the gabion includes cage body, is filled in the cage body
Lump material and perfusion are to the binder materials in the cage body, and the binder materials is at least filled between the adjacent lump material
Gap by the lump material in the cage body to be bonded as overall structure.But the barrier wall structure is in enhancing strength of wall body work(
Effect is outer but often to ignore its destruction to environment, and the barrier wall structure reduces the mass exchange between soil and water body, makes original
This vivifying river course loses vitality, causes the aquatic plants growth with water purification function difficult, under river self-purification capacity
Drop.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide what a kind of ecology was combined with hard phase
Barrier wall structure, with that can preserve the ecological environment, can meet the advantage of barricade intensity effect again.
To achieve the above object, the utility model provides following technical scheme:The gear that a kind of ecology is combined with hard phase
Wall construction, including the concrete bodies of river course both sides are arranged on, the concrete bodies are arranged on the position below river course ordinary water level, institute
Concrete bodies upper end is stated provided with ecological block barricade body, the ecological block barricade body is provided with graded broken stone away from the side in river course
Layer, the graded broken stone layer is wrapped with geotechnological layer of cloth.
By using above-mentioned technical proposal, the concrete bodies that ordinary water level lower end is set play antiscour, meet the work(of intensity
Effect, the ecological block barricade body in ordinary water level upper end is beneficial on the growth of bank slope plant and water plant, ecological block barricade body
Graded broken stone layer and geotechnological layer of cloth be beneficial to the growth of plant on ecological block barricade body, stabilize the soil body, concrete bodies with
The combination of ecological block barricade two kinds of walls of body, both ensure that the stability of retaining wall foundation also improved the ecological of barricade.
The utility model is further arranged to:Geogrids layer, the geotechnological lattice are provided with the ecological block barricade body
Extend geotechnological layer of cloth in one end of gate layer.
By using above-mentioned technical proposal, geogrids layer, which is laid in ecological block barricade body, to prevent ecological block from keeping off
Wall comes down and easy construction, adds the scour resistance of ecological block barricade body, one end of geogrids layer is extended
Geotechnological layer of cloth, interlocking of the geogrids layer with the rubble interlocking power in graded broken stone layer by force and with the soil body of the geotechnological layer of cloth of stretching
Power is strong, improves the globality of graded broken stone layer and the stability of the soil body, and geogrids layer tensile strength is high, tearing toughness
Greatly.
The utility model is further arranged to:The concrete bodies upper end offers the fixation for the insertion of ecological block wall
Groove, lower end both sides are provided with horizontal-extending fixed plate.
By using above-mentioned technical proposal, fixing groove has consolidated position of the ecological block wall on concrete bodies so that
Ecological block wall lower end fixing-stable, fixed plate is arranged on the both sides of concrete bodies lower end so that what concrete bodies were more consolidated
It is fixed in the soil body, reduces movement of the water in river course to concrete bodies during the extruded concrete body of both sides.
The utility model is further arranged to:The fixed plate includes C30 reinforced concretes bottom plate and is arranged on C30 reinforced concretes bottom
The plain concrete bed courses of the C20 of plate lower end.
By using above-mentioned technical proposal, C20 element concrete bed course protection C30 reinforced concrete bottom plates prevent disturbance, reduce the soil body and
Erosion of the water body to C30 reinforced concrete bottom base plates, C30 reinforced concrete bottom plates are played a supporting role to concrete bodies, stabilize coagulation
The position of the soil body.
The utility model is further arranged to:The thickness of the C30 reinforced concretes bottom plate is 400mm, the plain concrete bed courses of the C20
Thickness be 100mm.
By using above-mentioned technical proposal, the thickness of C20 element concrete bed courses is 100mm, and steady quality, hardness is high, to C30 steel
Muscle concrete bottom plate plays a protective role, and the thickness of C30 reinforced concrete bottom plates is 400mm so that C30 reinforced concrete bottom plates are carried to concrete bodies
For stable support force.
The utility model is further arranged to:The fixed plate away from river course is provided with the non-slipping block in the embedded soil body.
By using above-mentioned technical proposal, non-slipping block reduces movement of the fixed plate under the squeezing action of water body so that
The position of fixed plate is stable.
The utility model is further arranged to:The fixed plate is away from the side of concrete bodies provided with some insertion soil bodys
Timber, according to quincuncial arrangement in fixed plate lower end between the timber.
By using above-mentioned technical proposal, fixed plate is further fixed on the soil body by timber, by timber according to quincunx
It is arranged in the link position that fixed plate lower end adds fixed plate lower end and the soil body so that more stablize the position of fixed plate.
The utility model is further arranged to:The side of the fixed plate in river course is equipped with block stone layer.
By using above-mentioned technical proposal, block stone layer reduces contact of the water body with fixed plate, reduces water body to fixation
Plate washes away, and reduces water body and enter fixed plate lower end and cause rocking for fixed plate, protects fixed plate.
Compared with prior art, the utility model has the advantages that:Concrete bodies are set in river course ordinary water level lower end
The intensity at river course two ends is added, the ecological block barricade body of concrete bodies upper end is beneficial to planting plants, ecological block barricade body
The graded broken stone layer of upper setting and geotechnological layer of cloth add scour resistance, and ecological block barricade body intensity, concrete bodies
With the combination of ecological block barricade body, it both ensure that the stability of retaining wall foundation also improved the ecological of barricade.
Brief description of the drawings
Fig. 1 is the structural representation of the present embodiment;
Fig. 2 is the distribution schematic diagram for being used to embody timber of the present embodiment.
In figure, 1, concrete bodies;11st, fixing groove;12nd, fixed plate;121st, C30 reinforced concretes bottom plate;122nd, the plain concrete pads of C20
Layer;123rd, non-slipping block;124th, timber;125th, block stone layer;2nd, ecological block barricade body;21st, graded broken stone layer;22nd, geotechnological layer of cloth;
23rd, geogrids layer.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
The barrier wall structure that a kind of ecology is combined with hard phase, such as Fig. 1 and Fig. 2, including it is arranged on the concrete of river course both sides
Body 1, concrete bodies 1 are arranged on the position below river course ordinary water level, and the upper end of concrete bodies 1 is provided with ecological block barricade body 2, ecological
Block wall body 2 is provided with graded broken stone layer 21 away from the side in river course, and graded broken stone layer 21 is made up of the wide graded broken stones of 300mm,
Graded broken stone layer 21, which is wrapped with inside geotechnological layer of cloth 22, ecological block, can plant flowers and plants, so as to substantially increase the river course
Landscape effect, ecological, environmental protective, harmony and natural, graded broken stone layer 21 and the geotechnological profit of layer of cloth 22 on ecological block barricade body 2
In the growth of plant on ecological block barricade body 2, the soil body, concrete bodies 1 and 2 two kinds of walls of ecological block barricade body are stabilized
With reference to both having ensure that the stability of retaining wall foundation also improved the ecological of barricade.
Such as Fig. 1 and Fig. 2, the upper end of concrete bodies 1 offers the fixing groove 11 for the insertion of ecological block wall, and lower end both sides are set
There is horizontal-extending fixed plate 12, fixed plate 12 includes C30 reinforced concretes bottom plate 121 and is arranged on the lower end of C30 reinforced concretes bottom plate 121
The plain concrete bed courses 122 of C20, the thickness of C30 reinforced concretes bottom plate 121 is 400mm, and the thickness of C20 element concretes bed course 122 is 100mm,
C20 element concretes bed course 122 protects C30 reinforced concretes bottom plate 121, reduces the soil body and water body is invaded the bottom of C30 reinforced concretes bottom plate 121
Erosion so that C30 reinforced concretes bottom plate 121 plays stable supporting role to concrete bodies 1;One of fixed plate 12 in river course
Side is equipped with block stone layer 125, reduces water body and enters the lower end of fixed plate 12 and cause rocking for fixed plate 12.
Such as Fig. 1 and Fig. 2, the fixed plate 12 in river course is will be far from addition provided with the non-slipping block 123, Yi Jigu in the embedded soil body
Fixed board 12 is away from the side of concrete bodies 1 provided with the timber 124 in some insertion soil bodys, and non-slipping block 123 and timber 124 will be fixed
The position of plate 12 is fixed, by between timber 124 according to quincuncial arrangement in the lower end of fixed plate 12, the length of timber 124 is 5000mm,
Before in the insertion soil body of timber 124, timber 124 is first leached into blue or green a period of time so that timber 124 has anti-corrosive properties.
Such as Fig. 1 and Fig. 2, ecological block barricade body 2 is interior to be provided with geogrids layer 23, and geogrids layer 23 is laid on ecological block
It can prevent ecological block barricade body 2 from coming down and easy construction in block barricade body 2, one end of geogrids layer 23 is extended and is unearthed
Work layer of cloth 22, the soil body of the geogrids layer 23 with the rubble interlocking power in graded broken stone layer 21 by force and with the geotechnological layer of cloth 22 of stretching
Interlocking power it is strong, improve the globality and the stability of the soil body of graded broken stone layer 21.
Ecological block barricade body 2 can also be ecological grid, ecology bag etc. in the present embodiment.
This specific embodiment is only to explain of the present utility model, and it is not to limitation of the present utility model, ability
Field technique personnel can make the modification without creative contribution to the present embodiment as needed after this specification is read, but
As long as all being protected in right of the present utility model by Patent Law.
Claims (8)
1. the barrier wall structure that a kind of ecology is combined with hard phase, including it is arranged on the concrete bodies of river course both sides(1), its feature
It is:The concrete bodies(1)It is arranged on the position below river course ordinary water level, the concrete bodies(1)Upper end is provided with ecological block
Barricade body(2), the ecological block barricade body(2)Side away from river course is provided with graded broken stone layer(21), the graded broken stone
Layer(21)It is wrapped with geotechnological layer of cloth(22).
2. the barrier wall structure that ecology according to claim 1 is combined with hard phase, it is characterized in that:The ecological block barricade
Body(2)It is interior to be provided with geogrids layer(23), the geogrids layer(23)One end extend geotechnological layer of cloth(22).
3. the barrier wall structure that ecology according to claim 1 is combined with hard phase, it is characterized in that:The concrete bodies(1)
Upper end offers the fixing groove for the insertion of ecological block wall(11), lower end both sides are provided with horizontal-extending fixed plate(12).
4. the barrier wall structure that ecology according to claim 3 is combined with hard phase, it is characterized in that:The fixed plate(12)Bag
Include C30 reinforced concrete bottom plates(121)Be arranged on C30 reinforced concrete bottom plates(121)The plain concrete bed courses of the C20 of lower end(122).
5. the barrier wall structure that ecology according to claim 4 is combined with hard phase, it is characterized in that:The C30 reinforced concretes bottom
Plate(121)Thickness be 400mm, the plain concrete bed course of the C20(122)Thickness be 100mm.
6. the barrier wall structure that ecology according to claim 3 is combined with hard phase, it is characterized in that:It is described solid away from river course
Fixed board(12)Provided with the non-slipping block in the embedded soil body(123).
7. the barrier wall structure that ecology according to claim 3 is combined with hard phase, it is characterized in that:The fixed plate(12)The back of the body
From concrete bodies(1)Side provided with it is some insertion the soil bodys in timbers(124), the timber(124)Between according to quincunx
It is arranged in fixed plate(12)Lower end.
8. the barrier wall structure that ecology according to claim 3 is combined with hard phase, it is characterized in that:Described in river course
Fixed plate(12)Side be equipped with block stone layer(125).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720200314.5U CN206512674U (en) | 2017-03-02 | 2017-03-02 | The barrier wall structure that ecology is combined with hard phase |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720200314.5U CN206512674U (en) | 2017-03-02 | 2017-03-02 | The barrier wall structure that ecology is combined with hard phase |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206512674U true CN206512674U (en) | 2017-09-22 |
Family
ID=59867893
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720200314.5U Expired - Fee Related CN206512674U (en) | 2017-03-02 | 2017-03-02 | The barrier wall structure that ecology is combined with hard phase |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206512674U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110258449A (en) * | 2019-06-25 | 2019-09-20 | 中国电建集团成都勘测设计研究院有限公司 | Urban Water Environment landscape gentle slope water-retaining structure |
-
2017
- 2017-03-02 CN CN201720200314.5U patent/CN206512674U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110258449A (en) * | 2019-06-25 | 2019-09-20 | 中国电建集团成都勘测设计研究院有限公司 | Urban Water Environment landscape gentle slope water-retaining structure |
CN110258449B (en) * | 2019-06-25 | 2024-05-24 | 中国电建集团成都勘测设计研究院有限公司 | Gentle slope water retaining structure for urban water environment landscape |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104264692B (en) | A kind of side slope ecological renovation method | |
CN106193066B (en) | A kind of Loess landslide administering method based on restoration of the ecosystem | |
CN101649608B (en) | Ecological slope protection structure | |
CN106759104A (en) | Ecological slope protection structure and construction method | |
CN201343730Y (en) | Ecological protection structure for high rock slope | |
CN110387904A (en) | A kind of compound retaining wall structure of ecology and its construction method | |
CN207392130U (en) | A kind of ecology block stone revetment structure | |
CN205475261U (en) | Ash dam structure of power plant | |
CN100507163C (en) | Slope protection and greening method | |
CN206512674U (en) | The barrier wall structure that ecology is combined with hard phase | |
CN206873395U (en) | A kind of ecological revetment dike | |
CN106012971A (en) | Vegetation concrete protection slope and construction method thereof | |
CN210031903U (en) | Retaining wall structure based on mortar rubble | |
CN204252074U (en) | A kind of bank slope protection structure | |
CN202492856U (en) | Reinforced concrete pile type buttress retaining wall | |
CN112227342A (en) | Steel slag-doped composite foundation structure and construction method thereof | |
CN214832388U (en) | River course shore protection structure of reinforcing river bank steadiness | |
CN104674765A (en) | Self-locking ecological concrete channel protecting slope with embedded ceramic particles | |
CN202227354U (en) | Greening structure for high and steep concrete slopes | |
CN214061571U (en) | Steel slag doped composite foundation structure | |
CN205348098U (en) | A retaining wall structure for river course | |
CN203583437U (en) | Pile-net dinas dam mudflat enclosure hydraulic structure | |
CN206829084U (en) | A kind of protection against erosion concrete segment ecological revetment | |
CN205917649U (en) | River bank slope protection structure | |
CN206359949U (en) | A kind of steel plate bank protection formula water body revetment structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170922 |
|
CF01 | Termination of patent right due to non-payment of annual fee |