CN103991766B - Elevator and the elevator control method of function is continued to run with when there is power failure - Google Patents
Elevator and the elevator control method of function is continued to run with when there is power failure Download PDFInfo
- Publication number
- CN103991766B CN103991766B CN201310209460.0A CN201310209460A CN103991766B CN 103991766 B CN103991766 B CN 103991766B CN 201310209460 A CN201310209460 A CN 201310209460A CN 103991766 B CN103991766 B CN 103991766B
- Authority
- CN
- China
- Prior art keywords
- elevator
- information
- run
- power supply
- object range
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The present invention provides elevator and the elevator control method continuing to run with function when having power failure.According to embodiment, the elevator of operation object range when being preset with usual has and continues to run with information storage part (131A~131C), power supply control portion (134A~134C), continues to run with information setting portion (135A~135C) and control board for elevator (11A~11C).Continue to run with operation object range information when making elevator continue to run with when information storage part is stored in power failure.Power supply control portion makes from accumulator from the beginning of the power supply of elevator when having a power failure.Continue to run with information setting portion, the operation object range that object range information setting is self elevator will be run when starting to the power supply in self elevator from accumulator.Control board for elevator operation to self elevator in the operation object range set is controlled.
Description
Technical field
Embodiments of the present invention continue to run with elevator and the elevator control method of function when relating to having power failure.
Background technology
In the past, in order to make the operation of elevator continue when there occurs power failure, continue when power failure is set sometimes in building
Running gear.Continue to run with device during power failure and there is accumulator, if be detected that come from electrical network electricity owing to occurring power failure to cause
The power supply supply in source stops, then converting power source supply source makes, from accumulator, elevator is supplied electric power.
Device is continued to run with, when there is unpredictable power failure because of disaster etc. during by arranging power failure in building
Elevator also is able to continue to run with, it is possible to keep the convenience of the user of user and/or the high-storey being difficult by stair.
[patent documentation 1] Japanese Unexamined Patent Publication 2007-238316 publication
In the case of continuing to run with the operation continuation that device makes elevator when having a power failure when by as described above power failure, energy
Enough in the range of accumulator capacity, carry out power supply supply, but if the capacity of accumulator is used up, cannot carry out after this
Power supply supplies, and the operation of elevator just cannot continue.
If the operation of elevator does not continues to, the most just become: the user in building must pass through stair at each floor
Mobile, especially inconvenient to the user of high-storey state.
Summary of the invention
The present invention completes in view of the foregoing, its object is to provide the elevator continuing to run with function when there is power failure with
And elevator control method so that when occurring to have a power failure and supply electric power by accumulator in building, by inhibiting
The operation of the elevator of power consumption and proceed elevator the most for a long time and run.
According to being used for realizing the embodiment of above-mentioned purpose, the elevator that operation object range time usual is preset,
Have and continue to run with information storage part, power supply control portion, continue to run with information setting portion and control board for elevator.Continue to run with
Information storage part continues to operation object range information when running when being stored in power failure.Power supply control portion is when having a power failure
Make from accumulator from the beginning of the power supply of elevator.Continue to run with information setting portion, from accumulator to the electricity in self elevator
The operation object range that object range information setting is self elevator will be run when power supply starts.Control board for elevator is set
Operation object range in the operation of self elevator is controlled.
Accompanying drawing explanation
Fig. 1 is the overall diagram of the structure representing the elevator device that make use of the elevator in the 1st embodiment.
Fig. 2 is the block diagram of the structure representing the elevator in the 1st embodiment.
The explanation of operation object range information when Fig. 3 is to represent power failure that the elevator in the 1st embodiment prestores
Figure.
The flow chart of the work of each elevator when Fig. 4 is to represent the elevator being provided with in multiple 1st embodiment.
Fig. 5 is the block diagram of the structure representing the elevator in the 2nd embodiment.
Description of reference numerals
1 ... elevator device;10A ... the 1st elevator;
10B ... the 2nd elevator;10C ... the 3rd elevator;
11A~11C ... control board for elevator;12A~12C ... car;
13A~13C ... continue to run with device during power failure;21~29 ... boarding place call register apparatus;
30 ... group management control device;111A~111C ... cage operation control portion;
112A~112C ... car internal information output control part;
113A~113C ... continue to run with information update section;
131A~131C ... continue to run with information storage part;
132A~132C ... accumulator;
133A~133C ... electric network source monitoring unit;
134A~134C ... power supply control portion;
135A~135C ... continue to run with information setting portion;
136A~136C ... battery capacity monitoring unit
Detailed description of the invention
As embodiments of the present invention, about the building of management object, there is 1 layer~the floor of 9 layers, at this
The elevator setting that a little floors move has the situation of 3 to illustrate.
1st embodiment
< has structure > of the elevator device of the elevator in the 1st embodiment
About the structure of the elevator device 1 of the elevator in the 1st embodiment with the present invention, illustrate with reference to Fig. 1.
Elevator device 1 in present embodiment, by the 1st elevator 10A arranged in the building of management object, the 2nd electricity
Ladder 10B and the 3rd elevator 10C and the boarding place calling registration dress being respectively provided with at the elevator riding of each floor (1 layer~9 layers)
Put 21~29 and group management control device 30 couple together and constitute.
When 1st elevator 10A~the 3rd elevator 10C is respectively provided with control board for elevator 11A~11C, car 12A~12C and power failure
Continue to run with device 13A~13C.The detailed construction of these the 1st elevator 10A~the 3rd elevator 10C is shown in Fig. 2.It addition, Fig. 2 is table
Show the block diagram of the structure of elevator in present embodiment.
Control board for elevator 11A~11C has cage operation control portion 111A~111C and car internal information output control part
112A~112C.
Cage operation control portion 111A~111C, based on the control information obtained from group management control device 30 and/or with
The target zone register information that the operation of the target zone register button (not shown) in car 12A~12C is correlated with, in set fortune
In row object range, the lifting work to car 12A~12C is controlled.Below in cage operation control portion 111A~111C
The mode of stating converts: make to be set as whole floors (1 layer~9 layers) running object range, in the generation that has a power failure when usual
Time by have a power failure time continue to run with device 13A~13C set operation object range information time using this range information as fortune
Row object, is controlled.
Car internal information output control part 112A~112C, is maintained at when power failure occurs and continues to run with device in time having a power failure
13A~13C send transfer layer information, make as required information speaker (not shown) in car 12A~12C and/or
Display device (not shown) exports.
Continue to run with device 13A~13C during power failure to have and continue to run with information storage part 131A~131C, accumulator 132A
~132C, electric network source monitoring unit 133A~133C, power supply control portion 134A~134C, continue to run with information setting portion
135A~135C and battery capacity monitoring unit 136A~136C.
Continue to run with information storage part 131A~131C to be used for setting power failure respectively about self elevator 10A~10C, storage
Time the operation object range information continuing to run with object and transfer layer information, this transfer layer information represent based on have a power failure time
Run the change floor changed to when object range information continues to run with to other elevators.Running object range information at this is
Represent the information of a part of floor in the whole floors in this building.
Electric network source monitoring unit 133A~133C, the power supply state to the electric network source in the building of management object
Monitor, if be detected that the power supply of electric network source stops, there occurs power failure, then power failure detection information is supplied to electric power
Export to control portion 134A~134C.Afterwards, if be detected that the power supply of electric network source starts again at, then will again open
Begin to export to power supply control portion 134A~134C for electro-detection information.
Power supply control portion 134A~134C, if obtained from stopping that electric network source monitoring unit 133A~133C export
Electro-detection information, then be controlled such that from accumulator 132A~132C from the beginning of the power supply in elevator 10A~10C.It
After, start again at for power detection signal from what electric network source monitoring unit 133A~133C exported if obtained, be then controlled
Make to stop to the power supply in elevator 10A~10C from accumulator 132A~132C.
It addition, power supply control portion 134A~134C, if during accumulator 132A~132C carry out power supply
Obtain the low announcement information of capacity from battery capacity monitoring unit 136A~136C, be then judged to that the operation of elevator is difficult to continue,
It is controlled such that and stops to the power supply in elevator 10A~10C from accumulator 132A~132C.
Continue to run with information setting portion 135A~135C, started from storage by power supply control portion 134A~134C
When battery 132A~132C carries out power supply, by the operation object model continuing to run with information storage part 131A~131C storage
Enclose information setting to control board for elevator 11A~11C, and transfer layer information is sent to control board for elevator 11A~11C.
The battery capacity of accumulator 132A~132C is monitored by battery capacity monitoring unit 136A~136C, is detecting
When battery capacity is below predetermined value set in advance, to the low letter that sends a notice of power supply control portion 134A~134C output capacity
Breath.
Boarding place call register apparatus 21~29, is arranged at the elevator riding of each floor of this building, if up
The car call button in direction or the car call button of down direction are operated, then generate take advantage of relevant to these push-botton operations
Call register information at Ti, and send it to group management control device 30.
Group management control device 30 is to the 1st elevator 10A, the 2nd elevator 10B and the operation conditions (car of the 3rd elevator 10C
Position and/or traffic direction etc.) monitor, if getting boarding place calling from boarding place call register apparatus 21~29
Register information, then carry out the elevator of this boarding place of Response to selection calling register information according to the operation conditions of each elevator.Then, to institute
The elevator selected sends the control information for responding this boarding place calling register information.
The work > of the elevator device in < the 1st embodiment
It follows that the work about the elevator device 1 in present embodiment illustrates.In the present embodiment, the 1st electricity
Continuing to run with of ladder 10A~10C is previously stored with in information storage part 131A~131C for continuing to run with when having a power failure
Operation object range information.Such as, as shown in thick line in Fig. 3, continue to run with information storage part at the 1st elevator 10A
131A stores " 7 layers~9 layers ", stores " 4 layers~7 layers " continuing to run with in information storage part 131B of the 2nd elevator 10B,
3rd elevator 10C continues to run with storage " 1 layer~4 layers " in information storage part 131C.Additionally, here, Fig. 3 is to represent that the 1st implements
The explanatory diagram of the operation object range information during power failure prestored in the elevator in mode.
It addition, continue to run with, information storage part 131A~131C is previously stored with transfer layer information, this transfer layer information
Represent and run, based on these, the change floor changed to other elevators when object range continues to run with.Such as, at the 1st elevator
Continuing to run with of 10A stores the transfer layer letter changed to when running in the downstream direction to the 2nd elevator 10B in information storage part 131A
Breath " 7 layers ", the 2nd elevator 10B continue to run with information storage part 131B stores in the upstream direction run time to the 1st elevator
10A transfer transfer layer information " 7 layers " and in the downstream direction run time to the 3rd elevator 10C transfer transfer layer information " 4
Layer ", the 3rd elevator 10C continue to run with information storage part 131C stores in the upstream direction run time to the 2nd elevator 10B
The transfer layer information " 4 layers " of transfer.
In these the 1st elevator 10A~the 3rd elevator 10C, it is right to be set as whole floors (1 layer~9 layers) time usual running
As scope.And, group management control device 30 operation conditions of the 1st elevator 10A~the 3rd elevator 10C is monitored, if
Obtain boarding place calling register information from boarding place call register apparatus 21~29, then select according to the operation conditions of each elevator
Select the elevator that this boarding place calling register information is responded.Then, send for this boarding place to selected elevator
Calling register information carries out the control information responded, and in corresponding elevator, the lifting work of car is controlled.
It addition, in the 1st elevator 10A~the 3rd elevator 10C, based on by the target zone register button in car 12A~12C
Target zone register information determined by operation, enters the lifting work of car 12A~12C in set operation object range
Row controls.
It follows that the work of each elevator when there occurs power failure in building is illustrated by the flow chart with reference to Fig. 4.
If had a power failure in building, first, with the 1st elevator 10A, the 2nd elevator 10B and the 3rd elevator 10C
Electric network source monitoring unit 133A~the 133C that continue to run with device 13A~13C during each power failure detect power failure, power failure are examined
Measurement information exports power supply control portion 134A~134C(S1~S3).
Following control is carried out in each power supply control portion 134A~134C of the 1st elevator 10A~the 3rd elevator 10C: as
Fruit obtains the power failure detection information exported from electric network source monitoring unit 133A~133C, then make from accumulator 132A~132C to
Power supply in elevator 10A~10C starts.
It addition, proceeding by electricity by the control of power supply control portion 134A~134C from accumulator 132A~132C
During the supply of source, by continuing to run with information setting portion 135A~135C, operation object range information and transfer layer information are exported
Control board for elevator 11A~11C.
In each control board for elevator 11A~11C, by from the operation object continuing to run with information setting portion 135A~135C output
Range information, is set to cage operation control portion 111A~111C as later operation object range.It addition, from continuing to run with
The transfer layer information of information setting portion 135A~135C output is held in car internal information output control part 112A~112C(S4
~S6).
It addition, in each control board for elevator 11A~11C, if be detected that the power supply from accumulator 132A~132C is opened
Begin, then carry out following control: make the operation by the target zone register button in car 12A~12C and formerly register
Target zone register information is cancelled, and by the executory control break relevant to the lifting work of car 12A~12C, and makes
Car 12A~12C stops at nearest floor and opens the door (S7~S9) on schedule.Here, open the door the phase at car 12A~12C
Between, by the control of car internal information output control part 112A~112C, by sound and/or display in car 12A~12C
User export urge everybody temporary transient descending stair information.
Afterwards, in each control board for elevator 11A~11C, based on being set in cage operation control portion 111A's~111C
Run object range information, by the electric power supplied from accumulator 132A~132C, carry out each elevator 10A's~10C unceasingly
Run.
Such as, illustrate from 1 layer of situation moving to 8 layers of entry level of building about the user X when having a power failure.
First, the car call button of up direction is operated at the boarding place call register apparatus 21 of 1 layer if, with person X,
Then generate the boarding place calling register information relevant to this push-botton operation, and send to group management control device 30.
In group management control device 30, identifying acquired information is for from 1 layer of boarding moved by up direction
To running object range information, place's calling register information, includes that the 3rd elevator 10C on 1 layer and upper strata sends for making car 12C
Move to the control information of 1 layer.
If passing through sent control information, the car 12C of the 3rd elevator 10C is made to arrive 1 layer and open the door, then user X
Boarding.Then, exported in car 12C with sound and/or display by the control of car internal information output control part 112C: table
Show the operation object range of the 3rd elevator 10C be 1 layer~4 layers and in the case of going to more than 5 layers in transfer 4 layers of layer transfer
The information of the 2nd elevator 10B.
User X, by having understood the information exported, presses the destination of transfer layer that is 4 layer in car 12C
Button operates.Cage operation control portion 111C makes car 12C from 1 layer to 4 layers movement (S10) based on this operation.
When car 12C arrives 4 layers and opens the door, user X, in order to change to and descending stair, calls registration the boarding places of 4 layers
The car call button of up direction is operated by device 24.In boarding place call register apparatus 24, due to this car call
The operation of button and generate boarding place calling register information, and send to group management control device 30.
In group management control device 30, identifying acquired information is for from 4 layers of boarding moved by up direction
To running object range information, place's calling register information, includes that the 2nd elevator 10B on 4 layers and upper strata sends for making car 12B
Move to the control information of 4 layers.
If passing through sent control information, the car 12B of the 2nd elevator 10B is made to arrive 4 layers and open the door, then user X
Boarding.Then, exported in car 12B with sound and/or display by the control of car internal information output control part 112B: table
Show that the operation object range of the 2nd elevator 10B is 4 layers~7 layers and is changing to layer that is 7 layer in the case of going to more than 8 layers
Change to the information of the 1st elevator 10A.
User X, by knowing that the information exported, presses the destination of transfer layer that is 7 layer in car 12B
Button operates.Cage operation control portion 111B makes car 12B from 4 layers to 7 layers movement (S11) based on this operation.
When car 12B arrives 7 layers and opens the door, user X, in order to change to and descending stair, calls registration the boarding places of 7 layers
The car call button of up direction is operated by device 27.In boarding place call register apparatus 27, due to this car call
The operation of button and generate boarding place calling register information, and send to group management control device 30.
In group management control device 30, identifying acquired information is for from 7 layers of boarding moved by up direction
Place's calling register information, includes the 1st elevator 10A on 7 layers and its upper strata, sends and be used for making car operation object range information
12A moves to the control information of 7 layers.
If passing through sent control information so that the car 12A of the 1st elevator 10A arrives 7 layers and opens the door, then utilize
Person's X boarding.Then, destination's button of target zone that is 8 layer is operated in car 12A by user X.
Cage operation control portion 111A makes car 12A from 7 layers to 8 layers movement (S12) based on this operation.By the most so
Process, user X can move to 8 layers from 1 layer.
It addition, have a power failure time user Y want from 1 layer move to 6 layers in the case of, likewise by transfer layer from the 3rd
The car 12C of elevator 10C changes to the car 12B of the 2nd elevator 10B and utilizes, it is possible to move (S13, S14).
It addition, when having a power failure user Z want from 1 layer move to 3 layers in the case of, only by the utilization of the 3rd elevator 10C just
(S15) can be moved.
So, have a power failure time by limit each elevator operation object range continue to run with, it is possible to make traveling away from
From and/or number of starts reduce with suppression accumulator 132A~132C capacity reduce, it is possible to make elevator operation longer time
Ground continues.
It addition, continue to run with period, with battery capacity monitoring unit 136A~136C respectively to each accumulator 132A performing
~the capacity of 132C monitors.And, if be detected that battery capacity becomes below predetermined value set in advance, then generate appearance
Measure low announcement information, and export to power supply control portion 134A~134C.
Now, in battery capacity monitoring unit 136A~136C can also: the destination's registration registered according to this elevator
And/or the content of boarding place calling registration, predict the phases such as opening and closing work times with the traveling to next target zone and/or door
The power consumption closed, is being judged as that the surplus with current accumulator can not generate and hold in the case of the power consumption that goes out of availability forecast
Measure low announcement information.
In power supply control portion 134A~134C, if obtaining capacity from battery capacity monitoring unit 136A~136C
Low announcement information, then be judged to that the operation of elevator is difficult to continue, and stops from corresponding accumulator 132A~132C to elevator 10A
~the power supply in 10C.
If running the multiple elevator in building as described above when having a power failure, then to include the entry level etc. of building
Low floor be run object range the 1st elevator 10A by low floor (2~4 layers), intermediate floor (5 layers~7 layers), high-storey
All users of (8 layers, 9 layers) utilize.Therefore, the usage frequency of the 1st elevator 10A uprises, and the capacity of accumulator 132C reduces
The probability that ground is very fast, this elevator stops the earliest among 3 is the highest.
To this, with intermediate floor for running the 2nd elevator 10B of object range, by intermediate floor (5~7 layers) and lowrise
The user of layer (2~4 layers) utilizes, and for longer periods carries out compared with the 3rd elevator 10C of operation object range with low floor
The probability continued to run with based on accumulator 132B is high.
And then, with high-storey for running the 3rd elevator 10C of object range only by user's profit of high-storey (8 layers, 9 layers)
With, so the probability carrying out to maximum duration continuing to run with among 3 is high.
Therefore, for high-storey that the necessity of the utilization of elevator is high, it is possible to perform continuing to run with of elevator for a long time,
User can be provided high convenience.
2nd embodiment
In the 2nd embodiment of the present invention, it is configured to, is not provided with group management control device 30, and by by the 1st electricity
The ladder control board for elevator 11A of 10A, the control board for elevator 11C phase of control board for elevator 11B and the 3rd elevator 10C of the 2nd elevator 10B
Connecting and sent-received message, the group management carrying out these multiple elevator 10A~10C controls.
In the case of Gai, continue to run with information update section as it is shown in figure 5, be respectively equipped with in control board for elevator 11A~11C
113A~113C, in this continues to run with information update section 113A~113C, the operation different with self elevator is right from being set with
Control board for elevator sent-received message as other elevators of range information.
Additionally, Fig. 5 is the block diagram of the structure representing the elevator in the 2nd embodiment.
Continue to run with information update section 113A~113C, if be detected that come from the electric power of accumulator in other elevators
Supply stopped, then by the predetermined benchmark floor information in the operation object range information of these other elevators or whole floor model
The information of enclosing is included in the operation object range information of self elevator, to being set in cage operation control portion 111A~111C
Run object range information to be updated.
Such as, if stopping coming from the power supply of accumulator 132C in the 3rd elevator 10C, then with the 2nd elevator 10B
Information update section 113B that continues to run with detect this situation.Then, set as the operation object range information of the 3rd elevator 10C
The entry level of the fixed building in floor " 1 layer~4 layers " i.e. " 1 layer ", is included in the operation object range of the 2nd elevator 10B
In information " 4 layers~7 layers ", the operation object information being set in cage operation control portion 111B is updated to " 1 layer, 4 layers~7
Layer ".Or, the floor " 1 layer~4 layers " set as the operation object range information of the 3rd elevator 10C is entirely included in the 2nd
In the operation object range information " 4 layers~7 layers " of elevator 10B, the operation object letter being set in cage operation control portion 111B
Breath is updated to " 1 layer~7 layers ".
Object information is run, it is possible to if stopped by the elevators such as the entry level of building, user is very by so updating
Inconvenient datum layer is included in the operation object range of arbitrary elevator all the time, it is possible to increase the convenience of user.
This datum layer, is not limited to the entrance (1 layer etc.) of building, it is also possible to by being set to (2 layers of the floor close to entry level
And/or 3 layers), make the power consumption of accumulator reduce further.
In above-mentioned each embodiment, the information setting portion that continues to run with 135A~135C of each elevator, owing to occurring
Have a power failure and object range information setting will be run after control board for elevator 11A~11C, detecting accumulator 132A~132C
When capacity minimizing, stopping power supply, it is also possible to the operation object range letter that will set in control board for elevator 11A~11C
Breath releases.Thus, terminate in power failure, electric network source is when starting again at power supply, it is possible to made by whole floors as generally
Operation is started again at for object.
It addition, when having a power failure, it is also possible to only to the multiple stage arranged in building in the way of limiting operation object range
The elevator corresponding with preferential user of the elevator etc. of the button of application is set by the wheelchair user that is provided with in elevator,
Suppress the minimizing of the capacity of the accumulator of this elevator the most as far as possible so that it is run the most for a long time to improve preferential utilization
The convenience of person.
Illustrate several embodiments of the invention, but these embodiments propose as an example, are not used in limit
The scope of fixed invention.These new embodiments, it is possible to implement in other various modes, it is possible to without departing from invention
Carry out various omission in the range of purport, replace, change.These embodiments and/or its deformation, be included in invention
In scope and/or purport, and it is included in the invention described in technical scheme and equivalency range thereof.
Claims (6)
1. continuing to run with an elevator for function when having power failure, it is arranged in the building of management object, is preset with
Operation object range time generally, it is characterised in that
Possess:
Continuing to run with information storage part, its storage running object range information, this operation object range information is for building described
Build a part of floor in thing and be set as operation object range when making self elevator continue to run with when having a power failure;
Power supply control portion, it, when detecting that generation has a power failure, makes from accumulator to make corresponding elevator continue to run with
Power supply in self elevator starts;
Continuing to run with information setting portion, it is made by described power supply control portion from described accumulator in self elevator
When power supply starts, will be self electricity at the described operation object range information setting stored in information storage part that continues to run with
The operation object range of ladder;
Control board for elevator, its operation to self elevator in set operation object range is controlled;With
Battery capacity monitoring unit, the capacity of described accumulator is monitored by this battery capacity monitoring unit, is detecting described storage
When the capacity of battery has become below predetermined value, low for capacity announcement information is exported described power supply control portion,
Described power supply control portion, if obtaining the low announcement information of described capacity from described battery capacity monitoring unit, then
Stop from described accumulator to the power supply in self elevator,
Described continue to run with information setting portion, if be detected that be stopped from described accumulator by described power supply control portion
To the power supply of self elevator, then the described operation object range information set in self elevator is released and return to
With whole floors for running the state of object.
The elevator continuing to run with function time there is power failure the most according to claim 1, it is characterised in that
Described power supply control portion, after detecting and having a power failure, if be detected that the power supply of electric network source is opened again
Begin, then stop from accumulator to the power supply in self elevator,
Described continue to run with information setting portion, after setting described operation object range information, if be detected that from accumulator
Power supply in self elevator stopped, then the described operation object range information set in self elevator released
And return to whole floors for running the state of object.
The elevator continuing to run with function time there is power failure the most according to claim 1 and 2, it is characterised in that
The described information storage part that continues to run with also stores transfer layer information, and this transfer layer information represents based on described operation object model
The change floor when information of enclosing continues to run with, that change to other elevators,
Described continue to run with information setting portion, when setting described operation object range information, in order to make described transfer layer information
Output device in the car of self elevator exports and sends it to described control board for elevator.
The elevator continuing to run with function time there is power failure the most according to claim 1 and 2, it is characterised in that
Described elevator is provided with multiple stage in this building,
Also having and continue to run with information update section, this continues to run with information update section, if be detected that setting in described building
Surely have in other elevators of the operation object range information different from self elevator and stopped the power supply coming from accumulator,
Then the predetermined floor information in the operation object range information of these other elevators or whole range of floors information are included in self
In the operation object range information of elevator, continue to run with the operation object range information that information setting portion sets enter by described
Row updates.
The elevator continuing to run with function time there is power failure the most according to claim 1 and 2, it is characterised in that
Described elevator is the elevator corresponding with preferential user in the multiple elevator arranged in this building.
6. an elevator control method, it is characterised in that
The elevator making operation object range when arranging and be preset with usual in the building managing object performs:
Continuing to run with information storing step, wherein, storage running object range information, this operation object range information is for by institute
State a part of floor in building and be set as operation object range when making self elevator continue to run with when having a power failure;
Power supply rate-determining steps, wherein, when detecting that generation has a power failure, in order to make corresponding elevator continue to run with, makes from storage
Battery power supply in self elevator starts;
Continue to run with information setting step, wherein, made from described accumulator to self by described power supply rate-determining steps
When power supply in elevator starts, will set in the described operation object range information stored in information storing step that continues to run with
It is set to the operation object range of self elevator;
Elevator controlling step, wherein, in set operation object range, the operation to self elevator is controlled;With
Battery capacity monitors step, wherein, monitors the capacity of described accumulator, at the capacity detecting described accumulator
When having become below predetermined value, low for capacity announcement information is exported,
In described power supply rate-determining steps, if outputed in described battery capacity monitors step, described capacity is low to send a notice
Information, then stop from described accumulator to the power supply in self elevator,
Described continue to run with in information setting step, if be detected that be stopped from described by described power supply rate-determining steps
Accumulator to the power supply of self elevator, then the described operation object range information set in self elevator is released and
Return to whole floors for running the state of object.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013028981A JP5650772B2 (en) | 2013-02-18 | 2013-02-18 | Elevator with continuous operation function during power failure and elevator control method |
JP028981/2013 | 2013-02-18 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103991766A CN103991766A (en) | 2014-08-20 |
CN103991766B true CN103991766B (en) | 2016-08-17 |
Family
ID=51306157
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310209460.0A Active CN103991766B (en) | 2013-02-18 | 2013-05-30 | Elevator and the elevator control method of function is continued to run with when there is power failure |
Country Status (2)
Country | Link |
---|---|
JP (1) | JP5650772B2 (en) |
CN (1) | CN103991766B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109689555B (en) * | 2016-09-14 | 2020-10-27 | 三菱电机株式会社 | Monitoring system |
CN108178040B (en) * | 2017-12-11 | 2019-12-10 | 日立楼宇技术(广州)有限公司 | power failure emergency method and device for multiple elevators, computer equipment and storage medium |
CN111532926B (en) * | 2020-03-30 | 2021-12-10 | 日立电梯(中国)有限公司 | Elevator group management method and system |
CN114229635B (en) * | 2021-12-23 | 2023-11-21 | 苏州汇川控制技术有限公司 | Elevator staggered floor judging method, device, equipment and storage medium |
JP7367097B2 (en) | 2022-03-01 | 2023-10-23 | 東芝エレベータ株式会社 | Elevator control device, elevator system, and elevator evacuation operation method during power outage |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60209480A (en) * | 1984-04-02 | 1985-10-22 | 三菱電機株式会社 | Controller for elevator |
JP2005132501A (en) * | 2003-10-28 | 2005-05-26 | Mitsubishi Electric Corp | Elevator device |
JP2007238316A (en) * | 2006-03-10 | 2007-09-20 | Ntt Facilities Inc | Elevator emergency power supply system |
CN101239685A (en) * | 2006-12-22 | 2008-08-13 | 因温特奥股份公司 | Lift system for a building with at least two floors |
CN101689769A (en) * | 2007-06-22 | 2010-03-31 | 松下电器产业株式会社 | Power supply system, and power supply control method and power supply control program employed in power supply system |
CN102040129A (en) * | 2009-10-09 | 2011-05-04 | 株式会社日立制作所 | Control operation device of elevator |
JP2011126617A (en) * | 2009-12-15 | 2011-06-30 | Hitachi Ltd | Elevator power supply control device, elevator power supply control method, and power supply control program |
CN102216194A (en) * | 2008-11-28 | 2011-10-12 | 通力股份公司 | Elevator system |
CN102942096A (en) * | 2011-08-16 | 2013-02-27 | 苏州嘉莱机电科技有限公司 | Energy-saving lifting mechanical device based on mass regulation and control |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0977392A (en) * | 1995-09-07 | 1997-03-25 | Toshiba Corp | Elevator controller |
JP2006143456A (en) * | 2004-11-24 | 2006-06-08 | Toshiba Elevator Co Ltd | Group supervisory operation control device of elevator |
JP4539682B2 (en) * | 2007-06-12 | 2010-09-08 | 株式会社日立製作所 | Multi car elevator |
-
2013
- 2013-02-18 JP JP2013028981A patent/JP5650772B2/en active Active
- 2013-05-30 CN CN201310209460.0A patent/CN103991766B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS60209480A (en) * | 1984-04-02 | 1985-10-22 | 三菱電機株式会社 | Controller for elevator |
JP2005132501A (en) * | 2003-10-28 | 2005-05-26 | Mitsubishi Electric Corp | Elevator device |
JP2007238316A (en) * | 2006-03-10 | 2007-09-20 | Ntt Facilities Inc | Elevator emergency power supply system |
CN101239685A (en) * | 2006-12-22 | 2008-08-13 | 因温特奥股份公司 | Lift system for a building with at least two floors |
CN101689769A (en) * | 2007-06-22 | 2010-03-31 | 松下电器产业株式会社 | Power supply system, and power supply control method and power supply control program employed in power supply system |
CN102216194A (en) * | 2008-11-28 | 2011-10-12 | 通力股份公司 | Elevator system |
CN102040129A (en) * | 2009-10-09 | 2011-05-04 | 株式会社日立制作所 | Control operation device of elevator |
JP2011126617A (en) * | 2009-12-15 | 2011-06-30 | Hitachi Ltd | Elevator power supply control device, elevator power supply control method, and power supply control program |
CN102942096A (en) * | 2011-08-16 | 2013-02-27 | 苏州嘉莱机电科技有限公司 | Energy-saving lifting mechanical device based on mass regulation and control |
Also Published As
Publication number | Publication date |
---|---|
JP2014156331A (en) | 2014-08-28 |
JP5650772B2 (en) | 2015-01-07 |
CN103991766A (en) | 2014-08-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103991766B (en) | Elevator and the elevator control method of function is continued to run with when there is power failure | |
CN102730500B (en) | Cluster management elevator with multiple elevator banks | |
CN103145010B (en) | Elevator group management system and elevator group management method | |
WO2010032623A1 (en) | Elevator group management system | |
CN109319608B (en) | Gesture calling landing method and system | |
CN105270937B (en) | Elevator group management apparatus | |
CN102001556B (en) | Group management control device of an elevator | |
JP2012218898A (en) | Group supervisory control system | |
CN108002153A (en) | A kind of wearable automatic elevator calling device, system and method | |
CN102897637B (en) | Elevator control apparatus | |
CN108975110A (en) | Elevator device and elevator control method | |
CN106744089A (en) | Elevator control method and device | |
CN104030100A (en) | Elevator group management control device | |
JP2012056702A (en) | Elevator | |
CN108689260A (en) | Elevator and control method | |
CN107310995A (en) | Elevator set management and control device | |
CN104909224A (en) | Elevator group management system | |
JP2009155042A (en) | Group supervisory elevator performance assessment device | |
CN112141831A (en) | Group management system for elevator | |
CN1953924A (en) | Control device of elevator | |
JP5717301B2 (en) | Elevator group management control device | |
RU2581283C2 (en) | Power-saving elevator installation | |
JP5547001B2 (en) | Elevator operation control system | |
CN207713199U (en) | A kind of wearable elevator VIP control devices and system | |
CN103339050A (en) | Elevator group management and control apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |