CN102040129A - Control operation device of elevator - Google Patents

Control operation device of elevator Download PDF

Info

Publication number
CN102040129A
CN102040129A CN2010102988099A CN201010298809A CN102040129A CN 102040129 A CN102040129 A CN 102040129A CN 2010102988099 A CN2010102988099 A CN 2010102988099A CN 201010298809 A CN201010298809 A CN 201010298809A CN 102040129 A CN102040129 A CN 102040129A
Authority
CN
China
Prior art keywords
elevator
control operation
control
running gear
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010102988099A
Other languages
Chinese (zh)
Other versions
CN102040129B (en
Inventor
畠山望
前原知明
会田敬一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Publication of CN102040129A publication Critical patent/CN102040129A/en
Application granted granted Critical
Publication of CN102040129B publication Critical patent/CN102040129B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The present invention provides a control operation device of an elevator. A control operation starting signal detector (1) generates a control operation starting signal according to the information of power failure, earthquake or fire disaster, etc. from a building of the elevator. The control operation starting signal is transmitted to control operation function validity/failure determination parts (4a-4c) through input parts (3a-3c). If the determination parts (4a-4c) determine that the control operation function is failed, submission notification parts (6a-6c) notify the item. Furthermore when control operation function failure time measuring parts (7a-7c) determine that the failure state of the control operation function lasts for a certain time period, alarming notification parts (8a-8c) function and alarm, simultaneously a centralized management center of the elevator is notified through a communication line. Therefore, the inspection and maintenance operation of elevators which are equipped in parallel are facilitated. Furthermore the reliability of a control operation function is maintained.

Description

The control running gear of elevator
Technical field
The present invention relates to a kind of control running gear of elevator, especially relate to a kind of elevator control running gear that many elevators that are provided with are side by side carried out the control operation, the improvement of the device during with inspection and maintenance etc. is relevant.
Background technology
In general, elevator is called out according to the destination floor in elevator lobby calling and the lift car and is moved, and in the lift facility that is provided with many elevators side by side, mostly above-mentioned elevator lobby is called out and is moved as common calling.Except above-mentioned normal operation, when power failure, fire or earthquake etc. have taken place the building side at the elevator place,, the control running gear is installed also in order preferentially to guarantee passenger's safety.
Because above-mentioned control operation mainly results from the disaster of building side, so will be arranged to common instruction at the instruction (for example instruction of when fire, earthquake and power failure etc. have taken place, having sent) of many elevators, move the safety of guaranteeing elevator by making each elevator enter control simultaneously from the building side.
On the other hand, in order to keep the safety of lift facility, need carry out the inspection and maintenance operation termly to lift facility.When carrying out above-mentioned inspection and maintenance operation, the inspection and maintenance that the control drive ability carries out is also implemented simultaneously.At this moment, because the above-mentioned characteristic of control operation, the elevator that is set up in parallel enters the control operation simultaneously.In addition, when carrying out inspection and maintenance,,, at this moment, can consider the control operation temporarily to be lost efficacy according to signal from the building side so need sometimes provisionally the control operation to be limited owing to will carry out various inspection operations.
On the other hand, when carrying out inspection and maintenance etc., need to make the safety switch class A of geometric unitA temporarily to lose efficacy sometimes, if but after the end of job, do not recover the function of these safety switch class A of geometric unitA immediately, then may cause danger.In order to address this problem, a kind of scheme is disclosed in patent documentation 1, it is set to this item of failure state in above-mentioned occasion with regard to safety switch class A of geometric unitA and notifies, and after having passed through certain hour, automatically remove to lose efficacy and set, prevent that with this situation of forgetting the function of recovering these safety switch class A of geometric unitA from taking place.
[patent documentation 1] spy of Japan opens flat 7-277626 communique
When carrying out the inspection and maintenance of elevator, be under the situation of failure state at the function setting that control is moved temporarily, the same if forgotten recovery control operation function with the situation of forgetting the function of recovering above-mentioned safety switch class A of geometric unitA, also can cause danger.Therefore, the same with described patent documentation 1, can consider to set in the inefficacy of passing through the operation function of automatically decontroling behind the certain hour.
But the floor of building that is provided with many elevators side by side is generally all very high, so required time of inspection and maintenance operation is long, if the inefficacy of the operation of being arranged to automatically to decontrol is set, then has the problem that can cause safety to descend on the contrary.In addition, if be arranged to make the control operation of all elevators that are set up in parallel to lose efficacy together, then can occur being difficult to individually control be moved the problem of checking.
Summary of the invention
The present invention makes in view of the above problems, is to make the inspection and maintenance operation of the control operation of the elevator that is set up in parallel to become convenient order of the present invention.
Of the present invention other order be to keep the reliability of control operation function.
In order to realize above-mentioned order ground, the invention provides a kind of elevator control running gear that above-mentioned many elevators is carried out the control operation according to control operation commencing signal, it is characterized in that having disabling unit, this disabling unit is that unit will be set at failure state according to the control operation that above-mentioned control operation commencing signal carries out respectively with each elevator.
In order to realize described other order ground, of the present invention other are characterised in that to have the alarm notification unit, this alarm notification unit is measured control operation and is set to institute's elapsed time after the failure state, reached the unit of alarming and notifying when certain hour is above in this elapsed time, especially have notification unit, this notification unit is circulated a notice of to elevator centralized management center by communication line.
According to the present invention, at the elevator that is set up in parallel that manages operation together, can be individually the control operation of each elevator be set at failure state, so can reduce the restriction that control operation brings the inspection and maintenance operation of each elevator of carrying out separately, and carrying out of the inspection and maintenance operation of the elevator that can conveniently be set up in parallel.
In addition, removing this inefficacys setting in order to forget after preventing that control operation is set at inefficacy, and take making after the regular hour when lost efficacy setting the measure that automatically terminates having passed through, can not be subjected to the restriction of production time aspect, can carry out the inspection and maintenance operation relievedly, simultaneously, setting was forgotten when having removed and can automatically be alarmed losing efficacy, especially can also be in the elevator centralized management intracardiac managing, so can not cause the reliability decrease of control operation function because of having made things convenient for the inspection and maintenance operation.
Description of drawings
Fig. 1 is the functional block diagram of the control operation of the expression elevator that is set up in parallel of the present invention.
Fig. 2 is a scheme drawing of having used elevator lobby of the present invention.
Fig. 3 has used lift car in-to-in scheme drawing of the present invention.
Fig. 4 is the scheme drawing of control board for elevator involved in the present invention.
Fig. 5 is the diagram of circuit that control involved in the present invention moves.
Among the figure:
2a~2c... elevator control gear
10,13, the 21... telltale
16... operation board
20... control board for elevator
22... buzzer phone
23... alarm notification device.
The specific embodiment
Following reference embodiment shown in the drawings describes embodiments of the present invention.In the present embodiment, the platform number of the elevator that is set up in parallel is 3, as the control operation, operates to example with the control of tackling situations such as common power failure, earthquake and fire and describes, but be not limited in above-mentioned situation.
Fig. 1 represents the functional block diagram of the control operation in the related elevator that is set up in parallel of one embodiment of the invention.Control operation commencing signal detecting device 1 basis produces control operation commencing signal from the information of power failure, earthquake or the fire etc. of the building at elevator place.
This control operation commencing signal is sent among 3 elevators elevator control gear 2a~2c separately that is set up in parallel, and receives this signal by control operation commencing signal importation 3a~3c.The signal that is received by control operation commencing signal importation 3a~3c is sent to the control operation function judgment part 4a~4c that effectively lost efficacy, if the control operation function is not set at failure state by external input device (for example maintaining the operation board 16 of device or Fig. 3), it is effective then to be set at the control operation function in the 4a~4c of judgment part, and this information is sent to control operation operating part 5a~5c.Thus, 3 elevators will begin the control operation together.If the control operation function is set at failure state by external input device, then judgment part 4a~4c is judged as inefficacy with the control operation function, does not send information, can not carry out the control operation this moment to control operation operating part 5a~5c.
As implied above, in the present embodiment, owing to be respectively arranged with the control operation function judgment part 4a~4c that effectively lost efficacy among each elevator control gear 2a~2c, so can be that unit is set at the control operation effectively respectively or lost efficacy with each elevator.
After the control operation function is set to failure state, judgment part 4a~4c is judged as the control operation function and is in failure state, and represents that with visual manner and audible means the control operation function has been set to the instruction of failure state from the notification section 6a that draws attention to~6c output.In addition, when the failure state that is judged as the control operation function in control operational failure time measurement part 7a~7c has continued the regular hour, alarm notification part 8a~8c action.Thus, the inefficacy of sending expression control operation is towards periphery set and may be forgotten the alarm of having removed, and by communication line notice elevator centralized management center.Therefore, when the maintenance activity personnel are arranged around, can cause maintenance activity personnel's attention, even there are not the maintenance activity personnel around, because elevator centralized management center is managing all the time, so can impel the maintenance activity personnel to remove operation effectively.
Fig. 2 and Fig. 3 have used elevator lobby of the present invention and lift car in-to-in scheme drawing, as everyone knows, the position of the elevator door 12 of contiguous elevator lobby side is provided with telltale 10 and elevator lobby is called out login button 11, and the position of the elevator door 17 of contiguous lift car side is provided with telltale 13, destination floor login button 14, elevator door switch button 15 and operation board 16.
To operate in order being arranged to wait by the maintenance activity personnel, to be provided with special-purpose key in this operation board 16.At this, also can be arranged in the disable switch that constitutes the described control operation function inefficacy of making of present embodiment feature also is set in this operation board 16, making it possible to each elevator is that unit is set at failure state with the control operation function individually.
Fig. 4 is the scheme drawing of control board for elevator involved in the present invention.Fig. 4 still is a constructional drawing of the present invention simultaneously.It is indoor that control board for elevator 20 is arranged on elevator machine, and it has telltale 21, buzzer phone 22, alarm notification device 23 and indicator lamp 24.Telltale 21 shows " the control operation has been set at failure state " this information, is in failure state with visual manner notice control operation.Buzzer phone 22 makes the buzzer phone generation buzzer in indoor buzzer phone of elevator machine or the caretaker room, thereby draws attention to audible means when " the control operation has been set at failure state ".Alarm notification device 23 is not set under the situation about removing this inefficacy after the control operation function is set to failure state, after having passed through certain hour, to elevator centralized management center 25 circulars, notify its " inefficacy of control operation is set and also is not disengaged " by order wire.
Elevator centralized management center 25 is configured to the elevator in certain zone is carried out integrated management, and the system that can keep in touch with maintenance activity person at any time.Therefore, after receiving the notice of sending from alarm notification device 23, this advisory maintenance activity of elevator personnel that can will have elevator or " releasing of setting of losing efficacy has been forgotten " of " inefficacy of control operation is set and also is not disengaged " immediately from elevator centralized management center 25, can manage effectively thus, set up to losing efficacy and removed effectively.
Fig. 5 is the one embodiment of the invention that are used to carry out above action, and expression is used to carry out the diagram of circuit of the control operation of above action.
At first, by the switch in maintenance device or the described operation board 16, the control operation function of certain elevator is set at failure state (step 31).Through after above-mentioned setting makes the control operation function of elevator be in failure state, submit to this is noted (step 32).Control operation be set to failure state during, this elevator is carried out specific test, simultaneously the elevator that is not set to failure state is carried out (steps 33) such as control commissioning tests.
After the control commissioning test finishes, set (step 34) by releasing inefficacies such as maintenance devices.In the regular hour, set (step 35) if be set to failure state (step 31) back by maintenance device releasing inefficacy at the control operation function, then being judged as lost efficacy to set and forgetting and removed, at this moment, send alarm from the alarm notification device to elevator centralized management center, notify its setting of losing efficacy still not to be disengaged (step 36), and this item notice maintenance personnel (step 37) that removed are forgotten in the inefficacy setting of control operation by elevator centralized management center.
According to the foregoing description, can be that unit is set at failure state with the control operation function respectively with each elevator.Even just in case forgotten under the situation of each elevator being removed the setting of losing efficacy respectively, also can manage, so can not cause the reliability decrease of control operation function because of having made things convenient for the inspection and maintenance operation at elevator centralized management center the maintenance personnel.

Claims (4)

1. the control running gear of an elevator, the control running gear of described elevator carries out the control operation according to control operation commencing signal to many elevators that are provided with side by side, the control running gear of described elevator is characterised in that, have disabling unit, this disabling unit is that unit will be set at failure state according to the control operation that above-mentioned control operation commencing signal carries out respectively with each elevator.
2. the control running gear of elevator as claimed in claim 1, it is characterized in that, the control running gear of described elevator has notification unit, and this notification unit is that unit notifies with regard to by described disabling unit the control operation being set at this item of failure state respectively with each elevator.
3. as the control running gear of claim 1 or 2 described elevators, it is characterized in that, the control running gear of this elevator has the alarm notification unit, this alarm notification unit is measured described control operation is set at the back institute elapsed time that lost efficacy, and has reached certain hour in this elapsed time and send alarm and notice when above.
4. the control running gear of elevator as claimed in claim 3 is characterized in that, described alarm notification unit comprises by communication line the described elapsed time has been reached the unit of the elevator more than the certain hour to elevator centralized management center circular.
CN201010298809.9A 2009-10-09 2010-09-29 Control operation device of elevator Active CN102040129B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2009234844A JP5461946B2 (en) 2009-10-09 2009-10-09 Elevator control operation device
JP2009-234844 2009-10-09

Publications (2)

Publication Number Publication Date
CN102040129A true CN102040129A (en) 2011-05-04
CN102040129B CN102040129B (en) 2014-10-22

Family

ID=43906729

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010298809.9A Active CN102040129B (en) 2009-10-09 2010-09-29 Control operation device of elevator

Country Status (2)

Country Link
JP (1) JP5461946B2 (en)
CN (1) CN102040129B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103287941A (en) * 2012-02-27 2013-09-11 东芝电梯株式会社 Linkage operation test device and linkage operation test method for elevator
CN103991766A (en) * 2013-02-18 2014-08-20 东芝电梯株式会社 Elevator with function of keeping moving during power off and control method for the same

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6045226B2 (en) * 2012-07-04 2016-12-14 アズビル株式会社 Facility management apparatus and test method
JP5897666B1 (en) * 2014-09-03 2016-03-30 東芝エレベータ株式会社 Elevator remote monitoring system
JP6479899B2 (en) * 2017-06-30 2019-03-06 東芝エレベータ株式会社 Elevator inspection system
JP7251881B2 (en) * 2021-09-03 2023-04-04 東芝エレベータ株式会社 Elevator remote monitoring system
CN113879927B (en) * 2021-09-07 2023-03-14 中震博远(武汉)科技有限公司 Elevator early warning system integrating multiple disaster early warning and third-party monitoring

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02294000A (en) * 1989-05-09 1990-12-05 Hitachi Elevator Eng & Service Co Ltd Remote supervisory device
JPH07277626A (en) * 1994-04-05 1995-10-24 Hitachi Building Syst Eng & Service Co Ltd Short circuiting device of elevator safety switch
JP2000247556A (en) * 1999-02-26 2000-09-12 Otis Elevator Co Machine room-less elevator
JP2007131360A (en) * 2005-11-08 2007-05-31 Kajima Corp Elevator control operation device
CN101353125A (en) * 2007-07-23 2009-01-28 东芝电梯株式会社 Safety monitoring system of elevator
CN101362566A (en) * 2007-08-06 2009-02-11 株式会社日立制作所 Elevator control system
WO2009028070A1 (en) * 2007-08-30 2009-03-05 Mitsubishi Electric Corporation Control operation system of elevator

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009190822A (en) * 2008-02-13 2009-08-27 Hitachi Building Systems Co Ltd Control operation examination device of elevator

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH02294000A (en) * 1989-05-09 1990-12-05 Hitachi Elevator Eng & Service Co Ltd Remote supervisory device
JPH07277626A (en) * 1994-04-05 1995-10-24 Hitachi Building Syst Eng & Service Co Ltd Short circuiting device of elevator safety switch
JP2000247556A (en) * 1999-02-26 2000-09-12 Otis Elevator Co Machine room-less elevator
JP2007131360A (en) * 2005-11-08 2007-05-31 Kajima Corp Elevator control operation device
CN101353125A (en) * 2007-07-23 2009-01-28 东芝电梯株式会社 Safety monitoring system of elevator
CN101362566A (en) * 2007-08-06 2009-02-11 株式会社日立制作所 Elevator control system
WO2009028070A1 (en) * 2007-08-30 2009-03-05 Mitsubishi Electric Corporation Control operation system of elevator

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103287941A (en) * 2012-02-27 2013-09-11 东芝电梯株式会社 Linkage operation test device and linkage operation test method for elevator
CN103991766A (en) * 2013-02-18 2014-08-20 东芝电梯株式会社 Elevator with function of keeping moving during power off and control method for the same
CN103991766B (en) * 2013-02-18 2016-08-17 东芝电梯株式会社 Elevator and the elevator control method of function is continued to run with when there is power failure

Also Published As

Publication number Publication date
JP5461946B2 (en) 2014-04-02
JP2011079652A (en) 2011-04-21
CN102040129B (en) 2014-10-22

Similar Documents

Publication Publication Date Title
CN102040129B (en) Control operation device of elevator
JP5442679B2 (en) Elevator control device
US20180282118A1 (en) Passenger-initiated dynamic elevator service request
CN109502439A (en) It is limited to enter region security system
JP2019085247A (en) Abnormality detection device for elevator operation button
JP2017226507A (en) Elevator
JP6450265B2 (en) Elevator seismic control operation control system and method
JP2010100369A (en) Emergency operation control device of elevator
JP5968109B2 (en) Monitoring system
JP2020029314A (en) Elevator diagnosis system and elevator diagnosis method
KR101868935B1 (en) Alarm device for parts replacement time of Elevator
JP4708211B2 (en) Elevator apparatus and elevator control method
JP5935433B2 (en) Elevator fire operation system
JP2000351545A (en) Elevator maintenance safety device
JP2019014582A (en) Alarm system
KR102348615B1 (en) elevator system
JP2010013254A (en) Control device of passenger conveyer
JP2004359405A (en) Remote rescue method for elevator in case of earthquake
KR102348614B1 (en) elevator system
KR101224732B1 (en) Elevator and elevator system and method of controlling the same
JP5328115B2 (en) Abnormality reporting system for residential elevators
JP5839388B2 (en) Safety confirmation system
JP2008056360A (en) Elevator restoration device and restoration method for elevator after occurrence of earthquake
CN109422153A (en) Elevator monitoring system
JP2012014328A (en) Patrol recording system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant