CN103983451A - 次同步振荡系统阻尼的在线测量方法 - Google Patents

次同步振荡系统阻尼的在线测量方法 Download PDF

Info

Publication number
CN103983451A
CN103983451A CN201410241516.5A CN201410241516A CN103983451A CN 103983451 A CN103983451 A CN 103983451A CN 201410241516 A CN201410241516 A CN 201410241516A CN 103983451 A CN103983451 A CN 103983451A
Authority
CN
China
Prior art keywords
generator unit
sub
under
increment
oscillation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410241516.5A
Other languages
English (en)
Other versions
CN103983451B (zh
Inventor
肖永
徐梅梅
顾威
李永忠
邵梦桥
林呈辉
徐振宇
高自强
张旭
苏静棋
陈婧华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Sifang Automation Co Ltd
North China Electric Power University
Guizhou Electric Power Test and Research Institute
Original Assignee
North China Electric Power University
Guizhou Electric Power Test and Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Electric Power University, Guizhou Electric Power Test and Research Institute filed Critical North China Electric Power University
Priority to CN201410241516.5A priority Critical patent/CN103983451B/zh
Publication of CN103983451A publication Critical patent/CN103983451A/zh
Application granted granted Critical
Publication of CN103983451B publication Critical patent/CN103983451B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Eletrric Generators (AREA)

Abstract

一种次同步振荡系统阻尼的在线测量方法,包括以下步骤:①用传感器采样得到待研究的发电机机组的转子角速度瞬时值,并将其转换为标幺值,记为;用功率表采样得到发电机机组三相有功功率瞬时值,并将其转换为标幺值,记为;将上述两个量进行傅里叶分解,得到不同频率下的

Description

次同步振荡系统阻尼的在线测量方法
技术领域:
本发明涉及电力系统技术领域,特别涉及一种次同步振荡系统阻尼的在线测量方法。
背景技术:
次同步振荡属于系统的振荡失稳,它是由电力系统中一种特殊的机电耦合作用造成的,其最大的危害是严重的机电耦合作用可能直接导致大型汽轮发电机转子轴系的严重破坏,造成重大事故,危及电力系统的安全运行。
复转矩系数法是一种次同步振荡的分析方法。该方法在次同步频率范围内对轴系机械复转矩系数及电气复转矩系数(转子电磁转矩增量相量和转子角速度增量相量之比)进行频率扫描,根据使机械弹性系数和电气弹性系数之和为零的频率下,净阻尼系数(即机械阻尼系数和电气阻尼系数之和)的正负来判定系统是否会发生次同步振荡。在实际使用时,机械阻尼系数通过现场实验得到,而各频率处的电气阻尼系数则通常由复转矩系数法的时域仿真实现方法求得。
复转矩系数由于使用的是机械转矩增量和电磁转矩增量同发电机转子角位移增量(或转子角速度增量)的关系,而机械转矩增量和电磁转矩增量都无法在现场测量得到,使得复转矩系数法只能用于离线仿真分析,无法用于在线分析系统阻尼情况。考虑到发电机机端功率和电磁转矩的关系,在复转矩系数法里转子电磁转矩增量和转子角速度增量关系的基础上,推导发电机机端功率增量和转子角速度增量的关系,有助于将来通过在线监测机端功率和转子角速度的变化,实时监控系统的电气阻尼,实时掌控系统发生次同步振荡的风险。
发明内容
鉴于此,有必要设计一种能够通过在线监测得到的机端功率和转子角速度的关系来计算电力系统阻尼的方法。
一种次同步振荡系统阻尼的在线测量方法,包括以下步骤:
步骤一:用传感器采样得到待研究的发电机机组的转子角速度瞬时值,并将其转换为标幺值,记为                                                ;用功率表采样得到发电机机组三相有功功率瞬时值,并将其转换为标幺值,记为;将上述两个量进行傅里叶分解,得到不同频率下的
步骤二:计算不同模态频率下的电气阻尼系数;
发电机机组三相功率P与发电机电磁转矩的关系用下式表示:
                                           (1)
上式中为发电机转子的机械角速度,当其取标幺值时与电气角速度标幺值相同,下文将不予区分;将上式在稳定运行点处线性化,可得                 
                                                                        (2)
假设同步发电机转子的角位移在其平均值附近产生了的偏移,此时相应的发电机角速度增量为,该扰动将分别在机械系统和电气系统中产生机械转矩和电气转矩的变化,小扰动下该发电机机械系统的机械转矩的增量和电气系统的电磁转矩的增量的关系式如下:
                                    (3)
                                       (4)
式中为机械同步转矩;为机械阻尼转矩;分别为机械同步转矩系数和机械阻尼系数;为电气同步转矩;为电气阻尼转矩;分别为电气同步转矩系数和电气阻尼系数;分别为相对于同步旋转坐标系的功率角增量和角速度增量。如上式各量取标么值,则的单位是pu,的单位是rad,的单位是pu。
在机械系统中,发电机转子轴段发生小扰动时,整个机械子系统在发电机转子上所形成的等效机械转矩增量,由于这个等效机械转矩增量与电气转矩增量相平衡,即
                                        (5)
联立式(3),(4),(5)可以求得同步发电机转子发生小扰动时,整个系统总的电磁转矩增量为
                 (6)
将式(6)代入式(2)得,
  
                          (7)
同时,之间的关系为
                                           (8)
式中,为同步转速,t的单位为s。
假定发电机转子做频率为的小值振荡,各量可以用相量来表示,则根据式(8)有  
                                   (9)
而由式(7)得 
                     (10)
从而有
                                       (11)
                      (12)
发电机稳定运行时,
                                                                                       (13)
                                          (14)
将式(13)和式(14)代入式(12)得
                           (15)
在发电机次同步振荡各模态频率及其机械模态阻尼系数已知的情况下,按照公式(15)就可以通过发电机机组功率增量和发电机转子角速度增量的关系来求得电气阻尼系数,
                                   (16)
步骤三:根据电气阻尼系数和机械阻尼系数的大小判断系统的次同步振荡情况,对任一模态而言,如果在该模态频率下
                                             (17)
则在该模态频率下,系统会发生次同步振荡或轴系扭振。否则该模态下轴系的次同步振荡和轴系扭振就是稳定的。
优选的,根据步骤三的公式,如果发电机机组在其所有的模态频率下均稳定,那么此时发电机机组轴系的次同步振荡和轴系扭振就是稳定的。
本发明将原来的复转矩系数法使用的转矩增量换成了可以在线测量的发电机机组功率增量,并由公式通过在线监测得到的机端功率和转子角速度,在线计算系统的电气阻尼系数,进而在线监控系统发生次同步振荡的可能性,解决了以往不能实时监控造成的滞后性。
具体实施方式:
一种次同步振荡系统阻尼的在线测量方法,包括以下步骤:
用传感器采样得到待研究的发电机机组的转子角速度瞬时值,并将其转换为标幺值,记为;用功率表采样得到发电机机组三相有功功率瞬时值,并将其转换为标幺值,记为;将上述两个量进行傅里叶分解,得到不同频率下的
计算不同模态频率下的电气阻尼系数:
对任一模态,其电气阻尼系数可以由式(1)得到,
                                   (1)
式中,为该模态频率下的发电机机组功率增量和角速度增量,为该模态频率下的机械阻尼系数,一般通过发电机制造厂家的试验测出,为稳态的发电机机组三相功率,上述分量均为标幺值。
根据电气阻尼系数和机械阻尼系数的大小判断系统的次同步振荡情况,对任一模态而言,如果在该模态频率下
                                             (2)
则在该模态频率下,系统会发生次同步振荡或轴系扭振;否则该模态频率下轴系的次同步振荡和轴系扭振就是稳定的。
在本实施方式中,根据步骤的公式,如果发电机机组在其所有的模态频率下均稳定,那么此时发电机机组轴系的次同步振荡和轴系扭振就是稳定的。

Claims (2)

1.一种次同步振荡系统阻尼的在线测量方法,其特征在于:包括以下步骤:
用传感器采样得到待研究的发电机机组的转子角速度瞬时值,并将其转换为标幺值,记为;用功率表采样得到发电机机组三相有功功率瞬时值,并将其转换为标幺值,记为;将上述两个量进行傅里叶分解,得到不同频率下的
计算不同模态频率下的电气阻尼系数:
对任一模态,其电气阻尼系数可以由式(1)得到,
                                   (1)
式中,为该模态频率下的发电机机组功率增量和角速度增量,为该模态频率下的机械阻尼系数,为稳态的发电机机组三相功率,上述分量均为标幺值;
根据电气阻尼系数和机械阻尼系数的大小判断系统的次同步振荡情况,对任一模态而言,如果在该模态频率下
                                             (2)
则在该模态频率下,系统会发生次同步振荡或轴系扭振;否则该模态频率下轴系的次同步振荡和轴系扭振就是稳定的。
2.如权利要求1所述的次同步振荡系统阻尼的在线测量方法,其特征在于:根据步骤的公式,如果发电机机组在其所有的模态频率下均稳定,那么此时发电机机组轴系的次同步振荡和轴系扭振就是稳定的。
CN201410241516.5A 2014-06-03 2014-06-03 次同步振荡系统阻尼的在线测量方法 Active CN103983451B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410241516.5A CN103983451B (zh) 2014-06-03 2014-06-03 次同步振荡系统阻尼的在线测量方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410241516.5A CN103983451B (zh) 2014-06-03 2014-06-03 次同步振荡系统阻尼的在线测量方法

Publications (2)

Publication Number Publication Date
CN103983451A true CN103983451A (zh) 2014-08-13
CN103983451B CN103983451B (zh) 2016-08-24

Family

ID=51275511

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410241516.5A Active CN103983451B (zh) 2014-06-03 2014-06-03 次同步振荡系统阻尼的在线测量方法

Country Status (1)

Country Link
CN (1) CN103983451B (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR970013766A (ko) * 1995-08-14 1997-03-29 김광호 동기식 디지탈 주파수 합성기
JP2007049799A (ja) * 2005-08-09 2007-02-22 Shindengen Electric Mfg Co Ltd 同期整流駆動回路
CN101895117A (zh) * 2010-07-27 2010-11-24 南方电网技术研究中心 一种次同步谐振的评估方法和装置
CN103336874A (zh) * 2013-07-15 2013-10-02 国家电网公司 基于时域仿真的电力系统次同步振荡在线分析及预警方法
CN103778283A (zh) * 2014-01-13 2014-05-07 国网北京经济技术研究院 一种基于pscad的电气复转矩系数扫描方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR970013766A (ko) * 1995-08-14 1997-03-29 김광호 동기식 디지탈 주파수 합성기
JP2007049799A (ja) * 2005-08-09 2007-02-22 Shindengen Electric Mfg Co Ltd 同期整流駆動回路
CN101895117A (zh) * 2010-07-27 2010-11-24 南方电网技术研究中心 一种次同步谐振的评估方法和装置
CN103336874A (zh) * 2013-07-15 2013-10-02 国家电网公司 基于时域仿真的电力系统次同步振荡在线分析及预警方法
CN103778283A (zh) * 2014-01-13 2014-05-07 国网北京经济技术研究院 一种基于pscad的电气复转矩系数扫描方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周长春等: "由直流输电引起的次同步振荡的阻尼特性分析", 《中国电机工程学报》, vol. 23, no. 10, 31 October 2003 (2003-10-31) *
张帆等: "励磁系统及电力系统稳定器对发电机组次同步谐振阻尼特性的影响", 《电网技术》, vol. 30, no. 18, 30 September 2006 (2006-09-30) *

Also Published As

Publication number Publication date
CN103983451B (zh) 2016-08-24

Similar Documents

Publication Publication Date Title
Yamamoto et al. A smart experimental setup for vibration measurement and imbalance fault detection in rotating machinery
CN105606895B (zh) 电力系统次同步振荡成份的在线检测及滤除方法
US20180331602A1 (en) Shaft-mounted monitor for monitoring rotating machinery
CN101977008B (zh) 双馈风电机组关键传感器故障的判断方法
Lee et al. Transformation algorithm of wind turbine blade moment signals for blade condition monitoring
US8912792B2 (en) Systems and methods for rotor angle measurement in an electrical generator
Yao et al. A novel method based on self-sensing motor drive system for misalignment detection
CN103259485A (zh) 电网电压不平衡条件下提高无速度传感器辨识精度的方法
CN103217545B (zh) 同步电机转速信号容错及异常判别的方法
CN102624012B (zh) 基于力矩分解的积分算法识别负阻尼低频振荡的方法
CN103956957A (zh) 一种异步电机转子电阻辨识方法和装置
CN108388839A (zh) 一种基于二阶同步提取变换的强转速波动特征提取方法
Kim et al. A new method of recording generator dynamics and its application to the derivation of synchronous machine parameters for power system stability studies
CN102694387B (zh) 基于力矩分解的积分算法识别电力系统功率振荡的方法
CN102117374B (zh) 一种基于扰动信号进行发电机组轴系扭振模态阻尼的计算方法
CN101358989A (zh) 一种基于旋转矢量法的同步发电机转速的测量方法
Khatib et al. Load modeling assumptions: What is accurate enough?
CN103138261B (zh) 基于转速差—功角差变化趋势的暂态功角稳定辨识方法
CN105958886B (zh) 基于转矩实时观测叶轮疲劳寿命的在线估计装置及方法
CN105301405A (zh) 一种用于确定电力系统的次同步振荡扰动源的方法及装置
CN103983451A (zh) 次同步振荡系统阻尼的在线测量方法
Bliznyuk et al. Defining the damping properties of synchronous generator using disturbance measurements
Xie et al. Identifying torsional modal parameters of large turbine generators based on the supplementary-excitation-signal-injection test
Yonggang et al. Blade mass imbalance fault diagnosis using rotor and stator current based on coordinate transformation and HED
Wang et al. A novel wind turbine fault diagnosis method based on generator current analysis

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HUABEI POWER UNIV. BEIJING SIFANG JIBAO AUTOMATION

Free format text: FORMER OWNER: HUABEI POWER UNIV.

Effective date: 20141201

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Xiao Yong

Inventor after: Su Jingqi

Inventor after: Chen Jinghua

Inventor after: Zheng Wei

Inventor after: Liang Xinyan

Inventor after: Chang Fujie

Inventor after: Wang Yingying

Inventor after: Xu Meimei

Inventor after: Gu Wei

Inventor after: Li Yongzhong

Inventor after: Shao Mengqiao

Inventor after: Lin Chenghui

Inventor after: Xu Zhenyu

Inventor after: Gao Ziqiang

Inventor after: Zhang Xu

Inventor before: Xiao Yong

Inventor before: Su Jingqi

Inventor before: Chen Jinghua

Inventor before: Xu Meimei

Inventor before: Gu Wei

Inventor before: Li Yongzhong

Inventor before: Shao Mengqiao

Inventor before: Lin Chenghui

Inventor before: Xu Zhenyu

Inventor before: Gao Ziqiang

Inventor before: Zhang Xu

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: XIAO YONG XU MEIMEI GU WEI LI YONGZHONG SHAO MENGQIAO LIN CHENGHUI XU ZHENYU GAO ZIQIANG ZHANG XU SU JINGQI CHEN JINGHUA TO: XIAO YONG XU MEIMEI GU WEI LI YONGZHONG SHAO MENGQIAO LIN CHENGHUI XU ZHENYU GAO ZIQIANG ZHANG XU SU JINGQI CHEN JINGHUA ZHENG WEI LIANG XINYAN CHANG FUJIE WANG YINGYING

TA01 Transfer of patent application right

Effective date of registration: 20141201

Address after: 550001 Jiefang Road, Nanming, Guizhou, No. 32,

Applicant after: Guizhou Power Test Institute

Applicant after: North China Electric Power University

Applicant after: Beijing Sifang Jibao Automation Co., Ltd.

Address before: 550001 Jiefang Road, Nanming, Guizhou, No. 32,

Applicant before: Guizhou Power Test Institute

Applicant before: North China Electric Power University

C14 Grant of patent or utility model
GR01 Patent grant