CN103982198A - 盾构双液浆注浆接头 - Google Patents
盾构双液浆注浆接头 Download PDFInfo
- Publication number
- CN103982198A CN103982198A CN201410166037.1A CN201410166037A CN103982198A CN 103982198 A CN103982198 A CN 103982198A CN 201410166037 A CN201410166037 A CN 201410166037A CN 103982198 A CN103982198 A CN 103982198A
- Authority
- CN
- China
- Prior art keywords
- tee piece
- socket
- hollow
- section
- jurisdiction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000012530 fluid Substances 0.000 title 1
- 239000002002 slurry Substances 0.000 claims abstract description 34
- 235000019353 potassium silicate Nutrition 0.000 claims abstract description 13
- NTHWMYGWWRZVTN-UHFFFAOYSA-N sodium silicate Chemical compound [Na+].[Na+].[O-][Si]([O-])=O NTHWMYGWWRZVTN-UHFFFAOYSA-N 0.000 claims abstract description 13
- 238000003466 welding Methods 0.000 claims description 9
- 239000004568 cement Substances 0.000 claims description 5
- 238000005553 drilling Methods 0.000 claims description 3
- 239000007788 liquid Substances 0.000 abstract description 13
- 238000007569 slipcasting Methods 0.000 abstract description 6
- 239000000203 mixture Substances 0.000 abstract description 4
- 239000002689 soil Substances 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 230000002265 prevention Effects 0.000 description 2
- 230000001360 synchronised effect Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 235000019994 cava Nutrition 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000003673 groundwater Substances 0.000 description 1
- 239000011148 porous material Substances 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
本发明公开了一种盾构双液浆注浆接头,其内丝三通管通过外接头Ⅰ连接中空三通管,所述的中空三通管右侧连接有管片连接头,所述的中空三通管上方设有外接头Ⅱ,外接头Ⅱ上设有用于控制注入水玻璃接口的单向阀,水玻璃管与单向阀连接,通过中空三通管向管片连接头内注入水玻璃;采用此注浆接头,可以有效填充管片与土体之间的孔隙,稳定地层,防止沉降还可以有效缩短双液浆混合距离,使两种浆液快速、均匀的混合,使浆液在管片壁后混合凝固,避免浆液在管道内凝固堵塞管道,从而提高双液浆注浆效果,提高工作效率。
Description
技术领域
本发明涉及一种注浆装置,特别涉及一种盾构双液浆注浆接头。
背景技术
随着我国经济的发展,各主要城市均在建设城市轨道交通工程,区间多采用盾构法施工,盾构二次注浆采用双液浆,双液浆注浆工艺复杂,液浆凝结时间短,经常造成管道堵塞;我公司负责施工成都地铁4号线一期工程土建7标段省文联站~玉双路站盾构区间,左线全长990.637m,右线全长1310.134m,盾构机刀盘直径6280mm,管片外径6000mm,管片拼装完毕之后,脱出盾尾,管片与土体间形成一道环向间隙;同时砂卵石地层在地下水作用下,岩体松散,无胶结,自稳定能力差,刀盘旋转切削时,地层很容易破坏原来的相对稳定或平衡状态,引起较大的地层损失自稳性及差,扰动后极易坍塌;盾构孔隙采用同步注浆填充,浆液采用单液浆,单液浆凝固时间长,在富水砂卵石地层中损失大,无法有效填充孔隙和固定管片,单液浆强度低,不利于隧道管片早期稳定及防渗。为弥补同步注浆的不足,一般再次进行二次注浆填充,浆液采用单液浆和双液浆,单液浆采用存水泥浆,单液浆操作简单,初凝时间长,不利管片的稳定和防渗;双液浆由纯水泥浆和水玻璃混合而成,双液浆凝结时间短,强度高,可以有效稳定管片,防止管片渗漏,单双液浆注浆复杂,注双液浆过程中容易造成管路堵塞,清理比较麻烦。
发明内容
本发明的发明目的是为了克服上述背景技术的缺点,提供一种可以有效填充管片与土体之间的孔隙,稳定地层,防止沉降还可以有效缩短双液浆混合距离的盾构双液浆注浆接头。
本发明的技术方案是:一种盾构双液浆注浆接头,所述的盾构双液浆注浆接头包括:球阀、内丝三通管、单向阀、泄压阀、管片连接头、外接头Ⅰ、外接头Ⅱ、中空三通管,所述的内丝三通管左侧设有球阀,该球阀连接水泥浆注浆管,所述的内丝三通管通过外接头Ⅰ连接中空三通管,所述的中空三通管右侧连接有管片连接头,所述的中空三通管上方设有外接头Ⅱ,外接头Ⅱ上设有用于控制注入水玻璃接口的单向阀,水玻璃管与单向阀连接,通过中空三通管向管片连接头内注入水玻璃。
所述的内丝三通管下方设有泄压阀。注浆过程中,水泥浆注浆压力一般达到0.5MPa,有时瞬间压力更大,防止拆卸管道时伤人,可以通过旁边的泄压阀,卸掉注浆压力,确保了操作人员的安全。
所述的中空三通管长度为89mm,外径为70mm,内径为32mm,所述的中空三通管侧面钻直径15mm孔与内管相通,外侧焊接DN15的外接头Ⅱ,高度18mm;所述的中空三通管一端焊接DN25的外接头Ⅰ,长度为20mm,另一端焊接中空的管片连接头,长度为79mm。
本发明的有益效果是:采用此注浆接头,可以有效填充管片与土体之间的孔隙,稳定地层,防止沉降还可以有效缩短双液浆混合距离,使两种浆液快速、均匀的混合,使浆液在管片壁后混合凝固,避免浆液在管道内凝固堵塞管道,从而提高双液浆注浆效果,提高工作效率。
附图说明
图1为本发明整体结构示意图;
图2为本发明注浆接头结构示意图;
图3为图2中A-A的剖面图;
图4为图2中B-B的剖面图;
其中:1、球阀,2、内丝三通管,3、单向阀,4、管片连接头,5、外接头Ⅰ,6、外接头Ⅱ,7、中空三通管,8、泄压阀。
具体实施方式
本实施例为一种盾构双液浆注浆接头,所述的盾构双液浆注浆接头包括:球阀、内丝三通管、单向阀、泄压阀、管片连接头、外接头Ⅰ、外接头Ⅱ、中空三通管,所述的内丝三通管左侧设有球阀,该球阀连接水泥浆注浆管,所述的内丝三通管通过外接头Ⅰ连接中空三通管,所述的中空三通管右侧连接有管片连接头,所述的中空三通管上方设有外接头Ⅱ,外接头Ⅱ上设有用于控制注入水玻璃接口的单向阀,水玻璃管与单向阀连接,通过中空三通管向管片连接头内注入水玻璃。。
所述的内丝三通管下方设有泄压阀。注浆过程中,水泥浆注浆压力一般达到0.5MPa,有时瞬间压力更大,防止拆卸管道时伤人,可以通过旁边的泄压阀,卸掉注浆压力,确保了操作人员的安全。
所述的中空三通管长度为89mm,外径为70mm,内径为32mm,所述的中空三通管侧面钻直径15mm孔与内管相通,外侧焊接DN15的外接头Ⅱ,高度18mm;所述的中空三通管一端焊接DN25的外接头Ⅰ,长度为20mm,另一端焊接中空的管片连接头,长度为79mm。
Claims (3)
1.一种盾构双液浆注浆接头,其特征是所述的盾构双液浆注浆接头包括:球阀、内丝三通管、单向阀、泄压阀、管片连接头、外接头Ⅰ、外接头Ⅱ、中空三通管,其特征在于所述的内丝三通管左侧设有球阀,该球阀连接水泥浆注浆管,所述的内丝三通管通过外接头Ⅰ连接中空三通管,所述的中空三通管右侧连接有管片连接头,所述的中空三通管上方设有外接头Ⅱ,外接头Ⅱ上设有用于控制注入水玻璃接口的单向阀,水玻璃管与单向阀连接,通过中空三通管向管片连接头内注入水玻璃。
2.根据权利要求1所述的盾构双液浆注浆接头,其特征是所述的内丝三通管下方设有泄压阀。
3.根据权利要求1所述的盾构双液浆注浆接头,其特征是所述的中空三通管长度为89mm,外径为70mm,内径为32mm,所述的中空三通管侧面钻直径15mm孔与内管相通,外侧焊接DN15的外接头Ⅱ,高度18mm;所述的中空三通管一端焊接DN25的外接头Ⅰ,长度为20mm,另一端焊接中空的管片连接头,长度为79mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410166037.1A CN103982198A (zh) | 2014-04-24 | 2014-04-24 | 盾构双液浆注浆接头 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410166037.1A CN103982198A (zh) | 2014-04-24 | 2014-04-24 | 盾构双液浆注浆接头 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103982198A true CN103982198A (zh) | 2014-08-13 |
Family
ID=51274340
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410166037.1A Pending CN103982198A (zh) | 2014-04-24 | 2014-04-24 | 盾构双液浆注浆接头 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103982198A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104879140A (zh) * | 2015-06-18 | 2015-09-02 | 广东济通建设工程有限公司 | 一种浆液混合器 |
CN107676105A (zh) * | 2016-08-02 | 2018-02-09 | 上海力行工程技术发展有限公司 | 一种盾构机注浆防堵构件 |
CN113565519A (zh) * | 2021-08-30 | 2021-10-29 | 中铁隧道股份有限公司 | 同步双液注浆装置及方法 |
CN114517683A (zh) * | 2022-02-28 | 2022-05-20 | 英诺威阀业有限公司 | 一种盾尾双液同步注浆混合器 |
CN114776331A (zh) * | 2022-04-13 | 2022-07-22 | 南京工业大学 | 一种盾构区间管片开口段壁后回填注浆装置及施工方法 |
TWI784775B (zh) * | 2021-10-29 | 2022-11-21 | 潛盾工程有限公司 | 地下工程潛盾隧道建物保護第二次背填灌漿結構 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2190697Y (zh) * | 1993-11-13 | 1995-03-01 | 北京科技大学 | 双泵双液多功能混合器 |
JPH11173072A (ja) * | 1997-12-11 | 1999-06-29 | Ohbayashi Corp | 薬液注入方法及び薬液注入装置 |
JPH11200769A (ja) * | 1998-01-09 | 1999-07-27 | Aktio Corp | 泥水管用三方切替え弁 |
CN201763349U (zh) * | 2010-09-17 | 2011-03-16 | 中铁十九局集团轨道交通工程有限公司 | 双液注浆装置 |
CN202250100U (zh) * | 2011-06-24 | 2012-05-30 | 北京市三一重机有限公司 | 一种盾构机超前注浆设备 |
CN203170233U (zh) * | 2013-04-03 | 2013-09-04 | 巴斯夫浩珂矿业化学(中国)有限公司 | 化学注浆用混合枪 |
CN204024663U (zh) * | 2014-04-24 | 2014-12-17 | 中铁四局集团第二工程有限公司 | 盾构双液浆注浆接头 |
-
2014
- 2014-04-24 CN CN201410166037.1A patent/CN103982198A/zh active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2190697Y (zh) * | 1993-11-13 | 1995-03-01 | 北京科技大学 | 双泵双液多功能混合器 |
JPH11173072A (ja) * | 1997-12-11 | 1999-06-29 | Ohbayashi Corp | 薬液注入方法及び薬液注入装置 |
JPH11200769A (ja) * | 1998-01-09 | 1999-07-27 | Aktio Corp | 泥水管用三方切替え弁 |
CN201763349U (zh) * | 2010-09-17 | 2011-03-16 | 中铁十九局集团轨道交通工程有限公司 | 双液注浆装置 |
CN202250100U (zh) * | 2011-06-24 | 2012-05-30 | 北京市三一重机有限公司 | 一种盾构机超前注浆设备 |
CN203170233U (zh) * | 2013-04-03 | 2013-09-04 | 巴斯夫浩珂矿业化学(中国)有限公司 | 化学注浆用混合枪 |
CN204024663U (zh) * | 2014-04-24 | 2014-12-17 | 中铁四局集团第二工程有限公司 | 盾构双液浆注浆接头 |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104879140A (zh) * | 2015-06-18 | 2015-09-02 | 广东济通建设工程有限公司 | 一种浆液混合器 |
CN107676105A (zh) * | 2016-08-02 | 2018-02-09 | 上海力行工程技术发展有限公司 | 一种盾构机注浆防堵构件 |
CN107676105B (zh) * | 2016-08-02 | 2020-01-14 | 上海力行工程技术发展有限公司 | 一种盾构机注浆防堵构件 |
CN113565519A (zh) * | 2021-08-30 | 2021-10-29 | 中铁隧道股份有限公司 | 同步双液注浆装置及方法 |
TWI784775B (zh) * | 2021-10-29 | 2022-11-21 | 潛盾工程有限公司 | 地下工程潛盾隧道建物保護第二次背填灌漿結構 |
CN114517683A (zh) * | 2022-02-28 | 2022-05-20 | 英诺威阀业有限公司 | 一种盾尾双液同步注浆混合器 |
CN114776331A (zh) * | 2022-04-13 | 2022-07-22 | 南京工业大学 | 一种盾构区间管片开口段壁后回填注浆装置及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103982198A (zh) | 盾构双液浆注浆接头 | |
CN104534167B (zh) | 触变泥浆的减阻方法 | |
CN107120121B (zh) | 一种盾构施工实时补充注浆防沉降控制方法 | |
CN103899323B (zh) | 一种盾构穿越铁路站场的施工方法 | |
CN107842374B (zh) | 用于上软下硬富水地层的盾构新型惰性浆液及组合注浆工艺 | |
CN103277120A (zh) | 一种非全深冻结立井解冻后的涌水防治方法 | |
CN105174886B (zh) | 一种适用于超长距离泵送的灰岩含水层注浆改造材料 | |
CN204024663U (zh) | 盾构双液浆注浆接头 | |
CN105386435B (zh) | 一种用于水泥与水玻璃溶液的双液注浆系统及其施工工艺 | |
CN101793154A (zh) | 利用隧道围岩地质参数和设置分流孔的注浆堵水方法 | |
CN109681236A (zh) | 大断面富水砂层盾构掘进同步注浆方法 | |
CN103866780A (zh) | 一种在岩溶管道渗漏区进行快速防渗帷幕灌浆的施工方法 | |
CN205422773U (zh) | 一种新型中空注浆锚杆 | |
CN103396065A (zh) | 一种盾构施工控制用同步注浆浆液及其注浆方法 | |
CN203669876U (zh) | 无端头加固盾构接收结构 | |
CN104481555A (zh) | 一种穿过软弱围岩进行钻注注浆施工的方法 | |
CN204456124U (zh) | 一种多次压力注浆管 | |
CN102731035A (zh) | 一种触变性盾构壁后注浆液 | |
CN105569045A (zh) | 一种注浆管 | |
CN106593489A (zh) | 一种难采煤层底板薄层灰岩高压强含水层岩溶裂隙骨料灌注方法 | |
CN204533836U (zh) | 管道穿楼板防渗漏装置 | |
CN106085387A (zh) | 一种用于膨胀性地层顶管的泥浆及其制备方法 | |
CN203603155U (zh) | 新型双液注浆端头混合装置 | |
CN201635765U (zh) | 用于高速公路下伏采空区的投沙器 | |
CN209384238U (zh) | 一种注浆系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140813 |