CN103955617B CN201410191270.5A CN201410191270A CN103955617B CN 103955617 B CN103955617 B CN 103955617B CN 201410191270 A CN201410191270 A CN 201410191270A CN 103955617 B CN103955617 B CN 103955617B
Authority
CN
China
Prior art keywords
chassis
separate unit
concrete
unit car
time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410191270.5A
Other languages
Chinese (zh)
Other versions
CN103955617A (en
Inventor
江海
王奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Gezhouba Group Construction Engineering Co ltd
Original Assignee
China Gezhouba Group No 6 Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group No 6 Engineering Co Ltd filed Critical China Gezhouba Group No 6 Engineering Co Ltd
Priority to CN201410191270.5A priority Critical patent/CN103955617B/en
Publication of CN103955617A publication Critical patent/CN103955617A/en
Application granted granted Critical
Publication of CN103955617B publication Critical patent/CN103955617B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

A method for calculating the optimal quantity of steel mould lining trolleys comprises the following steps: decomposing each working procedure of lining construction and determining the time required by a single working procedure; determining the lowest cycle process time t1 of the single trolley; determining the construction process time t2 which cannot be parallel in the single trolley cycle process time; and determining the optimal trolley number (= { t1/t2 }. The method for calculating the optimal quantity of the steel mould lining trolleys realizes the purposes of optimal construction efficiency of a plurality of trolleys and highest equipment utilization rate.

Description

A kind of punching block lining trolley optimal number computational methods
Technical field
A kind of punching block lining trolley optimal number computational methods of the present invention, carry out lining cutting and apply simultaneously for many chassis of long tunnel Man-hour telescoping steel form optimal number is calculated.
Background technology
In the processs of construction such as China's water power, traffic, it is frequently encountered first excavation and completes and then carry out concrete-lined Tunnel.Wherein lining concrete construction speed is one kind of FAQs more slowly.Increase chassis quantity and be to speed up progress One of modal method.But the increase of chassis quantity can cause to be interfered between each chassis, cause work efficiency to reduce.And And increasing with chassis quantity, auxiliary facility can be caused to meet the requirement of chassis construction speed, the chassis work holdup is caused, affect Efficiency of construction.How chassis quantity is reasonably arranged, reach the purpose of economical and efficient, be the weight in lining concrete detail design Want content.
The content of the invention
The technical problem to be solved is to provide a kind of punching block lining trolley optimal number computational methods, to realize Many chassis construction efficiency optimums and utilization rate of equipment and installations supreme good.
The technical scheme that the present invention takes is:A kind of punching block lining trolley optimal number computational methods, comprise the following steps:
Step 1:The time required to decomposing each operation of lining construction and determining single operation;
Step 2:Determine the minimum circulating process time t1 of separate unit car;
Step 3:Determining cannot parallel construction activity time t2 in the separate unit car circulating process time;
Step 4:It is determined that optimal chassis quantity=└ t1/t2 ┘.
A kind of punching block lining trolley optimal number computational methods, need not consider concrete process flow arrangement in calculating process.
Whole technological process is divided into the operation and the minimum circulating process two parts of separate unit car not limited by chassis use, no The operation limited by chassis use, constructs in advance during construction depending on actual conditions, does not enter calculating.
The minimum circulating process of separate unit car is divided into can parallel construction operation and cannot parallel construction operation, it is impossible to parallel construction work Sequence because take public resource must carry out by chassis by storehouse, can parallel construction operation by rational construction procedure in other chassis The minimum circulating process of separate unit car is carried out during carrying out.
The minimum circulating process of separate unit car:Pour in circulation in Dan Cang, it is necessary to occupy whole operations that chassis could construct With, the minimum circulating process of separate unit car of the present invention, comprising:Chassis position in storehouse is checked and accepted, chassis walking and formwork erection, concrete treat it is strong and Form removal, concrete cast.
Can parallel construction operation:Refer to that in the minimum circulation technology of bicycle, when the operation is carried out, other chassis also can be same The operation of Shi Jinhang same processes, it is of the present invention can parallel construction operation, comprising:Chassis position in storehouse is checked and accepted, chassis is walked and vertical Mould, concrete treat strong and form removal.
Cannot parallel construction operation:Refer to that, when the operation is carried out, other chassis cannot be same in the minimum circulation technology of bicycle The operation of Shi Jinhang identical operations, it is of the present invention cannot parallel construction operation include:Concrete is poured into a mould.
Can parallel construction operation other minimum circulating processes of chassis separate unit car be arranged in by rational construction carry out process In carry out.Under normal conditions and in embodiment, i.e., the position in storehouse examination of any chassis, chassis are walked and formwork erection, concrete are treated Strong and form removal can carry out position in storehouse examination, chassis walking and formwork erection, concrete and treat that strong and form removal, concrete are poured into a mould in other chassis Carry out simultaneously in time period, the same time can only at most have a chassis to carry out concrete cast.
Nothing in punching block lining trolley optimal number=separate unit car minimum circulating process time t1/ separate unit car circulating process time Method parallel construction activity time t2.
Quotient rounds up can cause chassis to leave unused, corollary equipment work is not full.Rounding downwards can cause corollary equipment Idle, chassis work is not full.In view of situations such as maintaining, punching block lining trolley optimal number is rounded downwards.
A kind of punching block lining trolley optimal number computational methods of the present invention, have gathered the think of of parallel operations and cross construction Think, by division and classification to operation, on the premise of having independently working condition operation in advance, during with separate unit car work cycle Between and the concrete that wherein can only pour into a mould by car by storehouse pour into a mould operation and go out optimal chassis quantity for core calculations, entirely calculating The impact that concrete process flow is arranged need not be considered in journey.
Specific embodiment
A kind of punching block lining trolley optimal number computational methods, comprise the following steps:
1) the time required to, decomposing each operation of lining construction and determining single operation:
According to lining concrete construction technology process, whole technological process is decomposed into successively:Floor (inverted arch) concrete Cast, side and roof arch reinforcing bar system peace, concrete pump in place, position in storehouse examination, chassis walking and formwork erection, concrete cast, coagulation Soil treats strong and form removal, the time required to then calculating single operation according to physical device ability and labour, also can be by actual survey Calculate and obtain;
2) the minimum circulating process time t1 of separate unit car, is determined:
The workload of each punching block lining trolley is identical, can complete independently and by the construction constraint of other chassis with separate unit car With all process steps for limiting as the minimum circulating process of separate unit car, it is included, and position in storehouse is checked and accepted, chassis walking and formwork erection, concrete are poured Note, concrete treat strong and form removal, and separate unit car minimum circulating process time t1 as appeals four activity time sums;
3), determining cannot parallel construction activity time t2 in the separate unit car circulating process time:
In separate unit car circulating process cannot parallel construction operation be concrete cast, in the order chassis circulating process time Cannot parallel construction activity time t2 be single storehouse concrete duration of pouring;
4) optimal chassis quantity, is determined:
When concrete cast is ceaselessly carried out in whole t1 time ranges, the efficiency highest of chassis.Therefore, optimal platform Car quantity=└ t1/t2 ┘.I.e. optimal chassis quantity is:When separate unit car minimum circulating process time t1 is with separate unit car circulating process Between in cannot parallel construction activity time t2 business and round downwards.
Embodiment:
a:The time required to decomposing each operation of lining construction and determining single operation;The cast of floor (inverted arch) concrete, side Crown reinforcing bar system peace, concrete pump are in place, position in storehouse is checked and accepted:0.5h, chassis walking and formwork erection:10h, concrete cast:8h、 Concrete treats strong and form removal:18h;
b:The minimum circulating process time t1 of separate unit car is calculated by below equation:
T1=positions in storehouse reception time+chassis walking and the formwork erection time+concrete duration of pouring+concrete are when strong and form removal Between;
That is 0.5h+10h+8h+18h=36.5h;
c:Cannot parallel construction activity time t2 in calculating the separate unit car circulating process time by below equation:
The t2=concrete durations of pouring=8h;
d:Optimal chassis quantity is calculated by below equation:
Optimal chassis quantity=└ t1/t2 ┘=└ 36.5h/8h ┘=4.

Claims (2)

1. a kind of punching block lining trolley optimal number computational methods, it is characterised in that comprise the following steps:
Step 1:The time required to decomposing each operation of lining construction and determining single operation;
According to lining concrete construction technology process, whole technological process is decomposed into successively:Floor concrete cast, side and roof arch Reinforcing bar system peace, concrete pump are in place, position in storehouse is checked and accepted, chassis is walked and formwork erection, concrete are poured into a mould, concrete is treated strong and torn open Mould, the time required to then calculating single operation according to physical device ability and labour, also can be obtained by actual measuring and calculating;
Step 2:Determine the minimum circulating process time t1 of separate unit car;
The workload of each punching block lining trolley is identical, complete independently and by other chassis construction constraint and can not limited with separate unit car The all process steps of system as the minimum circulating process of separate unit car, its include position in storehouse check and accept, chassis walking and formwork erection, concrete cast, Concrete treats strong and form removal, and separate unit car minimum circulating process time t1 as appeals four activity time sums;
Step 3:Determining cannot parallel construction activity time t2 in the separate unit car circulating process time;
In separate unit car circulating process cannot parallel construction operation be concrete cast, cannot in the order chassis circulating process time Parallel construction activity time t2 is single storehouse concrete duration of pouring;
Step 4:Determine chassis optimal number=└ t1/t2 ┘;
When concrete cast is ceaselessly carried out in whole t1 time ranges, the efficiency highest of chassis, optimal chassis quantity= └t1/t2┘;I.e. optimal chassis quantity is:Cannot in separate unit car minimum circulating process time t1 and separate unit car circulating process time The business of parallel construction activity time t2 simultaneously rounds downwards.
2. a kind of punching block lining trolley optimal number computational methods according to claim 1, it is characterised in that by whole technique Flow process is divided into the operation and the minimum circulating process two parts of separate unit car not limited by chassis use, the work not limited by chassis use Sequence, constructs in advance during construction depending on actual conditions, does not enter calculating;
The minimum circulating process of separate unit car is divided into can parallel construction operation and cannot parallel construction operation, it is impossible to parallel construction operation because Take public resource must carry out by chassis by storehouse, can parallel construction operation cannot in other chassis by rational construction procedure Parallel construction operation is carried out during carrying out.
CN201410191270.5A 2014-05-08 2014-05-08 Method for calculating optimal quantity of steel mould lining trolleys Active CN103955617B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410191270.5A CN103955617B (en) 2014-05-08 2014-05-08 Method for calculating optimal quantity of steel mould lining trolleys

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410191270.5A CN103955617B (en) 2014-05-08 2014-05-08 Method for calculating optimal quantity of steel mould lining trolleys

Publications (2)

Publication Number Publication Date
CN103955617A CN103955617A (en) 2014-07-30
CN103955617B true CN103955617B (en) 2017-04-12

Family

ID=51332892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410191270.5A Active CN103955617B (en) 2014-05-08 2014-05-08 Method for calculating optimal quantity of steel mould lining trolleys

Country Status (1)

Country Link
CN (1) CN103955617B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103470272A (en) * 2013-10-11 2013-12-25 北京住总集团有限责任公司 Trolley for concrete construction on multiple sections by employing mining method and construction method thereof
CN203394540U (en) * 2013-07-25 2014-01-15 成都锐龙机械制造有限公司 Suspension overturning inverted arch formwork trolley for tunnels
CN103577952A (en) * 2012-07-26 2014-02-12 丰田自动车株式会社 Transportation planning formulation device and transportation planning formulation method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103577952A (en) * 2012-07-26 2014-02-12 丰田自动车株式会社 Transportation planning formulation device and transportation planning formulation method
CN203394540U (en) * 2013-07-25 2014-01-15 成都锐龙机械制造有限公司 Suspension overturning inverted arch formwork trolley for tunnels
CN103470272A (en) * 2013-10-11 2013-12-25 北京住总集团有限责任公司 Trolley for concrete construction on multiple sections by employing mining method and construction method thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中天山特长隧道敞开式TBM掘进与二次衬砌同步施工技术;李宏亮;《现代隧道技术》;20100430;第47卷(第2期);第63-67页 *
全圆断面针梁式钢模台车在察汗乌苏水电站洞室混凝土衬砌中的应用;吴远亮等;《水利水电技术》;20080415;第39卷(第4期);第63-72页 *

Also Published As

Publication number Publication date
CN103955617A (en) 2014-07-30

Similar Documents

Publication Publication Date Title
CN202450774U (en) Shaft template of small-step-pitch self-climbing elevator
CN105888294A (en) Construction method for reversely removing floor slab by using chain saw
CN203213402U (en) Steel pipe column used for concrete pouring
CN103955617B (en) Method for calculating optimal quantity of steel mould lining trolleys
CN103953362A (en) Clearance-free strengthening system for serious cracks of existing tunnel arch lining
CN204163342U (en) A kind of pipe-hanging hook for tread air channel, station of constructing
CN203835403U (en) Clearance strengthening system for serious cracking of existing tunnel lining arch
CN105568856B (en) A kind of dilute cable stayed-cable bridge Suo Liang method for synchronously constructing
CN103645948B (en) Dependency-based parallel computing method for intensive data
CN106193279B (en) Time building method of main structure wall prestressed structure and main structure wall
CN202227705U (en) Stretching device
CN203248173U (en) Detachable trestle for pouring tunnel inverted arch concrete
CN103646186B (en) The analysis method of vibrator work efficiency in concrete construction
CN206581952U (en) Open trench tunnel reinforcing steel bar-binding bench rack device
CN202809905U (en) Tie bar structure of steel-plate shear wall
CN204001749U (en) One can realize exterior wall and be inverted construction equipment
CN204977005U (en) Small -size prefabricated component drawing of patterns frame
CN205500628U (en) Climb in tower crane and install conversion equipment who climbs between roof beam and bracket
Kim et al. A productivity analysis of tower crane installation progress based on simulation technique
CN204699989U (en) Geotechnique's cutting ring cleaning machine
CN206090330U (en) Arch gate pier bent cap construction equipment
CN206840364U (en) A kind of Special vibrator of prefabricated highway earth shoulder shoulder protector plate
CN204676431U (en) Highway crash wall construction formwork installation carriage
CN104384404A (en) Reinforcement cage lengthening construction method and temporary fixing hook
CN205024573U (en) Concrete trowelling machine that vibrates fast

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: Guandu District of Yunnan city in Kunming province 650206 New Asia sports star city international headquarters base business district office building 19

Applicant after: CHINA GEZHOUBA GROUP NO.6 ENGINEERING CO., LTD.

Address before: 443002 Xiling, Hubei Province sheep mountain road, No. 29, No.

Applicant before: Gezhouba Group No.6 Engineering Co., Ltd.

GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 650217 Building 2, class E industrial building, International Jewelry City (No. 31, Shuntong Avenue), Kunming Export Processing Zone, Kunming Economic and Technological Development Zone, Yunnan Province

Patentee after: China Gezhouba Group Construction Engineering Co.,Ltd.

Address before: 650206 building 19, business office area, Xingdu international headquarters base, New Asia Sports City, Guandu District, Kunming City, Yunnan Province