CN103939135A - Rapid construction method for support dismantling channel of fully mechanized coal mining face - Google Patents

Rapid construction method for support dismantling channel of fully mechanized coal mining face Download PDF

Info

Publication number
CN103939135A
CN103939135A CN201410191621.2A CN201410191621A CN103939135A CN 103939135 A CN103939135 A CN 103939135A CN 201410191621 A CN201410191621 A CN 201410191621A CN 103939135 A CN103939135 A CN 103939135A
Authority
CN
China
Prior art keywords
support
hydraulic support
coal
frame
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410191621.2A
Other languages
Chinese (zh)
Other versions
CN103939135B (en
Inventor
马立强
金志远
王强
王广
王飞
孙海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology CUMT
Original Assignee
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology CUMT filed Critical China University of Mining and Technology CUMT
Priority to CN201410191621.2A priority Critical patent/CN103939135B/en
Publication of CN103939135A publication Critical patent/CN103939135A/en
Application granted granted Critical
Publication of CN103939135B publication Critical patent/CN103939135B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a rapid construction method for a support dismantling channel of a fully mechanized coal mining face. The rapid construction method is applicable to construction of the dismantling channel of the fully mechanized coal mining face under the coal mine hard roof geological condition. The method comprises the steps that a roof is weakened, and when it is guaranteed that the distance from the front canopy end of a hydraulic support to a mining stop line reaches the designed width of the support dismantling channel, the hard roof is cracked at the tail end of a top beam of the hydraulic support; when the distance from the front canopy end of the hydraulic support to the mining stop line reaches the designed width of the support dismantling channel, support transfer is stopped, and accordingly the hydraulic support reaches a setting load; under the supporting and protecting function of the hydraulic support, the mine ground pressure borne by the support dismantling channel is reduced obviously, and thus surrounding rock control over the support dismantling channel can be better achieved. A coal face inclined cutting feeding mode is adopted, coal bodies in the support dismantling channel can be extracted gradually, the roof is supported and protected, the steps are executed repeatedly, and finally construction of the entire support dismantling channel is achieved by continuously extending in the working face machine tail direction. The method is easy to operate, safe and reliable, high in efficiency, and capable of accelerating the construction progress of the support dismantling channel remarkably and shortening the working face moving time.

Description

A kind of fully-mechanized mining working is removed frame passage rapid constructing method
Technical field
The present invention relates to fully-mechanized mining working and remove frame passage rapid constructing method, especially a kind of tight roof fully-mechanized mining working being applicable under tight roof geological conditions is removed frame passage rapid constructing method.
Background technology
The develop rapidly of modern science and technology is that coal in China industry has been brought boundless vital force, raising along with coal industry technical level, large quantities of Modern Pits with high content of technology, that production efficiency is high, good in economic efficiency are successively constructed and put into operation, greatly promote coal industry integral production level, fully mechanized coal winning technology becomes coal mining main flow.
Can the removal of home preparation of fully-mechanized mining working be that can a n-th-trem relation n to ore deposit complete normal production and take over, realize the important process of stable and high yields.The continual and steady sound development that it is produced for mine has very important strategic importance, says to a certain extent, has done a good job of it the removal of home preparation of fully-mechanized mining working, also, with regard to having created good condition for the safety in production of mine, has established solid foundation.Wherein, remove frame passage and be the necessary condition that guarantees that working face equipment is withdrawn from smoothly, and the rapid construction of removing frame passage can promote that digging operation is normally connected.
At present, China's fully-mechanized mining working is removed the formation of frame passage and is mainly contained 2 kinds of modes: first kind of way is to excavate in advance return channel, and the direct admission passage of support withdraws; The second way is when support is shifted withdrawing position onto, by coal-winning machine coal cutting, and sets anchor pole, anchor cable, forms return channel.
Excavate in advance and remove frame passage and have in advance construction, driving is subject to the advantages such as external influence factor is less with supporting.But due in working face extraction process, stand the once impact of leading bearing pressure, need to install the maintenance that brettis is strengthened passage, simultaneously leading bearing pressure will make passage before perforation, produce gross distortion, cause and remove frame channel space deficiency, affect hydraulic support withdrawing efficiency, remove frame space availability ratio low; And due to the existence of brettis, also can affect rack restoring efficiency; Simultaneously driving is removed frame passage and is also needed the ventilation resource outside occupying volume in advance.What adopt that the second way forms removes frame passage, have and not affected by leading bearing pressure, surrouding rock stress is less, need not set up brettis, can use transportation and the ventilation system of coal-face, and utilize hydraulic support to carry out temporary lining to top board simultaneously, the advantage such as number that per tour can be constructed is simultaneously more, but also there is following shortcoming: remove the impact that lives through leading bearing pressure before frame passage forms, the rib scope of meeting head on is larger, to rib, need take corresponding anti-slabbing measure; Coal wall caving is serious, and need under hydraulic support, to top board, set anchor pole (rope) controlroof, and frame passage impact construction is removed in impact, and has hidden danger.Meanwhile, roofbolt anchor cable is constructed under support, impact construction.
Summary of the invention
Technical problem: the object of the invention is to overcome the deficiency that existing fully-mechanized mining working is removed frame channel construction method, provide the tight roof fully-mechanized mining working that a kind of method is simple, safe and reliable, efficiency is high to remove frame passage rapid constructing method.
Technical scheme: tight roof fully-mechanized mining working of the present invention is removed frame passage rapid constructing method, comprises the steps:
A, employing hydraulic fracture or presplitting technique weaken top board in two stope drift active workings at coal-face rear, guarantee that hydraulic support forestope end reaches and removes frame channels designs width b apart from the distance of stopping adopting line, makes tight roof rupture at hydraulic support top beam end;
B, when the forestope end of hydraulic support reaches while removing frame channels designs width b apart from the distance of stopping adopting line, stop moving frame, and make hydraulic support reach setting load;
C, the attachment pegs that drag conveyor is connected with hydraulic support are removed, and with hydraulic prop, replace the connecting rod between drag conveyor and hydraulic support, by hydraulic prop, pass drag conveyor;
D, the coal-winning machine on riding over drag conveyor move to middle part and cut sth. askew feed starting point during apart from the distance L of head, and to handpiece of scraper conveyer direction, according to the coal-face middle part tool feeding method of cutting sth. askew, progressively the coal body in frame passage is removed in back production; Whenever the space width in hydraulic support the place ahead reaches while removing frame channels designs width b, adopt hydraulic prop and large plate-girder to coordinate support pattern in time top board to be carried out to supporting;
E, along with the feed work cycle of repeatedly cutting sth. askew, constantly to working surface tail direction, extend, the complete all coal bodies removed in frame passage of back production, and remove the roof timbering in frame passage, finally complete the construction of removing frame full tunnel.
The described middle part feed starting point of cutting sth. askew is 30~40m apart from the distance L of head, and the feed work cycle of cutting sth. askew number of times is 3~4 times.
Beneficial effect: the present invention has overcome the deficiency that conventional coal-face is removed frame channel construction method, by top board is weakened, hydraulic support forestope end is reached while removing frame channels designs width apart from the distance of stopping adopting line, and tight roof ruptures at hydraulic support top beam end; And when hydraulic support forestope end reaches while removing frame channels designs width apart from the distance of stopping adopting line, stop moving frame, and make hydraulic support reach setting load; Under hydraulic support stand effect, remove the mine pressure that frame passage bears and significantly reduce, be conducive to remove frame passage Surrounding Rock Control.On the other hand, the attachment pegs that drag conveyor is connected with hydraulic support is removed, and with hydraulic prop, replaces the connecting rod between drag conveyor and hydraulic support, by hydraulic prop, passes drag conveyor, according to the tool feeding method of cutting sth. askew in the middle part of coal-face, progressively the coal body in frame passage is removed in back production, whenever the space width in hydraulic support the place ahead reaches while removing frame channels designs width, just adopt hydraulic prop and large plate-girder to coordinate support pattern in time top board to be carried out to supporting, complete and remove frame passage rapid construction once supporting, overcome conventional drawback of removing the supporting repeatedly of repeatedly constructing in frame channel construction method, for example routine is removed 1/3 width of first constructing in frame channel construction method and is removed frame passage, just top board is carried out to supporting, when construction 2/3 width is removed frame passage, again top board is carried out to supporting, when construction complete design width is removed frame passage, finally top board is carried out to supporting, frame passage construction progress is removed in the repeatedly supporting of repeatedly constructing impact.The present invention is simple to operate, safe and reliable, and efficiency is high, has practicality and generalization widely.
Accompanying drawing explanation
Fig. 1 is that tight roof fully-mechanized mining working of the present invention is removed frame passage rapid constructing method schematic diagram.
In figure: 1-hydraulic prop, the large plate-girder of 2-, 3-hydraulic support, 4-coal-winning machine, 5-drag conveyor, 6-goaf,
The feed starting point of cutting sth. askew in the middle part of L-is apart from the distance of head, and b-removes frame channels designs width.
The specific embodiment
Below in conjunction with accompanying drawing, embodiments of the invention are further described:
As shown in Figure 1, tight roof fully-mechanized mining working of the present invention is removed frame passage rapid constructing method, and concrete steps are as follows:
A, employing hydraulic fracture or presplitting technique weaken top board in two stope drift active workings at coal-face rear, guarantee that hydraulic support forestope end reaches and removes frame channels designs width b apart from the distance of stopping adopting line, makes tight roof rupture at hydraulic support top beam end;
B, when the forestope end of hydraulic support 3 reaches while removing frame channels designs width b apart from the distance of stopping adopting line, stop moving frame, and make hydraulic support reach setting load;
C, the attachment pegs that drag conveyor 5 is connected with hydraulic support 3 are removed, and the connecting rod of replacing between drag conveyor 5 and hydraulic support 3 with hydraulic prop 1 is passed drag conveyor 5 by hydraulic prop 1;
D, the coal-winning machine on riding over drag conveyor 54 move to middle part and cut sth. askew feed starting point while being 30~40m apart from the distance L of head, and to handpiece of scraper conveyer direction, according to the coal-face middle part tool feeding method of cutting sth. askew, progressively the coal body in frame passage is removed in back production; Whenever the space width in hydraulic support 3 the place aheads reaches while removing frame channels designs width b, adopt hydraulic prop 1 and large plate-girder 2 to coordinate support patterns in time top board to be carried out to supporting;
E, along with 3~4 feed work cycle of cutting sth. askew, constantly to working surface tail direction, extend, the complete all coal bodies removed in frame passage of back production, and remove the roof timbering in frame passage, finally complete the construction of removing frame full tunnel.
Example 1, the average 2.56m of certain Seams thickness, average 4 ° of seam inclination, immediate roof is limestone, average thickness 8.5m, the average 101.6MPa of unidirectional compressive strength, belongs to solidly top board, the long 143.9m of work plane inclination, face roof supporting adopts 4 ZT13200-16/30 type face end supports and 96 ZZ6000-17/32 type supports, and it is 0.6m that coal-winning machine cuts dark.
Remove frame passage enforcement concrete steps as follows:
In a, fully-mechanized mining working exploitation process, in advance in its place ahead two crossheadings, to the long drilled holes of constructing in work plane, adopt directed hydraulic fracturing technology to weaken top board, guarantee that beam-ends before hydraulic support reaches while removing frame channels designs width 2.5m apart from the distance of stopping adopting line, makes tight roof rupture at hydraulic support top beam end;
B, when hydraulic support forestope end reaches while removing frame channels designs width 2.5m apart from the distance of stopping adopting line, stop moving frame, and make it reach setting load;
C, the attachment pegs that drag conveyor is connected with hydraulic support are removed, and with hydraulic prop, replace the connecting rod between drag conveyor 5 and hydraulic support, by hydraulic prop, pass drag conveyor;
D, the empty cutter of coal-winning machine 4 riding on drag conveyor 5 moves to while being 30m~40m apart from the distance L of work plane head, with fluid injection gun to hydraulic prop 1 fluid injection successively within the scope of work plane head 30m~40m, pass drag conveyor, simultaneously according to the tool feeding method of cutting sth. askew in the middle part of coal-face, progressively the coal body in frame passage is removed in back production, complete and cut sth. askew for 4 times after the circulation of feed stoping operation, when the space width in hydraulic support the place ahead reaches while removing frame channels designs width 2.5m, adopt hydraulic prop and large plate-girder to coordinate support pattern in time top board to be carried out to supporting,
E, repeat above step, constantly to working surface tail direction, extend, until the complete all coal bodies removed in frame passage of back production, and remove the roof timbering in frame passage, finally complete the construction of removing frame full tunnel.

Claims (2)

1. fully-mechanized mining working is removed a frame passage rapid constructing method, it is characterized in that, comprises the steps:
A, employing hydraulic fracture or presplitting technique weaken top board in two stope drift active workings at coal-face rear, guarantee that hydraulic support forestope end reaches and removes frame channels designs width b apart from the distance of stopping adopting line, makes tight roof rupture at hydraulic support top beam end;
B, when the forestope end of hydraulic support (3) reaches while removing frame channels designs width b apart from the distance of stopping adopting line, stop moving frame, and make hydraulic support reach setting load;
C, the attachment pegs that drag conveyor (5) is connected with hydraulic support (3) are removed, with hydraulic prop (1), replace the connecting rod between drag conveyor (5) and hydraulic support (3), by hydraulic prop (1), pass drag conveyor (5);
D, the coal-winning machine (4) on riding over drag conveyor (5) move to middle part and cut sth. askew feed starting point during apart from the distance L of head, to handpiece of scraper conveyer direction, according to the tool feeding method of cutting sth. askew in the middle part of coal-face, progressively the coal body in frame passage is removed in back production; Whenever the space width in hydraulic support (3) the place ahead reaches while removing frame channels designs width b, adopt hydraulic prop (1) and large plate-girder (2) cooperation support pattern in time top board to be carried out to supporting;
E, along with the feed work cycle of repeatedly cutting sth. askew, constantly to working surface tail direction, extend, the complete all coal bodies removed in frame passage of back production, and remove the roof timbering in frame passage, finally complete the construction of removing frame full tunnel.
2. tight roof fully-mechanized mining working according to claim 1 is removed frame passage rapid constructing method, it is characterized in that: the described middle part feed starting point of cutting sth. askew is 30~40m apart from the distance L of head, and the feed work cycle of cutting sth. askew number of times is 3~4 times.
CN201410191621.2A 2014-05-07 2014-05-07 A kind of fully-mechanized mining working removes frame passage rapid constructing method Expired - Fee Related CN103939135B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410191621.2A CN103939135B (en) 2014-05-07 2014-05-07 A kind of fully-mechanized mining working removes frame passage rapid constructing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410191621.2A CN103939135B (en) 2014-05-07 2014-05-07 A kind of fully-mechanized mining working removes frame passage rapid constructing method

Publications (2)

Publication Number Publication Date
CN103939135A true CN103939135A (en) 2014-07-23
CN103939135B CN103939135B (en) 2016-03-02

Family

ID=51186981

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410191621.2A Expired - Fee Related CN103939135B (en) 2014-05-07 2014-05-07 A kind of fully-mechanized mining working removes frame passage rapid constructing method

Country Status (1)

Country Link
CN (1) CN103939135B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104847406A (en) * 2015-03-25 2015-08-19 中国矿业大学 Method for fracturing retained filled wall of adjacent coal face
CN106089234A (en) * 2016-07-15 2016-11-09 北京科技大学 A kind of method of distance auxiliary lane multichannel Quick-return fully-mechanized mining working
CN106593529A (en) * 2017-01-24 2017-04-26 四川川煤华荣能源股份有限公司 Forming method for retracting channel of fully mechanized coal mining face device with large dip angle and large mining height
CN109268049A (en) * 2018-08-08 2019-01-25 中国神华能源股份有限公司 Fully-mechanized mining working withdraws method
CN109339789A (en) * 2018-11-30 2019-02-15 山西平阳广日机电有限公司 A kind of support electrohydraulic control system beveling feed control method
CN112065395A (en) * 2020-09-16 2020-12-11 刘雪 Method for quickly withdrawing fully-mechanized coal mining face
CN114352286A (en) * 2021-12-10 2022-04-15 安徽恒源煤电股份有限公司 Quick construction supporting method for fully mechanized coal mining face frame removing channel
CN115199272A (en) * 2022-08-11 2022-10-18 中国矿业大学 Full-life-cycle surrounding rock stability control method for fully-mechanized mining face pre-excavation withdrawal passage

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1482344A (en) * 2002-09-09 2004-03-17 神华集团有限责任公司 Fully-mechanized mining working plane supplementary laneway multiple passage quick-speed moving process
CN2934574Y (en) * 2006-07-21 2007-08-15 兖州煤业股份有限公司 Comprehensive mechanical work face hydraulic prop retreating device
CN101349159A (en) * 2008-08-23 2009-01-21 山西焦煤集团有限责任公司 Method of single channel railless plastic core-rubber-tire vehicle back withdrawing fully-mechanized mining working face
CN101509395A (en) * 2009-03-16 2009-08-19 太原理工大学 The roof caving and tunnel protecting method
CN102094675A (en) * 2010-12-31 2011-06-15 大同煤矿集团有限责任公司 Safe moving and withdrawing method of complex-structured thick coal seam fully mechanized heavy equipment
CN102312676A (en) * 2011-09-26 2012-01-11 山西晋城无烟煤矿业集团有限责任公司 Construction method for high face mining support removing passage under complicated geological condition

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1482344A (en) * 2002-09-09 2004-03-17 神华集团有限责任公司 Fully-mechanized mining working plane supplementary laneway multiple passage quick-speed moving process
CN2934574Y (en) * 2006-07-21 2007-08-15 兖州煤业股份有限公司 Comprehensive mechanical work face hydraulic prop retreating device
CN101349159A (en) * 2008-08-23 2009-01-21 山西焦煤集团有限责任公司 Method of single channel railless plastic core-rubber-tire vehicle back withdrawing fully-mechanized mining working face
CN101509395A (en) * 2009-03-16 2009-08-19 太原理工大学 The roof caving and tunnel protecting method
CN102094675A (en) * 2010-12-31 2011-06-15 大同煤矿集团有限责任公司 Safe moving and withdrawing method of complex-structured thick coal seam fully mechanized heavy equipment
CN102312676A (en) * 2011-09-26 2012-01-11 山西晋城无烟煤矿业集团有限责任公司 Construction method for high face mining support removing passage under complicated geological condition

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
蒋波: "通道法在14313工作面回撤工作中的应用", 《山东煤炭科技》, 15 February 2012 (2012-02-15) *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104847406A (en) * 2015-03-25 2015-08-19 中国矿业大学 Method for fracturing retained filled wall of adjacent coal face
CN106089234A (en) * 2016-07-15 2016-11-09 北京科技大学 A kind of method of distance auxiliary lane multichannel Quick-return fully-mechanized mining working
CN106089234B (en) * 2016-07-15 2018-05-25 北京科技大学 A kind of method of the auxiliary lane multichannel Quick-return fully-mechanized mining working of long range
CN106593529A (en) * 2017-01-24 2017-04-26 四川川煤华荣能源股份有限公司 Forming method for retracting channel of fully mechanized coal mining face device with large dip angle and large mining height
CN109268049A (en) * 2018-08-08 2019-01-25 中国神华能源股份有限公司 Fully-mechanized mining working withdraws method
CN109339789A (en) * 2018-11-30 2019-02-15 山西平阳广日机电有限公司 A kind of support electrohydraulic control system beveling feed control method
CN112065395A (en) * 2020-09-16 2020-12-11 刘雪 Method for quickly withdrawing fully-mechanized coal mining face
CN114352286A (en) * 2021-12-10 2022-04-15 安徽恒源煤电股份有限公司 Quick construction supporting method for fully mechanized coal mining face frame removing channel
CN115199272A (en) * 2022-08-11 2022-10-18 中国矿业大学 Full-life-cycle surrounding rock stability control method for fully-mechanized mining face pre-excavation withdrawal passage
CN115199272B (en) * 2022-08-11 2023-07-18 中国矿业大学 Full life cycle surrounding rock stability control method for fully mechanized mining face pre-digging retracting channel

Also Published As

Publication number Publication date
CN103939135B (en) 2016-03-02

Similar Documents

Publication Publication Date Title
CN103939135B (en) A kind of fully-mechanized mining working removes frame passage rapid constructing method
CN103306714B (en) Coal seam group with near interval Di Chou holes in lane the mash gas harnessing method in a hole three
CN100580219C (en) Underground no pillar recovery method of coal mine
CN104234749B (en) A kind of fully-mechanized mining working big cross section return channel surrounding rock control method
CN102644476B (en) Method for pumping gas of protected layer by layer penetration and hole drilling on high-position drilling fields of protecting layer machinery tunnel
CN104088638B (en) Large-inclination-angle coal bed longwell large-mining-height working surface coal wall caving and roof fall control technology
CN101725352A (en) Method for filling solid and fully mechanizing and recovering room type coal pillar
CN105952453B (en) Longwell protrusive working face of coal seam mechanization exploits complete set of equipments without lane
CN103775117B (en) Face gear cash is cut top and is hung mould gob side entry retaining hydraulic support
CN103016053A (en) Method of local filling to control surface subsidence in gob
CN104632219A (en) Large mining height gob-side entry retaining method for thick coal seams
CN101608552A (en) The seat earth aquifer reinforces and protects the method for water barrier in reinforcing process
CN103104260B (en) Under complex geological condition, comprehensive-machine is to hand-pulled noodles coal-mining method
CN105484790A (en) Method for promoting gas extraction and working face dust fall by injecting water at intervals in drilling holes
CN103362539A (en) Method for extracting pressure relief gas by retained roadway drill site drilling
CN102418525B (en) Soft coal seam long-wall high-mining-height comprehensive mechanized coal mining end mining method
CN101498216A (en) Thick coal seam large height workface step coal wall coal mining method
CN103498680A (en) Method for increasing top-coal recovery rate in primary mining period of fully-mechanized caving face
CN104074538A (en) Primary extraction working face high-level suction tunnel gas extraction method
CN102966359A (en) Working face ventilation oxidization zone roof control method
CN101718209B (en) Processing method of passing sunk pillars on full-mechanized mining working face
CN104895592A (en) Fully-mechanized coal mining and caving face support retracement supporting method
CN109630168A (en) Comprehensive extracting and caving face tunnel is arranged along floor strata and support pattern
CN204627657U (en) Coal mine gas ground extraction casing programme
CN104533419A (en) Method for partial recovery of residual coal from wide coal pillar

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160302

Termination date: 20190507

CF01 Termination of patent right due to non-payment of annual fee