CN103938872A - 混凝土竖直墙面钢筋保护层限位装置及限位方法 - Google Patents

混凝土竖直墙面钢筋保护层限位装置及限位方法 Download PDF

Info

Publication number
CN103938872A
CN103938872A CN201410131764.4A CN201410131764A CN103938872A CN 103938872 A CN103938872 A CN 103938872A CN 201410131764 A CN201410131764 A CN 201410131764A CN 103938872 A CN103938872 A CN 103938872A
Authority
CN
China
Prior art keywords
limiting
concrete
limiting drum
wire rope
inverted
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410131764.4A
Other languages
English (en)
Other versions
CN103938872B (zh
Inventor
刘忠友
张巍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
CCCC Highway Long Bridge Construction National Engineering Research Center Co Ltd
Original Assignee
No3 Engineering Co Ltd Of Cccc Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by No3 Engineering Co Ltd Of Cccc Second Harbor Engineering Co filed Critical No3 Engineering Co Ltd Of Cccc Second Harbor Engineering Co
Priority to CN201410131764.4A priority Critical patent/CN103938872B/zh
Publication of CN103938872A publication Critical patent/CN103938872A/zh
Application granted granted Critical
Publication of CN103938872B publication Critical patent/CN103938872B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

本发明公开了一种混凝土竖直墙面钢筋保护层限位装置,包括数个并排设置在模板外侧的倒L形支架,设置在模板和钢筋笼的横向钢筋之间且与倒L形支架数量相同的限位筒,钢丝绳手扳葫芦上端挂钩悬挂在倒L形支架顶端下,下端吊钩通过牵引钢丝绳与限位钢筒上端的锥形盖帽连接。本发明还公开了限位装置的限位方法,1)将限位筒放置在钢筋笼与模板之间,2)在模板外侧并排设置数个顶端悬挂了钢丝绳手扳葫芦的倒L形支架,3)将牵引钢丝绳上下端分别连接钢丝绳手扳葫芦及限位筒的顶端,4)浇筑混凝土直至充满混凝土保护层。本发明的限位装置结构简单、使用方便,本发明的限位方法降低了施工成本,提高了施工效率。

Description

混凝土竖直墙面钢筋保护层限位装置及限位方法
技术领域
本发明涉及一种浇筑竖直墙面混凝土的施工装置,尤其是一种确保钢筋笼外侧混凝土具有所需厚度的装置,还涉及这种施工装置的限位方法,属于建筑施工技术领域。
背景技术
    在混凝土浇筑施工中,为了保证钢筋笼外侧混凝土具有所需的钢筋保护层厚度,一般采用多块具有所需厚度的混凝土垫块或塑料垫块均匀固定在钢筋笼最外侧的钢筋上。由于混凝土垫块或塑料垫块是用细铁丝捆绑在钢筋上,这样的结构虽然可以在表面上保证了钢筋的保护层厚度,但由于细铁丝占有一定厚度的缘故,实际上减小了钢筋保护层的厚度。这种结构及限位方法不但浪费材料,而且施工效率低、费工费时。
发明内容
   本发明的目的是提供一种结构简单、提高施工效率并能达到钢筋保护层厚度的混凝土竖直墙面钢筋保护层限位装置及限位方法。
本发明通过以下技术方案予以实现:
一种混凝土竖直墙面钢筋保护层限位装置,包括数个并排设置在模板外侧的倒L形支架,设置在模板和钢筋笼的横向钢筋之间且与倒L形支架数量相等的限位筒,所述限位筒上端设有锥形盖帽;钢丝绳手扳葫芦上端挂钩通过卡环悬挂在倒L形支架顶端下,钢丝绳手扳葫芦下端牵引钢丝绳与限位钢筒上端的锥形盖帽连接。
    本发明的目的还可以通过以下技术措施来进一步实现。
前述的混凝土竖直墙面钢筋保护层限位装置,其中所述限位筒直径D=50~100mm,长度L=580~620mm。
前述的混凝土竖直墙面钢筋保护层限位装置,其中限位筒长度方向搭接钢筋笼至少上下三层横向钢筋。
    前述的混凝土竖直墙面钢筋保护层限位装置,其中数个并排限位筒之间的水平距离A为1500~2000mm。
    一种混凝土竖直墙面钢筋保护层限位装置的限位方法,包括以下步骤:
1)在完成钢筋笼绑扎后,先将限位筒放置在钢筋笼与模板之间,然后支起模板,限位筒直径应比钢筋笼的横向钢筋与模板之间设计距离B大2~5mm;
    2)在模板外侧并排设置数个倒L形支架,并在每个倒L形支架顶端下悬挂钢丝绳手扳葫芦;
    3)将牵引钢丝绳上下端分别连接钢丝绳手扳葫芦及限位筒的锥形盖帽顶端,浇筑混凝土前应扳动手扳葫芦使限位筒下端离开底面H=280~320mm;
    4)浇筑混凝土直至混凝土充满模板和钢筋笼的横向钢筋外侧之间的混凝土保护层,在浇筑完的混凝土顶面与限位筒的锥形盖帽顶端距离B达180~220mm时,正向扳动钢丝绳手扳葫芦,使钢丝绳手扳葫芦下端吊钩带动限位筒上升,然后继续浇筑混凝土;
    5)多次重复步骤4)的过程,直至完成全部混凝土的浇筑。
     本发明的限位装置结构简单、使用方便,并排设置在模板和钢筋笼横向钢筋外侧之间的数个限位筒确保了钢筋笼横向钢筋外侧的保护层厚度。本发明通过钢丝绳手扳葫芦拉动限位筒上升的限位方法使得在浇筑和振捣过程中钢筋笼横向钢筋外侧的混凝土保护层随之上升,在施工过程中动态保持了保护层厚度。 本发明的限位方法降低了施工成本,提高了施工效率。
本发明的优点和特点,将通过下面优选实施例的非限制性说明进行图示和解释,这些实施例,是参照附图仅作为例子给出的。
附图说明
图1是本发明的结构示意图;
图2是图1的A-A剖视图。
具体实施方式
下面结合附图和实施例对本发明作进一步说明。
    如图1和图2 所示,本发明的限位装置包括数个并排设置在模板2外侧的倒L形支架1,所述倒L形支架1包括立杆11和横杆12,两者焊接成的直角形结构,立杆11和横杆12均采用加强槽钢。数个并排倒L形支架1之间的水平距离A为1500~2000mm,A的长短根据混凝土竖直墙面的长度而定。倒L形支架1下端的的垂直内侧面焊在模板2外侧的上下数排横向加强型钢21上。
    限位筒4设置在模板2和钢筋笼3的横向钢筋31之间,其数量与倒L形支架1数量相等,限位筒4上端设有锥形盖帽41,可以防止混凝土湿料堆积在限位筒4上端。钢丝绳手扳葫芦上端挂钩51通过焊在横杆12下的卡环6悬挂在倒L形支架1顶端下,钢丝绳手扳葫芦5下端通过牵引钢丝绳52与限位钢筒4上端的锥形盖帽41连接。本实施例的钢丝绳手扳葫芦5的牵引力为5~8kN,牵引钢丝绳52的直径为10mm。限位筒4采用钢管制成,直径D=50~100mm,长度L=580~620mm,本实施例的限位筒4长度为600mm,限位筒4的长度方向搭接钢筋笼3至少上下三层横向钢筋31,防止限位筒4倾斜。
    本发明的限位方法包括以下步骤
    1)在完成钢筋笼3绑扎后,先将限位筒4放置在钢筋笼3与模板2之间,然后支起模板3,并使限位筒4直径比钢筋笼3的横向钢筋31与模板2之间设计距离B大2~5mm。
    2)在模板3外侧并排焊接数个倒L形支架1,并在每个倒L形支架顶端横杆12下悬挂钢丝绳手扳葫芦5。
    3)将牵引钢丝绳7上下端分别连接钢丝绳手扳葫芦及限位筒4的锥形盖帽41顶端,浇筑混凝土前扳动钢丝绳手扳葫芦5,使限位筒4下端距需要浇筑混凝土的底面距离H=300mm左右。
    4)浇筑混凝土直至混凝土充满模板2和钢筋笼3的横向钢筋31外侧之间的混凝土保护层,在浇筑完的混凝土顶面与限位筒4的锥形盖帽41顶端距离B达200mm左右时,扳动钢丝绳手扳葫芦5,使钢丝绳手扳葫芦5带动限位筒4上升,然后继续浇筑混凝土。
    5)多次重复步骤4)的过程,直至完成全部混凝土的浇筑。
     除上述实施例外,本发明还可以有其他实施方式,凡采用等同替换或等效变换形成的技术方案,均落在本发明要求的保护范围内。

Claims (5)

1.一种混凝土竖直墙面钢筋保护层限位装置,其特征在于:包括数个并排设置在模板外侧的倒L形支架,设置在模板和钢筋笼的横向钢筋之间且与倒L形支架数量相等的限位筒,所述限位筒上端设有锥形盖帽;钢丝绳手扳葫芦上端挂钩通过卡环悬挂在倒L形支架顶端下,钢丝绳手扳葫芦下端牵引钢丝绳与限位钢筒上端的锥形盖帽连接。
2.如权利要求1所述的混凝土竖直墙面钢筋保护层限位装置,其特征在于:所述限位筒直径D=50~100mm,长度L=580~620mm。
3.如权利要求1或2所述的混凝土竖直墙面钢筋保护层限位装置,其特征在于:限位筒长度方向搭接钢筋笼至少上下三层横向钢筋。
4.如权利要求1所述的混凝土竖直墙面钢筋保护层限位装置,其特征在于:数个并排限位筒之间的水平距离A为1500~2000mm。
5.一种如权利要求1所述的混凝土竖直墙面钢筋保护层限位装置的限位方法,其特征在于:包括以下步骤:
在完成钢筋笼绑扎后,先将限位筒放置在钢筋笼与模板之间,然后支起模板,限位筒直径D比钢筋笼的横向钢筋与模板之间设计距离B大2~5mm;
在模板外侧并排设置数个倒L形支架,并在每个倒L形支架顶端下悬挂钢丝绳手扳葫芦;
    3)将牵引钢丝绳上下端分别连接钢丝绳手扳葫芦及限位筒的锥形盖帽顶端,浇筑混凝土前,扳动手扳葫芦,牵引钢丝绳向下移动,使限位筒下端离开原混凝土面距离H=280~320mm;
    4)浇筑混凝土直至混凝土充满模板和钢筋笼的横向钢筋外侧之间的混凝土保护层,在浇筑完的混凝土顶面与限位筒的锥形盖帽顶端距离B达180~220mm时,扳动钢丝绳手扳葫芦,牵引钢丝绳带动限位筒上升,然后继续浇筑混凝土;
    5)多次重复步骤4)的过程,直至完成全部混凝土的浇筑。
CN201410131764.4A 2014-04-03 2014-04-03 混凝土竖直墙面钢筋保护层限位装置及限位方法 Active CN103938872B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410131764.4A CN103938872B (zh) 2014-04-03 2014-04-03 混凝土竖直墙面钢筋保护层限位装置及限位方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410131764.4A CN103938872B (zh) 2014-04-03 2014-04-03 混凝土竖直墙面钢筋保护层限位装置及限位方法

Publications (2)

Publication Number Publication Date
CN103938872A true CN103938872A (zh) 2014-07-23
CN103938872B CN103938872B (zh) 2016-01-13

Family

ID=51186722

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410131764.4A Active CN103938872B (zh) 2014-04-03 2014-04-03 混凝土竖直墙面钢筋保护层限位装置及限位方法

Country Status (1)

Country Link
CN (1) CN103938872B (zh)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004026914A1 (de) * 2004-06-01 2005-12-29 Bitschnau Anlagen GmbH Schaltafel zur Ausbildung einer Schalung
CN2885972Y (zh) * 2006-04-07 2007-04-04 张金明 钢筋固定支架
CN201738499U (zh) * 2009-03-26 2011-02-09 浙江国泰建设集团有限公司 一种浇筑钢筋混凝土梁柱的钢筋保护层限位垫块
CN202899441U (zh) * 2012-11-26 2013-04-24 成都市第六建筑工程公司 工具式支架
CN203007980U (zh) * 2012-12-07 2013-06-19 中国建筑第八工程局有限公司 墙体多变钢筋限界装置
CN103161126A (zh) * 2013-04-11 2013-06-19 新疆北新路桥集团股份有限公司 路桥变截面空心高墩滑模施工方法
CN203320814U (zh) * 2013-07-04 2013-12-04 浙江自力建设集团有限公司 建筑楼板下部钢筋的钢筋混凝土保护层支架

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004026914A1 (de) * 2004-06-01 2005-12-29 Bitschnau Anlagen GmbH Schaltafel zur Ausbildung einer Schalung
CN2885972Y (zh) * 2006-04-07 2007-04-04 张金明 钢筋固定支架
CN201738499U (zh) * 2009-03-26 2011-02-09 浙江国泰建设集团有限公司 一种浇筑钢筋混凝土梁柱的钢筋保护层限位垫块
CN202899441U (zh) * 2012-11-26 2013-04-24 成都市第六建筑工程公司 工具式支架
CN203007980U (zh) * 2012-12-07 2013-06-19 中国建筑第八工程局有限公司 墙体多变钢筋限界装置
CN103161126A (zh) * 2013-04-11 2013-06-19 新疆北新路桥集团股份有限公司 路桥变截面空心高墩滑模施工方法
CN203320814U (zh) * 2013-07-04 2013-12-04 浙江自力建设集团有限公司 建筑楼板下部钢筋的钢筋混凝土保护层支架

Also Published As

Publication number Publication date
CN103938872B (zh) 2016-01-13

Similar Documents

Publication Publication Date Title
CN108019076B (zh) 大直径钢筋混凝土筒仓施工方法及用于锥壳施工的装置
CN107435438B (zh) 一种烟囱翻模施工装置
CN103669655B (zh) 变形缝两侧墙体混凝土浇筑施工工艺
GB201209006D0 (en) High rise building elevation concept
CN104060543B (zh) 一种预制桥面板的安装装置
CN203834914U (zh) 一种自动提升堆载平台
JP2012177226A (ja) 鉄筋籠の補強構造および補強方法
CN104712146A (zh) 墙体施工中钢筋绑扎的施工方法
CN203392766U (zh) 一种屋面上设置的轻型起重支架
CN204492198U (zh) 混凝土溜筒装置
CN105401723A (zh) 一种控制轻质块体填充内模上浮的可拆卸循环利用装置
CN204847755U (zh) 一种导轨吊装工装
JP2018154995A (ja) 傾斜面のコンクリート打設方法、及び、移動式型枠装置
CN102071812B (zh) 垂直运输建筑材料的方法
CN204022307U (zh) 煤矿立井井筒套壁模板运输装置和吊盘组
CN103964294A (zh) 一种吊装圆桶的固定装置
CN103938872B (zh) 混凝土竖直墙面钢筋保护层限位装置及限位方法
CN104652424A (zh) 一种钢筋笼吊装活动吊钩
CN105370027B (zh) 高层悬空结构中整体提升支撑钢平台结构的施工方法
CN203795865U (zh) 一种超高度砼浇筑用提升串筒
CN104164974A (zh) 建筑物浇筑方法及其使用的浇筑模具系统
CN208394614U (zh) 一种钢筋定位架
CN207988487U (zh) 大直径筒仓锥壳的施工装置
CN107364820A (zh) 一种简易提升架及使用方法
CN204139592U (zh) 用于建筑物浇筑的浇筑模具系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210902

Address after: 238 Nanxu Avenue, Runzhou District, Zhenjiang City, Jiangsu Province, 212004

Patentee after: CHINA COMMUNICATIONS 2ND NAVIGATIONAL BUREAU 3RD ENGINEERING Co.,Ltd.

Patentee after: CCCC HIGHWAY BRIDGES NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Address before: 212003 No. 90 Canal Road, Jiangsu, Zhenjiang

Patentee before: CHINA COMMUNICATIONS 2ND NAVIGATIONAL BUREAU 3RD ENGINEERING Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240304

Address after: 430048 No. 11 Jinyinhu Road, Dongxihu District, Wuhan City, Hubei Province

Patentee after: CCCC SECOND HARBOR ENGINEERING Co.,Ltd.

Country or region after: China

Patentee after: CCCC HIGHWAY BRIDGES NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

Address before: 238 Nanxu Avenue, Runzhou District, Zhenjiang City, Jiangsu Province, 212004

Patentee before: CHINA COMMUNICATIONS 2ND NAVIGATIONAL BUREAU 3RD ENGINEERING Co.,Ltd.

Country or region before: China

Patentee before: CCCC HIGHWAY BRIDGES NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd.

TR01 Transfer of patent right