- CN103938865A CN103938865A CN201410126884.5A CN201410126884A CN103938865A CN 103938865 A CN103938865 A CN 103938865A CN 201410126884 A CN201410126884 A CN 201410126884A CN 103938865 A CN103938865 A CN 103938865A
- Authority
- CN
- China
- Prior art keywords
- shear wall
- section
- anchoring
- construction method
- reinforcing bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The invention provides a shear wall inner plate reinforcing steel bar reserved anchoring construction method. The method sequentially includes the steps of cutting out an embedded reinforcing steel bar with an anchoring section and an exposed section, embedding the anchoring section to a reinforcing steel bar shear wall, covering the exposed section with an isolation strip, fixing the exposed section and the isolation strip, conducting die assembly, conducting pouring to form the reinforcing steel bar shear wall, removing the isolation strip, and installing the horizontal structure through the exposed section. The shear wall inner plate reinforcing steel bar reserved anchoring construction method solves the problem of conducting pouring to form vertical structures such as shearing walls and columns and horizontal structures such as floors and connecting the vertical structures with the horizontal structures in a butt joint mode, and the requirement for integrity and strength of the structure are further improved.
Description
Technical field
The present invention relates to a kind of reinforcing bar connection construction technique, be specifically related to a kind of reserved anchoring construction method of shear wall inner panel reinforcing bar.
Background technology
At present, Super High shear wall generally adopts climbing formwork for construction, and this just requires must possess continuity to the construction of vertical structure, generally can be in advance to vertical structure (as shear wall, post etc.) construction, then to horizontal structure (as floor etc.) construction.Based on this reason, how to solve horizontal structure and be connected and just become a difficult problem with the later stage reinforcing bar of vertical structure.
For addressing the above problem, first, take into full account globality and the requirement of strength of structure, secondly, guarantee constructor's safe construction.
Therefore, we need a kind of reserved anchoring construction method of shear wall inner panel reinforcing bar of innovation, to meet modern architecture construction demand.
Summary of the invention
For overcoming the existing defect of prior art, now provide a kind of shear wall inner panel reinforcing bar to reserve anchoring construction method, to solve vertical structure (as shear wall, post etc.) and horizontal structure (as floor etc.), build the problem of docking, and further improve globality and the requirement of strength of structure.
For achieving the above object, a kind of shear wall inner panel reinforcing bar is reserved anchoring construction method, comprises the step that next coming in order carry out:
Intercepting comprises the embedded bar of anchoring section and revealed section;
Anchoring section is pre-buried to shear wall;
On revealed section, cover isolation strip and fixed;
Matched moulds is also built shear wall;
Remove isolation strip and by revealed section, horizontal structure is installed.
The reserved anchoring construction further improvements in methods of shear wall inner panel reinforcing bar of the present invention are, before intercepting embedded bar, also comprise: choose diameter than the large reinforcing bar of floor bar as described embedded bar; According to concrete strength, calculate the length of anchoring section; And the length that calculates revealed section according to embedded bar diameter, the length of revealed section is not less than 20 times of embedded bar diameter.
The reserved anchoring construction further improvements in methods of shear wall inner panel reinforcing bar of the present invention are, also comprise in advance that embedded bar is crookedly before pre-buried described anchoring section, and the length direction along shear wall extends by revealed section.
The reserved anchoring construction further improvements in methods of shear wall inner panel reinforcing bar of the present invention are, also comprise: after removing isolation strip, and the smooth revealed section that manifests, and revealed section is stretching to vertically extend outside shear wall along the thickness direction of described shear wall.
Shear wall inner panel reinforcing bar of the present invention is reserved anchoring construction further improvements in methods and is, isolation strip is area spongiosa.
Shear wall inner panel reinforcing bar of the present invention is reserved anchoring construction further improvements in methods and is, the process that horizontal structure is installed comprises: by the horizontal reinforcement welding of revealed section and horizontal structure, its weld length is not less than 10 times of horizontal reinforcement diameter.
The reserved anchoring construction further improvements in methods of shear wall inner panel reinforcing bar of the present invention are, also comprise: long so that can stretch out from described shear wall in the situation that in described anchoring section length, first the tail end of anchoring section is again crooked, then the anchoring section after bending is pre-buried to shear wall.
The beneficial effect of the reserved anchoring construction method of shear wall inner panel reinforcing bar of the present invention is,
1) by embedded bar, horizontal structure can firmly fast be docked with vertical structure;
2), by area spongiosa being set in revealed section junction, avoided shear wall after building, to need again to reject concrete and the process of exposing embedded bar;
3), by implementation process of the present invention, can further improve globality and the requirement of strength of structure.
Accompanying drawing explanation
Fig. 1 is the schematic flow sheet of the reserved anchoring construction method of shear wall inner panel reinforcing bar of the present invention;
Fig. 2 is positioned over the structural representation in shear wall by embedded bar in the reserved anchoring construction method of shear wall inner panel reinforcing bar of the present invention;
Fig. 3 connects the structural representation of horizontal reinforcement and embedded bar in the reserved anchoring construction method of shear wall inner panel reinforcing bar of the present invention;
Fig. 4 covers in the reserved anchoring construction method of shear wall inner panel reinforcing bar of the present invention and the fixing plane structure schematic diagram of shear wall behind isolation strip;
Fig. 5 is the structural representation after shear wall concreting in the reserved anchoring construction method of shear wall inner panel reinforcing bar of the present invention;
Fig. 6 removes the structural representation of isolation strip after shear wall concreting in the reserved anchoring construction method of shear wall inner panel reinforcing bar of the present invention;
Fig. 7 be in the reserved anchoring construction method of shear wall inner panel reinforcing bar of the present invention after stretching processing the structural representation of embedded bar.
The specific embodiment
For the benefit of the understanding to structure of the present invention, describes below in conjunction with drawings and Examples.
Shown in Fig. 1, the invention provides a kind of reserved anchoring construction method of shear wall inner panel reinforcing bar, after having taken into full account the globality and requirement of strength of structure, adopt the mode of shear wall pre-buried " beard muscle ".And, vertical structure and horizontal structure are separated to construction, coordinate in addition Core Walls Structure creeping formwork to climb continuously, to accelerate efficiency of construction and to improve structural integrity intensity.
It should be noted that, some length calculation method applying in the method all should belong to conventional computational methods in existing shear force wall reinforcing steel bar construction, therefore, at this, does not add to repeat.
Actual job site, can implement by the step shown in successively in Fig. 1:
First, in conjunction with Fig. 1 and Fig. 2, carry out S1, the embedded bar 1 that intercepting consists of anchoring section and revealed section, specific practice is:
First select HPB300 grade reinforcing steel as embedded bar 1, the diameter of HPB300 grade reinforcing steel generally all adopts and is greater than rank of floor bar.For example, when the bar diameter of floor is 10mm, pre-buried HPB300 grade reinforcing steel diameter is got 12mm and is advisable.
After the selection of embedded bar 1 determines, according to the diameter of embedded bar 1, determine the length D1 of revealed section, and the concrete strength of building according to shear wall calculates the length D2 of anchoring section, to obtain the intercepted length of whole embedded bar 1.Wherein, the length D1 of revealed section requires to be not less than 20 times of embedded bar diameter; Meanwhile, after obtaining actual concrete strength numerical value, by existing anchoring section design formulas, (formula principle is not added to repeat at this, in theory, concrete strength is higher, and anchoring section length D2 just can be relatively smaller), to calculate the length D2 of anchoring section.
Next, as shown in Figure 2, at first take revealed section and anchoring section as boundary, by whole embedded bar 1 bending, then carries out S2, and the anchoring section of many embedded bars 1 is pre-buried to shear wall 2, and manifest the revealed section of embedded bar 1.
In addition, what need additional description is, because the length D2 of anchoring section is that intensity according to shear wall institute concreting determines, at whole embedded bar 1 after bending for the first time, may run into also relatively low situation of thinner and its concrete strength requirement of shear wall thickness requirement, thereby cause the tail end of anchoring section to stretch out from the opposite side of shear wall.Now, just need to be first that the tail end of anchoring section is again crooked, then the anchoring section after bending is pre-buried to shear wall 2, with the phenomenon of avoiding the tail end of anchoring section surprisingly to stretch out.
Afterwards, as shown in Figure 3, every crooked embedded bar 1 just consists of revealed section 10 and anchoring section 12.Wherein, require revealed section 10 and anchoring section 12 to keep vertical as far as possible, so that revealed section 10 can fit in the external surface of shear wall 2 as far as possible, and, revealed section 10 need be extended by the length direction along shear wall 2.So arrange, on the one hand, can be convenient to formwork for placing and shear wall 2 laminatings, on the other hand, be also convenient to cover isolation strip 3 at revealed section 10.
Then, in conjunction with Fig. 1 and Fig. 4, carry out S3, on revealed section 10, cover isolation strip 3 and fixed.In the present embodiment, select area spongiosa as isolation strip 3, and adopt colligation silk that area spongiosa and shear wall 2 colligations is firm, to guarantee that sponge there will not be when the concreting, come off.
Then, in conjunction with Fig. 4 and Fig. 5, carry out S4, matched moulds is also built shear wall 2, so that forms concrete vertical structure.After building, curing concrete vertical structure, until reach after form removal requirement, then stripping.
Finally, in conjunction with Fig. 6 and Fig. 7, carry out S5, remove isolation strip 3, by horizontal reinforcement 3, horizontal structure is installed, its specific practice is:
First remove sponge, revealed section 10 will be revealed in outside concrete naturally.Can be further to the reinforcing bar of exposed parts, carry out that concrete is whole picks work around, smooth so that the concrete of revealed section 10 peripheries keeps.Again that revealed section 10 is stretching along the thickness direction of shear wall 2, thus revealed section 10 can vertically extend outside shear wall, so far, the slab form of horizontal structure just can be installed.Can be on slab form colligation horizontal reinforcement, adopt one side welding mode by horizontal reinforcement and revealed section 10 welding, its weld length requirement is not less than ten times of horizontal reinforcement diameter.
So far, finally complete horizontal structure and vertical docking of structure, and after building, form " bearing " type docking structure being commonly called as in engineering.
Complete after above-mentioned implementation process the following characteristics of the present invention of should withdrawing deposit out:
1) by embedded bar 1, coordinate horizontal reinforcement 3 that horizontal structure can firmly fast be docked with vertical structure;
2) when being convenient to formwork for placing setting, by isolation strip 3, reduce and again carry out the difficulty of concrete Weeding, even avoid this work;
3), by above implementation process, further strengthen globality and the intensity of docking structure.
Below embodiment has been described in detail the present invention by reference to the accompanying drawings, and those skilled in the art can make many variations example to the present invention according to the above description.Thereby some details in embodiment should not form limitation of the invention, the present invention will be usingd scope that appended claims defines as protection domain.
Claims (7)
1. the reserved anchoring construction method of shear wall inner panel reinforcing bar, is characterized in that,
Comprise the following steps:
Intercepting comprises the embedded bar of anchoring section and revealed section;
Described anchoring section is pre-buried to shear wall;
On described revealed section, cover isolation strip and fixed;
Matched moulds is also built described shear wall;
Remove described isolation strip and by described revealed section, horizontal structure is installed.
2. the reserved anchoring construction method of shear wall inner panel reinforcing bar according to claim 1, is characterized in that, before the described embedded bar of intercepting, also comprises:
Choose diameter than the large reinforcing bar of floor bar as described embedded bar;
According to concrete strength, calculate the length of described anchoring section; And
The length that calculates described revealed section according to the diameter of described embedded bar, the length of described revealed section is not less than 20 times of described embedded bar diameter.
3. shear wall inner panel reinforcing bar according to claim 1 is reserved anchoring construction method, it is characterized in that, before pre-buried described anchoring section, also comprise in advance described embedded bar crookedly, and the length direction along described shear wall extends by described revealed section.
4. shear wall inner panel reinforcing bar according to claim 3 is reserved anchoring construction method, it is characterized in that, also comprise: after removing described isolation strip, smoothly manifest described revealed section, and described revealed section is stretching to vertically extend outside described shear wall along the thickness direction of described shear wall.
5. according to the reserved anchoring construction method of the shear wall inner panel reinforcing bar described in claim 1 or 4, it is characterized in that, described isolation strip is area spongiosa.
6. the reserved anchoring construction method of shear wall inner panel reinforcing bar according to claim 1, is characterized in that, the process that described horizontal structure is installed comprises:
By the horizontal reinforcement welding of described revealed section and described horizontal structure, its weld length is not less than 10 times of described horizontal reinforcement diameter.
7. shear wall inner panel reinforcing bar according to claim 1 is reserved anchoring construction method, it is characterized in that, also comprise: so that the situation that can stretch out from described shear wall long in described anchoring section length, first that the tail end of described anchoring section is again crooked, the more described anchoring section after bending is pre-buried to described shear wall.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410126884.5A CN103938865A (en) | 2014-03-31 | 2014-03-31 | Shear wall inner plate reinforcing steel bar reserved anchoring construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410126884.5A CN103938865A (en) | 2014-03-31 | 2014-03-31 | Shear wall inner plate reinforcing steel bar reserved anchoring construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103938865A true CN103938865A (en) | 2014-07-23 |
Family
ID=51186715
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410126884.5A Pending CN103938865A (en) | 2014-03-31 | 2014-03-31 | Shear wall inner plate reinforcing steel bar reserved anchoring construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103938865A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105735486A (en) * | 2016-03-01 | 2016-07-06 | 中建五局第三建设有限公司 | Super high-rise floor bearing plate steel bar reservation and embedding process |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2471807A1 (en) * | 2004-03-16 | 2005-09-16 | Lease Crutcher Lewis | Method of constructing a concrete shear core multistory building |
CN202831296U (en) * | 2012-08-08 | 2013-03-27 | 沈阳建筑大学 | Assembled spliced connecting structure of concrete frame-shear wall and structure constructed |
CN103485537A (en) * | 2013-07-16 | 2014-01-01 | 中国建筑第八工程局有限公司 | Construction method and structure of embedded reinforcement of super high-rise horizontal secondary structure |
CN103590510A (en) * | 2013-11-27 | 2014-02-19 | 上海建工五建集团有限公司 | Method for fixedly connecting embedded bars in assembly-type structure and cast-in-place structure |
-
2014
- 2014-03-31 CN CN201410126884.5A patent/CN103938865A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2471807A1 (en) * | 2004-03-16 | 2005-09-16 | Lease Crutcher Lewis | Method of constructing a concrete shear core multistory building |
US20050204687A1 (en) * | 2004-03-16 | 2005-09-22 | Raftery Michael C | Method of constructing a concrete shear core multistory building |
CN202831296U (en) * | 2012-08-08 | 2013-03-27 | 沈阳建筑大学 | Assembled spliced connecting structure of concrete frame-shear wall and structure constructed |
CN103485537A (en) * | 2013-07-16 | 2014-01-01 | 中国建筑第八工程局有限公司 | Construction method and structure of embedded reinforcement of super high-rise horizontal secondary structure |
CN103590510A (en) * | 2013-11-27 | 2014-02-19 | 上海建工五建集团有限公司 | Method for fixedly connecting embedded bars in assembly-type structure and cast-in-place structure |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105735486A (en) * | 2016-03-01 | 2016-07-06 | 中建五局第三建设有限公司 | Super high-rise floor bearing plate steel bar reservation and embedding process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104032869B (en) | A kind of Prefabricated stacking floor and precast construction method thereof | |
CN103485537B (en) | Super High horizontal secondary structure embedded bar construction method and structure thereof | |
CN104963431A (en) | Corner structural column construction method | |
CN204983662U (en) | To drawing screw rod and steel pipe framed bent combination unilateral formwork device | |
CN104295088A (en) | Steel-wood combined formwork structure of shear walls on two sides of deformation joint and construction method of steel-wood combined formwork structure | |
CN105525753A (en) | Method and structure for simultaneously constructing constructional column and main body structure | |
CN103556819B (en) | A kind of construction method of reserved constructional column hole on beam slab | |
CN107119901A (en) | The cast-in-place system of formwork structure and shear wall and construction method of shear wall angle node | |
CN103726589A (en) | H-shaped steel and steel pipe framework assembly shear wall with protruding interfaces and bent steel bars and manufacturing method | |
CN104295003A (en) | Structural column construction method | |
CN206888506U (en) | The cast-in-place system of formwork structure and shear wall of shear wall angle node | |
CN103568109A (en) | Hole forming method of precast concrete hollow component | |
CN103883053A (en) | Hollow floorslab of steel-bar truss floor support and construction method of floorslab | |
CN104895221B (en) | Assembled shaped steel confined concrete shear wall structure | |
CN207812307U (en) | The construction system of Cable stayed Bridge Main Tower and steel anchor beam | |
CN202483061U (en) | Post-cast strip supporting formwork | |
CN103938865A (en) | Shear wall inner plate reinforcing steel bar reserved anchoring construction method | |
CN104453226A (en) | Secondary structure post formwork erecting and positioning device | |
CN108979205B (en) | Staggered floor flow construction method for super high-rise residential structure | |
CN204385921U (en) | Clear-water concrete wall column joint bar fastening devices | |
CN203411992U (en) | Reserved hole template of deep hole in mass concrete | |
CN204715764U (en) | The structure that a kind of constructional column and agent structure are constructed simultaneously | |
CN106284372A (en) | The method for supporting of roof plate template during a kind of electric power ditch is integrated poured | |
CN105442628A (en) | Construction method for cantilever foundation side wall heavy embedded part | |
CN108867854A (en) | Reinforced concrete frame and its construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140723 |
|
RJ01 | Rejection of invention patent application after publication |