CN103927609A - 基于bom的成本核算机制 - Google Patents

基于bom的成本核算机制 Download PDF

Info

Publication number
CN103927609A
CN103927609A CN201310015801.0A CN201310015801A CN103927609A CN 103927609 A CN103927609 A CN 103927609A CN 201310015801 A CN201310015801 A CN 201310015801A CN 103927609 A CN103927609 A CN 103927609A
Authority
CN
China
Prior art keywords
bom
product
cost
mechanism based
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310015801.0A
Other languages
English (en)
Inventor
何晶晶
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI YUNDIAN INFORMATION TECHNOLOGY Co Ltd
Original Assignee
SHANGHAI YUNDIAN INFORMATION TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI YUNDIAN INFORMATION TECHNOLOGY Co Ltd filed Critical SHANGHAI YUNDIAN INFORMATION TECHNOLOGY Co Ltd
Priority to CN201310015801.0A priority Critical patent/CN103927609A/zh
Publication of CN103927609A publication Critical patent/CN103927609A/zh
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

基于BOM的成本核算机制。本发明涉及一种基于BOM的成本核算机制,用于向PLM企业用户提供高效的产品成本核算方法,其特征在于,包括:PLM平台,productlifecyclemanagement产品生命周期管理,其中包含源于产品架构的BOM视图(物料清单billofmaterials,用于描述产品是由哪些零部件、原材料所构成的,这些零部件的时间、数量上的相互关系是什么);价格因子/工艺信息知识库,包含最新的材料、工时价格和工艺流程信息;成本估算单元,用于存储记录指定的产品模块核算得出的成本信息。

Description

基于BOM的成本核算机制
技术领域
本发明涉及制造业成本核算领域,更具体地说,涉及一种基于BOM的成本核算机制及方法。
背景技术
产品成本是制造商重点关注的问题,但是绝大部分公司很难准确跟踪、测量产品成本。我们经过多年的PLM集成开发发现,将BOM与工时、定额等联系到一起,可以计算出完成特定产品的费用集合。
发明内容
本发明要解决的技术问题在于,针对以往BOM只是孤立地统计物料清单功用的问题,提供一种基于BOM的成本核算机制及方法。
本发明解决上述技术问题的技术方案是,提供一种用于向PLM企业用户提供高效的产品成本核算方法,包括:
PLM体系, product lifecycle management产品生命周期管理,其中包含源于产品架构的BOM视图(物料清单bill of materials,用于描述产品是由哪些零部件、原材料所构成的,这些零部件的时间、数量上的相互关系是什么);
价格因子/工艺信息知识库,包含最新的材料、工时价格和工艺流程信息;
成本估算单元,用于存储记录指定的产品模块核算得出的成本信息。
本发明有效利用了BOM信息,结合价格因子/工艺信息知识库,为用户搭建一个产品费用管理的平台。
附图说明
图1是本发明基于BOM的成本核算机制的示意图
图2是本发明基于BOM的成本核算机制的流程图
具体实施方式
本发明用于向PLM企业用户提供高效的产品成本核算方法。
如图1所示,是本发明基于BOM的成本核算机制的示意图,在本实施例中,包括:
PLM平台, product lifecycle management产品生命周期管理,其中包含源于产品架构的BOM---物料清单视图 ;
价格因子/工艺信息知识库,包含最新的材料、工时价格和工艺流程信息;
成本估算单元,用于存储记录指定的产品模块核算得出的成本信息,可以导出相应统计核算报表。
特别地,整个计算过程完全基于后台执行(Server Mode)。
如图2所示,是本发明基于BOM的成本核算机制的流程图,该方法用于向制造业企业用户提供高效的产品成本核算方法,包括以下步骤:
用户选定特定产品型号;
系统从PLM平台中获取详细的物料清单信息(包含设计BOM和工艺BOM);
系统结合价格因子/工艺信息知识库核算产品制造成本并导出成本统计表格。
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此。

Claims (6)

1.一种基于BOM的成本核算机制,用于向PLM企业用户提供高效的产品成本核算方法,其特征在于,包括:
PLM平台, product lifecycle management产品生命周期管理,其中包含源于产品架构的BOM视图(物料清单bill of materials,用于描述产品是由哪些零部件、原材料所构成的,这些零部件的时间、数量上的相互关系是什么);
价格因子/工艺信息知识库,包含最新的材料、工时价格和工艺流程信息;
成本估算单元,用于存储记录指定的产品模块核算得出的成本信息。
2.根据权利要求1所述的基于BOM的成本核算机制,其特征在于,PLM平台包含源于产品架构的设计BOM(EBOM)和工艺BOM(PBOM)信息。
3.根据权利要求2所述的基于BOM的成本核算机制,其特征在于: EBOM与PBOM主要是根据它们来源的应用系统不同来分类的,EBOM主要来源于CAD系统,PBOM主要来源于CAPP系统,它们都是对产品结构中零部件的属性描述;EBOM是一种产品结构的技术描述文件,它表明了产品组件、子件、零件直到原材料之间的结构关系,以及每个组装件所需要的各下属件部件的数量,偏重于产品信息的汇总,如明细表;工艺BOM则主要对产品工艺实施规划过程以及制造生产过程中所反映的产品属性的一种生成计划文件。
4.一种基于BOM的成本核算机制,其特征在于,价格因子/工艺信息知识库,包含最新的材料、工时价格和工艺信息。
5.一种基于BOM的成本核算机制,其特征在于,成本估算单元,用于存储记录指定的产品模块核算得出的成本信息,可以导出相应统计核算报表。
6.根据权利要求5所述的基于BOM的成本核算机制,其特征在于,整个计算过程完全基于后台执行(Server Mode)。
CN201310015801.0A 2013-01-16 2013-01-16 基于bom的成本核算机制 Pending CN103927609A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310015801.0A CN103927609A (zh) 2013-01-16 2013-01-16 基于bom的成本核算机制

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310015801.0A CN103927609A (zh) 2013-01-16 2013-01-16 基于bom的成本核算机制

Publications (1)

Publication Number Publication Date
CN103927609A true CN103927609A (zh) 2014-07-16

Family

ID=51145825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310015801.0A Pending CN103927609A (zh) 2013-01-16 2013-01-16 基于bom的成本核算机制

Country Status (1)

Country Link
CN (1) CN103927609A (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105574303A (zh) * 2016-03-04 2016-05-11 昆山远飞软件信息科技有限公司 企业信息化运行系统
CN107016463A (zh) * 2017-04-07 2017-08-04 成都任我行软件股份有限公司 产品成本预测方法及系统
CN107633370A (zh) * 2017-10-12 2018-01-26 苏州市春菊电器有限公司 一种产品生产成本查询系统
CN110060110A (zh) * 2019-04-28 2019-07-26 锋泾(中国)建材集团有限公司 一种产品成本的确定方法、装置和计算机可读存储介质
CN110490530A (zh) * 2019-08-31 2019-11-22 东莞市众金家具有限公司 一种家具制造生产线运营成本智能化核算监控方法
CN111353660A (zh) * 2018-12-20 2020-06-30 英业达科技有限公司 开发费用估算系统及其方法
CN112101910A (zh) * 2020-09-21 2020-12-18 浙江兴达讯软件股份有限公司 工序成本核算方法及其核算系统
CN113011560A (zh) * 2021-02-26 2021-06-22 橙色云互联网设计有限公司 一种基于产品结构的快速成本核算和产品报价方法及系统
CN113407549A (zh) * 2021-08-19 2021-09-17 清华四川能源互联网研究院 数据处理方法、装置、电子设备及可读存储介质
CN113627988A (zh) * 2021-08-16 2021-11-09 深圳市云采网络科技有限公司 组装电路板加工计费方法和电子设备
CN113706193A (zh) * 2021-08-16 2021-11-26 深圳市云采网络科技有限公司 Smt贴片加工费计算方法和电子设备

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105574303A (zh) * 2016-03-04 2016-05-11 昆山远飞软件信息科技有限公司 企业信息化运行系统
CN107016463A (zh) * 2017-04-07 2017-08-04 成都任我行软件股份有限公司 产品成本预测方法及系统
CN107633370A (zh) * 2017-10-12 2018-01-26 苏州市春菊电器有限公司 一种产品生产成本查询系统
CN111353660A (zh) * 2018-12-20 2020-06-30 英业达科技有限公司 开发费用估算系统及其方法
CN110060110A (zh) * 2019-04-28 2019-07-26 锋泾(中国)建材集团有限公司 一种产品成本的确定方法、装置和计算机可读存储介质
CN110490530A (zh) * 2019-08-31 2019-11-22 东莞市众金家具有限公司 一种家具制造生产线运营成本智能化核算监控方法
CN112101910A (zh) * 2020-09-21 2020-12-18 浙江兴达讯软件股份有限公司 工序成本核算方法及其核算系统
CN113011560A (zh) * 2021-02-26 2021-06-22 橙色云互联网设计有限公司 一种基于产品结构的快速成本核算和产品报价方法及系统
CN113627988A (zh) * 2021-08-16 2021-11-09 深圳市云采网络科技有限公司 组装电路板加工计费方法和电子设备
CN113706193A (zh) * 2021-08-16 2021-11-26 深圳市云采网络科技有限公司 Smt贴片加工费计算方法和电子设备
CN113407549A (zh) * 2021-08-19 2021-09-17 清华四川能源互联网研究院 数据处理方法、装置、电子设备及可读存储介质
CN113407549B (zh) * 2021-08-19 2021-11-23 清华四川能源互联网研究院 数据处理方法、装置、电子设备及可读存储介质

Similar Documents

Publication Publication Date Title
CN103927609A (zh) 基于bom的成本核算机制
Li et al. Additive manufacturing technology in spare parts supply chain: a comparative study
Li et al. The influence of additive manufacturing on the configuration of make-to-order spare parts supply chain under heterogeneous demand
Ma et al. Supply chain channel strategies with quality and marketing effort-dependent demand
US20140337083A1 (en) System and method for supply chain optimization
US20150109287A1 (en) Method and system for supply chain network sensitivity analysis and presentation
US7412295B2 (en) Modeling manufacturing processes to include defined markers
CN102004954A (zh) 一种产品信息系统和产品设计系统的信息集成方法
CN111461590A (zh) 一种根据销售、库存、采购信息计算物料齐套的方法
CN103106547A (zh) 一种钢材采购需求预测装置及方法
WO2017081739A1 (ja) 在庫解析装置および在庫解析方法
Yu et al. An integrated multi-stage supply chain inventory model under an infinite planning horizon and continuous price decrease
JP6301326B2 (ja) サービスアセットマネジメントシステム及び方法
JP6067630B2 (ja) 損益予測装置及び損益予測プログラム
Stekolschik Engineering change management method framework in mechanical engineering
Zapp et al. A reference model for collaborative capacity planning between automotive and semiconductor industry
JP2008052413A (ja) 販売計画の評価支援システム
Jain et al. Analytical modelling of multi stage convergent supply chain system under just-in-time
CN104599015A (zh) 一种机械制造业日常流程与资金的管理方法
JP4099076B2 (ja) 需要予測方法及び需要予測プログラム
JP6357388B2 (ja) リードタイム基準製造間接費配賦システム及びプログラム
CN102467696A (zh) 在制品过程管控方法及系统
KR20170055379A (ko) Erp데이터 베이스를 활용한 신규 개발품에 대한 구매가격 예측 방법
CN105741129A (zh) 一种注塑机的机械手的销售反馈方法及其系统
CN101350080A (zh) 产品报价方法及系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140716