CN103924526B - 一种跨海大桥宽大墩身钢筋笼整体预制胎架 - Google Patents
一种跨海大桥宽大墩身钢筋笼整体预制胎架 Download PDFInfo
- Publication number
- CN103924526B CN103924526B CN201410172826.6A CN201410172826A CN103924526B CN 103924526 B CN103924526 B CN 103924526B CN 201410172826 A CN201410172826 A CN 201410172826A CN 103924526 B CN103924526 B CN 103924526B
- Authority
- CN
- China
- Prior art keywords
- roomy
- frame assembly
- reinforcement cage
- pier shaft
- steel reinforcement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种跨海大桥宽大墩身钢筋笼整体预制胎架,属于桥梁下构施工装置领域,包括一各边可拆卸的框架组件,所述框架组件的顶边和底边的上表面沿其长度方向设有若干凹槽,所述框架组件的左右两侧边的内侧表面沿其长度方向也设有若干凹槽。本发明是一种施工效率高、质量高、安全可靠的墩身钢筋笼整体预制胎架,尤其适用于恶劣海洋环境下宽大墩身钢筋工程施工。
Description
技术领域
本发明属于桥梁下构施工装置领域,尤其涉及适用于跨海大桥宽大墩身施工装置。
背景技术
1)传统墩身钢筋施工:
传统墩身钢筋工程施工:钢筋在加工场集中下料、弯制成半成品,然后将半成品钢筋运输至施工现场绑扎,现场钢筋绑扎还需辅助设置临时脚手架系统。基本施工顺序:工人现场一根根绑扎立筋→绑扎横向水平箍筋→安装拉筋或支撑钢筋,钢筋绑扎完毕安装保护层垫块,立模浇注墩身混凝土。
2)传统施工的局限性:
传统施工中钢筋在加工场集中下料,现场绑扎钢筋,钢筋绑扎的间距、保护层等很难精确控制,且在海洋环境下,工人作业环境差,现场绑扎钢筋易受台风、季风、阵风、暴雨、高温、严寒等恶劣环境的影响,工效较低,作业环境差,对作业工人身体及劳动积极性负面影响大,且伴随较大的安全风险,施工质量难以得到有效保证。可见,传统施工有一定的局限性,特别在跨海大桥宽大墩身施工中,局限性更大。
发明内容
本发明的目的在于:提出一种施工效率高、质量高、安全可靠的墩身钢筋笼整体预制胎架,尤其适用于恶劣海洋环境下宽大墩身钢筋工程施工。
本发明的目的通过下述技术方案来实现:
一种跨海大桥宽大墩身钢筋笼整体预制胎架,包括一各边可拆卸的框架组件,所述框架组件的顶边和底边的上表面沿其长度方向设有若干凹槽,所述框架组件的左右两侧边的内侧表面沿其长度方向也设有若干凹槽。
上述方案中,框架组件各边上分布有凹槽,钢筋笼绑扎时,各根钢筋可以准确地一一对应放置在各个凹槽内,形成钢筋笼的各边,从而进行迅速、准确、安全地绑扎;绑扎完毕后,直接拆除框架组件各边即可将成品钢筋笼直接投入使用,而框架组件重新组装后又可以投入下一钢筋笼的制作。框架组件的形状可根据所需绑扎的不同形状的钢筋笼调整,其形状与钢筋笼对应。该框架组件可以是多个部件构成的一完整闭合框架,也可以是多个部件构成的非完整框架,但该多个部件在钢筋笼横断面上的投影构成一完整框架,比如一矩形框架可以由相互分离但在钢筋笼横断面上的投影上围成一矩形的各自独立的四边组件组成。所述凹槽可以是最简单的开设于部件上的缺口形成的凹槽,也可以是其他任何部件或形式形成的只要能容纳放置钢筋即可的结构,如侧边凹槽即可由多个上下排列的悬臂形成,上下相邻的两悬臂之间自然形成的空腔即为所述凹槽,钢筋放置于各悬臂上。
作为选择,所述框架组件的左右两侧边的各凹槽的底边还进一步设有一凹槽。
上述方案中,进一步设置的凹槽可以防止其内的钢筋滚动,使用更可靠。当左右两侧边的各凹槽由悬臂构成时,钢筋放置于悬臂上,此时即可直接在悬臂上表面进一步设置防止钢筋滚落的凹槽。
作为进一步选择,所述框架组件呈矩形,其内侧底部两角呈阶梯型,顶部两角由凹槽构成的悬臂长度越往上越长。
上述方案中,矩形四角的特殊设计使得可以绑扎圆角矩形的钢筋笼。
作为进一步选择,所述框架组件包括底座,以及可拆卸固定于所述底座上的立柱,所述底座和立柱上固定有齿板,所述立柱间也可拆卸固定有齿板,所述各齿板围成一矩形框。
上述方案中,底座和立柱构成基础支撑,而齿板则构成所需的凹槽分布,整体结构简单,使用方便高效。
作为进一步选择,所述立柱和底座之间还可拆卸加固有角钢。
上述方案中,角钢进一步强化立柱和底座间的连接,使得结构更稳定可靠,且角钢可根据需要随时拆卸。
前述本发明主方案及其各进一步选择方案可以自由组合以形成多个方案,均为本发明可采用并要求保护的方案:如本发明,各选择即可和其他选择任意组合,本领域技术人员在了解本发明方案后根据现有技术和公知常识可明了有多种组合,均为本发明所要保护的技术方案,在此不做穷举。
本发明的有益效果:针对海洋环境下宽大墩身钢筋工程施工,采用本装置,可以不采用钢筋加工场集中下料运输至现场绑扎的施工工艺,而是采用拆、装便捷的预制胎架在加工厂内长线法同槽进行钢筋笼整体预制,整条钢筋笼预制完毕,解除胎架横梁和立柱之间的螺栓连接,拆除横梁、立柱,将钢筋笼吊离胎架,集中存放或者直接运至现场安装即可,胎架可立即投入下一条墩身钢筋笼的预制。
本装置实现墩身钢筋工程从高空走向平地,从野外走向车间的工厂化流水作业模式,极大改善一线作业工人及工程技术人员的工作环境,实现平行作业,提高工效,预制精度高,钢筋间距,保护层控制质量得到了较大提高,且从源头上消除了施工现场钢筋绑扎交叉及高空作业带来的安全风险。
本装置实现了跨海大桥宽大截面墩身钢筋笼整体预制,克服了传统墩身钢筋现场绑扎工艺的安全风险大、工效低、施工质量不易保证的缺点,使用新型胎架实现了跨海大桥宽大墩身钢筋工程施工从高空野外走向工厂化流水作业模式,极大改善作业工人和现场技术人员的工作环境,使工序衔接更紧密,降低施工成本。
附图说明
图1是本发明实施例的立面结构示意图;
图2是本发明实施例的侧面结构示意图;
图3是图1的X部位的局部放大图;
图中,1为矩形凹槽,2为弧形凹槽,3为底部两角部位,4为顶部两角部位,5为底座,6为立柱,7为齿板,8为角钢,9为钢筋。
具体实施方式
下面结合具体实施例和附图对本发明作进一步的说明。
如图1至3所示,一种跨海大桥宽大墩身钢筋笼整体预制胎架,包括一各边可拆卸的框架组件,框架组件的顶边和底边的上表面沿其长度方向设有若干矩形凹槽1,框架组件的左右两侧边的内侧表面沿其长度方向也设有若干矩形凹槽1,各矩形凹槽1等间距均匀分布。如本实施例所示例子,矩形凹槽1是最简单的开设于部件上的缺口形成的凹槽,另外,作为其他例子,也可以是其他任何部件或形式形成的只要能容纳放置钢筋即可的结构,如侧边凹槽即可由多个上下排列的悬臂形成,上下相邻的两悬臂之间自然形成的空腔即为凹槽,各钢筋对应放置于各悬臂上。框架组件的左右两侧边的各矩形凹槽1的底边还进一步设有一弧形凹槽2,用以防止放置其内的钢筋滚落。当左右两侧边的各矩形凹槽1由悬臂构成时,钢筋9放置于悬臂上,此时即可直接在悬臂上表面进一步设置防止钢筋滚落的弧形凹槽2。多个胎架平行排列成串,即可支撑整个钢筋笼的绑扎制作。如本实施例所示,为了绑扎圆角矩形钢筋笼,框架组件呈矩形,其内侧底部两角部位3由台阶形部件形成阶梯型,顶部两角部位4由矩形凹槽构成的悬臂长度越往上越长,在阶梯形部件和渐长悬臂上也可放置钢筋以形成圆角部位。框架组件包括底座5,以及螺栓可拆卸固定于底座5上的立柱6,底座5和立柱6上固定有齿板7,立柱6间也螺栓可拆卸固定有齿板7,各齿板7围成一矩形框,齿板上均布矩形凹槽1,底,5和立柱6由槽钢制成,齿板7由钢板齿板制成,立柱5和底座6之间用角钢8加固,可根据需要随时拆卸。。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。
Claims (4)
1.一种跨海大桥宽大墩身钢筋笼整体预制胎架,其特征在于:包括一各边可拆卸的框架组件,所述框架组件的顶边和底边的上表面沿其长度方向设有若干凹槽,所述框架组件的左右两侧边的内侧表面沿其长度方向也设有若干凹槽,凹槽等间距均匀分布;所述框架组件呈矩形,其内侧底部两角呈阶梯型,顶部两角由凹槽构成的悬臂长度越往上越长。
2.如权利要求1所述的跨海大桥宽大墩身钢筋笼整体预制胎架,其特征在于:所述框架组件的左右两侧边的各凹槽的底边还进一步设有一凹槽。
3.如权利要求1或2所述的跨海大桥宽大墩身钢筋笼整体预制胎架,其特征在于:所述框架组件包括底座,以及可拆卸固定于所述底座上的立柱,所述底座和立柱上固定有齿板,所述立柱间也可拆卸固定有齿板,所述各齿板围成一矩形框。
4.如权利要求3所述的跨海大桥宽大墩身钢筋笼整体预制胎架,其特征在于:所述立柱和底座之间还可拆卸加固有角钢。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410172826.6A CN103924526B (zh) | 2014-04-25 | 2014-04-25 | 一种跨海大桥宽大墩身钢筋笼整体预制胎架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410172826.6A CN103924526B (zh) | 2014-04-25 | 2014-04-25 | 一种跨海大桥宽大墩身钢筋笼整体预制胎架 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103924526A CN103924526A (zh) | 2014-07-16 |
CN103924526B true CN103924526B (zh) | 2016-06-08 |
Family
ID=51142906
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410172826.6A Active CN103924526B (zh) | 2014-04-25 | 2014-04-25 | 一种跨海大桥宽大墩身钢筋笼整体预制胎架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103924526B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105057512A (zh) * | 2015-07-28 | 2015-11-18 | 中交一公局第二工程有限公司 | 制作节段梁钢筋的胎架装置 |
CN105537470B (zh) * | 2015-12-17 | 2017-10-27 | 中铁十六局集团第三工程有限公司 | 一种液压式墩身钢筋加工模架及墩身钢筋施工工艺 |
CN106400690B (zh) * | 2016-09-30 | 2019-02-15 | 中交路桥华南工程有限公司 | 钢筋节段的制造方法和所使用的可调式钢筋节段拼装胎架 |
CN109550874A (zh) * | 2018-11-27 | 2019-04-02 | 中交第四公路工程局有限公司 | 一种用于双层主筋钢筋笼加工的胎具 |
CN112176876B (zh) * | 2020-09-30 | 2021-11-30 | 中交第三航务工程局有限公司 | 一种单箱三室大截面悬浇箱梁腹板钢筋的预制和吊装工艺 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10280402A (ja) * | 1997-04-09 | 1998-10-20 | Miyashitamasahiro Sekkei Kobo:Kk | 場所打ちコンクリート杭の鉄筋かご |
CN103350165A (zh) * | 2013-06-28 | 2013-10-16 | 中国一冶集团有限公司 | 可制作不同直径钢筋笼的加工装置及方法 |
CN103362119A (zh) * | 2013-06-28 | 2013-10-23 | 中建七局第二建筑有限公司 | 大直径钢筋笼的免焊接连接方法与连接结构 |
CN203471630U (zh) * | 2013-08-28 | 2014-03-12 | 中交二公局第一工程有限公司 | 用于组装桩基钢筋笼的胎架 |
CN203834361U (zh) * | 2014-04-25 | 2014-09-17 | 中交二航局第四工程有限公司 | 一种跨海大桥宽大墩身钢筋笼整体预制胎架 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN202273178U (zh) * | 2011-07-25 | 2012-06-13 | 中铁四局集团第一工程有限公司 | 可调式钢筋骨架绑扎胎具 |
-
2014
- 2014-04-25 CN CN201410172826.6A patent/CN103924526B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10280402A (ja) * | 1997-04-09 | 1998-10-20 | Miyashitamasahiro Sekkei Kobo:Kk | 場所打ちコンクリート杭の鉄筋かご |
CN103350165A (zh) * | 2013-06-28 | 2013-10-16 | 中国一冶集团有限公司 | 可制作不同直径钢筋笼的加工装置及方法 |
CN103362119A (zh) * | 2013-06-28 | 2013-10-23 | 中建七局第二建筑有限公司 | 大直径钢筋笼的免焊接连接方法与连接结构 |
CN203471630U (zh) * | 2013-08-28 | 2014-03-12 | 中交二公局第一工程有限公司 | 用于组装桩基钢筋笼的胎架 |
CN203834361U (zh) * | 2014-04-25 | 2014-09-17 | 中交二航局第四工程有限公司 | 一种跨海大桥宽大墩身钢筋笼整体预制胎架 |
Also Published As
Publication number | Publication date |
---|---|
CN103924526A (zh) | 2014-07-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103924526B (zh) | 一种跨海大桥宽大墩身钢筋笼整体预制胎架 | |
CN103924711B (zh) | 装配式网格剪力墙结构体系的施工工艺 | |
CN103882813B (zh) | 用于桥墩与横系梁同步施工的牛腿托架平台及其搭建方法 | |
CN105888108A (zh) | 内置定位预制件钢筋混凝土剪力墙及施工方法 | |
CN203834361U (zh) | 一种跨海大桥宽大墩身钢筋笼整体预制胎架 | |
CN104153495B (zh) | 一种多功能轻质混凝土幕墙的连接结构 | |
CN204001652U (zh) | 装配式剪力墙结构便携式外墙操作平台 | |
CN104314095A (zh) | 一种用于超厚筏板施工的型钢支墩及其阀板和施工方法 | |
CN102936958B (zh) | 工具式支架定位混凝土楼板上部钢筋的施工方法 | |
CN103147457A (zh) | 一种风力发电机独立柱基础制作方法 | |
CN106284845A (zh) | 一种后浇带钢筋混凝土构造柱独立支撑体系施工方法 | |
CN104736779A (zh) | 每两天上升一个楼层的混凝土结构体施工方法 | |
CN206174482U (zh) | 一种无牛腿钢管柱的外包混凝土环梁钢筋整体安装装置 | |
CN103397638A (zh) | 高刚度整体预应力装配式基坑支护内支撑系统用的拉杆 | |
CN103388336B (zh) | 内支撑主围檩部件 | |
CN104018657A (zh) | 一种采用水平滑移平台施工高大挑檐的方法 | |
CN204225503U (zh) | 大跨度钢桁架高空散装转换梁胎架 | |
CN108792963A (zh) | 一种用于高层屋面构架的空间钢桁架式塔吊附墙支座方法 | |
CN103938877B (zh) | 锚栓套架的安装方法 | |
CN204040485U (zh) | 现浇板厚度及钢筋保护层控制支架 | |
CN204199509U (zh) | 薄壁方箱抗浮结构 | |
CN203393721U (zh) | 内支撑主围檩部件 | |
CN203383563U (zh) | 一种快装式通信铁塔 | |
CN207988457U (zh) | 高层建筑错层阳台外防护兼操作平台搭设结构 | |
CN205839789U (zh) | 光伏电站箱式变压器基础配置施工结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |