CN103912005A - Foundation structure - Google Patents

Foundation structure Download PDF

Info

Publication number
CN103912005A
CN103912005A CN201410145960.7A CN201410145960A CN103912005A CN 103912005 A CN103912005 A CN 103912005A CN 201410145960 A CN201410145960 A CN 201410145960A CN 103912005 A CN103912005 A CN 103912005A
Authority
CN
China
Prior art keywords
concrete
wall
foundation structure
concrete pile
ash
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410145960.7A
Other languages
Chinese (zh)
Inventor
曾晖
胡俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuyi University
Original Assignee
Wuyi University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuyi University filed Critical Wuyi University
Priority to CN201410145960.7A priority Critical patent/CN103912005A/en
Publication of CN103912005A publication Critical patent/CN103912005A/en
Pending legal-status Critical Current

Links

Landscapes

  • Foundations (AREA)

Abstract

The invention relates to a foundation structure comprising foundation walls, concrete piles, a flyash-lime pile, backing layers and a concrete raft. The foundation walls are walls with trapezoidal sections, cross sectional area of the bottom of each foundation wall is larger than that of the top of the same, the concrete piles and the flyash-lime pile are arranged between the two foundation walls, the depth of the foundation walls is larger than that of the concrete piles and the flyash-lime pile, the backing layers are arranged at the top ends of the foundation walls, the concrete piles and the flyash-lime pile, and the concrete raft are arranged above the backing layers. The foundation structure is hollowed in the middle, force borne on the upper portion is uniformly scattered to the lower layer of the concrete, and the structure is more stable and firm through the hollowed design. By arranging the foundation walls, the concrete piles and the flyash-lime pile, and sinking of the soft soil layer and tilting of the foundation can be effectively prevented. Meanwhile, deep concrete piles are used partly, and manufacturing cost is low.

Description

A kind of Toft foundation structure
Technical field
The invention belongs to the realm of building construction, particularly relate to a kind of Toft foundation structure.
Background technology
At present, the building of building on the soft foundation such as lakeside, river marsh by the sea,, depression or rhegma much can occur to tilt, as very high in whole use deep pile foundation costs, and adopt raft foundation that common strip foundation is single etc. can cause that a large amount of sinkings even tilt, cause very large economic loss.Common Toft foundation structure adopts the solidifying soil layer of very thick meeting as ground, needs a large amount of concrete, has caused certain waste.
Summary of the invention
The present invention provides a kind of simple in structure, easy to install, Toft foundation structure of increasing work efficiency for solving the technical problem existing in known technology.
The technical scheme that the present invention takes for the technical problem existing in solution known technology is: this Toft foundation structure comprises: ground body of wall, concrete pile, the stake of two ash, bed course, concrete raft plate; Described ground body of wall is that cross section is trapezoidal body of wall, the bottom transverse sectional area of ground body of wall is greater than top cross-sectional area, between two ground bodies of wall, mix and be provided with concrete pile and two ash stake, the degree of depth of the depth ratio concrete pile of ground body of wall and two ash stakes wants dark, top in ground body of wall and concrete pile and two ash stakes is provided with bed course, is provided with concrete raft plate above bed course.
The present invention can also adopt following technical measures:
Described concrete pile is arranged on the diagonal of two ground bodies of wall, and two ash stakes are arranged on other regions between two ground bodies of wall.
The cross section of described concrete pile is circular, and the top of concrete pile and the cross-sectional area of bottom are greater than the cross-sectional area of middle part.
Described two ash stakes are made up of quicklime, flyash and coarse sand.
Described bed course is formed by rubble, gravel and cement compacting.
A kind of Toft foundation structure also comprises: concrete pile, concrete lower floor, concrete hollow out frame, concrete upper strata; Described concrete pile is arranged on underground, and concrete pile upper end is connected with concrete lower floor, and described concrete hollow out frame is arranged in the middle of concrete lower floor and concrete upper strata, and is connected with concrete lower floor and concrete upper strata with bar construction.
Advantage and good effect that the present invention has are: the Toft foundation structure in the present invention adopts three layer concrete layers, the design of middle employing hollow out, the power that upper part can not only be born is distributed to Hui Ningtu lower floor uniformly, and hollow out project organization is more stable, firmer, in ensuring the quality of products, reduce again concrete use amount.By ground body of wall is set, layout concrete pile and two ash stake, can effectively prevent that Soft Soil Layer from sinking and ground tilts, and avoided the dark stake of whole use concrete simultaneously, and cost is lower.
Brief description of the drawings
Fig. 1 is the schematic diagram of a kind of Toft foundation structure provided by the invention;
Fig. 2 is the schematic diagram of a kind of Toft foundation structure provided by the invention;
In figure: 1, ground body of wall; 2, concrete pile; 3, two ash stakes; 4, bed course; 5, concrete raft plate; 6, concrete lower floor; 7, concrete hollow out frame; 8, concrete upper strata.
Detailed description of the invention
For further understanding summary of the invention of the present invention, Characteristic, hereby exemplify following examples, and coordinate accompanying drawing to be described in detail as follows:
Embodiment 1:
Fig. 1 is the schematic diagram of a kind of Toft foundation structure provided by the invention, and this Toft foundation structure comprises: ground body of wall 1, concrete pile 2, two ash stake 3, bed course 4, concrete raft plate 5; Described ground body of wall 1 for cross section be trapezoidal body of wall, the bottom transverse sectional area of ground body of wall 1 is greater than top cross-sectional area, between two ground bodies of wall 1, mix and be provided with concrete pile 2 and two ash stake 3, the degree of depth of the depth ratio concrete pile 2 of ground body of wall 1 and two ash stakes 3 wants dark, top in ground body of wall 1 and concrete pile 2 and two ash stakes 3 is provided with bed course 4, is provided with concrete raft plate 5 above bed course 4.
Described concrete pile 2 is arranged on the diagonal of two ground bodies of wall 1, two ash stake 3 other regions that are arranged between two ground bodies of wall 1.
The cross section of described concrete pile 2 is circular, and the top of concrete pile 2 and the cross-sectional area of bottom are greater than the cross-sectional area of middle part.
Described two ash stakes 3 are made up of quicklime, flyash and coarse sand.
Described bed course 4 is formed by rubble, gravel and cement compacting.
A kind of Toft foundation structure also comprises: concrete pile 2, concrete lower floor 6, concrete hollow out frame 7, concrete upper strata 8; Described concrete pile 2 is arranged on underground, and concrete pile 2 upper ends are connected with concrete lower floor 6, and described concrete hollow out frame 7 is arranged in the middle of concrete lower floor 6 and concrete upper strata 8, and is connected with concrete lower floor 6 and concrete upper strata 8 with bar construction.
Advantage and good effect that the present invention has are: the Toft foundation structure in the present invention adopts three layer concrete layers, the design of middle employing hollow out, the power that upper part can not only be born is distributed to Hui Ningtu lower floor uniformly, and hollow out project organization is more stable, firmer, in ensuring the quality of products, reduce again concrete use amount.By ground body of wall is set, layout concrete pile and two ash stake, can effectively prevent that Soft Soil Layer from sinking and ground tilts, and avoided the dark stake of whole use concrete simultaneously, and cost is lower.
The above is only to preferred embodiment of the present invention, not the present invention is done to any pro forma restriction, every foundation technical spirit of the present invention is to any simple modification made for any of the above embodiments, and equivalent variations and modification, all belong in the scope of technical solution of the present invention.

Claims (6)

1. a Toft foundation structure, this Toft foundation structure comprises: ground body of wall, concrete pile, the stake of two ash, bed course, concrete raft plate; It is characterized in that, described ground body of wall is that cross section is trapezoidal body of wall, the bottom transverse sectional area of ground body of wall is greater than top cross-sectional area, between two ground bodies of wall, mix and be provided with concrete pile and two ash stake, the degree of depth of the depth ratio concrete pile of ground body of wall and two ash stakes wants dark, top in ground body of wall and concrete pile and two ash stakes is provided with bed course, is provided with concrete raft plate above bed course.
2. Toft foundation structure according to claim 1, is characterized in that, described concrete pile is arranged on the diagonal of two ground bodies of wall, and two ash stakes are arranged on other regions between two ground bodies of wall.
3. Toft foundation structure according to claim 1, is characterized in that, the cross section of described concrete pile is circular, and the top of concrete pile and the cross-sectional area of bottom are greater than the cross-sectional area of middle part.
4. Toft foundation structure according to claim 1, is characterized in that, described two ash stakes are made up of quicklime, flyash and coarse sand.
5. Toft foundation structure according to claim 1, is characterized in that, described bed course is formed by rubble, gravel and cement compacting.
6. Toft foundation structure according to claim 1, is characterized in that, a kind of Toft foundation structure also comprises: concrete pile, concrete lower floor, concrete hollow out frame, concrete upper strata; Described concrete pile is arranged on underground, and concrete pile upper end is connected with concrete lower floor, and described concrete hollow out frame is arranged in the middle of concrete lower floor and concrete upper strata, and is connected with concrete lower floor and concrete upper strata with bar construction.
CN201410145960.7A 2014-04-14 2014-04-14 Foundation structure Pending CN103912005A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410145960.7A CN103912005A (en) 2014-04-14 2014-04-14 Foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410145960.7A CN103912005A (en) 2014-04-14 2014-04-14 Foundation structure

Publications (1)

Publication Number Publication Date
CN103912005A true CN103912005A (en) 2014-07-09

Family

ID=51037976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410145960.7A Pending CN103912005A (en) 2014-04-14 2014-04-14 Foundation structure

Country Status (1)

Country Link
CN (1) CN103912005A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839657A (en) * 2016-04-20 2016-08-10 叶香雄 Raft foundation
CN108824510A (en) * 2018-08-02 2018-11-16 中铁第四勘察设计院集团有限公司 The foundation stabilization construction and its construction method in shallow layer soft soil area

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1093766A (en) * 1993-04-14 1994-10-19 广州市经济技术开发区管理委员会 Soft-clay lime deep-layer consolidation method
JP2000291022A (en) * 1999-04-07 2000-10-17 Kumagai Gumi Co Ltd Pile foundation and structure
JP2005314991A (en) * 2004-04-30 2005-11-10 Nakamura Bussan Kk Pile foundation structure for building and its construction method
CN2853905Y (en) * 2005-07-06 2007-01-03 唐业清 Foundation structure of anti-sink foundation
CN203475457U (en) * 2013-08-19 2014-03-12 中信建设有限责任公司 Composite pile foundation used for soft soil building foundation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1093766A (en) * 1993-04-14 1994-10-19 广州市经济技术开发区管理委员会 Soft-clay lime deep-layer consolidation method
JP2000291022A (en) * 1999-04-07 2000-10-17 Kumagai Gumi Co Ltd Pile foundation and structure
JP2005314991A (en) * 2004-04-30 2005-11-10 Nakamura Bussan Kk Pile foundation structure for building and its construction method
CN2853905Y (en) * 2005-07-06 2007-01-03 唐业清 Foundation structure of anti-sink foundation
CN203475457U (en) * 2013-08-19 2014-03-12 中信建设有限责任公司 Composite pile foundation used for soft soil building foundation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105839657A (en) * 2016-04-20 2016-08-10 叶香雄 Raft foundation
CN108824510A (en) * 2018-08-02 2018-11-16 中铁第四勘察设计院集团有限公司 The foundation stabilization construction and its construction method in shallow layer soft soil area

Similar Documents

Publication Publication Date Title
CN102677695B (en) Mutually-embedded ecological building block retaining wall and construction method thereof
CN202718084U (en) Composite foundation with flexible piles and drain boards combined
CN203755341U (en) Geogrid retaining wall
CN202430681U (en) Bank protection structure
CN203066104U (en) H-shaped plain concrete brick and small ecological soil-blocking wall bricked by same
CN207685656U (en) A kind of pillar-shaped bridge
CN102535408A (en) Semi-assembly type ecological debris flow check dam, and construction method thereof
CN103912005A (en) Foundation structure
CN206143806U (en) Novel prefabricated assembled retaining wall
CN210395463U (en) Anti structure of floating of stake bottom plate of underground construction
CN202430726U (en) Cross-shaped self-locking slope-protecting concrete block
CN202830673U (en) Existing embankment heightening structure for limited using land area
CN203808101U (en) Reinforced earth retaining wall with concrete panel
CN202430682U (en) Permeable jetty
CN215441846U (en) Foundation anti-settling structure
CN202247910U (en) Soil retaining structure with different inclination angles of anti-skid cement soil pile
CN201738286U (en) Tetrapod pier type structure
CN211665773U (en) Unloading plate type supporting structure
CN204023489U (en) The compound bearing platform type sheet pile structure of a kind of pile foundation-flexible reinforcement bed course
JP6240625B2 (en) Retaining wall, creation site and creation method of creation site
CA2818730A1 (en) Reinforced arch with floating footer and method of constructing same
CN104099894B (en) A kind of without anchor deep-cement sheet-pile wharf
CN210507458U (en) Vertical anchor supporting system that draws of foundation ditch
CN203475457U (en) Composite pile foundation used for soft soil building foundation
CN203256771U (en) Semi-gravity type column and board combined retaining wall structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140709