CN103899092A - Construction method of stage inspection channel - Google Patents

Construction method of stage inspection channel Download PDF

Info

Publication number
CN103899092A
CN103899092A CN201410155598.1A CN201410155598A CN103899092A CN 103899092 A CN103899092 A CN 103899092A CN 201410155598 A CN201410155598 A CN 201410155598A CN 103899092 A CN103899092 A CN 103899092A
Authority
CN
China
Prior art keywords
packway
installs
layer
construction method
installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410155598.1A
Other languages
Chinese (zh)
Other versions
CN103899092B (en
Inventor
李军
马海龙
林磊
李建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201410155598.1A priority Critical patent/CN103899092B/en
Publication of CN103899092A publication Critical patent/CN103899092A/en
Application granted granted Critical
Publication of CN103899092B publication Critical patent/CN103899092B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The invention provides a construction method of a stage inspection channel, and belongs to the technical field of constructional engineering. The construction method includes the steps that firstly, an original concrete shear wall construction maintaining scaffold serves as an operating platform and is regulated so that a suspender can be installed conveniently; secondly, the suspender is installed; thirdly, the uppermost layer of bridleway is installed; fourthly, a second layer of bridleway is installed; fifthly, a third layer of bridleway is installed. According to the construction method of the stage inspection channel, a traditional construction mode from bottom to top is changed to a construction mode from top to bottom; meanwhile, the original concrete shear wall construction maintaining scaffold can serve as the operating platform, so that working time is saved, and installing quality is improved.

Description

The construction method of stage access path
Technical field
The present invention relates to construction engineering technical field, specifically a kind of construction method of stage access path.
Background technology
General, there are three layers of maintenance packway in wonderful stage platform storehouse, and packway layer absolute altitude is respectively 11.365m, 14.965m, 20.365m, and packway is connected with grid layer by suspension rod.Construction under normal circumstances, must safeguard after scaffold is removed and again set up scaffold in shear wall construction, successively install from bottom to top, the duration of this mounting means is long, and installation quality can not get good guarantee.
Summary of the invention
Technical assignment of the present invention is to solve the deficiencies in the prior art, and a kind of construction method of stage access path is provided.
Technical scheme of the present invention realizes in the following manner, the construction method of this stage access path, and the step of this construction method is:
The first step, taking former concrete shear force wall construction maintenance scaffold as operating platform, adjusts former concrete shear force wall construction maintenance scaffold, makes it easy to the installation of suspension rod;
Second step, installs suspension rod;
The 3rd step, installs one deck packway topmost;
The 4th step, installs below second layer packway;
The 5th step, installs the 3rd layer of packway in below.
The concrete steps of construction method are:
The first step, taking former concrete shear force wall construction maintenance scaffold as operating platform, adjusts former concrete shear force wall construction maintenance scaffold, makes it easy to the installation of suspension rod;
Second step, installs suspension rod;
The 3rd step, installs one deck packway topmost;
The 4th step, installs below second layer packway;
The 5th step, installs the 3rd layer of packway in below;
So, adopt erection sequence from top to bottom that packway is installed, on-site hoisting equipment adopts tower crane, the relative upper strata structure of installation can stop lower floor's lifting component of installing relatively afterwards, therefore adopt shoulder-pole hoisting method, that is: tower crane lifts a steel shoulder pole by lifting cable, and steel shoulder pole medial extremity arranges lifting and intends installation component, and the outboard end of steel shoulder pole arranges lifting mass;
Tower crane runs to the packway layer of institute's mounting layer, first by plan install build move in institute's mounting layer, removal intend installation component, mass is laid particular stress on sinking, steel shoulder pole tilt, avoid upper strata the structure of installation stop.
The beneficial effect that the present invention compared with prior art produced is:
The construction method of this stage access path changes from top to bottom traditional from bottom to top construction into construction, can utilize former shear wall construction time, safeguards that scaffold is as operating platform simultaneously, thereby has saved the duration, has improved installation quality.
Because member installation site is indoor, on-site hoisting equipment is tower crane, adopts erection sequence from top to bottom, and the structure of installation can stop lower floor's lifting component of rear installation, therefore " the shoulder-pole hoisting method " of our this construction method of innovation.
Through measuring and calculating, only avoid one of scaffold building just to reach 5000m3,50000 yuan of total expenses.By using the scheme of construction method of this this stage access path, the problem of having avoided former scheme that suspension rod layering is installed, at produce in factory, has saved Site Welding expense, check fee etc. by elongated suspension rod, amounts to more than 30,000 yuan.Comprehensive statistics is reduced expenses more than 100,000 yuan, saves 12 days durations.
Detailed description of the invention
Below the construction method of stage access path of the present invention is described in detail below.
The construction method of stage access path of the present invention, the step of this construction method is:
The first step, taking former concrete shear force wall construction maintenance scaffold as operating platform, adjusts former concrete shear force wall construction maintenance scaffold, makes it easy to the installation of suspension rod;
Second step, installs suspension rod;
The 3rd step, installs one deck packway topmost;
The 4th step, installs below second layer packway;
The 5th step, installs the 3rd layer of packway in below;
So, adopt erection sequence from top to bottom that packway is installed, on-site hoisting equipment adopts tower crane, the relative upper strata structure of installation can stop lower floor's lifting component of installing relatively afterwards, therefore adopt shoulder-pole hoisting method, that is: tower crane lifts a steel shoulder pole by lifting cable, and steel shoulder pole medial extremity arranges lifting and intends installation component, and the outboard end of steel shoulder pole arranges lifting mass;
Tower crane runs to the packway layer of institute's mounting layer, first by plan install build move in institute's mounting layer, removal intend installation component, mass is laid particular stress on sinking, steel shoulder pole tilt, avoid upper strata the structure of installation stop.

Claims (2)

1. the construction method of stage access path, is characterized in that the step of this construction method is:
The first step, taking former concrete shear force wall construction maintenance scaffold as operating platform, adjusts former concrete shear force wall construction maintenance scaffold, makes it easy to the installation of suspension rod;
Second step, installs suspension rod;
The 3rd step, installs one deck packway topmost;
The 4th step, installs below second layer packway;
The 5th step, installs the 3rd layer of packway in below.
2. the construction method of stage access path, is characterized in that the step of this construction method is:
The first step, taking former concrete shear force wall construction maintenance scaffold as operating platform, adjusts former concrete shear force wall construction maintenance scaffold, makes it easy to the installation of suspension rod;
Second step, installs suspension rod;
The 3rd step, installs one deck packway topmost;
The 4th step, installs below second layer packway;
The 5th step, installs the 3rd layer of packway in below;
So, adopt erection sequence from top to bottom that packway is installed, on-site hoisting equipment adopts tower crane, the relative upper strata structure of installation can stop lower floor's lifting component of installing relatively afterwards, therefore adopt shoulder-pole hoisting method, that is: tower crane lifts a steel shoulder pole by lifting cable, and steel shoulder pole medial extremity arranges lifting and intends installation component, and the outboard end of steel shoulder pole arranges lifting mass;
Tower crane runs to the packway layer of institute's mounting layer, first by plan install build move in institute's mounting layer, removal intend installation component, mass is laid particular stress on sinking, steel shoulder pole tilt, avoid upper strata the structure of installation stop.
CN201410155598.1A 2014-04-18 2014-04-18 The construction method of stage access path Active CN103899092B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410155598.1A CN103899092B (en) 2014-04-18 2014-04-18 The construction method of stage access path

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410155598.1A CN103899092B (en) 2014-04-18 2014-04-18 The construction method of stage access path

Publications (2)

Publication Number Publication Date
CN103899092A true CN103899092A (en) 2014-07-02
CN103899092B CN103899092B (en) 2016-06-08

Family

ID=50990641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410155598.1A Active CN103899092B (en) 2014-04-18 2014-04-18 The construction method of stage access path

Country Status (1)

Country Link
CN (1) CN103899092B (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09317185A (en) * 1996-05-30 1997-12-09 Natl House Ind Co Ltd Construction method of housing
JP2000037720A (en) * 1998-07-22 2000-02-08 Nippon Mesaraito Kogyo Kk Method for handling concrete material and concrete construction method
CN102808450A (en) * 2012-08-28 2012-12-05 初明进 Assembled monolithic shear wall building structure and construction method thereof
CN102561553B (en) * 2012-03-05 2013-12-25 河北联合大学 Prefabricated concrete-filled steel tube frame-shear wall and construction method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09317185A (en) * 1996-05-30 1997-12-09 Natl House Ind Co Ltd Construction method of housing
JP2000037720A (en) * 1998-07-22 2000-02-08 Nippon Mesaraito Kogyo Kk Method for handling concrete material and concrete construction method
CN102561553B (en) * 2012-03-05 2013-12-25 河北联合大学 Prefabricated concrete-filled steel tube frame-shear wall and construction method thereof
CN102808450A (en) * 2012-08-28 2012-12-05 初明进 Assembled monolithic shear wall building structure and construction method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘兰涛: "全悬空、倒挂型多层检修马道施工技术研究", 《青岛理工大学学报》 *

Also Published As

Publication number Publication date
CN103899092B (en) 2016-06-08

Similar Documents

Publication Publication Date Title
CN103758341B (en) Steel column drum rack support type hydraulic lifting overall steel platform cross truss layer construction method
CN103603504B (en) The dynamo-electric heavy caliber standpipe of super highrise building is with the method for main body progress lifting construction
CN101691191B (en) Self-climbing tower crane
CN205077845U (en) Hydraulic intelligent climbing operation scaffold for core barrel well of building
CN205077885U (en) Hydraulic intelligent climbing protection platform for core tube of building
CN101892717B (en) Large autoclaved lightweight aerated concrete slab and installation method thereof
WO2009017354A3 (en) Multi-horizontal structure member forming method
CN103982040A (en) Vertical comprehensive transportation device for super high-rise building construction
CN107476583A (en) A kind of concrete assembled building builds construction method
CN202530769U (en) Large span steel structure high-altitude subsection hoisting support system
CN102493666A (en) High-altitude translation installation and construction method for super-large super-heavy member
CN220723383U (en) Adjusting mechanism for tower crane wall-attached supporting platform
CN104032966A (en) Partitioning, hoisting, overhead closing and mounting method for arc-shaped double-layer net racks
CN102277900B (en) Sectional-stacking jacking mounting method of vase-shaped space steel structure
CN203922362U (en) Build-up type modularization steel structure lift shaft
CN107268971B (en) Dual self-lifting type external climbing frame for super high-rise building and application method
CN105347142A (en) Plate penetrating installing method for installing construction lifting machine on basement top plate
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN103899092B (en) The construction method of stage access path
CN102815631A (en) Plug-in tower crane support frame
CN204111122U (en) Optimize the composition component without scaffold lift-mounting
CN205575534U (en) Lattice formula groined type support body lifting means
CN101592006B (en) Method for preventing window being damaged in construction
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN103334592B (en) Step-type sliding installation construction method for convex structure of high-rise building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant