CN103898880B - The method of reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel - Google Patents

The method of reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel Download PDF

Info

Publication number
CN103898880B
CN103898880B CN201410147519.2A CN201410147519A CN103898880B CN 103898880 B CN103898880 B CN 103898880B CN 201410147519 A CN201410147519 A CN 201410147519A CN 103898880 B CN103898880 B CN 103898880B
Authority
CN
China
Prior art keywords
tunnel
flood discharging
diversion
reconstruction
reservoir
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410147519.2A
Other languages
Chinese (zh)
Other versions
CN103898880A (en
Inventor
韩秋茸
曹国利
李鑫
刘佳
郑宇�
邢建营
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201410147519.2A priority Critical patent/CN103898880B/en
Publication of CN103898880A publication Critical patent/CN103898880A/en
Application granted granted Critical
Publication of CN103898880B publication Critical patent/CN103898880B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses the method for a kind of reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel, import pylon and Diversion Tunnel stem Tunnel Section are built according to designing requirement when building and are put in place by Diversion Tunnel respectively, for the flow-guiding channel in described reservoir construction period; After reservoir building operations completes, in the maintenance gate slot of described import pylon, put into shutoff gate, the crest level of described shutoff gate equals flood discharging tunnel import floor elevation; Then according to the flood discharging tunnel requirement of design, reconstruction of diversion tunnel is flood discharging tunnel by the region fill concrete between described shutoff gate to Diversion Tunnel stem Tunnel Section.The invention has the advantages that more traditional rebuilding conduit into flood release tunnel mode, avoid secondary excavation flood discharging tunnel, reduce difficulty of construction and cost, economy and facility and shorten the duration.The inventive method is particularly useful for medium and small reservoirs flood discharging tunnel input elevation and the less situation of the inlet of diversion tunnel elevation discrepancy in elevation.

Description

The method of reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel
Technical field
The present invention relates to the construction method of medium and small reservoirs flood discharging tunnel, especially relate to the method for reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel.
Background technology
In reservoir construction process, be usually permanent flood discharging tunnel by construction period temporary building reconstruction of diversion tunnel, to reach the object reducing investment.At present in reconstruction, normally excavate Diversion Tunnel first section of tunnel (being commonly called as " dragon comes back ") and rearrange import, therefore there is certain difficulty of construction, particularly for medium and small reservoirs, permanent flood discharging tunnel input elevation and the inlet of diversion tunnel elevation discrepancy in elevation less, traditional digging mode is long in time limit, Investment Influence is comparatively large and construction technical requirement is high.
Summary of the invention
The object of the invention is to provide a kind of reservoir Diversion Tunnel to backfill the method for reconstruction flood discharging tunnel.
For achieving the above object, the present invention takes following technical proposals:
The method of reservoir Diversion Tunnel of the present invention backfill reconstruction flood discharging tunnel, import pylon and Diversion Tunnel stem Tunnel Section are built according to designing requirement when building and are put in place by Diversion Tunnel respectively, for the flow-guiding channel in described reservoir construction period; After reservoir building operations completes, in the maintenance gate slot of described import pylon, put into shutoff gate, the crest level of described shutoff gate equals flood discharging tunnel import floor elevation; Then according to the flood discharging tunnel requirement of design, reconstruction of diversion tunnel is flood discharging tunnel by the region fill concrete between described shutoff gate to Diversion Tunnel stem Tunnel Section.
The invention has the advantages that more traditional rebuilding conduit into flood release tunnel mode, avoid secondary excavation flood discharging tunnel, reduce difficulty of construction and cost, economy and facility and shorten the duration.The inventive method is particularly useful for medium and small reservoirs flood discharging tunnel input elevation and the less situation of the inlet of diversion tunnel elevation discrepancy in elevation.
Accompanying drawing explanation
Fig. 1 is the structural representation of flood discharging tunnel after the reconstruction according to the inventive method enforcement.
Detailed description of the invention
With reference to shown in Fig. 1, the method for reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel of the present invention, in reservoir construction period, merges the import pylon 1 of Diversion Tunnel and flood discharging tunnel and arranges that construction puts in place, for the flow-guiding channel in described reservoir construction period; The hole that after the stem Tunnel Section 2 of described Diversion Tunnel is once excavated to and meets reconstruction, flood discharging tunnel earial drainage requires is high; After reservoir construction has been constructed, shutoff gate 4 is put in the maintenance gate slot 3 of described import pylon 1, the crest level of described shutoff gate 4 equals described flood discharging tunnel import floor elevation, reconstruction of diversion tunnel is that flood discharging tunnel can play flood discharge function by the region fill concrete then between described shutoff gate 4 to Diversion Tunnel stem Tunnel Section 2.The vertical structure shape of Diversion Tunnel stem Tunnel Section 2 fill concrete as shown in Figure 1, i.e. the planform of " dragon come back " 6.

Claims (1)

1. a method for reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel, is characterized in that: in reservoir construction period, was merged by the import pylon of Diversion Tunnel and flood discharging tunnel and arranged that construction puts in place, for the flow-guiding channel in described reservoir construction period; The hole that after the stem Tunnel Section of described Diversion Tunnel is once excavated to and meets reconstruction, flood discharging tunnel earial drainage requires is high; After reservoir construction has been constructed, shutoff gate is put in the maintenance gate slot of described import pylon, the crest level of described shutoff gate equals described flood discharging tunnel import floor elevation, reconstruction of diversion tunnel is flood discharging tunnel by the region fill concrete then between described shutoff gate to Diversion Tunnel stem Tunnel Section.
CN201410147519.2A 2014-04-14 2014-04-14 The method of reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel Active CN103898880B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410147519.2A CN103898880B (en) 2014-04-14 2014-04-14 The method of reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410147519.2A CN103898880B (en) 2014-04-14 2014-04-14 The method of reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel

Publications (2)

Publication Number Publication Date
CN103898880A CN103898880A (en) 2014-07-02
CN103898880B true CN103898880B (en) 2016-03-16

Family

ID=50990435

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410147519.2A Active CN103898880B (en) 2014-04-14 2014-04-14 The method of reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel

Country Status (1)

Country Link
CN (1) CN103898880B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105386426B (en) * 2015-12-18 2018-04-20 长江勘测规划设计研究有限责任公司 The ecological drainage tunnel and method that diversion tunnel reconstruction controls for gates of segmental shape

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1236039A (en) * 1998-05-15 1999-11-24 刘伟亮 Dam for flood discharger
CN101280557A (en) * 2008-05-23 2008-10-08 水利部交通部电力工业部南京水利科学研究院 Method for rebuilding guide current hole to jet flow internal energy dissipating drilled shaft flood discharge hole
CN201214781Y (en) * 2008-06-06 2009-04-01 中国水电顾问集团西北勘测设计研究院 Horizontal rotational flow energy dissipating flood discharging hole
CN201943054U (en) * 2011-03-02 2011-08-24 中国水电顾问集团西北勘测设计研究院 Spillway tunnel rebuilt from diversion tunnel through adopting dragon tail tilting type
CN103388322A (en) * 2013-08-15 2013-11-13 黄河勘测规划设计有限公司 Method for rebuilding diversion tunnel body into flood discharging tunnel body
RU2506369C1 (en) * 2012-08-31 2014-02-10 Открытое акционерное общество "Федеральная гидрогенерирующая компания-РусГидро" Method to erect thin-walled labyrinth water drain from prefabricated reinforced concrete elements

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1236039A (en) * 1998-05-15 1999-11-24 刘伟亮 Dam for flood discharger
CN101280557A (en) * 2008-05-23 2008-10-08 水利部交通部电力工业部南京水利科学研究院 Method for rebuilding guide current hole to jet flow internal energy dissipating drilled shaft flood discharge hole
CN201214781Y (en) * 2008-06-06 2009-04-01 中国水电顾问集团西北勘测设计研究院 Horizontal rotational flow energy dissipating flood discharging hole
CN201943054U (en) * 2011-03-02 2011-08-24 中国水电顾问集团西北勘测设计研究院 Spillway tunnel rebuilt from diversion tunnel through adopting dragon tail tilting type
RU2506369C1 (en) * 2012-08-31 2014-02-10 Открытое акционерное общество "Федеральная гидрогенерирующая компания-РусГидро" Method to erect thin-walled labyrinth water drain from prefabricated reinforced concrete elements
CN103388322A (en) * 2013-08-15 2013-11-13 黄河勘测规划设计有限公司 Method for rebuilding diversion tunnel body into flood discharging tunnel body

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
小浪底水利枢纽孔板泄洪洞改建施工简述;李洛生;《水利水电科技进展》;20030430;第23卷(第02期);第36页第1节至38页第2.4节 *

Also Published As

Publication number Publication date
CN103898880A (en) 2014-07-02

Similar Documents

Publication Publication Date Title
CN204738302U (en) Multi -storey frame formula double row pile supporting construction
CN103132497B (en) Treatment method of deep karst large-flow underground karst cave
CN205205793U (en) Water delivery that utilizes diversion tunnel reconstruction hole makeup of imports of emptyying simultaneously
CN103266594A (en) Slide-resistant pile
CN203795398U (en) Structure for backfilling and reconstructing diversion hole of reservoir into flood discharge hole
CN103898880B (en) The method of reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel
CN205062827U (en) Composite seepage-proofing structure of large karst cave in karst area
CN104265305A (en) Enlarging and excavating method for merging two small-cross-section caverns into one large-cross-section cavern
CN202181907U (en) Tenon-free pipe curtain structure
CN104929129A (en) Concrete cover-weight consolidation grouting method for non-cover-weight combination of different holes through guide pipes
CN104018474B (en) The method in a working tunnel backfill reconstruction maintenance hole
CN104947689A (en) Hole collapse preventive trenching construction method of underground diaphragm wall
CN204212168U (en) Dam water retaining structure for jointly building dam by utilizing karst cave
CN204212180U (en) A kind of reinforcing cage for basement plugging dewatering well
CN105178268A (en) Construction method and structure for combining diversion tunnel and flood discharge tunnel
CN103276706B (en) The construction method of diversion tunnel lower curved section leakage preventing structure
CN205152918U (en) Structure that diversion tunnel and flood discharge tunnel combine
CN202370539U (en) Front tunnel face excavated soil pre-reinforcing structure of tunnel
CN204715318U (en) Diversion tunnel gate shaft structure in mountain
CN205116201U (en) Open caisson construction equipment
CN204782797U (en) Multiinjector drill bit
CN204825820U (en) Pressure regulating well structure using traffic hole as upper chamber
CN209817282U (en) Grout sleeve is used in connection of reinforcing bar of grout mouth above
CN203499692U (en) Special-shaped shaft adopted for subway construction under pipeline conditions
CN209482271U (en) Flood discharge tunnel water inlet structure reconstructed from diversion tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee after: Yellow River Survey Planning and Design Research Institute Co., Ltd.

Address before: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee before: Yellow River Engineering Consulting Co., Ltd.

CP01 Change in the name or title of a patent holder