CN103898880B - The method of reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel - Google Patents
The method of reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel Download PDFInfo
- Publication number
- CN103898880B CN103898880B CN201410147519.2A CN201410147519A CN103898880B CN 103898880 B CN103898880 B CN 103898880B CN 201410147519 A CN201410147519 A CN 201410147519A CN 103898880 B CN103898880 B CN 103898880B
- Authority
- CN
- China
- Prior art keywords
- tunnel
- flood discharging
- diversion
- reconstruction
- reservoir
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses the method for a kind of reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel, import pylon and Diversion Tunnel stem Tunnel Section are built according to designing requirement when building and are put in place by Diversion Tunnel respectively, for the flow-guiding channel in described reservoir construction period; After reservoir building operations completes, in the maintenance gate slot of described import pylon, put into shutoff gate, the crest level of described shutoff gate equals flood discharging tunnel import floor elevation; Then according to the flood discharging tunnel requirement of design, reconstruction of diversion tunnel is flood discharging tunnel by the region fill concrete between described shutoff gate to Diversion Tunnel stem Tunnel Section.The invention has the advantages that more traditional rebuilding conduit into flood release tunnel mode, avoid secondary excavation flood discharging tunnel, reduce difficulty of construction and cost, economy and facility and shorten the duration.The inventive method is particularly useful for medium and small reservoirs flood discharging tunnel input elevation and the less situation of the inlet of diversion tunnel elevation discrepancy in elevation.
Description
Technical field
The present invention relates to the construction method of medium and small reservoirs flood discharging tunnel, especially relate to the method for reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel.
Background technology
In reservoir construction process, be usually permanent flood discharging tunnel by construction period temporary building reconstruction of diversion tunnel, to reach the object reducing investment.At present in reconstruction, normally excavate Diversion Tunnel first section of tunnel (being commonly called as " dragon comes back ") and rearrange import, therefore there is certain difficulty of construction, particularly for medium and small reservoirs, permanent flood discharging tunnel input elevation and the inlet of diversion tunnel elevation discrepancy in elevation less, traditional digging mode is long in time limit, Investment Influence is comparatively large and construction technical requirement is high.
Summary of the invention
The object of the invention is to provide a kind of reservoir Diversion Tunnel to backfill the method for reconstruction flood discharging tunnel.
For achieving the above object, the present invention takes following technical proposals:
The method of reservoir Diversion Tunnel of the present invention backfill reconstruction flood discharging tunnel, import pylon and Diversion Tunnel stem Tunnel Section are built according to designing requirement when building and are put in place by Diversion Tunnel respectively, for the flow-guiding channel in described reservoir construction period; After reservoir building operations completes, in the maintenance gate slot of described import pylon, put into shutoff gate, the crest level of described shutoff gate equals flood discharging tunnel import floor elevation; Then according to the flood discharging tunnel requirement of design, reconstruction of diversion tunnel is flood discharging tunnel by the region fill concrete between described shutoff gate to Diversion Tunnel stem Tunnel Section.
The invention has the advantages that more traditional rebuilding conduit into flood release tunnel mode, avoid secondary excavation flood discharging tunnel, reduce difficulty of construction and cost, economy and facility and shorten the duration.The inventive method is particularly useful for medium and small reservoirs flood discharging tunnel input elevation and the less situation of the inlet of diversion tunnel elevation discrepancy in elevation.
Accompanying drawing explanation
Fig. 1 is the structural representation of flood discharging tunnel after the reconstruction according to the inventive method enforcement.
Detailed description of the invention
With reference to shown in Fig. 1, the method for reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel of the present invention, in reservoir construction period, merges the import pylon 1 of Diversion Tunnel and flood discharging tunnel and arranges that construction puts in place, for the flow-guiding channel in described reservoir construction period; The hole that after the stem Tunnel Section 2 of described Diversion Tunnel is once excavated to and meets reconstruction, flood discharging tunnel earial drainage requires is high; After reservoir construction has been constructed, shutoff gate 4 is put in the maintenance gate slot 3 of described import pylon 1, the crest level of described shutoff gate 4 equals described flood discharging tunnel import floor elevation, reconstruction of diversion tunnel is that flood discharging tunnel can play flood discharge function by the region fill concrete then between described shutoff gate 4 to Diversion Tunnel stem Tunnel Section 2.The vertical structure shape of Diversion Tunnel stem Tunnel Section 2 fill concrete as shown in Figure 1, i.e. the planform of " dragon come back " 6.
Claims (1)
1. a method for reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel, is characterized in that: in reservoir construction period, was merged by the import pylon of Diversion Tunnel and flood discharging tunnel and arranged that construction puts in place, for the flow-guiding channel in described reservoir construction period; The hole that after the stem Tunnel Section of described Diversion Tunnel is once excavated to and meets reconstruction, flood discharging tunnel earial drainage requires is high; After reservoir construction has been constructed, shutoff gate is put in the maintenance gate slot of described import pylon, the crest level of described shutoff gate equals described flood discharging tunnel import floor elevation, reconstruction of diversion tunnel is flood discharging tunnel by the region fill concrete then between described shutoff gate to Diversion Tunnel stem Tunnel Section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410147519.2A CN103898880B (en) | 2014-04-14 | 2014-04-14 | The method of reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410147519.2A CN103898880B (en) | 2014-04-14 | 2014-04-14 | The method of reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103898880A CN103898880A (en) | 2014-07-02 |
CN103898880B true CN103898880B (en) | 2016-03-16 |
Family
ID=50990435
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410147519.2A Active CN103898880B (en) | 2014-04-14 | 2014-04-14 | The method of reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103898880B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105386426B (en) * | 2015-12-18 | 2018-04-20 | 长江勘测规划设计研究有限责任公司 | The ecological drainage tunnel and method that diversion tunnel reconstruction controls for gates of segmental shape |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1236039A (en) * | 1998-05-15 | 1999-11-24 | 刘伟亮 | Dam for flood discharger |
CN101280557A (en) * | 2008-05-23 | 2008-10-08 | 水利部交通部电力工业部南京水利科学研究院 | Method for rebuilding guide current hole to jet flow internal energy dissipating drilled shaft flood discharge hole |
CN201214781Y (en) * | 2008-06-06 | 2009-04-01 | 中国水电顾问集团西北勘测设计研究院 | Horizontal rotational flow energy dissipating flood discharging hole |
CN201943054U (en) * | 2011-03-02 | 2011-08-24 | 中国水电顾问集团西北勘测设计研究院 | Spillway tunnel rebuilt from diversion tunnel through adopting dragon tail tilting type |
CN103388322A (en) * | 2013-08-15 | 2013-11-13 | 黄河勘测规划设计有限公司 | Method for rebuilding diversion tunnel body into flood discharging tunnel body |
RU2506369C1 (en) * | 2012-08-31 | 2014-02-10 | Открытое акционерное общество "Федеральная гидрогенерирующая компания-РусГидро" | Method to erect thin-walled labyrinth water drain from prefabricated reinforced concrete elements |
-
2014
- 2014-04-14 CN CN201410147519.2A patent/CN103898880B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1236039A (en) * | 1998-05-15 | 1999-11-24 | 刘伟亮 | Dam for flood discharger |
CN101280557A (en) * | 2008-05-23 | 2008-10-08 | 水利部交通部电力工业部南京水利科学研究院 | Method for rebuilding guide current hole to jet flow internal energy dissipating drilled shaft flood discharge hole |
CN201214781Y (en) * | 2008-06-06 | 2009-04-01 | 中国水电顾问集团西北勘测设计研究院 | Horizontal rotational flow energy dissipating flood discharging hole |
CN201943054U (en) * | 2011-03-02 | 2011-08-24 | 中国水电顾问集团西北勘测设计研究院 | Spillway tunnel rebuilt from diversion tunnel through adopting dragon tail tilting type |
RU2506369C1 (en) * | 2012-08-31 | 2014-02-10 | Открытое акционерное общество "Федеральная гидрогенерирующая компания-РусГидро" | Method to erect thin-walled labyrinth water drain from prefabricated reinforced concrete elements |
CN103388322A (en) * | 2013-08-15 | 2013-11-13 | 黄河勘测规划设计有限公司 | Method for rebuilding diversion tunnel body into flood discharging tunnel body |
Non-Patent Citations (1)
Title |
---|
小浪底水利枢纽孔板泄洪洞改建施工简述;李洛生;《水利水电科技进展》;20030430;第23卷(第02期);第36页第1节至38页第2.4节 * |
Also Published As
Publication number | Publication date |
---|---|
CN103898880A (en) | 2014-07-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204738302U (en) | Multi -storey frame formula double row pile supporting construction | |
CN103132497B (en) | Treatment method of deep karst large-flow underground karst cave | |
CN205205793U (en) | Water delivery that utilizes diversion tunnel reconstruction hole makeup of imports of emptyying simultaneously | |
CN103266594A (en) | Slide-resistant pile | |
CN203795398U (en) | Structure for backfilling and reconstructing diversion hole of reservoir into flood discharge hole | |
CN103898880B (en) | The method of reservoir Diversion Tunnel backfill reconstruction flood discharging tunnel | |
CN205062827U (en) | Composite seepage-proofing structure of large karst cave in karst area | |
CN104265305A (en) | Enlarging and excavating method for merging two small-cross-section caverns into one large-cross-section cavern | |
CN202181907U (en) | Tenon-free pipe curtain structure | |
CN104929129A (en) | Concrete cover-weight consolidation grouting method for non-cover-weight combination of different holes through guide pipes | |
CN104018474B (en) | The method in a working tunnel backfill reconstruction maintenance hole | |
CN104947689A (en) | Hole collapse preventive trenching construction method of underground diaphragm wall | |
CN204212168U (en) | Dam water retaining structure for jointly building dam by utilizing karst cave | |
CN204212180U (en) | A kind of reinforcing cage for basement plugging dewatering well | |
CN105178268A (en) | Construction method and structure for combining diversion tunnel and flood discharge tunnel | |
CN103276706B (en) | The construction method of diversion tunnel lower curved section leakage preventing structure | |
CN205152918U (en) | Structure that diversion tunnel and flood discharge tunnel combine | |
CN202370539U (en) | Front tunnel face excavated soil pre-reinforcing structure of tunnel | |
CN204715318U (en) | Diversion tunnel gate shaft structure in mountain | |
CN205116201U (en) | Open caisson construction equipment | |
CN204782797U (en) | Multiinjector drill bit | |
CN204825820U (en) | Pressure regulating well structure using traffic hole as upper chamber | |
CN209817282U (en) | Grout sleeve is used in connection of reinforcing bar of grout mouth above | |
CN203499692U (en) | Special-shaped shaft adopted for subway construction under pipeline conditions | |
CN209482271U (en) | Flood discharge tunnel water inlet structure reconstructed from diversion tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 450003 Jinshui Road 109, Zhengzhou City, Henan Province Patentee after: Yellow River Survey Planning and Design Research Institute Co., Ltd. Address before: 450003 Jinshui Road 109, Zhengzhou City, Henan Province Patentee before: Yellow River Engineering Consulting Co., Ltd. |
|
CP01 | Change in the name or title of a patent holder |