CN103883350A - 一种间隔跳采的充填采煤方法 - Google Patents

一种间隔跳采的充填采煤方法 Download PDF

Info

Publication number
CN103883350A
CN103883350A CN201410135850.2A CN201410135850A CN103883350A CN 103883350 A CN103883350 A CN 103883350A CN 201410135850 A CN201410135850 A CN 201410135850A CN 103883350 A CN103883350 A CN 103883350A
Authority
CN
China
Prior art keywords
open
cut
mining
filling
coal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410135850.2A
Other languages
English (en)
Other versions
CN103883350B (zh
Inventor
张新国
张涛
张保良
冯玉振
郭惟嘉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201410135850.2A priority Critical patent/CN103883350B/zh
Publication of CN103883350A publication Critical patent/CN103883350A/zh
Application granted granted Critical
Publication of CN103883350B publication Critical patent/CN103883350B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明提出了一种间隔跳采的充填采煤方法,属于煤矿充填采煤方法技术领域。该方法首先在区段平巷末端开掘出第一开切眼,然后在距离第一开切眼一定距离掘进第二开切眼,待第二开切眼掘进完毕后,在第二开切眼用壁式体系采煤法进行开采;在距离第二开切眼一定距离掘进第三开切眼,在掘进第三开切眼的同时对第二开切眼处开采后的采空区进行充填,依次类推,直至开采至停采线。本发明采煤方法使开采能够在两端有支撑的条件下进行,实现轮采轮充,保证了顶底板的完整性,减少了上覆岩层的运动,达到了控制地表沉陷的目的;充填开采结束后,回采剩下的煤柱不需要进行充填,减少了充填材料,节省了充填成本。

Description

一种间隔跳采的充填采煤方法
技术领域
本发明属于煤矿充填采煤方法领域,具体涉及一种间隔跳采的充填采煤方法。
背景技术
煤炭资源日渐枯竭,建筑物下、铁路下、水体下和承压水上(“三下一上”)压煤开采成为煤矿开采面临的重要问题。目前采用的采煤方法有长壁式充填采煤方法、短壁充填采煤方法、巷式充填采煤方法,但是长壁采煤方法不能有效控制在开采中的顶底板的稳定性,短壁采煤方法充填率高,材料消耗大。巷式采煤方法采出率低,工艺复杂,劳动强度较大。
发明内容
为了解决上述现有技术中存在的问题,本发明提出了一种间隔跳采的充填采煤方法,该采煤方法减少了上覆岩层的运动,达到了控制地表沉陷的目的。
本发明技术方案包括:
一种间隔跳采的充填采煤方法,包括以下步骤:
a、在待采区段工作面上部和下部分别布置一条区段平巷,作为上部区段平巷和下部区段平巷,在所述上部区段平巷末端和下部区段平巷末端分别开掘第一开切眼,使两条区段平巷连通,形成均压通风,在第一开切眼内设置风门;
b、在上述上部区段平巷中布置充填主管,所述充填主管通过变径三通连接对采空区进行充填的高压充填胶管;
c、在距离上述第一开切眼20m处,掘进第二开切眼,待第二开切眼掘进完毕后,关闭第一开切眼中的风门,从第二开切眼处用壁式体系采煤法开始开采;
d、接步骤c,开采结束后在下部区段平巷处垒砌隔离墙,打开第一开切眼中的风门,在距离第一开切眼60m处掘进第三开切眼,与此同时对步骤c中第二开切眼处开采后的采空区进行充填,待第三开切眼掘进完毕后,在第三开切眼处用壁式体系采煤法开始开采;
e、接步骤d,开采结束后在下部区段平巷处垒砌隔离墙,打开第一开切眼中的风门,在距离第一开切眼100m处掘进第四开切眼,同时对上述第三开切眼处开采后的采空区进行充填;待第四开切眼掘进完毕后,在第四开切眼处用壁式体系采煤法开始开采;
f、按照步骤c、d、e的方法依次类推,直至开采至停采线;
g、充填开采结束后,在第一开切眼采用壁式体系采煤法开采第一段剩余煤柱;
h、开采结束后在第二段剩余煤柱靠近第一开切眼附近再掘进开切眼,采用壁式开采体系开采第二段剩余煤柱;
j、依次类推,回收所有剩余煤柱。
作为本发明的一个优选方案,上述充填主管上设置有阀门、压力传感器和流量传感器。
本发明所带来的有益技术效果:
本发明提出了一种间隔跳采的充填采煤方法,首先在区段平巷末端开掘出第一开切眼,然后在距离第一开切眼一定距离掘进第二开切眼,而现有技术中普遍采用的方法是开掘出第一开切眼后,在距离第一开切眼一定距离进行采煤,与现有技术相比,本发明采煤方法使得开采能够在两端有支撑的条件下进行,实现轮采轮充,保证了顶底板的完整性,减少了上覆岩层的运动,达到了控制地表沉陷的目的;充填开采结束后,回采剩下的煤柱不需要进行充填,减少了充填材料,节省了充填成本。
附图说明
下面结合附图对本发明做进一步清楚、完整的说明。
图1为本发明采煤系统结构简图;
图中,11、区段平巷一,12、区段平巷二,2、充填主管,3、变径三通,4、充填支管,5、隔离墙,61、第一开切眼,62、第二开切眼,63、第三开切眼,71、第二开切眼处煤层,72、第三开切眼处煤层。
具体实施方式
本发明提出了一种间隔跳采的充填采煤方法,为了使本发明的优点、技术方案更加清楚、明确,下面结合具体实施方式对本发明做进一步清楚、完整的说明。
如图1所示,以某煤矿为例,首先布置充填采煤系统,本发明,充填采煤系统包括布置在工作面区段平巷内的充填主管2、高压胶管和多根充填支管4,充填主管2上布置有变径三通3,变径三通3根据充填面的布置设置在区段平巷一11的中部,高压胶管通过变径三通3连接到充填主管2上,多根充填支管4并联连接在高压胶管上,固定在工作面区段平巷一11内,隔离墙5采用防水布和草苫子,外部加木板和液压支柱加固。
为检测充填量和充填压力,可以在每根充填主管上均安设流量、压力传感器,通过控制系统,如计算机、PLC等设备实时监控充填状况,同时还可以在每根工作面充填主管上设置阀门,当需要停止某处的充填时,关闭相关位置的充填管上的阀门即可,当需要停止整个充填时,则关闭充填主管上的阀门。
采用上述充填系统实施的采煤方法,包括以下步骤:
步骤1:在设计好的区段中布置两条区段平巷,区段平巷一11和区段平巷二12,在区段平巷一11与区段平巷二12的末端开掘第一开切眼61,使两条区段平巷一11与区段平巷二12联通,连通后的形成均压通风,在第一开切眼61内设置风门;
步骤2:在工作面区段平巷一11中布置充填主管2,并将充填主管2通过变径三通连接至高压充填胶管;
步骤3:上述区段从第一开切眼61至停采线按照每20m距离分为,第一,二,三···块段;
步骤4:在距离采煤工作面第一开切眼6120m,即第二块段处,掘进第二开切眼62,待第二开切眼62掘进完毕后,关闭第一开切眼61中的风门,从第二开切眼62开始用壁式体系采煤法进行开采第二块段;
步骤5:第二块段开采结束后迅速在下部区段平巷垒砌隔离墙,打开第一开切眼中的风门,在距离第一开切眼6160m,即第四块段处,掘进第三开切眼63,同时对步骤4中第二开切眼62处开采后的采空区71进行充填,待第三开切眼63掘进完毕后,在第三开切眼63开始用壁式体系采煤法开始开采第四块段;
步骤6:第四块段开采结束后迅速在下部区段平巷垒砌隔离墙,打开第一开切眼中的风门,在距离第一开切眼61100m,即第六块段处掘进第四开切眼,同时对步骤5第三开切眼处72开采后的采空区进行充填第六块段;
步骤7:按照步骤4、5、6的采煤方法依此类推,直至开采完所有偶数块段。
步骤8:充填开采结束后,在第一开切眼61处采用壁式开采体系开采第一段剩余煤柱,即图1中第一开切眼61附近的黑色填充部分;
步骤9:开采结束后在第二段剩余煤柱靠近第一开切眼61附近再掘进开切眼,采用壁式开采体系开采第二段剩余煤柱;
步骤10:依次类推,回收所有奇数块段剩余煤柱。
需要说明的是,在本说明书的教导下,本领域技术人员所做出的任何等同替代方式,或明显变型方式,均应在本发明的保护范围之内。

Claims (2)

1.一种间隔跳采的充填采煤方法,其特征在于:包括以下步骤:
a、在待采区段工作面上部和下部分别布置一条区段平巷,作为上部区段平巷和下部区段平巷,在所述上部区段平巷末端和下部区段平巷末端分别开掘第一开切眼,使两条区段平巷连通,形成均压通风,在第一开切眼内设置风门;
b、在上述上部区段平巷中布置充填主管,所述充填主管通过变径三通连接对采空区进行充填的高压充填胶管;
c、在距离上述第一开切眼20m处,掘进第二开切眼,待第二开切眼掘进完毕后,关闭第一开切眼中的风门,从第二开切眼处用壁式体系采煤法开始开采;
d、接步骤c,开采结束后在下部区段平巷处垒砌隔离墙,打开第一开切眼中的风门,在距离第一开切眼60m处掘进第三开切眼,与此同时对步骤c中第二开切眼处开采后的采空区进行充填,待第三开切眼掘进完毕后,在第三开切眼处用壁式体系采煤法开始开采;
e、接步骤d,开采结束后在下部区段平巷处垒砌隔离墙,打开第一开切眼中的风门,在距离第一开切眼100m处掘进第四开切眼,同时对上述第三开切眼处开采后的采空区进行充填;待第四开切眼掘进完毕后,在第四开切眼处用壁式体系采煤法开始开采;
f、按照步骤c、d、e的方法依次类推,直至开采至停采线;
g、充填开采结束后,在第一开切眼采用壁式体系采煤法开采第一段剩余煤柱;
h、开采结束后在第二段剩余煤柱靠近第一开切眼附近再掘进开切眼,采用壁式开采体系开采第二段剩余煤柱;
j、依次类推,回收所有剩余煤柱。
2.根据权利要求1所述的一种间隔跳采的充填采煤方法,其特征在于:所述充填主管上设置有阀门、压力传感器和流量传感器。
CN201410135850.2A 2014-04-04 2014-04-04 一种间隔跳采的充填采煤方法 Expired - Fee Related CN103883350B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410135850.2A CN103883350B (zh) 2014-04-04 2014-04-04 一种间隔跳采的充填采煤方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410135850.2A CN103883350B (zh) 2014-04-04 2014-04-04 一种间隔跳采的充填采煤方法

Publications (2)

Publication Number Publication Date
CN103883350A true CN103883350A (zh) 2014-06-25
CN103883350B CN103883350B (zh) 2016-04-27

Family

ID=50952444

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410135850.2A Expired - Fee Related CN103883350B (zh) 2014-04-04 2014-04-04 一种间隔跳采的充填采煤方法

Country Status (1)

Country Link
CN (1) CN103883350B (zh)

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104481536A (zh) * 2014-11-13 2015-04-01 中国矿业大学 控制覆岩裂隙与地表沉陷的掘采充平行作业的采煤方法
CN104564011A (zh) * 2015-02-11 2015-04-29 新奥气化采煤有限公司 一种地下气化方法
CN105041319A (zh) * 2015-08-25 2015-11-11 袁伟昊 一种井工煤矿巷邦无人工作面及充填开采方法
CN105673014A (zh) * 2016-01-07 2016-06-15 山东科技大学 坚硬顶板跳采工作面冲击地压控制方法
CN106089206A (zh) * 2016-05-23 2016-11-09 西安科技大学 中小矿井窄条带开采残采区局部充填煤柱置换方法
CN106522948A (zh) * 2016-11-25 2017-03-22 山东科技大学 一种短壁矸石胶结连采连充采煤法
CN107829736A (zh) * 2017-08-03 2018-03-23 西安科技大学 一种煤矿条带开采与充填置换煤柱方法
CN108457652A (zh) * 2018-02-09 2018-08-28 中国煤炭科工集团太原研究院有限公司 一种分区块段式全风压短壁连采充填方法
WO2019015362A1 (zh) * 2017-07-21 2019-01-24 中国矿业大学 一种浅埋煤层保水开采方法及其应用
CN110295905A (zh) * 2019-07-15 2019-10-01 中国矿业大学 一种倾斜煤层的高压水精准碎煤充填开采方法
CN110439561A (zh) * 2019-08-29 2019-11-12 山东能源集团科技发展有限公司 一种连采连充采煤工艺
CN112253115A (zh) * 2020-10-14 2021-01-22 中国矿业大学(北京) 近水平煤层巷式胶结充填开采方法
WO2021068691A1 (zh) * 2019-10-09 2021-04-15 巨峰 一种煤矿强弱强全采全充方法
CN113217025A (zh) * 2021-05-21 2021-08-06 长沙矿山研究院有限责任公司 一种适用于大水矿床快速开采的帷幕注浆方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2277171C1 (ru) * 2004-11-09 2006-05-27 ГНУ "Центр информационно-аналитического обеспечения системы дистанционного образования Министерства образования Российской Федерации" (ЦИАН) Способ подземной разработки месторождения твердого полезного ископаемого
CN101660410A (zh) * 2008-11-03 2010-03-03 侯忠杰 一种长壁间隔式采煤方法
RU2390633C1 (ru) * 2009-02-05 2010-05-27 Учреждение Российской академии наук Институт горного дела Сибирского отделения РАН Способ разработки крутых пластов угля
US20100295359A1 (en) * 2009-05-20 2010-11-25 Mti Products Pty Ltd Collapsible Cushion
CN102444419A (zh) * 2011-12-31 2012-05-09 山东科技大学 一种薄煤层破碎顶板拖管式充填系统
CN103147757A (zh) * 2013-03-26 2013-06-12 白如鸿 一种间歇式采煤方法
CN103696771A (zh) * 2013-12-18 2014-04-02 中国矿业大学 一种跳采式旺格维利采场支巷充填采煤方法

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2277171C1 (ru) * 2004-11-09 2006-05-27 ГНУ "Центр информационно-аналитического обеспечения системы дистанционного образования Министерства образования Российской Федерации" (ЦИАН) Способ подземной разработки месторождения твердого полезного ископаемого
CN101660410A (zh) * 2008-11-03 2010-03-03 侯忠杰 一种长壁间隔式采煤方法
RU2390633C1 (ru) * 2009-02-05 2010-05-27 Учреждение Российской академии наук Институт горного дела Сибирского отделения РАН Способ разработки крутых пластов угля
US20100295359A1 (en) * 2009-05-20 2010-11-25 Mti Products Pty Ltd Collapsible Cushion
CN102444419A (zh) * 2011-12-31 2012-05-09 山东科技大学 一种薄煤层破碎顶板拖管式充填系统
CN103147757A (zh) * 2013-03-26 2013-06-12 白如鸿 一种间歇式采煤方法
CN103696771A (zh) * 2013-12-18 2014-04-02 中国矿业大学 一种跳采式旺格维利采场支巷充填采煤方法

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104481536A (zh) * 2014-11-13 2015-04-01 中国矿业大学 控制覆岩裂隙与地表沉陷的掘采充平行作业的采煤方法
CN104564011B (zh) * 2015-02-11 2018-08-14 新奥科技发展有限公司 一种地下气化方法
CN104564011A (zh) * 2015-02-11 2015-04-29 新奥气化采煤有限公司 一种地下气化方法
CN105041319A (zh) * 2015-08-25 2015-11-11 袁伟昊 一种井工煤矿巷邦无人工作面及充填开采方法
CN105673014A (zh) * 2016-01-07 2016-06-15 山东科技大学 坚硬顶板跳采工作面冲击地压控制方法
CN106089206A (zh) * 2016-05-23 2016-11-09 西安科技大学 中小矿井窄条带开采残采区局部充填煤柱置换方法
CN106522948A (zh) * 2016-11-25 2017-03-22 山东科技大学 一种短壁矸石胶结连采连充采煤法
WO2019015362A1 (zh) * 2017-07-21 2019-01-24 中国矿业大学 一种浅埋煤层保水开采方法及其应用
CN107829736A (zh) * 2017-08-03 2018-03-23 西安科技大学 一种煤矿条带开采与充填置换煤柱方法
CN108457652A (zh) * 2018-02-09 2018-08-28 中国煤炭科工集团太原研究院有限公司 一种分区块段式全风压短壁连采充填方法
CN110295905A (zh) * 2019-07-15 2019-10-01 中国矿业大学 一种倾斜煤层的高压水精准碎煤充填开采方法
CN110439561A (zh) * 2019-08-29 2019-11-12 山东能源集团科技发展有限公司 一种连采连充采煤工艺
WO2021068691A1 (zh) * 2019-10-09 2021-04-15 巨峰 一种煤矿强弱强全采全充方法
CN112253115A (zh) * 2020-10-14 2021-01-22 中国矿业大学(北京) 近水平煤层巷式胶结充填开采方法
CN113217025A (zh) * 2021-05-21 2021-08-06 长沙矿山研究院有限责任公司 一种适用于大水矿床快速开采的帷幕注浆方法

Also Published As

Publication number Publication date
CN103883350B (zh) 2016-04-27

Similar Documents

Publication Publication Date Title
CN103883350A (zh) 一种间隔跳采的充填采煤方法
CN103527200B (zh) 无底柱分段菱形矿房嗣后充填采矿法
CN102996131B (zh) 一种预掘两巷前进式固体充填采煤方法
CN102493838B (zh) 一种急倾斜煤层综采连续充填采煤方法
AU2013354613B2 (en) Method of local filling to control surface subsidence in worked-out area
WO2014187163A1 (zh) 一种特厚煤层倾斜分层固体充填采煤方法
CN104500070B (zh) 一种连续采煤机膏体充填开采方法
CN106014344B (zh) 一种绿色保水煤铀协调开采系统及其应用方法
CN104088638B (zh) 大倾角煤层长壁大采高工作面煤壁片帮及冒顶控制技术
CN101749020A (zh) 充填法前进式采煤
CN104330107A (zh) 一种固体充填采煤工作面充填质量评价方法
CN106761750B (zh) 急倾斜煤层纵向长壁刨铣建槽式开采方法
CN110847912A (zh) 一种回采工作面“支-卸”组合沿空留巷巷道及施工方法
CN204299617U (zh) 一种防刮裂型沿空留巷充填气囊
CN112253115A (zh) 近水平煤层巷式胶结充填开采方法
CN103993881A (zh) 一种长壁巷式胶结充填开采方法
CN116163730A (zh) 一种薄煤层钻机双向前进充填开采及二氧化碳封存的方法
CN204283488U (zh) 一种恒阻让压沿空留巷充填气囊
CN106285692A (zh) 一种沿空留巷的施工方法
CN105298494A (zh) 固体与胶结体复合充填采煤方法
CN203756173U (zh) 一种采后充填原巷道无煤柱沿空掘巷系统
CN112412461B (zh) 一种露天矿端帮煤充填开采工艺方法
CN112610212B (zh) 一种采区单向掘进无煤柱开采方法
CN112647947B (zh) 一种采区无煤柱采掘方法
CN205036404U (zh) 一种解决工作面瓦斯超限问题的专用瓦斯抽放巷布置装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160427

Termination date: 20170404