CN103882791A - 一种混凝土预制半涵管急流槽结构 - Google Patents
一种混凝土预制半涵管急流槽结构 Download PDFInfo
- Publication number
- CN103882791A CN103882791A CN201410058382.3A CN201410058382A CN103882791A CN 103882791 A CN103882791 A CN 103882791A CN 201410058382 A CN201410058382 A CN 201410058382A CN 103882791 A CN103882791 A CN 103882791A
- Authority
- CN
- China
- Prior art keywords
- culvert pipe
- concrete prefabricated
- concrete
- prefabricated half
- half culvert
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Sewage (AREA)
Abstract
本发明公开了一种混凝土预制半涵管急流槽结构,在底部固定砂浆(1)上设有混凝土预制半涵管(2),在所述的混凝土预制半涵管(2)的槽底中部设有弧高40mm~60mm的小圆弧形消能阶步(10),在两节所述的混凝土预制半涵管(2)接缝部位设有弧高180mm~220mm的大圆弧形消能阶步(9),在所述的混凝土预制半涵管(2)的两侧各设有一个沟帮(3)。本发明提供的混凝土预制半涵管急流槽结构,与浆砌片石急流槽比既能快速施工,又具备成本低、易维护等显著优势的混凝土预制半涵管急流槽结构。
Description
技术领域
本发明涉及一种公路边坡的排水结构物,特别是涉及到一种混凝土预制半涵管急流槽结构。
背景技术
在长度超过100米的高路堤或高路堑边坡,为将截水沟和各级平台边沟中汇集的地表水排至路基边沟中,防止降雨对边坡的冲刷破坏,一般应在坡面中部设置1个以上急流槽。目前在我国高速公路高路堤或高路堑边坡中常采用浆砌片石急流槽。在高路堑边坡中常常无运输道路,由于人工工资的大幅提高,施工浆砌片石急流槽的人工费已大为提高,加上人工搬运片石也需较大的人工运输费,这使得在无法用运输工具运输片石的条件下,浆砌片石急流槽施工成本的增加,施工工期也大为增加。尤其是当边坡采用柔性支护结构加固时,在柔性支护结构体上施工浆砌片石急流槽易因柔性支护结构某些部位的变形造成部分浆砌片石急流槽开裂破坏,由此还将出现急流槽修复难度大的问题。
发明内容
本发明所要解决的技术问题是提供一种既能在无运输道路的高路堑边坡中快速施工、又具有成本低、易于修复优势的混凝土预制半涵管急流槽结构。
为了解决上述技术问题,本发明提供的混凝土预制半涵管急流槽结构,在底部固定砂浆上设有混凝土预制半涵管,在所述的混凝土预制半涵管的槽底中部设有弧高40mm~60mm的小圆弧形消能阶步,在两节所述的混凝土预制半涵管接缝部位设有弧高180mm~220mm的大圆弧形消能阶步,在所述的混凝土预制半涵管的两侧各设有一个沟帮。
所述的底部固定砂浆采用M7.5水泥砂浆,宽度大于700mm、厚度不小于100mm。
所述的混凝土预制半涵管采用钢筋混凝土管,规格是:单节长1000mm,直径为800mm,厚度为50mm;所述的混凝土预制半涵管各节之间通过混凝土砂浆连接。
所述的弧高40mm~60mm的小圆弧形消能阶步由直径6mm、相互间距90mm的3根垂向钢筋和一根直径6mm的横向水平钢筋组成阶步骨架和50mm厚混凝土现浇而成,所述阶步骨架由3根一端插入到预先在混凝土预制半涵管槽底中部钻好的30mm深钻孔中并用现浇混凝土固定的垂向钢筋和与垂向钢筋另一端焊接的一根直径6mm的横向水平钢筋组成,横向水平钢筋与半涵管的最大弧高不超过50mm;所述的弧高180mm~220mm的大圆弧形消能阶步由三根横向水平钢筋组成阶步骨架后再用40mm~60mm厚混凝土现浇而成,所述的3根横向水平钢筋直径为6mm,相互间距为60mm,且两端应延伸到接缝混凝土边部。
所述的沟帮由一片平行的40mm×80mm×120mm的片砖采用M7.5水泥砂浆砌筑并抹面后形成。
所述的小圆弧形消能阶步的弧高为50mm,所述的大圆弧形消能阶步的弧高为200mm。
采用上述技术方案的混凝土预制半涵管急流槽结构,由于一节一米长的混凝土预制半涵管可直接由小挖机从平台运至施工部位,且在现场施工一米长的混凝土预制半涵管急流槽的施工时间不到同长度浆砌片石急流槽的三分之一,因运输和施工中人工成本的大量节省,也使得本发明提供的混凝土预制半涵管急流槽结构比浆砌片石急流槽具有成本低的显著优势。此外,当在柔性支护结构体上使用时,由于柔性支护结构的变形只会造成半涵管接缝处破坏,因此,混凝土预制半涵管急流槽易于修复。
综上所述,本发明提供的混凝土预制半涵管急流槽结构与浆砌片石急流槽比,既能快速施工,又具备成本低、易维护等显著优势。
附图说明
图1是本发明提供的混凝土预制半涵管急流槽结构的大样图。
具体实施方式
下面结合附图和具体实施方式对本发明作进一步说明。
参见图1和图2,混凝土预制半涵管急流槽结构包括底部固定砂浆1、混凝土预制半涵管2、大圆弧形消能阶步9、小圆弧形消能阶步10和顶部两个沟帮3四个部分。在底部固定砂浆1上设有混凝土预制半涵管2,在单节混凝土预制半涵管2的槽底中部设有弧高40mm~60mm的小圆弧形消能阶步10,优选高度为50mm,在两节混凝土预制半涵管2的接缝处设有弧高180mm~220mm的大圆弧形消能阶步9,优选高度为200mm,在混凝土预制半涵管2的两侧各设有一个沟帮3。底部固定砂浆1采用M7.5水泥砂浆,宽度4应大于700mm、最小厚度5不得小于100mm;预制半涵管2采用半边单节长1000mm、直径6为800mm、厚度11为50mm的钢筋混凝土管,在相邻各节混凝土预制半涵管2之间通过混凝土砂浆连接12,并要求用水泥沟缝;小圆弧形消能阶步10由直径6mm、相互间距90mm的3根垂向钢筋和一根直径6mm的横向水平钢筋组成阶步骨架13后再用50mm混凝土现浇而成,横向水平钢筋与半涵管的最大弧高不超过50mm,大圆弧形消能阶步9由三根横向水平钢筋组成阶步骨架14后再用50mm厚混凝土现浇而成,3根横向水平钢筋直径为6mm,相互间距为60mm,且两端应延伸到接缝混凝土边部。在混凝土预制半涵管2的两侧设置的两个沟帮3各为由一片平行的40mm×80mm×120mm的片砖7采用M7.5水泥砂浆砌筑并抹面8后形成。
参见图1和图2,在边坡设计部位先开挖一深度为200mm的小沟(对于柔性支护结构应挖至土工格栅包裹面);在小沟中部采用M7.5水泥砂浆按底部固定砂浆1的尺寸砌筑宽度4大于700mm、最小厚度5不小于100mm的砂浆;将预制好的单节长1000mm、直径6为800mm、厚度11为50mm的钢筋混凝土管用电锯对半锯开,并在每节半涵管的槽底中部钻好3个平行管径、30mm深、间距100mm、直径8mm的钻孔;将准备好的混凝土预制半涵管2运至施工部位并压入底部固定砂浆1;参照图1中13用直径6mm钢筋按最大弧高不超过50mm及深度30mm的要求制作小圆弧形消能阶步骨架;将制作好的小圆弧形消能阶步骨架的三根竖向钢筋的一端插于所述半涵管的槽底中部钻好的3个钻孔中并用水泥浆固定,再用50mm厚的M7.5水泥砂浆现浇形成小圆弧形消能阶步10;参照图2中14按580mm、700mm、780mm剪好三根直径6mm钢筋,并在半涵管的接缝处用M7.5水泥砂浆按60mm间距均匀装上三根水平钢筋;在将第二节混凝土预制半涵管2压入底部固定砂浆1后,在混凝土预制半涵管2各节之间通过水泥砂浆连接12并勾缝,再用50mm厚的M7.5水泥砂浆现浇形成大圆弧形消能阶步9;在混凝土预制半涵管2顶部两个沟帮3各用M7.5水泥砂浆砌筑一片平行的40mm×80mm×120mm的片砖7,并用水泥砂浆抹面8。
参见图1和图2,本发明提供了一种比浆砌片石急流槽施工快速、成本低且易于维护的新型急流槽结构。
Claims (6)
1.一种混凝土预制半涵管急流槽结构,其特征是:在底部固定砂浆(1)上设有混凝土预制半涵管(2),在所述的混凝土预制半涵管(2)的槽底中部设有弧高40mm~60mm的小圆弧形消能阶步(10),在两节所述的混凝土预制半涵管(2)接缝部位设有弧高180mm~220mm的大圆弧形消能阶步(9),在所述的混凝土预制半涵管(2)的两侧各设有一个沟帮(3)。
2.根据权利要求1所述的混凝土预制半涵管急流槽结构,其特征是:所述的底部固定砂浆(1)采用M7.5水泥砂浆,宽度(4)大于700mm、厚度(5)不小于100mm。
3.根据权利要求1或2所述的混凝土预制半涵管急流槽结构,其特征是:所述的混凝土预制半涵管(2)采用钢筋混凝土管,规格是:单节长1000mm,直径(6)为800mm,厚度(11)为50mm;所述的混凝土预制半涵管(2)各节之间通过混凝土砂浆(12)连接。
4.根据权利要求1或2所述的混凝土预制半涵管急流槽结构,其特征是:所述的弧高40mm~60mm的小圆弧形消能阶步(10)由直径6mm、相互间距90mm的3根垂向钢筋和一根直径6mm的横向水平钢筋组成阶步骨架和50mm厚混凝土现浇而成(13),所述阶步骨架由3根一端插入到预先在混凝土预制半涵管槽底中部钻好的30mm深钻孔中并用现浇混凝土固定的垂向钢筋和与垂向钢筋另一端焊接的一根直径6mm的横向水平钢筋组成,横向水平钢筋与半涵管的最大弧高不超过50mm;所述的弧高180mm~220mm的大圆弧形消能阶步(9)由三根横向水平钢筋组成阶步骨架(14)后再用50mm厚混凝土现浇而成,所述的3根横向水平钢筋直径为6mm,相互间距为60mm,且两端应延伸到接缝混凝土边部。
5.根据权利要求1或2所述的混凝土预制半涵管急流槽的结构,其特征是:所述的沟帮(3)由一片平行的40mm×80mm×120mm的片砖(7)采用M7.5水泥砂浆砌筑并抹面(8)后形成。
6.根据权利要求1或2所述的混凝土预制半涵管急流槽的结构,其特征是:所述的小圆弧形消能阶步(10)的弧高为50mm,所述的大圆弧形消能阶步(9)的弧高为200mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410058382.3A CN103882791B (zh) | 2014-02-20 | 2014-02-20 | 一种混凝土预制半涵管急流槽结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410058382.3A CN103882791B (zh) | 2014-02-20 | 2014-02-20 | 一种混凝土预制半涵管急流槽结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103882791A true CN103882791A (zh) | 2014-06-25 |
CN103882791B CN103882791B (zh) | 2015-11-18 |
Family
ID=50951894
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410058382.3A Expired - Fee Related CN103882791B (zh) | 2014-02-20 | 2014-02-20 | 一种混凝土预制半涵管急流槽结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103882791B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110777816A (zh) * | 2019-10-31 | 2020-02-11 | 安徽省路港工程有限责任公司 | 复合装配式急流槽的施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004137788A (ja) * | 2002-10-18 | 2004-05-13 | Maruei Concrete Industries Co Ltd | 道路用側溝 |
EP1867795A1 (de) * | 2006-06-16 | 2007-12-19 | BIRCO Baustoffwerk GmbH | Entwässerungskörper mit Reinigungsausnehmungen |
CN200999325Y (zh) * | 2007-01-19 | 2008-01-02 | 王又超 | 公路管式路面排水装置 |
CN201411613Y (zh) * | 2009-05-08 | 2010-02-24 | 王大卫 | 一种公路用急流槽 |
CN201648912U (zh) * | 2010-04-26 | 2010-11-24 | 吴泽宏 | 一种预制的排水系统沟槽 |
CN203393537U (zh) * | 2013-07-17 | 2014-01-15 | 中国十七冶集团有限公司 | 装配式公路路堤排水急流槽 |
-
2014
- 2014-02-20 CN CN201410058382.3A patent/CN103882791B/zh not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004137788A (ja) * | 2002-10-18 | 2004-05-13 | Maruei Concrete Industries Co Ltd | 道路用側溝 |
EP1867795A1 (de) * | 2006-06-16 | 2007-12-19 | BIRCO Baustoffwerk GmbH | Entwässerungskörper mit Reinigungsausnehmungen |
CN200999325Y (zh) * | 2007-01-19 | 2008-01-02 | 王又超 | 公路管式路面排水装置 |
CN201411613Y (zh) * | 2009-05-08 | 2010-02-24 | 王大卫 | 一种公路用急流槽 |
CN201648912U (zh) * | 2010-04-26 | 2010-11-24 | 吴泽宏 | 一种预制的排水系统沟槽 |
CN203393537U (zh) * | 2013-07-17 | 2014-01-15 | 中国十七冶集团有限公司 | 装配式公路路堤排水急流槽 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110777816A (zh) * | 2019-10-31 | 2020-02-11 | 安徽省路港工程有限责任公司 | 复合装配式急流槽的施工方法 |
CN110777816B (zh) * | 2019-10-31 | 2021-06-29 | 安徽省路港工程有限责任公司 | 复合装配式急流槽的施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103882791B (zh) | 2015-11-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103924501B (zh) | 一种农村水泥路面局部破坏修复中的加筋施工方法 | |
CN108547641B (zh) | 富水软弱地层重载铁路隧道的基底加固体系及其施工方法 | |
CN109356173A (zh) | 一种拼装式锚杆框架梁结构及其施工方法 | |
CN103874803A (zh) | 用于建造结构的方法,尤其是建造运营铁路或类似物下通道的方法 | |
CN105714635B (zh) | 一种混凝土排水路面及其施工、修补方法 | |
CN201089875Y (zh) | 用于道路加宽中混凝土新旧路面相接处的路面结构 | |
CN104631440A (zh) | 一种既有大直径灌注桩劲芯增长基坑支护结构及施工方法 | |
CN108035379B (zh) | 一种综合管廊及其施工方法 | |
CN105839651A (zh) | 路基边坡装配式变形自适应防护骨架及其拼接方法 | |
CN210194361U (zh) | 道路加宽新旧路基拼接结构 | |
CN103835310A (zh) | 一种框格式重力挡土墙 | |
CN108824240A (zh) | 一种圆管涵施工方法及辅助装置 | |
CN113502835A (zh) | 一种湿连接蜂窝状装配式格梁护坡结构 | |
CN109163143A (zh) | 一种装配式顶管工作沉井及利用其的施工方法 | |
CN111139863B (zh) | 一种用于明挖半逆作法隧道围檩节点的防水施工方法 | |
KR100784201B1 (ko) | 암석구간에서의 강관루프 구조체를 이용한 터널시공 방법 | |
CN103882791B (zh) | 一种混凝土预制半涵管急流槽结构 | |
CN109853624B (zh) | 一种针对既有高速公路矩形涵洞的扩建施工方法 | |
CN108729466B (zh) | 一种构筑无锚钉砼挡墙的大模板支撑方法 | |
CN103850162A (zh) | 桥式组合结构路面体系及其施工方法 | |
CN112962534B (zh) | 一种大面积疏浚吹填土地基结构及其处理方法 | |
CN105926652B (zh) | 一种挡土斜墙的加固方法及结构 | |
CN211815250U (zh) | 一种道路加宽路基拼接结构 | |
CN209620049U (zh) | 一种拼装式锚杆框架梁结构 | |
CN210049908U (zh) | 地表冲沟铺砌结构及浅埋地段隧道结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151118 Termination date: 20210220 |
|
CF01 | Termination of patent right due to non-payment of annual fee |