Brick wall reinforcing method and structure Download PDFInfo
- Publication number
- CN103835521A CN103835521A CN201210471183.6A CN201210471183A CN103835521A CN 103835521 A CN103835521 A CN 103835521A CN 201210471183 A CN201210471183 A CN 201210471183A CN 103835521 A CN103835521 A CN 103835521A
- Authority
- CN
- China
- Prior art keywords
- brick wall
- reinforcement
- wall
- sides
- sand bed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a brick wall reinforcing method and structure. The method includes the steps of enabling reinforcing mesh pieces to be attached to the two faces of a brick wall after a paint layer is removed from the surface of the brick wall to be reinforced, fixing the reinforcing mesh pieces on the two sides of the wall body through steel ties, enabling the wall body to be clamped between the reinforcing mesh pieces, and then spraying cement mortar. The wall body and a reinforcing body are connected into a whole, and therefore bearing capacity, lateral stiffness and wall body ductility of the brick wall can be greatly improved. According to the brick wall reinforcing method and structure, a traditional brick wall cross section expanding method is changed for reinforcement, and influences on clearance and attractiveness of a building are small. The method is safe and reliable in technology, easy and convenient to implement and high in operability, and practice shows that the reinforcing effect is good as well.
Description
Technical field
the present invention relates to a kind of reinforcement means and structure of brick wall, belong to masonry structure reinforcing technique field.
Background technology
masonry structure is to build the wall that forms, the post structure as building main bearing member by laying bricks or stones by block and mortar, comprises brickwork, block masonry and stone masonry structure, is widely used in industry and civilian construction.Brick wall is vertical applied force member important in brick masonry structure, in engineering practice: 1, make brick wall bearing capacity generally not reach designing requirement because construction quality is poor; 2, the local body of wall such as wall between windows does not reach designing requirement; 3, because overbuilding story or overload cause brick wall Lack of support; 4, because fire or earthquake make full wafer wall bearing capacity or insufficient rigidity etc.At this moment all need original brick wall to reinforce.Traditional expansion masonry method of section is reinforced headroom to building and is attractive in appearancely had a certain influence, original brick wall is also not suitable for during by pressure break adopting, owing to not being that the disposable fissure of displacement is built by laying bricks or stones and formed between the old and new's masonry, cannot produce interlocking, so just cannot form one co-operation, brick wall easily produces crack, and consolidation effect is not ideal enough.
Summary of the invention
the object of the invention is to, a kind of reinforcement means and structure of brick wall is provided.Masonry cross section need not be expanded, the bearing capacity of brick wall, anti-side rigidity and wall ductility can be improved greatly.Headroom on building and attractive in appearancely have or not impact, to overcome the deficiencies in the prior art.
technical scheme of the present invention:
a reinforcement means for brick wall, the method is constructed by following operation:
1., remove the mortar bed that needs to reinforce brick wall both sides;
2., reject brick wall surface porosity brick body, water cleans up, and then with cement, rejectings is partly repaired smooth;
3., with reinforcing bar binding or be welded into reinforced mesh, be attached to brick wall both sides;
4., hole on brick wall with drilling machine, one group of steel tie is run through to body of wall opposite side from brick wall one side, by steel tie, the reinforced mesh that is positioned at brick wall both sides is fixed;
5., brick wall both side surface and reinforced mesh water are cleaned up;
6., brick wall surface and reinforced mesh are covered at brick wall both sides layering shotcrete layer with cement spraying equipment;
7., timing wet curing three days on cement sand bed after the cement sand bed of brick wall both sides is fixed.
in preceding method, described operation 3. middle reinforced mesh adopts crisscross reinforcing bar binding or is welded; Longitudinal reinforcement is compressive reinforcement, adopts diameter to be not less than the HPB300 grade reinforcing steel of 8mm, and the clear distance of longitudinal reinforcement is not less than 30mm; The employing diameter of transverse reinforcement is 4-6mm reinforcing bar, and its spacing is not less than 20 times of longitudinal reinforcement diameters and is not more than 500mm.
in preceding method, the described operation 3. longitudinal reinforcement of middle brick wall both sides is not less than 5mm apart from brick wall surface distance.
in preceding method, 4. described operation hooks longitudinal reinforcement by U-shaped hook in middle steel tie two ends; The diameter of steel tie is 4-6mm, and the spacing between steel tie is not more than 500mm.
in preceding method, 6. described operation constructs above 5 DEG C of environment temperatures; Described cement sand bed gross thickness is 30-45mm, and adopting strength grade is M7.5-M15 cement mortar.
in preceding method, described cement sand bed layering is sprayed, and the thickness of every layer is not more than 15mm; Reinforced mesh in cement sand bed is apart from the indoor 15mm that is not less than of cement sand bed surface distance, the outdoor 25mm that is not less than.
according to the structure of preceding method formation, comprise the body of wall of brick wall to be reinforced, body of wall both sides are provided with steel mesh reinforcement, and steel mesh reinforcement connects through one group of steel tie that runs through body of wall, and the surface of body of wall both sides and steel mesh reinforcement place are provided with cement sand bed.
in aforementioned structure, described steel mesh reinforcement comprises one group of longitudinal reinforcement and one group of transverse reinforcement, and longitudinal reinforcement is connected or welds with transverse reinforcement colligation.
in aforementioned structure, described steel tie two ends are provided with U-shaped hook, and U-shaped hook and longitudinal reinforcement hook connect.
in aforementioned structure, described cement sand bed is that strength grade is M7.5-M15 cement mortar.
compared with prior art, the present invention changes the method in traditional expansion brick wall cross section and reinforces, headroom on building and impact attractive in appearance are less, by steel tie, the steel mesh reinforcement of body of wall both sides is fixed, by steel mesh reinforcement, body of wall is clipped in the middle, make body of wall and reinforcing body connect into an entirety, can improve greatly the bearing capacity of brick wall, anti-side rigidity and wall ductility.The method technical security is reliable, easy construction, strong operability, and consolidation effect is proven also fine.
Brief description of the drawings
fig. 1 is structural representation of the present invention;
fig. 2 is the plan view of Fig. 1;
fig. 3 is the partial enlarged drawing of Fig. 2.
being labeled as in accompanying drawing: 1-body of wall, 2-steel tie, 3-cement sand bed, 4-longitudinal reinforcement, 5-transverse reinforcement, 6-U-shaped hook.
Detailed description of the invention
below in conjunction with accompanying drawing, the present invention is described in further detail, but not as any limitation of the invention.
a reinforcement means for brick wall, as depicted in figs. 1 and 2.The method is constructed by following operation:
1., remove the mortar bed that needs to reinforce brick wall both sides;
2., reject brick wall surface porosity brick body, water cleans up, and then with cement, rejectings is partly repaired smooth;
3., with reinforcing bar binding or be welded into reinforced mesh, be attached to brick wall both sides; Reinforced mesh adopts crisscross reinforcing bar binding or is welded; Longitudinal reinforcement is compressive reinforcement, adopts diameter to be not less than the HPB300 grade reinforcing steel of 8mm, and the clear distance of longitudinal reinforcement is not less than 30mm; The employing diameter of transverse reinforcement is 4-6mm reinforcing bar, and its spacing is not less than 20 times of longitudinal reinforcement diameters and is not more than 500mm; The longitudinal reinforcement of brick wall both sides is not less than 5mm(apart from brick wall surface distance and sees Fig. 3).When described reinforced mesh runs into door and window hole, reinforcing bar can be become to the straight hook anchoring in addition of 90 degree along hole spring.
4., hole on brick wall with drilling machine, one group of steel tie is run through to body of wall opposite side from brick wall one side, by steel tie, the reinforced mesh that is positioned at brick wall both sides is fixed; Longitudinal reinforcement is hooked by U-shaped hook in steel tie two ends; The diameter of steel tie is 4-6mm, and the spacing between steel tie is not more than 500mm.
5., brick wall both side surface and reinforced mesh water are cleaned up;
6., more than 5 DEG C use cement spraying equipment at brick wall both sides layering shotcrete layer in environment temperature, by brick wall surface and reinforced mesh covering; Cement sand bed gross thickness is that 30-45mm(is shown in Fig. 3), adopting strength grade is M7.5-M15 cement mortar, and cement sand bed layering is sprayed, and the thickness of every layer is not more than 15mm; Reinforced mesh in cement sand bed is apart from the indoor 15mm that is not less than of cement sand bed surface distance, and the outdoor 25mm(of being not less than is shown in Fig. 3).
7., timing wet curing three days on cement sand bed after the cement sand bed of brick wall both sides is fixed.
the structure forming according to preceding method, as depicted in figs. 1 and 2.Comprise the body of wall 1 of brick wall to be reinforced, described body of wall 1 is that the brick wall body after rendering layer is removed on surface, and body of wall 1 both sides are provided with steel mesh reinforcement, and steel mesh reinforcement connects through one group of steel tie 2 that runs through body of wall, and surface and the steel mesh reinforcement place of body of wall 1 both sides are provided with cement sand bed 3.Described steel mesh reinforcement comprises one group of longitudinal reinforcement 4 and one group of transverse reinforcement 5, and longitudinal reinforcement 4 is connected or welds with transverse reinforcement 5 colligations.Described steel tie 2 two ends are provided with U-shaped hook 6, the similar S shape of U-shaped hook 6 or C shape.U-shaped hook 6 connects with longitudinal reinforcement 4 hooks.Described cement sand bed 3 thickness are 30-45mm, and strength grade is M7.5-M15 cement mortar.
Claims (10)
1. a reinforcement means for brick wall, is characterized in that: the method is constructed by following operation:
1., remove the mortar bed that needs to reinforce brick wall both sides;
2., reject brick wall surface porosity brick body, water cleans up, and then with cement, rejectings is partly repaired smooth;
3., with reinforcing bar binding or be welded into reinforced mesh, be attached to brick wall both sides;
4., hole on brick wall with drilling machine, one group of steel tie is run through to body of wall opposite side from brick wall one side, by steel tie, the reinforced mesh that is positioned at brick wall both sides is fixed;
5., brick wall both side surface and reinforced mesh water are cleaned up;
6., brick wall surface and reinforced mesh are covered at brick wall both sides layering shotcrete layer with cement spraying equipment;
7., timing wet curing three days on cement sand bed after the cement sand bed of brick wall both sides is fixed.
2. method according to claim 1, is characterized in that: described operation 3. in reinforced mesh adopt crisscross reinforcing bar binding or be welded; Longitudinal reinforcement is compressive reinforcement, adopts diameter to be not less than the HPB300 grade reinforcing steel of 8mm, and the clear distance of longitudinal reinforcement is not less than 30mm; The employing diameter of transverse reinforcement is 4-6mm reinforcing bar, and its spacing is not less than 20 times of longitudinal reinforcement diameters and is not more than 500mm.
3. method according to claim 2, is characterized in that: described operation 3. in the longitudinal reinforcement of brick wall both sides be not less than 5mm apart from brick wall surface distance.
4. method according to claim 1, is characterized in that: described operation 4. in steel tie two ends hook longitudinal reinforcement by U-shaped hook; The diameter of steel tie is 4-6mm, and the spacing between steel tie is not more than 500mm.
5. method according to claim 1, is characterized in that: 6. described operation constructs above 5 DEG C of environment temperatures; Described cement sand bed gross thickness is 30-45mm, and adopting strength grade is M7.5-M15 cement mortar.
6. method according to claim 5, is characterized in that: described cement sand bed layering is sprayed, and the thickness of every layer is not more than 15mm; Reinforced mesh in cement sand bed is apart from the indoor 15mm that is not less than of cement sand bed surface distance, the outdoor 25mm that is not less than.
7. the structure forming according to method described in the arbitrary claim of claim 1-6, comprise the body of wall (1) of brick wall to be reinforced, it is characterized in that: body of wall (1) both sides are provided with steel mesh reinforcement, steel mesh reinforcement connects through one group of steel tie (2) that runs through body of wall, and surface and the steel mesh reinforcement place of body of wall (1) both sides are provided with cement sand bed (3).
8. structure according to claim 7, is characterized in that: described steel mesh reinforcement comprises one group of longitudinal reinforcement (4) and one group of transverse reinforcement (5), longitudinal reinforcement (4) is connected or welds with transverse reinforcement (5) colligation.
9. structure according to claim 7, is characterized in that: described steel tie (2) two ends are provided with U-shaped hook (6), and U-shaped hook (6) connects with longitudinal reinforcement (4) hook.
10. structure according to claim 7, is characterized in that: described cement sand bed (3) for strength grade be M7.5-M15 cement mortar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210471183.6A CN103835521A (en) | 2012-11-20 | 2012-11-20 | Brick wall reinforcing method and structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210471183.6A CN103835521A (en) | 2012-11-20 | 2012-11-20 | Brick wall reinforcing method and structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103835521A true CN103835521A (en) | 2014-06-04 |
Family
ID=50799381
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210471183.6A Pending CN103835521A (en) | 2012-11-20 | 2012-11-20 | Brick wall reinforcing method and structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103835521A (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105604344A (en) * | 2016-02-28 | 2016-05-25 | 叶香竹 | Reinforcing method of cracked interior wall |
CN105625742A (en) * | 2016-02-17 | 2016-06-01 | 朱奎 | Brick wall reinforcing structure |
CN105908988A (en) * | 2016-04-20 | 2016-08-31 | 上海市建筑科学研究院 | Method for reinforcing masonry wall through bamboo tendon, cement and mortar surface layer |
CN106088390A (en) * | 2016-06-24 | 2016-11-09 | 长安大学 | A kind of viscous fiber mortar mix green cob brick masonry wall and construction method thereof |
CN106401013A (en) * | 2016-09-13 | 2017-02-15 | 西南科技大学 | Manufacturing method of light composite load-bearing wall |
CN107269022A (en) * | 2017-08-10 | 2017-10-20 | 沈阳建筑大学建筑设计研究院 | The structure and method of a kind of concrete panels |
CN107288364A (en) * | 2017-07-21 | 2017-10-24 | 北京城建远东建设投资集团有限公司 | A kind of gunite concrete strengthens the construction method of processing with brick wall binder course |
IT201700024226A1 (en) * | 2017-03-03 | 2018-09-03 | Renzo Manganello | COMBINED STATIC AND SEISMIC CONSOLIDATION SYSTEM AND THERMAL AND ACOUSTIC INSULATION OF WALLS AND EXISTING BUILDINGS AND OF NEW CONSTRUCTION |
CN108979192A (en) * | 2018-08-20 | 2018-12-11 | 广东省建筑科学研究院集团股份有限公司 | A kind of ruggedized construction and its construction method of masonry structure load bearing wall |
CN110565974A (en) * | 2019-07-27 | 2019-12-13 | 中建科技有限公司 | method for transforming existing building structure |
CN113216678A (en) * | 2021-05-08 | 2021-08-06 | 中国建筑第四工程局有限公司 | Existing building masonry load-bearing wall reinforcing structure and construction method thereof |
CN113638620A (en) * | 2021-08-27 | 2021-11-12 | 西安五和土木工程新材料有限公司 | Wall reinforcing device and construction method thereof |
CN114687578A (en) * | 2022-01-27 | 2022-07-01 | 中交四公局第一工程有限公司 | Construction method for reinforcing red brick outer wall of historical building |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004031068A1 (en) * | 2004-06-23 | 2006-01-12 | Bennert Restaurierungen Gmbh | Masonry hardening method for use in building, involves producing surface pressure by using medium, and inserting binding agent into inner side of surface section of masonry surface, so that pressure is greater than another pressure |
CN201962877U (en) * | 2011-01-07 | 2011-09-07 | 上海市第二建筑有限公司 | Reinforcing net for building wall |
CN102392542A (en) * | 2011-11-29 | 2012-03-28 | 上海市第四建筑有限公司 | Unilateral-ribbing anti-seismic reinforcing method for existing brickwork structure |
CN102493672A (en) * | 2011-11-29 | 2012-06-13 | 上海市第四建筑有限公司 | Bilateral reinforced seismic strengthening method for existing masonry structure |
CN102587683A (en) * | 2011-01-07 | 2012-07-18 | 上海市第二建筑有限公司 | Method for reinforcing wall surfaces of buildings |
CN202509792U (en) * | 2012-03-31 | 2012-10-31 | 西安工业大学 | Cement mortar surface layer reinforcing mesh for reinforcing brick-concrete structural wall |
-
2012
- 2012-11-20 CN CN201210471183.6A patent/CN103835521A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004031068A1 (en) * | 2004-06-23 | 2006-01-12 | Bennert Restaurierungen Gmbh | Masonry hardening method for use in building, involves producing surface pressure by using medium, and inserting binding agent into inner side of surface section of masonry surface, so that pressure is greater than another pressure |
CN201962877U (en) * | 2011-01-07 | 2011-09-07 | 上海市第二建筑有限公司 | Reinforcing net for building wall |
CN102587683A (en) * | 2011-01-07 | 2012-07-18 | 上海市第二建筑有限公司 | Method for reinforcing wall surfaces of buildings |
CN102392542A (en) * | 2011-11-29 | 2012-03-28 | 上海市第四建筑有限公司 | Unilateral-ribbing anti-seismic reinforcing method for existing brickwork structure |
CN102493672A (en) * | 2011-11-29 | 2012-06-13 | 上海市第四建筑有限公司 | Bilateral reinforced seismic strengthening method for existing masonry structure |
CN202509792U (en) * | 2012-03-31 | 2012-10-31 | 西安工业大学 | Cement mortar surface layer reinforcing mesh for reinforcing brick-concrete structural wall |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107386676A (en) * | 2016-02-17 | 2017-11-24 | 朱奎 | Brick wall reinforced construction method |
CN105625742A (en) * | 2016-02-17 | 2016-06-01 | 朱奎 | Brick wall reinforcing structure |
CN105625742B (en) * | 2016-02-17 | 2017-12-15 | 朱奎 | Brick wall reinforcement structure |
CN105604344A (en) * | 2016-02-28 | 2016-05-25 | 叶香竹 | Reinforcing method of cracked interior wall |
CN105604344B (en) * | 2016-02-28 | 2018-01-30 | 叶香竹 | A kind of reinforcement means for having crack interior wall |
CN105908988A (en) * | 2016-04-20 | 2016-08-31 | 上海市建筑科学研究院 | Method for reinforcing masonry wall through bamboo tendon, cement and mortar surface layer |
CN106088390A (en) * | 2016-06-24 | 2016-11-09 | 长安大学 | A kind of viscous fiber mortar mix green cob brick masonry wall and construction method thereof |
CN106088390B (en) * | 2016-06-24 | 2017-10-13 | 长安大学 | A kind of construction method of viscous fiber mortar mix raw-soil brick masonry wall |
CN106401013A (en) * | 2016-09-13 | 2017-02-15 | 西南科技大学 | Manufacturing method of light composite load-bearing wall |
IT201700024226A1 (en) * | 2017-03-03 | 2018-09-03 | Renzo Manganello | COMBINED STATIC AND SEISMIC CONSOLIDATION SYSTEM AND THERMAL AND ACOUSTIC INSULATION OF WALLS AND EXISTING BUILDINGS AND OF NEW CONSTRUCTION |
CN107288364A (en) * | 2017-07-21 | 2017-10-24 | 北京城建远东建设投资集团有限公司 | A kind of gunite concrete strengthens the construction method of processing with brick wall binder course |
CN107269022A (en) * | 2017-08-10 | 2017-10-20 | 沈阳建筑大学建筑设计研究院 | The structure and method of a kind of concrete panels |
CN108979192A (en) * | 2018-08-20 | 2018-12-11 | 广东省建筑科学研究院集团股份有限公司 | A kind of ruggedized construction and its construction method of masonry structure load bearing wall |
CN110565974A (en) * | 2019-07-27 | 2019-12-13 | 中建科技有限公司 | method for transforming existing building structure |
CN113216678A (en) * | 2021-05-08 | 2021-08-06 | 中国建筑第四工程局有限公司 | Existing building masonry load-bearing wall reinforcing structure and construction method thereof |
CN113638620A (en) * | 2021-08-27 | 2021-11-12 | 西安五和土木工程新材料有限公司 | Wall reinforcing device and construction method thereof |
CN114687578A (en) * | 2022-01-27 | 2022-07-01 | 中交四公局第一工程有限公司 | Construction method for reinforcing red brick outer wall of historical building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103835521A (en) | Brick wall reinforcing method and structure | |
CN103469939B (en) | A kind of masonry filler wall and main body flexibly connect earthquake resistant structure and construction method thereof | |
CN103758031B (en) | A kind of method utilizing Steel Fiber Reinforced Self-compacting Concrete to prepare assembling bridge pier stud | |
CN105780964B (en) | A kind of light block filling wall and frame structure construction technique | |
CN104405041B (en) | The prefabricated floor connector of steel building and mounting method thereof | |
CN103306493B (en) | The reinforcement means of fabric structure | |
CN105484391A (en) | Construction method for manufacturing heat-preservation waterproof wall through light heat-preservation GRC disassembling-free formworks | |
CN203321531U (en) | Lining processing structure for underground cavern after collapse of top arch | |
CN204225277U (en) | The prefabricated floor connector of steel building | |
CN110565974A (en) | method for transforming existing building structure | |
CN102168460A (en) | Aerated concrete block masonry composite wall reinforced with embedded reinforcements and borehole core columns | |
CN103790168A (en) | Application method of soil nailing wall in deep foundation pit supporting | |
CN103046765B (en) | Construction process for continued application of air-raid shelter | |
CN102251582B (en) | Barrier-free decoration structure of high and low incorporated buildings and construction method thereof | |
CN101545287A (en) | Multifunctional thermal insulation board | |
CN103590508B (en) | A kind of construction method of composite thermal-insulating wall | |
CN104594654B (en) | A kind of concrete structure reinforcement scheme generation method | |
CN100427708C (en) | Energy saving composite self heat insulation wall for building | |
CN105804274B (en) | A kind of light block filling wall and frame structure construction technique | |
CN104389360A (en) | Externally suspended insulation board type reinforcement brickwork shear wall system and construction method thereof | |
CN108035453B (en) | Sliding shock insulation device with ring beam masonry structure and construction method thereof | |
CN103498567A (en) | Method for conducting anti-seismic reinforcement through later-arranged dark ring beams in masonry panel and reinforcement structure thereof | |
CN106639051B (en) | Steel-building block combined beam for outer leaf wall of block building | |
CN204238264U (en) | A kind of sole plate post-poured strip structure | |
JP2011069151A (en) | Concrete panel form |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140604 |