CN103821536A CN201410105462.XA CN201410105462A CN103821536A CN 103821536 A CN103821536 A CN 103821536A CN 201410105462 A CN201410105462 A CN 201410105462A CN 103821536 A CN103821536 A CN 103821536A
Authority
CN
China
Prior art keywords
landslide
reinforcing pile
tunnel
pile
location
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410105462.XA
Other languages
English (en)
Other versions
CN103821536B (zh
Inventor
张志军
畅建伟
张志跃
李彩莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
Third Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical Third Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority to CN201410105462.XA priority Critical patent/CN103821536B/zh
Publication of CN103821536A publication Critical patent/CN103821536A/zh
Application granted granted Critical
Publication of CN103821536B publication Critical patent/CN103821536B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

本发明公开了一种滑坡地段隧道施工方法,在施工初期支护仰拱上钻孔,钻孔阵列排布;并在钻孔中安装与洞底滑坡面相垂直的加固桩;通过洞内进行简易的滑坡治理,不但提高了隧道的承载能力,而且达到了在隧道内部治理滑坡的目的,工艺简单,经济快捷。

Description

滑坡地段隧道施工方法
技术领域
本发明属于隧道施工技术领域,尤其涉及一种滑坡地段隧道施工方法。
背景技术
滑坡作为一种主要地质灾害,由于其多样性、多变性和复杂性,一直是世界各国研究的重要地质和工程问题之一。在传统的设计选线上,隧道、桥梁等结构物大部分采用的绕避方案,但是随着公路、铁路等基础交通设施建设的快速发展,受到地形地理条件限制,隧道结构物不可避免要穿越滑坡体等特殊地层,如何安全、快捷、经济的完成滑坡治理是设计、施工单位面临的新课题。
目前大部分滑坡治理都采用的是抗滑桩方案,但是该方案只能对隧道外部进行处理,是一种被动方案,而且施工周期长,治理费用昂贵。
目前有在隧道仰拱进行小导管注浆和钢管桩施工的例子,导管一般采用50mm~70mm,主要是解决隧道的承载能力和处理软弱围岩基底。但是钢管桩和小导管有一定的局限性,没有抗剪能力,不能起到抗滑作用,同时他们单独成孔,没有桩基承台支撑,承载能力较差。
发明内容
有鉴于此,本发明的目的是在于提供一种滑坡地段隧道施工方法,以实现通过简易的洞内加固方法,提高隧道的承载能力,并对滑坡进行主动治理。
为实现上述目的,本发明提供如下技术方案:一种滑坡地段隧道施工方法,包括以下步骤:
a)、施工初期支护仰拱;
b)、采用地质潜孔钻在所述仰拱上进行钻孔,所述钻孔阵列排布;
c)、在所述钻孔中安装加固桩,所述加固桩穿过底拱并伸入滑坡面,加固桩均倾斜设置,且每根加固桩与其所对应的滑坡面垂直;
d)、对加固桩进行注浆;
e)、绑扎仰拱钢筋并浇筑仰拱混凝土层。
优选地,所述加固桩是由两根钢轨交错固定在一起形成的双轨束钢轨桩。
优选地,所述加固桩在靠山体一侧的间距大于在背离山体一侧的间距。
优选地,所述加固桩在靠山体一侧的间距为150cm*150cm,在背离山体一侧的间距为90cm*90cm。
优选地,所述加固桩直径为180mm,桩长10m~15m。
优选地,所述加固桩桩身与隧道纵向断面间斜度为10°~15°。
从上述技术方案中可以看出,本发明通过洞内进行简易的滑坡治理,不但提高了隧道的承载能力,而且达到了在隧道内部治理滑坡的目的,工艺简单,经济快捷。
附图说明
图1为本发明施工方法的流程图;
图2为本发明施工方法的隧道断面示意图;
图3为本发明所述加固桩在仰拱平面内的布置示意图;
图4为本发明提供的加固桩的横截面示意图。
具体实施方式
本发明的核心就是通过安装倾斜设置的加固桩,与二衬仰拱钢筋混凝土共同形成隧道桩基群,以提高隧道承载能力,在隧道内部进行简易、快捷、经济、有效的滑坡处置。
为了使本发明的目的、技术方案及优点更加清楚明白,以下通过实施例,并结合附图,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅用以解释本发明,并不用于限定本发明。
如图1至3所示,一种滑坡地段隧道施工方法,包括以下步骤:
a)、施工初期支护仰拱1;
b)、采用地质潜孔钻在所述仰拱1上进行钻孔,所述钻孔阵列排布;
c)、在所述钻孔中安装加固桩2,所述加固桩2穿过底拱1并伸入滑坡面,加固桩2均倾斜设置,且每根加固桩2与其所对应的滑坡面垂直;
d)、对加固桩2进行注浆;
e)、绑扎仰拱钢筋并浇筑仰拱混凝土层3。
所述加固桩2与对应的滑坡面垂直,能够使加固桩桩身更好的固定在滑坡面上,增强隧道承载能力的同时,能够起到在隧道内部治理滑坡的目的。
在靠山体一侧,加固桩桩身深入滑坡面的深度较深,相应地,在背离山体一侧,桩身深入滑坡面的深度较浅,所述加固桩2在靠山体一侧的间距D大于在背离山体一侧的间距d,能够使加固桩2在靠山体侧和背山体侧的受力更加均匀,有效改善加固桩2的受力情况,并在满足承载要求的同时尽可能地节约了成本。
所述加固桩2是由两根钢轨交错固定在一起形成的双轨束钢轨桩,采用以上结构,能够使加固桩具有抗剪能力,提高加固桩的承载性能。
为进一步增强所述加固桩2的承载能力,本发明中,所述加固桩(3)直径D1为180mm,桩长10m~15m。
为便于施工,并满足加固桩与对应滑坡面垂直的要求,加固桩与隧道纵向断面间斜度为10°~15°。
以上所述实施例仅表达了本发明的几种实施方式,其描述较为具体和详细,但并不能因此而理解为对本发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形和改进,这些都属于本发明的保护范围。因此,本发明专利的保护范围应以所附权利要求为准。

Claims (6)

1.一种滑坡地段隧道施工方法,其特征在于包括以下步骤: 
a)、施工初期支护仰拱(1); 
b)、采用地质潜孔钻在所述仰拱(1)上进行钻孔,所述钻孔阵列排布; 
c)、在所述钻孔中安装加固桩(2),所述加固桩(2)穿过底拱(1)并伸入滑坡面,加固桩(2)均倾斜设置,且每根加固桩(2)与其所对应的滑坡面垂直; 
d)、对加固桩(2)进行注浆; 
e)、绑扎仰拱钢筋并浇筑仰拱混凝土层(3)。 
2.根据权利要求1所述的滑坡地段隧道施工方法,其特征在于:所述加固桩(2)是由两根钢轨交错固定在一起形成的双轨束钢轨桩。 
3.根据权利要求1或2所述的滑坡地段隧道施工方法,其特征在于:所述加固桩(2)在靠山体一侧的间距(D)大于在背离山体一侧的间距(d)。 
4.根据权利要求3所述的滑坡地段隧道施工方法,其特征在于:所述加固桩(2)在靠山体一侧的间距(D)为150cm*150cm,在背离山体一侧的间距(d)为90cm*90cm。 
5.根据权利要求4所述的滑坡地段隧道施工方法,其特征在于:所述加固桩(2)直径(D1)为180mm,桩长10m~15m。 
6.根据权利要求5所述的滑坡地段隧道施工方法,其特征在于:所述加固桩(2)桩身与隧道纵向断面间斜度为10°~15°。 
CN201410105462.XA 2014-03-20 2014-03-20 滑坡地段隧道施工方法 Active CN103821536B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410105462.XA CN103821536B (zh) 2014-03-20 2014-03-20 滑坡地段隧道施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410105462.XA CN103821536B (zh) 2014-03-20 2014-03-20 滑坡地段隧道施工方法

Publications (2)

Publication Number Publication Date
CN103821536A true CN103821536A (zh) 2014-05-28
CN103821536B CN103821536B (zh) 2016-04-27

Family

ID=50756798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410105462.XA Active CN103821536B (zh) 2014-03-20 2014-03-20 滑坡地段隧道施工方法

Country Status (1)

Country Link
CN (1) CN103821536B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567723A (zh) * 2015-10-13 2017-04-19 尹瑜 一种滑体段隧道加固系统及其加固方法
CN108386198A (zh) * 2018-02-01 2018-08-10 中国水利水电第十四工程局有限公司 一种新型隧道仰拱基底软弱围岩处理方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4232290A1 (de) * 1992-09-28 1994-03-31 Willich F Berg Bautechnik Verfahren zur Sicherung rutschgefährdeter Massen beim Tunnelbau und Verpreßanker
CN201148621Y (zh) * 2008-01-11 2008-11-12 肖世国 微型抗滑桩组合结构
CN101476466A (zh) * 2008-12-24 2009-07-08 中国科学院水利部成都山地灾害与环境研究所 巨厚层滑坡预应力锚索抗滑隧道施工方法及防治新结构
CN201433396Y (zh) * 2009-06-07 2010-03-31 中铁西北科学研究院有限公司 锚索钢轨桩墙
CN102392649A (zh) * 2011-10-19 2012-03-28 中铁西北科学研究院有限公司勘察设计分公司 一种隧道纵向穿越滑坡的预加固组合结构和实施方法
KR20120117251A (ko) * 2011-04-14 2012-10-24 강릉건설 주식회사 토류패널

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4232290A1 (de) * 1992-09-28 1994-03-31 Willich F Berg Bautechnik Verfahren zur Sicherung rutschgefährdeter Massen beim Tunnelbau und Verpreßanker
CN201148621Y (zh) * 2008-01-11 2008-11-12 肖世国 微型抗滑桩组合结构
CN101476466A (zh) * 2008-12-24 2009-07-08 中国科学院水利部成都山地灾害与环境研究所 巨厚层滑坡预应力锚索抗滑隧道施工方法及防治新结构
CN201433396Y (zh) * 2009-06-07 2010-03-31 中铁西北科学研究院有限公司 锚索钢轨桩墙
KR20120117251A (ko) * 2011-04-14 2012-10-24 강릉건설 주식회사 토류패널
CN102392649A (zh) * 2011-10-19 2012-03-28 中铁西北科学研究院有限公司勘察设计分公司 一种隧道纵向穿越滑坡的预加固组合结构和实施方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
郭长庆等: "丹朱岭隧道出口明洞设计", 《山西建筑》 *
郭长庆等: "丹朱岭隧道出口明洞设计", 《山西建筑》, vol. 33, no. 27, 20 September 2007 (2007-09-20) *
陈鹏飞: "山体滑坡综合治理技术", 《石家庄铁道学院学报》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106567723A (zh) * 2015-10-13 2017-04-19 尹瑜 一种滑体段隧道加固系统及其加固方法
CN108386198A (zh) * 2018-02-01 2018-08-10 中国水利水电第十四工程局有限公司 一种新型隧道仰拱基底软弱围岩处理方法

Also Published As

Publication number Publication date
CN103821536B (zh) 2016-04-27

Similar Documents

Publication Publication Date Title
CN104120731B (zh) 一种隧道沉降防护装置及其施工方法
CN109458185B (zh) 上下重叠交叉并行隧道盾构施工方法
CN109026024B (zh) 一种高水平应力作用巷道顶板变形控制方法
CN104727828A (zh) 基于变形控制的隧道超前支护管理方法
CN102966359A (zh) 工作面过风氧化带区顶板控制方法
CN203822311U (zh) 对盾构下穿既有站超前探测及预加固结构
CN103821536B (zh) 滑坡地段隧道施工方法
CN203145956U (zh) 一种防治隧道岩爆结构
Hong-gui et al. Differential settlement of metro tunnels and its zonal control in soft deposits
CN203796284U (zh) 滑坡地段隧道支护结构
CN202731938U (zh) 极松软岩层煤仓井壁圈梁支护装置
CN209585033U (zh) 一种锚索端部对中支架结构
Huo et al. Numerical analysis of effects of foundation pit excavation on metro tunnels
Huang et al. Reinforcement mechanism and slurry diffusion law of deep-shallow coupled fully bolting-grouting in deep broken roadway
CN205047234U (zh) 一种沿空留巷横斜双拉纤维柔性模板
Xiao et al. Numerical research on the floor heave control of deep roadway in coal mining
Kobayashi et al. Design, Construction and Monitored Behavior of Urban Tunnels under Existing Railways
JP2013150445A (ja) 電線共同溝の管路部及び設置構造
Xiaojun et al. Design of a Subway Station Crossing Urban Trunk Road by Open Cut and Tunneling method
Ming-guang et al. Numerical study on a deep excavation of transportation hub underlying operating railways and a metro station
Zhou Ground treatment and its application in shallow subway tunnel crossing urban river by shield tunneling method
Tuan et al. Analysis of the effect of the Ho Chi Minh City Tunnel settlement on the adjacent buildings
Tian et al. Supporting reinforcement and stability analysis of the roadway crossing the fault in deep mining
Hartlén et al. Citytunneln, Malmö: geotechnical hazards and opportunities
Jiao et al. Settlement characteristics of major infrastructures in Shanghai

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: Three, 710032 Shaanxi city of Xi'an province Guang'an Chanba Ecological District Road No. 2899, China Railway seven Bureau

Applicant after: The Third Engineering Co., Ltd.of China Railway Seventh Group

Address before: Three, Chongqing city Fengjie County Baidi town 404600 Scenic Bay Village seven Bureau of China Railway Bridge

Applicant before: The Third Engineering Co., Ltd.of China Railway Seventh Group

C14 Grant of patent or utility model