CN102392649A - 一种隧道纵向穿越滑坡的预加固组合结构和实施方法 - Google Patents

一种隧道纵向穿越滑坡的预加固组合结构和实施方法 Download PDF

Info

Publication number
CN102392649A
CN102392649A CN2011103169770A CN201110316977A CN102392649A CN 102392649 A CN102392649 A CN 102392649A CN 2011103169770 A CN2011103169770 A CN 2011103169770A CN 201110316977 A CN201110316977 A CN 201110316977A CN 102392649 A CN102392649 A CN 102392649A
Authority
CN
China
Prior art keywords
tunnel
landslide
anchor cable
lining
land
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011103169770A
Other languages
English (en)
Inventor
吴红刚
马惠民
张红利
宋响军
张俊德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Prospecting & Design Branch Of Northwest Research Institute Co Ltdof Crec
Original Assignee
Prospecting & Design Branch Of Northwest Research Institute Co Ltdof Crec
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Prospecting & Design Branch Of Northwest Research Institute Co Ltdof Crec filed Critical Prospecting & Design Branch Of Northwest Research Institute Co Ltdof Crec
Priority to CN2011103169770A priority Critical patent/CN102392649A/zh
Publication of CN102392649A publication Critical patent/CN102392649A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

本发明涉及一种隧道-滑坡体系的预加固工程,提出了一种隧道纵向穿越滑坡的预加固组合结构和实施方法。预加固组合结构包括地表注浆、地表锚索框架、隧道衬砌、洞内注浆和衬砌锚索。预加固组合结构的实施方法是依据工程地质勘察成果和隧道-滑坡体系的地质力学模式识别,确定预加固组合结构的空间布设形式,在隧道-滑坡体系的地表优先设置地表注浆和地表锚索框架,并根据需要在隧道内部设置洞内注浆,在隧道衬砌上增设受力钢筋并预留锚索孔,设置衬砌锚索。本发明的实施能有效地加固隧道-滑坡体系,提高滑坡的稳定性和隧道围岩的自承载力,确保隧道的安全运营。

Description

一种隧道纵向穿越滑坡的预加固组合结构和实施方法
技术领域
本发明涉及一种隧道-滑坡体系的预加固工程,特别是在隧道纵向穿越滑坡的预加固工程方面,提出了一种隧道纵向穿越滑坡的预加固组合结构和实施方法,该组合结构能有效地加固隧道-滑坡体系,提高滑坡的稳定性和隧道围岩的自承载力,确保隧道的安全运营。
背景技术
当前我国迎来了新一轮大规模工程建设的高峰期,越来越多的能源、交通、矿山、水利和国防隧道工程建造在中西部山区。这些地区地形和地质复杂,公路、铁路和水工隧道往往要穿过地质不良地段,不可避免地要受到滑坡等地质灾害的影响,这给工程顺利建设和正常运营造成了严重威胁。
目前滑坡地段隧道加固措施主要有滑坡治理措施和隧道加固措施两方面。在滑坡治理措施方面,最常用的是削方减载、截排水(包括地表和地下截排水)、锚固(如锚索、锚杆)和支挡工程(如抗滑桩、挡土墙等)。在隧道加固方面,主要的措施有:提高隧道围岩自稳能力(如锚杆锚固);增强衬砌强度(如增加衬砌厚度、嵌轨套拱、抽换边墙、衬砌内配筋等)。
通常隧道-滑坡体系的围岩自承载能力比较弱,有的甚至没有自承载能力。因此,为了确保隧道建设及后续作业的进行,开挖时应重点控制围岩的变形和避免诱发滑坡灾害,采用强度较高和刚度较大的初期支护和预加固措施,避免围岩和坡体结构破坏。本发明旨在解决隧道纵向穿越滑坡的体系安全性问题,提出了一种预加固组合结构和实施方法。
发明内容
本发明的目的是提供一种隧道纵向穿越滑坡的预加固组合结构和实施方法,确保隧道-滑坡体系的安全,使预加固工程更为合理、有效和经济。
本发明的目的是这样实现的:
所述的预加固组合结构包括地表注浆、地表锚索框架、隧道衬砌、洞内注浆和衬砌锚索。
所述的预加固组合结构的实施方法,按照以下步骤依次进行:
(a)组织隧道工程所在区域的调查、测绘和工程地质勘察,特别是对隧道工程有影响的滑坡工程地质特征(包括地质条件、滑坡性质及其稳定性、隧道埋深及其与滑坡的关系、隧道走向和滑坡滑动方向等情况)应进行详尽调研;
(b)以勘察结果为依据,从“坡体结构、灾变诱发因素和隧道与滑坡的空间组合关系”几方面综合考虑,确认隧道-滑坡体系的力学模型,制定针对性的预加固防治方案;
(c)根据设计要求,进行各种工况下的荷载计算,确认最不利工况,进行注浆和锚固工程的空间布设,并进行工程细部设计与优化;
(d)先进行地表注浆和地表锚索框架施工,并建立地表和深孔位移监测系统,实时反馈坡体的变形情况,严格按照动态设计、动态施工的思路组织实施;
(e)待地表预加工程实施后再进行隧道开挖与衬砌施工,注意按照设计要求在衬砌内增设受力钢筋并预留锚索孔,充分利用隧道开挖后的工作空间进行洞内注浆和衬砌上锚索的施工,注浆深度应穿越滑动带,锚索穿越滑动带锚固于稳定、坚硬地层中,以达到加固隧道围岩和稳定滑坡的作用。
本发明的有益效果是:
(a)提出的预加固组合结构是安全有效、经济合理的,能实现对隧道-滑坡体系的科学防治。
该组合结构能够充分利用注浆来有效改善隧道围岩和滑坡滑带土的物理力学性能,提高滑坡稳定性和隧道围岩的自承载能力;以隧道衬砌作为部分抗滑锚固工程的反力机构,在衬砌内增设受力钢筋并预留锚索孔,隧道充分发挥出作为交通设施和抗滑锚固工程反力结构的双重作用,提高了隧道-滑坡体系预加固工程的安全经济性。
(b)预加固组合结构的实施方法是切实可行的。
该组合结构的施工主要包括地表注浆、洞内注浆、衬砌施工和预应力锚索施工等,这些施工技术都是比较成熟的常规技术,且隧道的开挖为洞内注浆和衬砌上锚索的施工提供了充足的工作空间。
附图说明
下面结合附图对本发明进一步说明。
图1是本发明的隧道-滑坡体系的预加固工程平面示意图
图2是本发明的隧道-滑坡体系的预加固工程断面示意图
图中1.地表注浆,2.地表锚索框架,3.隧道衬砌,4.洞内注浆,5.衬砌锚索,6.滑坡,7.隧道。
具体实施方式
本发明是依据工程地质勘察成果和隧道-滑坡体系的地质力学模式识别,确定预加固组合结构的空间布设形式,在隧道-滑坡体系的地表优先设置地表注浆和地表锚索框架,并根据需要在隧道内部设置洞内注浆,在隧道衬砌上增设受力钢筋并预留锚索孔,设置衬砌锚索。
所述预加固组合结构和实施方法是在充分研究“隧道-滑坡体系”灾害控制理论和关键技术的基础上,提出的基于预加固思想的工程结构及其实施方法。本发明的突出特点是一方面能够充分利用注浆来有效改善隧道围岩和滑坡滑带土的物理力学性能,提高滑坡稳定性和隧道围岩的自承载能力;另一方面以隧道衬砌作为部分抗滑锚固工程的反力结构,在衬砌内增设受力钢筋并预留锚索孔,隧道充分发挥出作为交通设施和抗滑锚固工程反力结构的双重作用。

Claims (2)

1.一种隧道纵向穿越滑坡的预加固组合结构,其特征是:所述的预加固组合结构包括地表注浆(1)、地表锚索框架(2)、隧道衬砌(3)、洞内注浆(4)和衬砌锚索(5)五个部分;所述的预加固组合结构是依据工程地质勘察成果和地质力学模式识别,确定该组合结构的空间布设形式,在隧道-滑坡体系的地表优先设置地表注浆(1)和地表锚索框架(2),并根据需要在隧道内部设置洞内注浆(4),在隧道衬砌(3)上增设受力钢筋并预留锚索孔,设置衬砌锚索(5)。
2.一种隧道纵向穿越滑坡的预加固组合结构的实施方法,其特征是:按照以下步骤依次进行:
(a)组织隧道工程所在区域的调查、测绘和工程地质勘察,特别是对隧道工程有影响的滑坡工程地质特征(包括地质条件、滑坡性质及其稳定性、隧道埋深及其与滑坡的关系、隧道走向和滑坡滑动方向等情况)应进行详尽调研;
(b)以勘察结果为依据,从“坡体结构、灾变诱发因素和隧道与滑坡的空间组合关系”几方面综合考虑,识别隧道-滑坡体系的地质力学模型,制定针对性的预加固防治方案;
(c)根据设计要求,进行各种工况下的荷载计算,确认最不利工况,进行注浆和锚固工程的空间布设,并进行工程细部设计与优化;
(d)先进行地表注浆(1)和地表锚索框架(2)施工,并建立地表和深孔位移监测系统,实时反馈坡体的变形情况,严格进行动态设计和动态施工;
(e)待地表预加工程实施后再进行隧道开挖与衬砌施工,注意按照设计要求在隧道衬砌(3)内增设受力钢筋并预留锚索孔,充分利用隧道开挖后的工作空间进行洞内注浆(4)和衬砌锚索(5)的施工,洞内注浆(4)深度应穿越滑动带,衬砌锚索(5)穿越滑动带锚固于稳定、坚硬地层中,以达到加固隧道围岩和稳定滑坡的作用。
CN2011103169770A 2011-10-19 2011-10-19 一种隧道纵向穿越滑坡的预加固组合结构和实施方法 Pending CN102392649A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011103169770A CN102392649A (zh) 2011-10-19 2011-10-19 一种隧道纵向穿越滑坡的预加固组合结构和实施方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011103169770A CN102392649A (zh) 2011-10-19 2011-10-19 一种隧道纵向穿越滑坡的预加固组合结构和实施方法

Publications (1)

Publication Number Publication Date
CN102392649A true CN102392649A (zh) 2012-03-28

Family

ID=45860018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011103169770A Pending CN102392649A (zh) 2011-10-19 2011-10-19 一种隧道纵向穿越滑坡的预加固组合结构和实施方法

Country Status (1)

Country Link
CN (1) CN102392649A (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821536A (zh) * 2014-03-20 2014-05-28 中铁七局集团第三工程有限公司 滑坡地段隧道施工方法
CN104405403A (zh) * 2014-10-20 2015-03-11 西南交通大学 一种控制暗挖大跨地铁车站围岩变形的施工方法
CN106567723A (zh) * 2015-10-13 2017-04-19 尹瑜 一种滑体段隧道加固系统及其加固方法
CN106968260A (zh) * 2017-04-05 2017-07-21 五冶集团上海有限公司 用于加固隧道洞口山体滑坡的装置及方法
CN111473779A (zh) * 2020-03-17 2020-07-31 北京工业大学 一种滑坡-隧道体系变形的识别和联动监测的方法
CN114991807A (zh) * 2022-05-16 2022-09-02 中国矿业大学(北京) 一种隧道进出口边坡耦合双补偿施工方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH606770A5 (en) * 1976-06-02 1978-11-15 Jean Bernold Mine gallery anchorage rod
SU1719643A1 (ru) * 1989-01-02 1992-03-15 Донецкий политехнический институт Способ креплени выработки
CN101280684A (zh) * 2008-05-12 2008-10-08 淮南矿业(集团)有限责任公司 三软地质条件下采空区留巷围岩支护方法
CN101476466A (zh) * 2008-12-24 2009-07-08 中国科学院水利部成都山地灾害与环境研究所 巨厚层滑坡预应力锚索抗滑隧道施工方法及防治新结构
CN101967984A (zh) * 2010-09-03 2011-02-09 安徽理工大学 深井巷道锚网索刚柔耦合支护及围岩整体加固支护方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH606770A5 (en) * 1976-06-02 1978-11-15 Jean Bernold Mine gallery anchorage rod
SU1719643A1 (ru) * 1989-01-02 1992-03-15 Донецкий политехнический институт Способ креплени выработки
CN101280684A (zh) * 2008-05-12 2008-10-08 淮南矿业(集团)有限责任公司 三软地质条件下采空区留巷围岩支护方法
CN101476466A (zh) * 2008-12-24 2009-07-08 中国科学院水利部成都山地灾害与环境研究所 巨厚层滑坡预应力锚索抗滑隧道施工方法及防治新结构
CN101967984A (zh) * 2010-09-03 2011-02-09 安徽理工大学 深井巷道锚网索刚柔耦合支护及围岩整体加固支护方法

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103821536A (zh) * 2014-03-20 2014-05-28 中铁七局集团第三工程有限公司 滑坡地段隧道施工方法
CN103821536B (zh) * 2014-03-20 2016-04-27 中铁七局集团第三工程有限公司 滑坡地段隧道施工方法
CN104405403A (zh) * 2014-10-20 2015-03-11 西南交通大学 一种控制暗挖大跨地铁车站围岩变形的施工方法
CN104405403B (zh) * 2014-10-20 2016-08-24 西南交通大学 一种控制暗挖大跨地铁车站围岩变形的施工方法
CN106567723A (zh) * 2015-10-13 2017-04-19 尹瑜 一种滑体段隧道加固系统及其加固方法
CN106968260A (zh) * 2017-04-05 2017-07-21 五冶集团上海有限公司 用于加固隧道洞口山体滑坡的装置及方法
CN111473779A (zh) * 2020-03-17 2020-07-31 北京工业大学 一种滑坡-隧道体系变形的识别和联动监测的方法
CN111473779B (zh) * 2020-03-17 2021-09-24 北京工业大学 一种滑坡-隧道体系变形的识别和联动监测的方法
CN114991807A (zh) * 2022-05-16 2022-09-02 中国矿业大学(北京) 一种隧道进出口边坡耦合双补偿施工方法
CN114991807B (zh) * 2022-05-16 2023-08-18 中国矿业大学(北京) 一种隧道进出口边坡耦合双补偿施工方法

Similar Documents

Publication Publication Date Title
CN106761778B (zh) 一种适用于上软下硬地层的地铁车站暗挖施工工艺
CN102392649A (zh) 一种隧道纵向穿越滑坡的预加固组合结构和实施方法
CN102071607B (zh) 一种不影响既有行车条件下铁路路基修复方法
CN101476466B (zh) 巨厚层滑坡预应力锚索抗滑隧道施工方法及防治新结构
CN107130613B (zh) 大跨隧道正穿既有挡墙的支挡结构及其施工方法
CN103306680B (zh) 既有单线隧道扩建为多线隧道的施工方法
CN105257301A (zh) 一种浅埋暗挖隧道软弱围岩塌方加固处理方法
CN102562074A (zh) 大断面隧道上硬下软复合地层的施工方法
Chen et al. Recent advances in high slope reinforcement in China: Case studies
CN109595034B (zh) 煤矿地下水库工字型强帮阻渗挡水坝
CN204941545U (zh) 车站暗挖施工系统
CN103526773A (zh) 悬臂式垂向锚杆复合挡土墙及其设计与施工方法
CN207934910U (zh) 一种新建隧道近距离上跨既有隧道的抗上浮加固体系
CN106246192A (zh) 一种隧道基础及底板下的大型溶洞处理及隧道开挖方法
CN108755698A (zh) 一种陡坡松散堆积体大倾斜岩面基础施工方法
CN106894350A (zh) 一种钢刃角入土顶进箱涵装置及施工方法
CN109611103A (zh) 一种针对盾构区间上悬孤石群加固处理的方法
CN107012874A (zh) 一种上软下硬地层地铁车站围护结构
CN204511463U (zh) 极破碎围岩双喷锚复合式支护结构
CN101691760A (zh) 一种锚杆联合掏挖复合基础及其施工方法
CN205804372U (zh) 一种适于非煤露天矿边坡滑坡治理的桩‑锚‑梁一体化结构
CN203559430U (zh) 悬臂式垂向锚杆复合挡土墙
CN202936782U (zh) 扩孔柱状抗滑键注浆锚固锚杆
CN203583501U (zh) 一种抵抗岩体滑动的深层抗剪装置
CN209652904U (zh) 一种用于山体隧道开挖的竖向预加固处理结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120328