CN107012874A - 一种上软下硬地层地铁车站围护结构 - Google Patents
一种上软下硬地层地铁车站围护结构 Download PDFInfo
- Publication number
- CN107012874A CN107012874A CN201710314956.2A CN201710314956A CN107012874A CN 107012874 A CN107012874 A CN 107012874A CN 201710314956 A CN201710314956 A CN 201710314956A CN 107012874 A CN107012874 A CN 107012874A
- Authority
- CN
- China
- Prior art keywords
- stake
- pin
- hung
- impact
- anchor pole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/20—Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
本发明公开了一种上软下硬地层地铁车站围护结构,采用冲击钻孔吊脚桩,吊脚桩的底部采用预应力锚索结构加围护圈梁体系维护,桩身采用全长粘结型锚杆加喷射混凝土结构支护。在基坑开挖深度较大的情况下,目前已有的人工开孔吊脚桩+预应力锚索作支撑装置,该装置容易发生桩体偏移导致基坑边坡失稳,采用冲击吊脚桩+混凝土圈梁、预应力锚索、全长粘结型锚杆作为支护结构,对冲击吊脚桩的桩底采用圈梁和预应力锁脚加固处理,从而有效防止了基坑变形和滑移的现象发生。
Description
技术领域
本发明涉及一种上软下硬地层地铁车站围护结构,尤其是涉及类似车站深大基坑维护结构施工方法,属于城市轨道交通技术领域。
背景技术
在车站施工建设中,由于线路交出为充分利用地下空间,现在基坑的开挖深度、尺寸逐步增加。对于深、大基坑采用吊脚桩支护结构,作为临时支撑体系,后期增加幕墙腰梁等进行维护。对于桩身强度高的吊脚桩却没有利用在基坑围护体系上。此外,在安全适用的基础上如何有效的降低吊脚桩基坑支护体系的造价、加快施工进度,也是仍需解决的问题。
发明内容
本发明的目的在于在深、大基坑的支护体系中,采用圈梁和吊脚桩组合一体,使得吊脚桩支护体系成为支撑结构,即有效防止基坑偏移,又充分利用桩基支护节约成本。
本发明的目的是通过以下技术方案实现的:
一种上软下硬地层地铁车站围护结构,本结构适用于基坑开挖深度大的情况,其中,吊脚桩的桩长为18~28m,吊脚高度为3~9m时。
该结构采用冲击钻孔吊脚桩,所述吊脚桩的底部采用预应力锚索结构加围护圈梁体系维护。吊脚桩的桩身采用全长粘结型锚杆加喷射混凝土结构支护。吊脚桩桩顶采用混凝土圈梁支撑。吊脚桩桩底深入基坑下层的挡土墙,吊脚桩与挡土墙采用圈梁连接为一体做支撑结构。
附图说明
图1本发明基坑围护体系示意图
图2本发明基坑围护体系基坑剖面示意图
图中:1、冲击吊脚桩,2、全长粘结型锚杆,3、圈梁,4、微风化岩层,5、锁脚锚索,6、钢筋混凝土挡墙,7、挂网素混凝土。
具体实施方式
图1和图2所示为本发明的实施例,基坑设计深度为30.0米,施工时实际深度主要有29.5m和30.3m。采用冲击吊脚桩(1),桩长18~28米,吊脚高度为3~9m。如图1所示,基坑上部锚索(2)预应力和桩的支护共同作用,如图2所示,支护桩的脚部利用微风化岩层(4)的自稳性,主动土压力很小,分析计算桩底岩层免得倾斜情况,采用预应力锁脚锚索解决吊脚桩支护结构的受力和变形问题。
在冲击吊脚桩(1)的顶部浇筑混凝土圈梁(3),进行基坑开挖,开挖过程中插打锚索(2)和锁脚锚索(5),开挖至桩身设计标高时,桩间和桩身清理干净凿毛后,在桩间挂网喷射混凝土(7)。微风化岩层(4)采用爆破开挖至设计标高,在桩底部浇筑约40cm厚的钢筋混凝土挡墙(6),在钢筋混凝土挡墙(6)与桩底之间浇筑圈梁(3)并设置锁脚锚索(5)以锁定桩脚岩石。桩顶处设置圈梁支撑顶部变形,吊脚桩桩身采用全长粘结型锚杆加喷射混凝土结构支护。并在桩间锚固钢筋浇筑混凝土(7)与桩底结构连接为一体形成支护体系。
由于围岩整体性好,减少围护桩入岩深度,围岩部分采用钻孔桩锁脚采用预应力锚索结构加围护腰梁体系、全长粘结型锚杆加喷射混凝土结构支护。车站主体围护结构桩桩脚采用预应力锚索锁脚(5),预应力锚索锁脚(5)的内侧为全场粘结锚杆(2),同时下部采用挂网喷射混凝土(7)稳固岩面。锁脚锚索(5)采用两道Φ15.2mm钢绞线配腰梁,全场粘结锚杆(2)水平间距为1.5m。锚杆为采用螺纹钢。锚杆应沿轴线方向每隔2m设置一个定位支架,锚杆孔内注浆应选用M20的水泥砂浆。
Claims (2)
1.一种上软下硬地层地铁车站围护结构,其特征在于:本结构适用于基坑开挖深度大的情况,其中,吊脚桩的桩长为18~28m,吊脚高度为3~9m时;
该结构采用冲击吊脚桩,所述吊脚桩的底部采用预应力锚索结构加围护圈梁体系维护;冲击吊脚桩的桩身采用全长粘结型锚杆加喷射混凝土结构支护;吊脚桩桩顶采用混凝土圈梁支撑;冲击吊脚桩桩底深入基坑下层的挡土墙,冲击吊脚桩与挡土墙采用圈梁连接为一体做支撑结构。
2.根据权利要求1所述的一种上软下硬地层地铁车站围护结构,其特征在于:基坑上部锚索(2)预应力和桩的支护共同作用,支护桩的脚部利用微风化岩层(4)的自稳性,主动土压力很小,分析计算桩底岩层免得倾斜情况,采用预应力锁脚锚索解决吊脚桩支护结构的受力和变形问题;
在冲击吊脚桩(1)的顶部浇筑混凝土圈梁(3),进行基坑开挖,开挖过程中插打锚索(2)和锁脚锚索(5),开挖至桩身设计标高时,桩间和桩身清理干净凿毛后,在桩间挂网喷射混凝土(7);微风化岩层(4)采用爆破开挖至设计标高,在桩底部浇筑约40cm厚的钢筋混凝土挡墙(6),在钢筋混凝土挡墙(6)与桩底之间浇筑圈梁(3)并设置锁脚锚索(5)以锁定桩脚岩石;桩顶处设置圈梁支撑顶部变形,冲击吊脚桩的桩身采用全长粘结型锚杆加喷射混凝土结构支护;并在桩间锚固钢筋浇筑混凝土(7)与桩底结构连接为一体形成支护体系;
由于围岩整体性好,减少围护桩入岩深度,围岩部分采用钻孔桩锁脚采用预应力锚索结构加围护腰梁体系、全长粘结型锚杆加喷射混凝土结构支护;车站主体围护结构桩桩脚采用预应力锚索锁脚(5),预应力锚索锁脚(5)的内侧为全场粘结锚杆(2),同时下部采用挂网喷射混凝土(7)稳固岩面;锁脚锚索(5)采用两道Φ15.2mm钢绞线配腰梁,全场粘结锚杆(2)水平间距为1.5m;锚杆为采用螺纹钢;锚杆应沿轴线方向每隔2m设置一个定位支架,锚杆孔内注浆应选用M20的水泥砂浆。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710314956.2A CN107012874A (zh) | 2017-05-07 | 2017-05-07 | 一种上软下硬地层地铁车站围护结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710314956.2A CN107012874A (zh) | 2017-05-07 | 2017-05-07 | 一种上软下硬地层地铁车站围护结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107012874A true CN107012874A (zh) | 2017-08-04 |
Family
ID=59450448
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710314956.2A Pending CN107012874A (zh) | 2017-05-07 | 2017-05-07 | 一种上软下硬地层地铁车站围护结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107012874A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107794927A (zh) * | 2017-09-11 | 2018-03-13 | 广州机施建设集团有限公司 | 一种具有硬岩地质的深基坑土方开挖方法 |
CN111794245A (zh) * | 2020-07-13 | 2020-10-20 | 北京中岩大地科技股份有限公司 | 一种利用既有地下结构的深基坑支护结构及施工方法 |
CN113026761A (zh) * | 2021-03-04 | 2021-06-25 | 青岛业高建设工程有限公司市北分公司 | 土岩双元基坑复合支护结构及其施工方法 |
CN113089685A (zh) * | 2021-04-24 | 2021-07-09 | 博尔建设集团有限公司 | 一种用于深基坑围护的锚索钻孔桩结构及其围护方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201347559Y (zh) * | 2009-01-08 | 2009-11-18 | 广州市设计院 | 一种吊脚桩基坑支护体系结构 |
CN103132530A (zh) * | 2011-11-29 | 2013-06-05 | 上海市基础工程有限公司 | 土岩结合地质条件下围护接力桩的施工方法 |
CN204311456U (zh) * | 2014-10-28 | 2015-05-06 | 广州市城市规划勘测设计研究院 | 基坑加固结构 |
CN206070541U (zh) * | 2016-08-31 | 2017-04-05 | 中铁二十局集团有限公司 | 上软下硬地层地铁车站基坑支护体系 |
-
2017
- 2017-05-07 CN CN201710314956.2A patent/CN107012874A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201347559Y (zh) * | 2009-01-08 | 2009-11-18 | 广州市设计院 | 一种吊脚桩基坑支护体系结构 |
CN103132530A (zh) * | 2011-11-29 | 2013-06-05 | 上海市基础工程有限公司 | 土岩结合地质条件下围护接力桩的施工方法 |
CN204311456U (zh) * | 2014-10-28 | 2015-05-06 | 广州市城市规划勘测设计研究院 | 基坑加固结构 |
CN206070541U (zh) * | 2016-08-31 | 2017-04-05 | 中铁二十局集团有限公司 | 上软下硬地层地铁车站基坑支护体系 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107794927A (zh) * | 2017-09-11 | 2018-03-13 | 广州机施建设集团有限公司 | 一种具有硬岩地质的深基坑土方开挖方法 |
CN107794927B (zh) * | 2017-09-11 | 2019-12-24 | 广州机施建设集团有限公司 | 一种具有硬岩地质的深基坑土方开挖方法 |
CN111794245A (zh) * | 2020-07-13 | 2020-10-20 | 北京中岩大地科技股份有限公司 | 一种利用既有地下结构的深基坑支护结构及施工方法 |
CN113026761A (zh) * | 2021-03-04 | 2021-06-25 | 青岛业高建设工程有限公司市北分公司 | 土岩双元基坑复合支护结构及其施工方法 |
CN113089685A (zh) * | 2021-04-24 | 2021-07-09 | 博尔建设集团有限公司 | 一种用于深基坑围护的锚索钻孔桩结构及其围护方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106638673B (zh) | 一种复合支挡结构的施工方法 | |
CN102518135B (zh) | 水平旋喷土锚和灌注桩复合基坑支护施工工法 | |
CN106759376B (zh) | 用于临近既有地下结构的基坑桩锚支护体系的施工方法 | |
CN202969392U (zh) | 复杂地质深基坑联合支护 | |
CN112127900B (zh) | 穿堆积体浅埋偏压隧道明拱暗作半墙半拱防护构造的施工方法 | |
CN107012874A (zh) | 一种上软下硬地层地铁车站围护结构 | |
CN106498950A (zh) | 锚头置于桩身的深基坑桩锚支护体系及其实施方法 | |
CN104790408B (zh) | 不规则基坑施工方法 | |
CN110924433A (zh) | 上软下硬岩石地层中地铁基坑吊脚桩围护结构的设计方法 | |
CN103306289A (zh) | 基坑桩锚护壁混凝土锚索冠梁结构及其施工方法 | |
CN103031839A (zh) | 人工挖孔桩施工方法 | |
CN111560962A (zh) | 一种回填区基坑支护结构及其施工方法 | |
CN110241828A (zh) | 一种排栅式管桩后注浆内锚外止水支护施工方法 | |
CN203334300U (zh) | 树根桩支挡结构 | |
CN109914422A (zh) | 一种钢管与土钉组合式基坑支护结构及施工方法 | |
CN108385715A (zh) | 一种装配式桩拱组合挡土墙及其施工方法 | |
CN109457709A (zh) | 一种双排桩结合大角度锚索的支护结构及施工方法 | |
CN109235490A (zh) | 挡土墙及其施工方法 | |
CN206408630U (zh) | 锚头置于桩身的深基坑桩锚支护体系 | |
CN213574100U (zh) | 一种穿堆积体浅埋偏压隧道明拱暗作半墙半拱防护构造 | |
CN115262596B (zh) | 一种适用于桥隧相连隧道洞口滑坡段的治理方法 | |
CN111911183B (zh) | 一种基于端墙式导向墙结构的隧道进洞工法 | |
CN106223344B (zh) | 一种地面管桩锚框架基坑支护方法 | |
CN212926108U (zh) | 端墙式导向墙结构 | |
CN107447775A (zh) | 滑坡灾害体造地排水加筋土挡墙结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170804 |