CN106223344B - 一种地面管桩锚框架基坑支护方法 - Google Patents
一种地面管桩锚框架基坑支护方法 Download PDFInfo
- Publication number
- CN106223344B CN106223344B CN201610597432.4A CN201610597432A CN106223344B CN 106223344 B CN106223344 B CN 106223344B CN 201610597432 A CN201610597432 A CN 201610597432A CN 106223344 B CN106223344 B CN 106223344B
- Authority
- CN
- China
- Prior art keywords
- foundation pit
- concrete tubular
- combination beam
- pile
- tubular pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 32
- 239000004567 concrete Substances 0.000 claims abstract description 33
- 238000010276 construction Methods 0.000 claims abstract description 19
- 239000002689 soil Substances 0.000 claims description 19
- 238000009412 basement excavation Methods 0.000 claims description 6
- 239000004927 clay Substances 0.000 claims description 6
- 239000004576 sand Substances 0.000 claims description 3
- -1 silt Substances 0.000 claims description 3
- 229910000831 Steel Inorganic materials 0.000 abstract description 7
- 239000010959 steel Substances 0.000 abstract description 7
- 239000011150 reinforced concrete Substances 0.000 abstract description 3
- 238000004904 shortening Methods 0.000 abstract description 2
- 239000011378 shotcrete Substances 0.000 abstract 1
- 238000005516 engineering process Methods 0.000 description 5
- 238000006073 displacement reaction Methods 0.000 description 4
- 239000002131 composite material Substances 0.000 description 3
- 230000003068 static effect Effects 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000002708 enhancing effect Effects 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000004873 anchoring Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Piles And Underground Anchors (AREA)
- Foundations (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610597432.4A CN106223344B (zh) | 2016-07-26 | 2016-07-26 | 一种地面管桩锚框架基坑支护方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610597432.4A CN106223344B (zh) | 2016-07-26 | 2016-07-26 | 一种地面管桩锚框架基坑支护方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106223344A CN106223344A (zh) | 2016-12-14 |
CN106223344B true CN106223344B (zh) | 2018-07-13 |
Family
ID=57534366
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610597432.4A Expired - Fee Related CN106223344B (zh) | 2016-07-26 | 2016-07-26 | 一种地面管桩锚框架基坑支护方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106223344B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638618B (zh) * | 2016-12-20 | 2018-10-23 | 杭州江润科技有限公司 | 地连墙围护基坑钢筋混凝土支撑结构的施工方法 |
CN107386310B (zh) * | 2017-08-15 | 2023-07-25 | 广东工业大学 | 一种应用于山坡地形的建筑物支护结构及其施工方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201137148Y (zh) * | 2007-12-25 | 2008-10-22 | 杭州南方土木工程咨询有限公司 | 双排毛竹桩复合土钉围护系统 |
KR20090091460A (ko) * | 2008-02-25 | 2009-08-28 | 코오롱건설주식회사 | 어스 앵커를 이용한 2열 엄지말뚝 흙막이 공법 |
CN103195069A (zh) * | 2013-04-01 | 2013-07-10 | 北京工业大学 | 预应力式双排桩强约束深基坑支护方法 |
CN103306289A (zh) * | 2013-06-28 | 2013-09-18 | 中国三冶集团有限公司第一建筑工程公司 | 基坑桩锚护壁混凝土锚索冠梁结构及其施工方法 |
CN103669369A (zh) * | 2013-12-23 | 2014-03-26 | 中国建筑第八工程局有限公司 | 基坑的支护结构及支护方法 |
CN203583494U (zh) * | 2013-11-25 | 2014-05-07 | 中国建筑股份有限公司 | 一种排间设置竖向锚杆的双排桩支护体系 |
CN104532851A (zh) * | 2014-12-17 | 2015-04-22 | 北京工业大学 | 一种回收装配式双排桩及其支护方法 |
-
2016
- 2016-07-26 CN CN201610597432.4A patent/CN106223344B/zh not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201137148Y (zh) * | 2007-12-25 | 2008-10-22 | 杭州南方土木工程咨询有限公司 | 双排毛竹桩复合土钉围护系统 |
KR20090091460A (ko) * | 2008-02-25 | 2009-08-28 | 코오롱건설주식회사 | 어스 앵커를 이용한 2열 엄지말뚝 흙막이 공법 |
CN103195069A (zh) * | 2013-04-01 | 2013-07-10 | 北京工业大学 | 预应力式双排桩强约束深基坑支护方法 |
CN103306289A (zh) * | 2013-06-28 | 2013-09-18 | 中国三冶集团有限公司第一建筑工程公司 | 基坑桩锚护壁混凝土锚索冠梁结构及其施工方法 |
CN203583494U (zh) * | 2013-11-25 | 2014-05-07 | 中国建筑股份有限公司 | 一种排间设置竖向锚杆的双排桩支护体系 |
CN103669369A (zh) * | 2013-12-23 | 2014-03-26 | 中国建筑第八工程局有限公司 | 基坑的支护结构及支护方法 |
CN104532851A (zh) * | 2014-12-17 | 2015-04-22 | 北京工业大学 | 一种回收装配式双排桩及其支护方法 |
Also Published As
Publication number | Publication date |
---|---|
CN106223344A (zh) | 2016-12-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205742213U (zh) | 基坑支护结构 | |
CN105155558A (zh) | 一种组合支挡结构及其施工方法 | |
CN106013171B (zh) | 一种深基坑侧壁的半刚性半柔性支护结构和方法 | |
CN105178327A (zh) | 一种基坑工程的复合围护结构及其施工方法 | |
CN207017275U (zh) | 可装配可回收的深基坑支护体系 | |
CN106498950A (zh) | 锚头置于桩身的深基坑桩锚支护体系及其实施方法 | |
CN109183809B (zh) | 一种淤泥质黏土深基坑工程复合支护换撑的施工方法 | |
CN106759376A (zh) | 用于临近既有地下结构的基坑桩锚支护体系及其施工方法 | |
CN106245927B (zh) | 一种适用于框架结构建筑物地下增层的方法及建筑物 | |
CN210104758U (zh) | 一种土钉灌注桩锚索组合的基坑支护体系 | |
CN109457709A (zh) | 一种双排桩结合大角度锚索的支护结构及施工方法 | |
CN106522236A (zh) | 基坑支护的结构及施工方法 | |
CN106522292A (zh) | 一种灌浆联合预应力锚杆静压桩纠偏加固方法 | |
CN108252307A (zh) | 一种用于地铁隧道上方的基坑修建方法 | |
CN106065628B (zh) | 基于永临结合理念的大直径自来水管安全防护施工方法 | |
CN112982431A (zh) | 一种基坑支护结构的施工方法 | |
CN207003421U (zh) | 一种坐落于硬岩顶面的钢板桩结构 | |
CN106223344B (zh) | 一种地面管桩锚框架基坑支护方法 | |
CN204940298U (zh) | 一种基坑工程的复合围护结构 | |
CN111810185B (zh) | 一种隧道隧底预加固施工方法 | |
CN109577322A (zh) | 一种用于土体内部既有桩基接桩的施工装置 | |
CN206800370U (zh) | 一种无肥槽开挖地下连续侧墙支挡防护构造 | |
CN112323816A (zh) | 卸荷式组合支挡结构及其施工方法 | |
CN209443472U (zh) | 一种双排桩结合大角度锚索的支护结构 | |
KR101117924B1 (ko) | 복합형 강가시설 및 그 시공방법 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Zhou Yijun Inventor after: Yao Aijun Inventor after: Lv Keyan Inventor after: Zhai Yuxin Inventor before: Yao Aijun Inventor before: Zhou Yijun Inventor before: Lv Keyan Inventor before: Zhai Yuxin |
|
CB03 | Change of inventor or designer information | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220121 Address after: 063210 Bohai Avenue, Caofeidian new town, Tangshan City, Hebei, 21 Patentee after: NORTH CHINA University OF SCIENCE AND TECHNOLOGY Address before: 100124 No. 100 Chaoyang District Ping Tian Park, Beijing Patentee before: Beijing University of Technology |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20220224 Address after: 063200 office building 217-62 of emerging industry park management committee, block C, Jindao building, Caofeidian Industrial Zone, Caofeidian area, Tangshan City, Hebei Province Patentee after: Hebei Hengyuan Construction Engineering Co.,Ltd. Address before: 063210 Bohai Avenue, Caofeidian new town, Tangshan City, Hebei, 21 Patentee before: NORTH CHINA University OF SCIENCE AND TECHNOLOGY |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180713 |