CN205804372U - 一种适于非煤露天矿边坡滑坡治理的桩‑锚‑梁一体化结构 - Google Patents
一种适于非煤露天矿边坡滑坡治理的桩‑锚‑梁一体化结构 Download PDFInfo
- Publication number
- CN205804372U CN205804372U CN201620606517.XU CN201620606517U CN205804372U CN 205804372 U CN205804372 U CN 205804372U CN 201620606517 U CN201620606517 U CN 201620606517U CN 205804372 U CN205804372 U CN 205804372U
- Authority
- CN
- China
- Prior art keywords
- anchor
- slope
- vierendeel girder
- integral structure
- row
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000003245 coal Substances 0.000 title claims abstract description 19
- 239000011435 rock Substances 0.000 claims abstract description 12
- 238000000034 method Methods 0.000 abstract description 8
- 230000003014 reinforcing effect Effects 0.000 abstract description 3
- 230000008093 supporting effect Effects 0.000 abstract 1
- 230000000694 effects Effects 0.000 description 10
- 230000002787 reinforcement Effects 0.000 description 9
- 238000010276 construction Methods 0.000 description 7
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 238000010008 shearing Methods 0.000 description 4
- 238000005065 mining Methods 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 238000005422 blasting Methods 0.000 description 2
- 235000019994 cava Nutrition 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- CWYNVVGOOAEACU-UHFFFAOYSA-N Fe2+ Chemical compound [Fe+2] CWYNVVGOOAEACU-UHFFFAOYSA-N 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 230000009514 concussion Effects 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 229910052500 inorganic mineral Inorganic materials 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 229910052751 metal Inorganic materials 0.000 description 1
- 239000011707 mineral Substances 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000007569 slipcasting Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620606517.XU CN205804372U (zh) | 2016-06-21 | 2016-06-21 | 一种适于非煤露天矿边坡滑坡治理的桩‑锚‑梁一体化结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620606517.XU CN205804372U (zh) | 2016-06-21 | 2016-06-21 | 一种适于非煤露天矿边坡滑坡治理的桩‑锚‑梁一体化结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205804372U true CN205804372U (zh) | 2016-12-14 |
Family
ID=58143087
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620606517.XU Active CN205804372U (zh) | 2016-06-21 | 2016-06-21 | 一种适于非煤露天矿边坡滑坡治理的桩‑锚‑梁一体化结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205804372U (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109868837A (zh) * | 2019-04-09 | 2019-06-11 | 易朋莹 | 一种无刻槽的肋柱式锚杆挡墙 |
CN110307005A (zh) * | 2019-07-09 | 2019-10-08 | 福建工程学院 | 用于加固隧道洞口山体滑坡的装置及方法 |
CN114411774A (zh) * | 2022-01-27 | 2022-04-29 | 中钢集团马鞍山矿山研究总院股份有限公司 | 一种用于矿山检修道路修复的桩锚墙加固方法 |
-
2016
- 2016-06-21 CN CN201620606517.XU patent/CN205804372U/zh active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109868837A (zh) * | 2019-04-09 | 2019-06-11 | 易朋莹 | 一种无刻槽的肋柱式锚杆挡墙 |
CN110307005A (zh) * | 2019-07-09 | 2019-10-08 | 福建工程学院 | 用于加固隧道洞口山体滑坡的装置及方法 |
CN110307005B (zh) * | 2019-07-09 | 2021-08-17 | 福建工程学院 | 用于加固隧道洞口山体滑坡的装置及方法 |
CN114411774A (zh) * | 2022-01-27 | 2022-04-29 | 中钢集团马鞍山矿山研究总院股份有限公司 | 一种用于矿山检修道路修复的桩锚墙加固方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106049511B (zh) | 一种适于非煤露天矿边坡滑坡治理的组合加固方法 | |
CN103244122B (zh) | 沿空掘巷煤柱稳定性三位一体耦合支护控制方法 | |
CN102536282A (zh) | 一种矿山回采巷道底臌灾害防治方法 | |
CN104763434B (zh) | 一种无煤柱双巷掘进方法 | |
CN105155556B (zh) | 一种露天矿边坡单台阶楔形缺口整平坡面的施工方法 | |
CN205804372U (zh) | 一种适于非煤露天矿边坡滑坡治理的桩‑锚‑梁一体化结构 | |
CN102182483A (zh) | 半刚性异型梁锚索桁架巷道支护系统 | |
CN102900449B (zh) | 一种煤矿井下采空区顶板的支护方法 | |
CN103216244B (zh) | 巷道软弱顶板锚固梁-拱组合结构支护系统及支护方法 | |
CN103352477A (zh) | 竖向预应力锚杆重力式复合挡墙及挡墙的设计与施工方法 | |
CN103075170A (zh) | 一种中空注浆锚索控制多次跨采巷道围岩变形的方法 | |
CN106401609A (zh) | 一种控制深部巷道底臌的底板卸压加固结构及其施工方法 | |
CN108316941A (zh) | 一种破碎围岩及软岩巷道u型钢套棚支护方法 | |
CN110242335A (zh) | 大变形回采巷道主被动耦合支护系统及施工方法 | |
CN206205903U (zh) | 一种控制深部巷道底臌的底板卸压加固结构 | |
CN108166978A (zh) | 一种用于三软煤层回采工作面的设备布置系统 | |
Qi et al. | Failure characteristics and control technology of surrounding rock in deep coal seam roadway with large dip angle under the influence of weak structural plane | |
CN106761867A (zh) | 急倾斜回采巷道围岩稳定支护设施及支护工艺 | |
CN103352707A (zh) | 一种多维多级支护方法 | |
CN206280090U (zh) | 急倾斜回采巷道围岩稳定支护设施 | |
CN205532652U (zh) | 一种复杂地质条件下石门揭煤的加强支护结构 | |
CN210948737U (zh) | 薄煤层倾斜小断面半煤岩巷的高效快速掘进巷道支护设施 | |
CN103244158B (zh) | 一种锚梁网一体化支护的强化结构 | |
CN106567721A (zh) | 高预应力锚索桁架支护方法 | |
CN203066986U (zh) | 一种用于煤岩巷顶板支护的复合型桁架 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666 Co-patentee after: HUAWEI METAL MINERAL RESOURCE EFFICIENT RECYCLING UTILIZATION NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd. Patentee after: MAANSHAN Mine Research Institute Co.,Ltd. Address before: 243000 Xitang Road, Ma'anshan Economic Development Zone, Anhui, No. 666 Co-patentee before: HUAWEI METAL MINERAL RESOURCE EFFICIENT RECYCLING UTILIZATION NATIONAL ENGINEERING RESEARCH CENTER Co.,Ltd. Patentee before: SINOSTEEL MAANSHAN INSTITUTE OF MINING RESEARCH Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |