CN103821038B - 高速铁路路基上拱修复加固结构 - Google Patents

高速铁路路基上拱修复加固结构 Download PDF

Info

Publication number
CN103821038B
CN103821038B CN201410042388.1A CN201410042388A CN103821038B CN 103821038 B CN103821038 B CN 103821038B CN 201410042388 A CN201410042388 A CN 201410042388A CN 103821038 B CN103821038 B CN 103821038B
Authority
CN
China
Prior art keywords
arch
repairing
supporting layer
fragment orbit
railway
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410042388.1A
Other languages
English (en)
Other versions
CN103821038A (zh
Inventor
姚裕春
李安洪
袁碧玉
徐骏
庞应刚
李井元
曾永红
张敏静
孙茑
邓敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Information Technology Co Ltd of CAS
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
Chengdu University of Information Technology
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu University of Information Technology, China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical Chengdu University of Information Technology
Priority to CN201410042388.1A priority Critical patent/CN103821038B/zh
Publication of CN103821038A publication Critical patent/CN103821038A/zh
Application granted granted Critical
Publication of CN103821038B publication Critical patent/CN103821038B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

高速铁路路基上拱修复加固结构,以有效消除因膨胀岩土膨胀引起的路基上拱,保证上部轨道结构的平顺性。它包括位于铁路路基填筑体顶部的无砟轨道支撑层,以及设置在铁路路堑坡脚两侧的侧沟,在铁路路基填筑体下方的路堑基底岩土体中纵向间隔布设卸压孔,各卸压孔由两侧侧沟位置倾斜钻入;所述无砟轨道支撑层位置对称设置横向间隔的锚索,各锚索的外端与无砟轨道支撑层锚固连接,内端锚入路堑基底岩土体中。

Description

高速铁路路基上拱修复加固结构
技术领域
本发明涉及土木工程,特别涉及膨胀(岩)土路堑段无砟轨道高速铁路路基上拱修复加固。
背景技术
高速铁路在我国快速发展,目前已有多条高速铁路开通运营。由于高速铁路对我国来说还是一种新的交通方式,还需要进行大量的经验积累,才能形成一套成熟的设计、施工、运营成套技术。比如在膨胀土地区修建无砟轨道高速铁路,特别是在膨胀土路堑地段,地表水下渗会引起路基上拱,这对于无砟轨道路基来说必须采取措施控制路基上拱,对于已建的无砟轨道来说,必须对路基上拱进行修复,因此,迫切需求一种新的结构或措施来解决路基上拱问题,且需具有经济、施工简单等特点,并符合环保的要求。
发明内容
本发明所要解决的技术问题是提供一种高速铁路路基上拱修复加固结构,以有效消除因膨胀岩土膨胀引起的路基上拱,保证上部轨道结构的平顺性。
本发明解决其技术问题所采用的技术方案如下:
本发明的高速铁路路基上拱修复加固结构,包括位于铁路路基填筑体顶部的无砟轨道支撑层,以及设置在铁路路堑坡脚两侧的侧沟,其特征是:所述铁路路基填筑体下方的路堑基底岩土体中纵向间隔布设卸压孔,各卸压孔由两侧侧沟位置倾斜钻入;所述无砟轨道支撑层位置对称设置横向间隔的锚索,各锚索的外端与无砟轨道支撑层锚固连接,内端锚入路堑基底岩土体中。
本发明的有益效果是,从路堑两侧侧沟位置倾斜向路基底部钻入卸压孔,利用卸压孔释放膨胀岩土的膨胀力,并有利于锚索张拉时无砟轨道支撑层向下变形;利用锚索的张拉力,把无砟轨道支撑层向下压以解决因膨胀岩土膨胀引起的路基上拱,保证上部轨道结构的平顺性。该结构有效解决了无砟轨道铁路路基上拱修复问题,而且施工简单、经济性好,具有广阔推广应用前景。
附图说明
本说明书包括如下一幅附图:
图1是本发明高速铁路路基上拱修复加固结构的断面示意图。
图中示出构件、部位名称及所对应的标记:无砟轨道支撑层1、侧沟2、卸压孔3、锚索4。
具体实施方式
下面结合附图和实施例对本发明进一步说明。
参照图1,本发明的高速铁路路基上拱修复加固结构,包括位于铁路路基填筑体顶部的无砟轨道支撑层1,以及设置在铁路路堑坡脚两侧的侧沟2。所述铁路路基填筑体下方的路堑基底岩土体中纵向间隔布设卸压孔3,各卸压孔3由两侧侧沟2位置倾斜钻入。所述无砟轨道支撑层1位置对称设置横向间隔的锚索4,各锚索4的外端与无砟轨道支撑层1锚固连接,内端锚入路堑基底岩土体中。
从路堑两侧侧沟2位置倾斜向路基底部钻入卸压孔3,利用卸压孔3释放膨胀岩土的膨胀力,并有利于锚索4张拉时无砟轨道支撑层1向下变形。利用锚索4的张拉力,把无砟轨道支撑层1向下压以解决因膨胀岩土膨胀引起的路基上拱,保证上部轨道结构的平顺性。该结构有效解决了无砟轨道铁路路基上拱修复问题,而且施工简单、经济性好,具有广阔推广应用前景。
参照图1,该结构施工顺序为:拆除侧沟2→施工卸压孔3→施工锚索4→张拉并固定锚索4→恢复重建侧沟2。
参照图1,所述卸压孔3采用地质钻孔倾斜成孔,孔径为Φ80mm~Φ150mm,间距以上拱量大小确定。所述锚索4锁定张拉力不小于设计值的110%,设置间距一般不小于4m。在无砟轨道支撑层1中施工锚索钻孔时必须保证其完整性,同一块无砟轨道支撑层1上的锚索4应对称同时张拉,张拉时须对无砟轨道支撑层1的竖向变形进行动态监测。
参照图1,在恢复重建侧沟2时,必须采取有效的防水措施,严禁水进入地基基底,侧沟2伸缩缝位置必须做好防水。
以上所述只是用图解说明本发明高速铁路路基上拱修复加固结构的一些原理,并非是要将本发明局限在所示和所述的具体结构和适用范围内,故凡是所有可能被利用的相应修改以及等同物,均属于本发明所申请的专利范围。

Claims (3)

1.高速铁路路基上拱修复加固结构,包括位于铁路路基填筑体顶部的无砟轨道支撑层(1),以及设置在铁路路堑坡脚两侧的侧沟(2),其特征是:所述铁路路基填筑体下方的路堑基底岩土体中纵向间隔布设卸压孔(3),各卸压孔(3)由两侧侧沟(2)位置倾斜钻入;所述无砟轨道支撑层(1)位置对称设置横向间隔的锚索(4),各锚索(4)的外端与无砟轨道支撑层(1)锚固连接,内端锚入路堑基底岩土体中。
2.如权利要求1所述的高速铁路路基上拱修复加固结构,其特征是:所述卸压孔(3)采用地质钻孔倾斜成孔,孔径为Φ80mm~Φ150mm。
3.如权利要求1所述的高速铁路路基上拱修复加固结构,其特征是:所述锚索(4)锁定张拉力不小于设计值的110%,设置间距不小于4m。
CN201410042388.1A 2014-01-28 2014-01-28 高速铁路路基上拱修复加固结构 Active CN103821038B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410042388.1A CN103821038B (zh) 2014-01-28 2014-01-28 高速铁路路基上拱修复加固结构

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410042388.1A CN103821038B (zh) 2014-01-28 2014-01-28 高速铁路路基上拱修复加固结构

Publications (2)

Publication Number Publication Date
CN103821038A CN103821038A (zh) 2014-05-28
CN103821038B true CN103821038B (zh) 2016-05-11

Family

ID=50756308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410042388.1A Active CN103821038B (zh) 2014-01-28 2014-01-28 高速铁路路基上拱修复加固结构

Country Status (1)

Country Link
CN (1) CN103821038B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107460790B (zh) * 2017-07-22 2023-07-18 中铁二院工程集团有限责任公司 一种无砟轨道铁路膨胀岩石路堑结构及施工方法
CN108951308B (zh) * 2018-05-02 2019-12-31 中国铁道科学研究院铁道建筑研究所 一种高速铁路路基上拱变形的修复方法
CN110565451B (zh) * 2018-06-05 2022-09-16 中铁二院工程集团有限责任公司 一种无砟轨道高速铁路上拱变形的修复施工方法
CN111560798B (zh) * 2020-05-29 2021-12-07 中铁二院工程集团有限责任公司 一种无砟轨道高速铁路路基基床变形双向调节装置、使用方法及施工方法
CN111749053B (zh) * 2020-06-03 2022-05-13 中铁四院集团工程建设有限责任公司 一种无砟轨道路基上拱的整治方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000087356A (ja) * 1998-09-10 2000-03-28 Sekisui Chem Co Ltd 軟弱地盤上の土構造物の安定化工法
JP2007070820A (ja) * 2005-09-05 2007-03-22 Kajima Corp 盛土の補強工法および盛土
JP2009046918A (ja) * 2007-08-22 2009-03-05 Penta Ocean Construction Co Ltd 真空圧密による軟弱地盤改良工法
CN202730544U (zh) * 2012-08-08 2013-02-13 中铁第一勘察设计院集团有限公司 一种深季节性冻土区防冻胀路基结构
CN103243724A (zh) * 2013-05-22 2013-08-14 中铁二院工程集团有限责任公司 顺层路堑高边坡收坡加固构造
CN203782490U (zh) * 2014-01-28 2014-08-20 中铁二院工程集团有限责任公司 高速铁路路基上拱修复加固结构

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000087356A (ja) * 1998-09-10 2000-03-28 Sekisui Chem Co Ltd 軟弱地盤上の土構造物の安定化工法
JP2007070820A (ja) * 2005-09-05 2007-03-22 Kajima Corp 盛土の補強工法および盛土
JP2009046918A (ja) * 2007-08-22 2009-03-05 Penta Ocean Construction Co Ltd 真空圧密による軟弱地盤改良工法
CN202730544U (zh) * 2012-08-08 2013-02-13 中铁第一勘察设计院集团有限公司 一种深季节性冻土区防冻胀路基结构
CN103243724A (zh) * 2013-05-22 2013-08-14 中铁二院工程集团有限责任公司 顺层路堑高边坡收坡加固构造
CN203782490U (zh) * 2014-01-28 2014-08-20 中铁二院工程集团有限责任公司 高速铁路路基上拱修复加固结构

Also Published As

Publication number Publication date
CN103821038A (zh) 2014-05-28

Similar Documents

Publication Publication Date Title
CN103821038B (zh) 高速铁路路基上拱修复加固结构
CN106638663B (zh) 一种沉陷区高压输电铁塔基础加固及整体纠倾平移方法
CN103422511B (zh) 一种复合式软土地基下输电杆塔浅埋基础地基加固方法
CN103603369B (zh) 一种锚拉桩扶壁式挡土墙施工方法
CN106437726A (zh) 浅埋暗挖隧道过地裂缝破碎带施工方法
CN101768924B (zh) 软基、高水位地段既有铁路架空方法
CN202595591U (zh) 用于岩溶地区隧道溶腔路基的微型钢管桩桩网结构
CN103290847A (zh) 超大面积深基坑内斜梁支撑结构及施工方法
CN102425155B (zh) 一种采空区上覆岩体浅层加固方法
CN105156114A (zh) 一种交岔点处巷道的扩修及加固方法
CN109056810A (zh) 既有建筑下方明挖或盖挖地下主体结构的横向扩挖构造及其施工方法
CN101838957A (zh) 整体式t形外悬臂道路及其施工方法
CN202100263U (zh) 高烈度膨胀土地区高回填隧道明洞衬砌构造
CN105926391A (zh) 一种既有铁路路基的路肩加宽方法
CN206834684U (zh) 一种高铁路基电缆槽系统
CN204097889U (zh) 一种补桩与增大台帽组合加固已建桥台结构
CN103882883B (zh) 塔吊与车库框架柱共用一个基础施工方法
CN203080558U (zh) 一种薄衬砌灌浆洞内直接式高压灌浆帷幕连接结构
CN203782490U (zh) 高速铁路路基上拱修复加固结构
CN207130545U (zh) 高速铁路活动断裂带区域路基结构
CN107975378A (zh) 具有输水功能的u形墙基与底板动静分离承载型衬砌结构
CN208073507U (zh) 一种带双侧集水廊道的哑铃型隧底衬砌结构
CN211227883U (zh) 岩石地基既有高铁细粒土填筑路堤帮宽结构
CN208310792U (zh) 具有低位泄水动能的π形隧底衬砌结构
CN208073500U (zh) 两侧设置兼具排水、承载及支挡功能的l形底座的衬砌结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: CHENGDU INFORMATION TECHNOLOGY INSTITUTE

Effective date: 20140512

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20140512

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 3

Applicant after: China Railway Eryuan Engineering Group Co., Ltd.

Applicant after: Chengdu Information Technology Institute

Address before: 610031 Sichuan Province, Chengdu City Kam Tong Road No. 3

Applicant before: China Railway Eryuan Engineering Group Co., Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 3

Applicant after: China Railway Eryuan Engineering Group Co., Ltd.

Applicant after: Chengdu information engineering university

Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 3

Applicant before: China Railway Eryuan Engineering Group Co., Ltd.

Applicant before: Chengdu Information Technology Institute

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant