CN103791886A - Google earth assisted short-distance transmission line plane section measurement method in plain regions - Google Patents

Google earth assisted short-distance transmission line plane section measurement method in plain regions Download PDF

Info

Publication number
CN103791886A
CN103791886A CN201410016974.9A CN201410016974A CN103791886A CN 103791886 A CN103791886 A CN 103791886A CN 201410016974 A CN201410016974 A CN 201410016974A CN 103791886 A CN103791886 A CN 103791886A
Authority
CN
China
Prior art keywords
image
section
measurement
transmission line
google earth
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410016974.9A
Other languages
Chinese (zh)
Other versions
CN103791886B (en
Inventor
陈正宇
李欣
徐君民
王骢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Electric Power Design Institute
Original Assignee
Jiangsu Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Electric Power Design Institute filed Critical Jiangsu Electric Power Design Institute
Priority to CN201410016974.9A priority Critical patent/CN103791886B/en
Publication of CN103791886A publication Critical patent/CN103791886A/en
Application granted granted Critical
Publication of CN103791886B publication Critical patent/CN103791886B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C7/00Tracing profiles

Landscapes

  • Engineering & Computer Science (AREA)
  • Multimedia (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a Google earth assisted short-distance transmission line plane section measurement method in plain regions. The method comprises the following steps: step 01. intercepting Google earth images along a path of a transmission line; step 02. performing field measurement and annotation; step 03. correcting the images; S04. performing image digitization according to a certain rule; S05. fusing field data and digital vector data, and automatically generating a plane section; and S06. performing tower measurement and plane section revision. Aiming at the surveying design of the short-distance transmission line in plain regions, the invention provides a method for rapidly converting Google earth image information and field measurement data fusion into Dao power SLCAD data achievements, the working efficiency is improved, and the field labor intensity is lightened.

Description

Plains region Google Earth is assisted the flat section survey method of short distance transmission line of electricity
Technical field
The present invention relates to Survey of Transmission Line design field, be specifically related to the short-range transmission line of electricity in a kind of plains region and utilize Google Earth to carry out the method for flat section subsidiary.
Background technology
Survey of Transmission Line design adopts aerophotogrammetric method conventionally, according to the transmission line of electricity route scheme that the preliminary stage designer such as can grind and provide, obtain the digitized video of the certain degree of overlapping in circuit corridor by aeroplane photography, in the digital photogrammetric work stations such as VirtuoZo, utilize field photo control measurement to carry out aerotriangulation encryption, obtain three-dimensional stereo model through data processing, carry out on this basis the survey and design of transmission line of electricity.But this technology has some limitations.First, aerial survey image wide cut is less, and a transmission line of electricity need to cover many air strips images conventionally, for meeting the requirement of relevant specification, conventionally will lay a large amount of photo control points like this.Secondly, be subject to the restriction of the factor such as weather and air control, boat flies to implement sometimes.Again, for the shorter transmission line of electricity (being less than 10km) of distance, the reason that flies cost due to boat does not adopt photogrammetric measurement conventionally.
Utilize the modes such as GPS RTK or CORS, total powerstation to carry out the main method that full Fie ld Digital Surveying is the flat section survey of current short distance transmission line of electricity.But the method needs more human and material resources, and inefficiency, cannot meet owner's requirement in the situation that comparison between projects is urgent.
In recent years, Google Earth (Goole Earth) is the survey and design stage such as route selection in widespread use transmission line of electricity circuit early stage, in some areas, particularly economically developed province Google Earth image resolution is higher, the trend of the times is better, if can make full use of this part image, adopt the flat section survey work that certain technology should be able to the auxiliary construction figure stage.
Though the road flat section disposal system of prosperous SLCAD aerial power transmission line is widely used in the survey and design of transmission line of electricity, it is poor at aspects such as graphical interaction operations.AutoCAD graphical interaction is strong, and survey crew relatively gets used to adopting AutoCAD mapping, but designer need to use the flat section disposal system of SLCAD aerial power transmission line to design.
Convert to aspect prosperous SLCAD achievement in topomap digitizing achievement, it is the method [patent No. CN 102236708] of overhead transmission line form by topographic map data format conversion that Inner Mongol power survey and design institute has proposed a kind of, it is mainly to utilize the data file of southern CASS to carry out the conversion of topomap and overhead transmission line form, this mode, to the regional conversion of atural object complexity inconvenient, does not relate to the conversion of ditch river section, house section and the scissors crossing of common plains region yet.
Summary of the invention
For above-mentioned problems of the prior art, the object of the present invention is to provide one to be applicable to the method for the auxiliary flat section survey of short distance transmission line of electricity of plains region Google Earth (Goole Earth), it can cannot carry out replacing in aerophotogrammetric situation full Fie ld Digital Surveying at transmission line of electricity, realize the integrated of the interior field operation of the flat section survey of transmission line of electricity, realize and automatically convert field data and image digitization achievement to prosperous SLCAD aerial power transmission line flat section achievement, improved greatly the efficiency of flat section survey.Technical solution of the present invention is:
For achieving the above object, the present invention adopts following technology and scheme:
The auxiliary flat section survey method of short distance transmission line of electricity of a kind of plains region Google Earth, comprises the following steps:
Step S01, intercepts Google Earth image: read Google Earth route selection file, Google Earth route selection file is generally KML file.Set along line boundary width, sectional drawing height and time delay, intercept Google Earth image along transmission line of electricity path.
Step S02, field operation is measured with tune and is painted: comprise that measurement painted in photogrammetric control point surveying, scissors crossing tune, house is adjusted and painted measurement, location survey and the measurement of crucial atural object; Field operation is measured with adjusting drawing tools body and is comprised:
(1) photogrammetric control point surveying
Photo control point is the unique point that feature is distinguished clearly and easily, comprise that road corner, ridge intersect and angle, room object point, described photo control point is evenly laid along both sides, transmission line of electricity path, if the image that whole piece transmission line of electricity intercepts has multiple, lays some photo control points at image edge fit place;
(2) scissors crossing is adjusted and is painted measurement
The line of electric force of underground utilities, 10kV and following grade and connection judge to adjust according to the relative position of atural object paints planimetric position and spanning height, and the influential atural object in power transmission line column position is surveyed to planimetric position; 35kV and above scissors crossing measurement plane location are surveyed by GPS, and spanning height obtains by the mode of total station survey.
(3) house is adjusted and is painted measurement
For not relating to the work transmission line of tearing room open, and floor is not higher than constrain height, floor and the room of painting house according to intercepting image tune are high, if floor is higher than constrain height, after actual measurement height of house, adjust and paint measurement, house limit for height can limit according to the general height of local building, and for example constrain height is 13 meters;
For not relating to the work transmission line of tearing room open, it is high that house and room within the scope of room line torn in actual measurement open;
(4) location survey
The corner WGS84 coordinate providing according to described Google Earth route selection file, become local coordinate to adjust and location survey on the spot by coordinate conversion, obtain accurate planimetric coordinates and the elevation of corner, the straight line stake position of laying according to corner coordinate, control section elevation between each strain section;
Corner alignment and measure of pile position point, field operation are adjusted to paint and are measured and check point, supplementary quick short steps point, plane and vertical control point that these are drawn as flat section; Adopt the principle of step control, the highest grade of corner, be secondly straight line stake, be quick short steps points again.
(5) crucial atural object is measured
Be beyond expression and Survey of Transmission Line designed to influential geomorphological features and carry out field operation in-site measurement and check intercepting image, mainly comprising high and nearer apart from the wire center point-like atural object of stalk of high-grade highway and floor level thereof, water system.
Step S03, image rectification: the photogrammetric control point surveying data of obtaining according to described field operation measurement, carry out image rectification by image rectification method to intercepting image, obtain correction image; Image rectification method comprises that application ENVI or ERDAS software carry out image rectification; The number of the required photo control point of described image rectification is relevant with the method for image rectification, and plains region often adopts geometric correction.
Step S04, image digitization: insert described correction image registration image under AutoCAD environment, the loose some data that field operation is measured are directed in AutoCAD, generate AutoCAD digitized image.
Step S05, field data and digitalized data merge, and generate plane cross section: convert described AutoCAD digitized image to prosperous SLCAD plane cross section according to digitizing and field operation measurement data fusion rule.
Step S06, tower position is measured with flat section and is repaiied survey: carry out the pre-ranking of shaft tower according to the prosperous SLCAD plane cross section in described road, according to described shaft tower, pre-ranking is carried out field operation and determine the measurement of tower position, and near flat section tower position is adjusted and repaiied survey in SLCAD.
More preferably, step S05 digitizing and field operation measurement data fusion rule comprise:
(1) set up the figure layer of settlement place, water system, road, Di Lei circle atural object classification, carry out digitizing by figure layer;
(2) annotation is higher than the house of 1 layer, by the high assignment in building of field operation actual measurement in house;
(3) water system is drawn and is comprised a point single line ditch, two-wire ditch and 4 section pools draftings;
(4) the point-like atural object such as coffin pit, street lamp and well, is directly depicted as a little or is depicted as the topomap standard proportional symbol of segment form;
(5) field operation is adjusted to paint with the high pressure leap of measuring, 380v, 10kV, connection, underground utilities, point-like atural object and is imported stratification drawing after AutoCAD.
More preferably, step S05 converts AutoCAD digitized image to prosperous SLCAD plane cross section by Visual C#, the programming of AutoCAD ActiveX technology, ditch section, pool section, river section, house section and scissors crossing section before and after automatically generating according to topological relation.
Compared with prior art, beneficial effect of the present invention is: the present invention is directed to and cannot carry out in aerophotogrammetric situation because of the reason such as weather, air control, change the mode of full Fie ld Digital Surveying of must carrying out in the past, only need field operation to measure a small amount of topographic(al) point can to realize the automatic generation of the flat section of transmission line of electricity.The inventive method work efficiency compared with full Fie ld Digital Surveying has been greatly improved, has alleviated the labour intensity of outdoor workers, and economic benefit and social benefit are obvious, is applicable to the survey and design field of more short-range transmission line of electricity of plains region.
Further, the situation that the present invention adjusts for transmission line of electricity corner among a small circle, can carry out field operation and measure the flat section of the prosperous SLCAD in generation road automatically, convenient and swift.
Further, the present invention, for the corner adjustment in transmission line of electricity certain limit, still has the value of recycling, has avoided the duplication of labour.
Accompanying drawing explanation
Fig. 1 is schematic flow sheet of the present invention;
Fig. 2 adopts the Google Earth image intercepting along line route;
Fig. 3 corrects and error for utilizing photo control point to carry out geometry polynomial expression to image;
Fig. 4 is the design of flat disconnected robotization mapping system;
Fig. 5 is that field data and terrain data merge, the function interface of data rough handling;
Fig. 6 is the digitizing on 4 section pools, plains region;
Fig. 7 is the automatic situation of conversionization road henry SLCAD plane and section after 4 section pool digitizings;
Fig. 8 is 4 section pool SLCAD Document type datas;
Fig. 9 is the function interface of the main scissors crossing of Mass production;
Figure 10 is scissors crossing SLCAD data file;
Figure 11 is scissors crossing SLCAD plane cross section;
Figure 12 is house batch setting and the single interface that arranges;
Figure 13 is that plains region transmission line of electricity utilizes image and field operation fused data automatically to generate the effect of SLCAD plane cross section.
Embodiment
Below in conjunction with drawings and Examples, method of the present invention is described in further detail.
As shown in Figure 1, a kind of plains region Google Earth is assisted the flat section survey method of short distance transmission line of electricity, comprises the following steps:
Step S01, intercepts Google Earth image: read Google Earth route selection file, set along line boundary width, sectional drawing height and time delay, intercept Google Earth image along transmission line of electricity path;
Step S02, field operation is measured with tune and is painted: comprise that measurement painted in photogrammetric control point surveying, scissors crossing tune, house is adjusted and painted measurement, location survey and the measurement of crucial atural object;
Step S03, image rectification: the photogrammetric control point surveying data of obtaining according to described field operation measurement, carry out image rectification by image rectification method to intercepting image, obtain correction image;
Step S04, image digitization: insert described correction image registration image under AutoCAD environment, the loose some data that field operation is measured are directed in AutoCAD, generate AutoCAD digitized image;
Step S05, field data and digitalized data merge, and generate plane cross section: convert described AutoCAD digitized image to prosperous SLCAD plane cross section according to digitizing and field operation measurement data fusion rule;
Step S06, tower position is measured with flat section and is repaiied survey: carry out the pre-ranking of shaft tower according to the prosperous SLCAD plane cross section in described road, according to described shaft tower, pre-ranking is carried out field operation and determine the measurement of tower position, and near flat section tower position is adjusted and repaiied survey in SLCAD.
As shown in Figure 2, read the KML file that line design provides, this area's Google Earth image is high-resolution Digital Globel image.The width of determining line route is 2km, and corresponding sectional drawing height is set is 350 meters, time delay is 300ms.
Adopt quadratic polynomial, lay altogether and measured 6 photo control points.Fig. 3 lists the root-mean-square error of photo control point and corresponding image points---and RMS is all less than 0.5 pixel, and correction precision is good.
Corner alignment and measure of pile position, field operation are adjusted to paint and are measured and check, supplement quick short steps point measurement, plane and vertical control point that these are drawn as flat section; Adopt the principle of step control, the highest grade of corner, be secondly straight line stake, be quick short steps points again.
The ground elevation control of center section, house, road and friendship cross-line is according to the Altitude classification control of above-mentioned reference mark; There is drawing by its actual elevation of height value for atural object, there is no being as the criterion with the elevation at reference mark according to the distance of circuit mileage according to controlled stage of elevation.
In AutoCAD, insert and correct image and according to grid line registration, set up figure layer according to road, water system, settlement place, point-like thing.
Measure and paint system that data and image digitization achievement generate SLCAD automatically as shown in Figure 4 with adjusting according to field operation.
As shown in Figure 5, import circuit corner coordinate, stake position coordinate and other field operation quick short steps point and visual fusion, each 50 meters of mapping scope left and right is set, it is 0 that initial mileage is set.
Road in image, water system, settlement place are pressed to regular digitizing.Fig. 6 shows the digitizing on typical 4 section pools, plains region (ditch, river).
Drawing different from water system in common topomap is the water system shape that transmission line of electricity plane cross section is only concerned about 50 meters of wire center both sides, in General Central position and neighbouring 15 meters, requiring accurately to exceed part can paint by grass, therefore be depicted as the i.e. polyline of an object, the laggard line ordering of mileage of computing center's section point is determined corresponding section coding.
Fig. 7 shows, the automatic generation effect of above-mentioned water system corresponding flat section in SLCAD.
Except the section of center, other set-points coding is " 0 " with line coding, and Fig. 8 has provided the text data of above-mentioned water system corresponding flat section in SLCAD.
Adjust batch 380v, 10kV and the connection painted to carry out digitizing by polyline in corresponding diagram layer to field operation.
Measure coordinate according to field operations such as corners and calculate 380v, 10kV and connection center leap place mileage and elevation, if Fig. 9 is according to the self-defining acquiescence spanning height high 8m of frame, 11m and 6m respectively, define respectively its bar type according to figure layer and be encoded to " 10 ", " 13 " and " 1 ", define its line and be encoded to " 31 ", " 32 " and " 40 ", tie point is respectively the end points of each friendship cross-line, and SLCAD text data file as shown in Figure 10.
The flat section of SLCAD scissors crossing as shown in figure 11.
House digitizing is plotted in corresponding figure layer with closed polyline (inc Housing system can check and be automatically closed), annotation number of floor levels in closed polyline, the house that 1 floor is " 2 " without annotation, annotation is rear according to actual measurement generation highly one by one by picking up by hand according to the house of the high Mass production in default setting room, other floors, 5 section room signals of Figure 12 batch and manual drawing.
Coffin pit, street lamp point symbol atural object, carry out digitizing with the engineer's scale symbol layering of topomap form, and the mileage of computing center's point and offset distance arrange corresponding point and be encoded to " 317 ", " 256 ".
Figure 13 shows that plains region Typical Route automatically generates the situation of SLCAD plane cross section.
Designer, according to the SLCAD drawing, carries out shaft tower ranking, determines tangent tower position mileage.
Mapping worker is according to tower position mileage, and field operation GPS is Ding Ta and measurement on the spot, obtains accurate tower position elevation.
According to accurate tower position elevation, survey is adjusted and mended near may omit near section tangent tower position and tower position atural object, complete the survey work of repairing of plane cross section.
The present invention is directed to the survey and design of plains region short distance transmission line of electricity, provide a kind of Google Earth image information and field operation measurement data are merged to the rapid method that changes into prosperous SLCAD outcome data, improved work efficiency, alleviated field operation labour intensity.
The above is only the preferred embodiment of the present invention; be noted that for those skilled in the art; under the premise without departing from the principles of the invention, can also make some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (8)

1. the auxiliary flat section survey method of short distance transmission line of electricity of plains region Google Earth, is characterized in that, comprises the following steps:
Step S01, intercepts Google Earth image: read Google Earth route selection file, set along line boundary width, sectional drawing height and time delay, intercept Google Earth image along transmission line of electricity path;
Step S02, field operation is measured with tune and is painted: comprise that measurement painted in photogrammetric control point surveying, scissors crossing tune, house is adjusted and painted measurement, location survey and the measurement of crucial atural object;
Step S03, image rectification: the photogrammetric control point surveying data of obtaining according to described field operation measurement, carry out image rectification by image rectification method to intercepting image, obtain correction image;
Step S04, image digitization: insert described correction image registration image under AutoCAD environment, the loose some data that field operation is measured are directed in AutoCAD, generate AutoCAD digitized image;
Step S05, field data and digitalized data merge, and generate plane cross section: convert described AutoCAD digitized image to prosperous SLCAD plane cross section according to digitizing and field operation measurement data fusion rule;
Step S06, tower position is measured with flat section and is repaiied survey: carry out the pre-ranking of shaft tower according to the prosperous SLCAD plane cross section in described road, according to described shaft tower, pre-ranking is carried out field operation and determine the measurement of tower position, and near flat section tower position is adjusted and repaiied survey in SLCAD.
2. the auxiliary flat section survey method of short distance transmission line of electricity of plains region according to claim 1 Google Earth, is characterized in that: described step S02 field operation is measured with adjusting drawing tools body and comprised the following steps:
(1) photogrammetric control point surveying
Photo control point is the unique point that feature is distinguished clearly and easily, comprise that road corner, ridge intersect and angle, room object point, described photo control point is evenly laid along both sides, transmission line of electricity path, if the image that whole piece transmission line of electricity intercepts has multiple, lays some photo control points at image edge fit place;
(2) scissors crossing is adjusted and is painted measurement
The line of electric force of underground utilities, 10kV and following grade and connection judge to adjust according to the relative position of atural object paints planimetric position and spanning height, and the influential atural object in power transmission line column position is surveyed to planimetric position; 35kV and above scissors crossing measurement plane location are surveyed by GPS, and the mode that spanning height adopts polar method to measure by total powerstation is obtained;
(3) house is adjusted and is painted measurement
For not relating to the work transmission line of tearing room open, floor is not higher than the house of constrain height, and floor and the room of painting house according to intercepting image tune are high, if floor, higher than constrain height, after actual measurement height of house, is adjusted and painted measurement;
For relating to the work transmission line of tearing room open, should surveying, house and the room torn open within the scope of room line are high;
(4) location survey
The corner WGS84 coordinate providing according to described Google Earth route selection file, become local coordinate to adjust and location survey on the spot by coordinate conversion, obtain accurate planimetric coordinates and the vertical control point of corner, the straight line stake position of laying between each strain section according to corner coordinate, control section elevation;
(5) crucial atural object is measured
Be beyond expression and Survey of Transmission Line designed to influential geomorphological features and carry out field operation in-site measurement and check intercepting image, mainly comprising high and nearer apart from the wire center point-like atural object of stalk of high-grade highway and floor level thereof, water system.
3. the auxiliary short distance transmission route survey method of plains region according to claim 2 Google Earth, is characterized in that: described (4) location survey midplane coordinate and vertical control point are that corner alignment and measure of pile position point, field operation are adjusted to paint and measured and check point, supplement quick short steps point.
4. the auxiliary short distance transmission route survey method of plains region according to claim 2 Google Earth, it is characterized in that: in described (4) location survey, the principle of control section elevation is the principle that adopts step control, concrete classification comprises that corner grade is that the highest grade, next is straight line stake, and quick short steps point is the lowest class.
5. the auxiliary short distance transmission route survey method of plains region according to claim 1 Google Earth, is characterized in that: described step S05 digitizing and field operation measurement data fusion rule comprise:
Set up the figure layer of settlement place, water system, road, Di Lei circle atural object classification, carry out digitizing by figure layer;
Annotation is higher than the house of 1 layer, by the high assignment in building of field operation actual measurement in house;
Water system is drawn and is comprised a point single line ditch, two-wire ditch and 4 section pools draftings;
Point-like atural object is directly depicted as a little or is depicted as the topomap standard proportional symbol of segment form;
Field operation is adjusted to paint with the 380v measuring, 10kV low-voltage power line, connection, underground utilities and point-like atural object and is imported stratification drawing after AutoCAD.
6. the auxiliary short distance transmission route survey method of plains region according to claim 1 Google Earth, described step S03 image rectification method comprises that application ENVI or ERDAS software carry out image rectification; The number of the required photo control point of described image rectification is relevant with the method for image rectification, and plains region often adopts geometric correction.
7. the auxiliary short distance transmission route survey method of plains region according to claim 1 Google Earth, it is characterized in that: described step S05 converts AutoCAD digitized image to prosperous SLCAD plane cross section by Visual C#, the programming of AutoCAD ActiveX technology ditch section, pool section, river section, house section and scissors crossing section before and after automatically generating according to topological relation.
8. the auxiliary short distance transmission route survey method of plains region according to claim 1 Google Earth, is characterized in that: described Google Earth route selection file is KML file.
CN201410016974.9A 2014-01-15 2014-01-15 Plains region Google Earth assists the flat section survey method of short distance transmission line of electricity Active CN103791886B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410016974.9A CN103791886B (en) 2014-01-15 2014-01-15 Plains region Google Earth assists the flat section survey method of short distance transmission line of electricity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410016974.9A CN103791886B (en) 2014-01-15 2014-01-15 Plains region Google Earth assists the flat section survey method of short distance transmission line of electricity

Publications (2)

Publication Number Publication Date
CN103791886A true CN103791886A (en) 2014-05-14
CN103791886B CN103791886B (en) 2016-02-10

Family

ID=50667774

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410016974.9A Active CN103791886B (en) 2014-01-15 2014-01-15 Plains region Google Earth assists the flat section survey method of short distance transmission line of electricity

Country Status (1)

Country Link
CN (1) CN103791886B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105180903A (en) * 2015-09-18 2015-12-23 北京林业大学 Mobile phone/tablet PC control CCD topographic map photography supplementary survey, supplementary mapping and field investigation and plotting technical method
CN105279341A (en) * 2015-11-18 2016-01-27 中国能源建设集团江苏省电力设计院有限公司 Method for intercepting google earth image and directly applying in engineering design
CN106997523A (en) * 2017-02-21 2017-08-01 国核电力规划设计研究院有限公司 A kind of high pressure overhead power line houseclearing acquisition device and method
CN107590846A (en) * 2017-08-24 2018-01-16 山西晋城无烟煤矿业集团有限责任公司 A kind of nested conversion method of ground satellite image and underworkings
CN109655044A (en) * 2018-12-29 2019-04-19 中国能源建设集团浙江省电力设计院有限公司 A kind of Survey of Transmission Line positioning measurement final product quality control method
CN112163056A (en) * 2020-09-09 2021-01-01 四川长园工程勘察设计有限公司 Ground object insertion method based on path diagram
CN115499779A (en) * 2022-09-23 2022-12-20 山东智源电力设计咨询有限公司 Line cloud reconnaissance system based on mobile terminal

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0743109A (en) * 1993-08-03 1995-02-10 Nec Corp Detecting device for separation of nearby tree
CN101335431A (en) * 2008-07-27 2008-12-31 广西电力工业勘察设计研究院 Overhead power transmission line optimized line selection method based on airborne laser radar data
CN101949807A (en) * 2010-09-09 2011-01-19 华南理工大学 External insulation natural dirt accumulation testing method for high-voltage power transmission line

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0743109A (en) * 1993-08-03 1995-02-10 Nec Corp Detecting device for separation of nearby tree
CN101335431A (en) * 2008-07-27 2008-12-31 广西电力工业勘察设计研究院 Overhead power transmission line optimized line selection method based on airborne laser radar data
CN101949807A (en) * 2010-09-09 2011-01-19 华南理工大学 External insulation natural dirt accumulation testing method for high-voltage power transmission line

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
FAN,Y ETC.: "Power transmission lines maintenance system base on Google Earth (GE) platform", 《IEEE》 *
李少龙: "高分辨率遥感影像在输电线路选线中的应用", 《山西电力》 *
王敬泉等: "TBC 软件在输电线路选线测量中的应用", 《科协论坛》 *
王玉成,朱号东: "Google Earth在高压送电线路勘测设计中的应用", 《现代测绘》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105180903A (en) * 2015-09-18 2015-12-23 北京林业大学 Mobile phone/tablet PC control CCD topographic map photography supplementary survey, supplementary mapping and field investigation and plotting technical method
CN105180903B (en) * 2015-09-18 2017-11-17 北京林业大学 A kind of mobile phone/flat board control CCD topographic map photography benefit survey benefits are painted and the technical method of fieldwork measurement
CN105279341A (en) * 2015-11-18 2016-01-27 中国能源建设集团江苏省电力设计院有限公司 Method for intercepting google earth image and directly applying in engineering design
CN105279341B (en) * 2015-11-18 2019-03-15 中国能源建设集团江苏省电力设计院有限公司 A method of interception Google Earth image directly applies to engineering design
CN106997523A (en) * 2017-02-21 2017-08-01 国核电力规划设计研究院有限公司 A kind of high pressure overhead power line houseclearing acquisition device and method
CN106997523B (en) * 2017-02-21 2020-10-27 国核电力规划设计研究院有限公司 High-voltage overhead transmission line house information acquisition device and method
CN107590846A (en) * 2017-08-24 2018-01-16 山西晋城无烟煤矿业集团有限责任公司 A kind of nested conversion method of ground satellite image and underworkings
CN109655044A (en) * 2018-12-29 2019-04-19 中国能源建设集团浙江省电力设计院有限公司 A kind of Survey of Transmission Line positioning measurement final product quality control method
CN112163056A (en) * 2020-09-09 2021-01-01 四川长园工程勘察设计有限公司 Ground object insertion method based on path diagram
CN115499779A (en) * 2022-09-23 2022-12-20 山东智源电力设计咨询有限公司 Line cloud reconnaissance system based on mobile terminal

Also Published As

Publication number Publication date
CN103791886B (en) 2016-02-10

Similar Documents

Publication Publication Date Title
CN103791886B (en) Plains region Google Earth assists the flat section survey method of short distance transmission line of electricity
CN102518028B (en) Precise plane coordinate correction method in laser radar scanning measurement
CN111724477A (en) Method for constructing multi-level three-dimensional terrain model through multi-source data fusion
CN107066758B (en) Outdoor construction method based on unmanned aerial vehicle photography technology and BIM technology
CN102645203B (en) Power line crossover measurement method based on airborne laser radar data
CN101914890B (en) Airborne laser measurement-based highway reconstruction and expansion investigation method
CN104075691B (en) Method for measuring topography by using ground laser scanner
CN103711050B (en) A kind of laser radar road reorganization and expansion survey and design method
CN103884321B (en) A kind of remote sensing image becomes figure technique
CN102620721B (en) Fine digital terrain model based road surveying method
CN102662179A (en) Three-dimensional optimizing route selection method based on airborne laser radar
CN102426395B (en) Slip mass volume parameter measuring method based on three-dimensional geologic remote sensing interpretation technology
CN101159066A (en) Highway measuring and setting method based on three-dimensional airborne LIDAR
CN108020212A (en) A kind of small scale mapping method based on unmanned plane Yu CORS technologies
CN101976467A (en) High-precision three-dimensional urban scene construction method integrating airborne LIDAR (Laser Intensity Direction And Ranging) technology and vehicle-mounted mobile laser scanning technology
CN103940410B (en) A kind of superelevation doubly zooms into the digital aerial surveying method of figure
CN108764205A (en) The method that system carries out Municipal generaI investigation is taken the photograph based on unmanned plane low latitude boat
CN111428306A (en) Road fine design method
CN104933223B (en) A kind of electric transmission line channel digital mapping method
CN103136789A (en) Traffic accident road base map information processing method based on topographic map and image
Lv et al. Research on the technology of LIDAR data processing
CN114859374A (en) Newly-built railway cross measurement method based on unmanned aerial vehicle laser point cloud and image fusion
CN111426303A (en) Karst slope parameter measuring method
CN102495879A (en) Industrial overhead pipeline measurement method based on ground LIDAR (Light Detection And Ranging)
CN106052553A (en) Civil engineering temporary works design optimization method and device based on three-dimensional laser scanning

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 210009 Gulou District, Jiangsu, Nanjing new model road, No. 5

Applicant after: Chinese energy construction group Jiangsu Prov. Power Design Inst Co., Ltd

Address before: 210009 Gulou District, Jiangsu, Nanjing new model road, No. 5

Applicant before: Jiangsu Electric Power Designing Institute

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: JIANGSU ELECTRIC POWER DESIGNING INST. TO: CHINA ENERGY ENGINEERING GROUPJIANGSU ELECTRIC POWER DESIGN INSTITUTE CO., LTD.

C14 Grant of patent or utility model
GR01 Patent grant