CN103791228B - 液化天然气全容储罐次容器防潮板的连接方法 - Google Patents

液化天然气全容储罐次容器防潮板的连接方法 Download PDF

Info

Publication number
CN103791228B
CN103791228B CN201410055862.4A CN201410055862A CN103791228B CN 103791228 B CN103791228 B CN 103791228B CN 201410055862 A CN201410055862 A CN 201410055862A CN 103791228 B CN103791228 B CN 103791228B
Authority
CN
China
Prior art keywords
moist
proof board
embedded part
proof
natural gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410055862.4A
Other languages
English (en)
Other versions
CN103791228A (zh
Inventor
杨公升
杨尚玉
卢晶
叶忠志
孙瑜
张国中
蔡文刚
张宝和
孟术岐
张喜强
魏峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Original Assignee
China National Offshore Oil Corp CNOOC
Offshore Oil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, Offshore Oil Engineering Co Ltd filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201410055862.4A priority Critical patent/CN103791228B/zh
Publication of CN103791228A publication Critical patent/CN103791228A/zh
Application granted granted Critical
Publication of CN103791228B publication Critical patent/CN103791228B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

一种液化天然气全容储罐次容器防潮板的连接方法,包括:第一防潮板、第二防潮板及防潮板预埋件,其中:第一防潮板、第二防潮板及防潮板预埋件采用以下安装步骤:一:先安装第一防潮板,将第一防潮板的边缘与预先埋置在次容器混凝土中的防潮板预埋件的钢板贴紧,且贴紧的边缘处采用花焊的焊接方式;二:安装第二防潮板,将第二防潮板搭接在第一防潮板之上,且搭接焊缝为满焊。本发明结构简单、施工方便,在保证防潮板安装强度和安装稳定性的前提下,不仅减少了高空作业的工作量及焊接材料的使用量,而且,还提高了施工效率、降低了施工成本;同时,具有很好的防潮性能和保护性能。

Description

液化天然气全容储罐次容器防潮板的连接方法
技术领域
本发明涉及液化天然气储罐,尤其涉及一种液化天然气全容储罐次容器防潮板的连接方法。
背景技术
随着经济的发展和人们环保意识的增强,液化天然气作为一种清洁、高效的能源,其需求量与日俱增,这就要求必须加快液化天然气相关技术的发展步伐。对于技术密集型的液化天然气产业,研究和发展液化天然气相关技术,尤其是液化天然气储罐相关技术,对液化天然气产业的发展具有重要社会效益和经济效益。
液化天然气储罐按照对于液体和蒸汽封闭系统的力学承载方式主要分为:单容罐、双容罐、全容罐和薄膜罐,其中,全容罐是国内目前投入运行的接收终端的主要罐型。全容罐包括:一个主容器和次容器,共同来形成一个整体的储罐,主容器应是自支撑的钢制、单壁罐来容纳液体工质,材料通常采用耐低温的9%镍钢;次容器的主要作用是:在液化天然气储罐正常操作时容纳工质蒸气,并在液化天然气储罐泄漏时承载液体,并保持蒸气密封。在一般情况下,大型的液化天然气储罐的次容器主要采用预应力混凝土,混凝土内侧安装一层碳钢材质的防潮层。
如图1所示,现有的液化天然气全容罐的次容器防潮层是由防潮板和防潮板预埋件构成,防潮板预埋件埋置于次容器预应力混凝土中,防潮板四边搭接在防潮板预埋件上,搭接处全部采用满焊。由于防潮层中防潮板的四个边缘均需要满焊,受高空作业条件的限制,不仅施焊难度大、危险性大,而且,焊后需要在高空对全部焊缝进行100%真空箱检测,而真空箱检测的难度也比较大。因此,使得防潮板的施工质量存在不稳定因素,导致防潮层的气密性不严,存在一定的安全隐患,有必要做进一步改进。
发明内容
本发明的主要目的在于克服现有技术存在的上述缺点,而提供一种液化天然气全容储罐次容器防潮板的连接方法,其在保证防潮板安装强度和安装稳定性的前提下,不仅减少了高空作业的工作量及焊接材料的使用量,而且,还提高了施工效率、降低了施工成本,解决了防潮层的气密性不严的问题。
本发明的目的是由以下技术方案实现的:
一种液化天然气全容储罐次容器防潮板的连接方法,包括:第一防潮板、第二防潮板及防潮板预埋件,其特征在于:第一防潮板、第二防潮板及防潮板预埋件采用以下安装步骤:
第一步:先安装第一防潮板,将第一防潮板的边缘与预先埋置在次容器混凝土中的防潮板预埋件的钢板贴紧,且贴紧的边缘处采用花焊的焊接方式;
第二步:安装第二防潮板,将第二防潮板搭接在第一防潮板之上。
所述第一步中,第一防潮板的边缘与防潮板预埋件的边缘连接处为:间断的角焊缝。
所述第二步中,第一防潮板及相邻的第二防潮板搭接处为:角焊缝,且角焊缝为:满焊。
所述第一防潮板、第二防潮板和防潮板预埋件的材质均为碳钢。
本发明的有益效果:本发明由于采用上述技术方案,其结构简单、施工方便,在保证防潮板安装强度和安装稳定性的前提下,不仅减少了高空作业的工作量及焊接材料的使用量,而且,还提高了施工效率、降低了施工成本;同时,具有很好的防潮性能和保护性能。
下面结合附图及具体实施方式对本发明作进一步描述。
附图说明
图1为现有技术结构示意图。
图2为本发明防潮板结构示意图。
图3为本发明整体结构示意图。
图4为本发明整体结构连接示意图。
图中主要标号说明:
1.防潮板、2.防潮板、3.防潮板预埋件。
具体实施方式
如图2,图3,图4所示,本发明包括:防潮板1、防潮板2、防潮板预埋件3,其中,防潮板1、防潮板2、防潮板预埋件3的材质均为碳钢。防潮板预埋件3是由钢板和与螺柱构成,通过螺柱焊方式将钢板与螺柱连接在一起,将预制好的防潮板预埋件3按照设计图纸的要求固定,然后,进行次容器混凝土的浇筑,混凝土浇筑完毕后,防潮板预埋件3外表面应与混凝土外表面平齐。
防潮板1、防潮板2及防潮板预埋件3采用以下安装步骤:
第一步:安装时,将防潮板1的边缘与防潮板预埋件3的钢板贴紧,贴紧的边缘处采用花焊的焊接方式;即防潮板1与防潮板预埋件3连接处的焊缝为:间断的角焊缝;其中,每500mm上焊接300mm的角焊缝,以保证防潮板1与防潮板预埋件3的连接强度和稳定性;
第二步:将防潮板1及相邻的防潮板2之间采用搭接的方式连接,防潮板(1,2)的厚度为:5mm,搭接长度为:30mm(不小于5倍板厚25mm),且相邻的防潮板2搭接接头处为:角焊缝,且角焊缝为:满焊;焊后进行100%真空箱检测,以确保次容器防潮层具有良好的气密性,在储罐在正常操作时容纳工质蒸气,并在罐泄漏时保持蒸气密封。
以上所述,仅是本发明的较佳实施例而已,并非对本发明作任何形式上的限制,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。

Claims (1)

1.一种液化天然气全容储罐次容器防潮板的连接方法,包括:第一防潮板、第二防潮板及防潮板预埋件,其特征在于:第一防潮板、第二防潮板及防潮板预埋件采用以下安装步骤:
第一步:先安装第一防潮板,将第一防潮板的边缘与预先埋置在次容器混凝土中的防潮板预埋件的钢板贴紧,且贴紧的边缘处采用花焊的焊接方式;
第二步:安装第二防潮板,将第二防潮板搭接在第一防潮板之上;
所述第一步中,第一防潮板的边缘与防潮板预埋件的边缘连接处为:间断的角焊缝;其中,每500mm上焊接300mm的角焊缝,以保证防潮板与防潮板预埋件的连接强度和稳定性;
所述第二步中,第一防潮板及相邻的第二防潮板搭接处为:角焊缝,且角焊缝为:满焊;
所述第一防潮板、第二防潮板和防潮板预埋件的材质均为碳钢。
CN201410055862.4A 2014-02-19 2014-02-19 液化天然气全容储罐次容器防潮板的连接方法 Active CN103791228B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410055862.4A CN103791228B (zh) 2014-02-19 2014-02-19 液化天然气全容储罐次容器防潮板的连接方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410055862.4A CN103791228B (zh) 2014-02-19 2014-02-19 液化天然气全容储罐次容器防潮板的连接方法

Publications (2)

Publication Number Publication Date
CN103791228A CN103791228A (zh) 2014-05-14
CN103791228B true CN103791228B (zh) 2016-01-13

Family

ID=50667153

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410055862.4A Active CN103791228B (zh) 2014-02-19 2014-02-19 液化天然气全容储罐次容器防潮板的连接方法

Country Status (1)

Country Link
CN (1) CN103791228B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114562673A (zh) * 2022-02-23 2022-05-31 中太(苏州)氢能源科技有限公司 一种用于薄膜罐的瓦楞板防潮层

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015781A (zh) * 2012-12-05 2013-04-03 中国化学工程第十三建设有限公司 一种双壁储罐内罐带外罐顶提升安装方法
CN203355562U (zh) * 2013-05-16 2013-12-25 浙江保尔力胶带有限公司 一种分层吸附罐
CN103523411A (zh) * 2013-10-24 2014-01-22 成军 卧式埋地储油罐及其配套设备管线安装施工方法

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH11201399A (ja) * 1998-01-09 1999-07-30 Mitsubishi Heavy Ind Ltd 液化天然ガスの貯蔵方法と貯蔵設備
JP5337796B2 (ja) * 2007-05-29 2013-11-06 ヒュンダイ ヘビー インダストリーズ カンパニー リミテッド 溶接型2次防壁を備える液化天然ガス貯蔵容器用断熱システムとその施工方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103015781A (zh) * 2012-12-05 2013-04-03 中国化学工程第十三建设有限公司 一种双壁储罐内罐带外罐顶提升安装方法
CN203355562U (zh) * 2013-05-16 2013-12-25 浙江保尔力胶带有限公司 一种分层吸附罐
CN103523411A (zh) * 2013-10-24 2014-01-22 成军 卧式埋地储油罐及其配套设备管线安装施工方法

Also Published As

Publication number Publication date
CN103791228A (zh) 2014-05-14

Similar Documents

Publication Publication Date Title
CN112303475A (zh) 一种用于液化天然气储存的双金属低温薄膜陆用储罐
CN204548988U (zh) 一种拼接圆形筒体
CN104405975A (zh) 具有承插口的钢管
KR20120006752U (ko) 단열 액밀 탱크
CN204164534U (zh) 承插管子的组合式连接装置
CN204646250U (zh) 一种单管双洞矩形盾构隧道的衬砌结构
CN204023628U (zh) 一种止水结构
CN103791228B (zh) 液化天然气全容储罐次容器防潮板的连接方法
CN104456059A (zh) 自支撑式lng储罐的内罐壁板的安装方法
CN206545746U (zh) 具有安装限位的承插连接式保温复合管
CN201770539U (zh) 厌氧罐
CN105292831A (zh) 一种化学药品储液罐
CN103758387A (zh) 液化天然气储罐壁板的安装方法
CN204127495U (zh) 智能预制直埋交联聚乙烯双管变径工作保温管
CN204919607U (zh) 一种城市地下通道用预制件
CN204038066U (zh) 一种复合式不锈钢模压板块无焊接水箱
CN204554199U (zh) 承插连接式弯头
CN206172271U (zh) 一种双层油罐罐体结构
CN205221610U (zh) 一种防泄漏双层油罐
CN110883500A (zh) 一种工厂模块化预制浮顶及其现场安装方法
CN210318911U (zh) 一种埋地压力管道的连接结构
CN204137656U (zh) 一种钟型倒扣式储水箱
CN204979888U (zh) 一种新型sf双层油罐
CN209196300U (zh) 穿墙管道防水结构
CN104986416A (zh) 一种全封闭核生化存储运输罐

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee after: Offshore Oil Engineering Co., Ltd.

Patentee after: China Offshore Oil Group Co., Ltd.

Address before: 100010 Chaoyangmen North Street, Dongcheng District, Dongcheng District, Beijing

Co-patentee before: Offshore Oil Engineering Co., Ltd.

Patentee before: China National Offshore Oil Corporation