CN103790236A - 用于钢筋混凝土构件连接的连接件、制作方法及施工方法 - Google Patents
用于钢筋混凝土构件连接的连接件、制作方法及施工方法 Download PDFInfo
- Publication number
- CN103790236A CN103790236A CN201410052761.1A CN201410052761A CN103790236A CN 103790236 A CN103790236 A CN 103790236A CN 201410052761 A CN201410052761 A CN 201410052761A CN 103790236 A CN103790236 A CN 103790236A
- Authority
- CN
- China
- Prior art keywords
- connector
- reinforced concrete
- concrete member
- connecting piece
- locating slot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410052761.1A CN103790236A (zh) | 2014-02-17 | 2014-02-17 | 用于钢筋混凝土构件连接的连接件、制作方法及施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410052761.1A CN103790236A (zh) | 2014-02-17 | 2014-02-17 | 用于钢筋混凝土构件连接的连接件、制作方法及施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103790236A true CN103790236A (zh) | 2014-05-14 |
Family
ID=50666253
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410052761.1A Pending CN103790236A (zh) | 2014-02-17 | 2014-02-17 | 用于钢筋混凝土构件连接的连接件、制作方法及施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103790236A (zh) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103967220A (zh) * | 2014-05-21 | 2014-08-06 | 王睿敏 | 预制钢筋混凝土构件之间的钢筋连接调整构件、制作方法及施工方法 |
CN103981998A (zh) * | 2014-05-28 | 2014-08-13 | 王睿敏 | 预制剪力墙板及剪力墙和剪力墙的施工方法 |
CN104674946A (zh) * | 2014-12-31 | 2015-06-03 | 王睿敏 | 混凝土预制件连接调整构件及应用 |
CN109322445A (zh) * | 2018-11-24 | 2019-02-12 | 彭昊 | 一种钢筋连接结构 |
CN115306162A (zh) * | 2022-09-01 | 2022-11-08 | 中铁十一局集团有限公司 | 型钢柱与大尺寸截面混凝土梁逆向施工加焊连接施工方法 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2216302A1 (de) * | 1972-04-05 | 1973-10-18 | Zueblin Ag | Verbindungselement fuer bewehrungsstaebe von betonfertigbauteilen |
JPH10131303A (ja) * | 1996-11-05 | 1998-05-19 | Fuji Bolt Seisakusho:Kk | 鉄筋の継手構造 |
CN2473252Y (zh) * | 2001-04-04 | 2002-01-23 | 佟春双 | 等强钢筋机械连接用活接头 |
CN1715587A (zh) * | 2005-06-27 | 2006-01-04 | 浙江工业大学 | 钢筋连接器 |
WO2006094362A1 (en) * | 2005-03-11 | 2006-09-14 | Adjusta Pty Ltd | Concrete reinforcement connectors |
CN201343786Y (zh) * | 2008-12-09 | 2009-11-11 | 颜小荣 | 钢筋混凝土预制件连接装置 |
CN203320813U (zh) * | 2013-06-03 | 2013-12-04 | 徐曼 | 一种装配式混凝土构件用钢筋连接件 |
CN203716301U (zh) * | 2014-02-17 | 2014-07-16 | 王睿敏 | 用于钢筋混凝土构件连接的连接件 |
-
2014
- 2014-02-17 CN CN201410052761.1A patent/CN103790236A/zh active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2216302A1 (de) * | 1972-04-05 | 1973-10-18 | Zueblin Ag | Verbindungselement fuer bewehrungsstaebe von betonfertigbauteilen |
JPH10131303A (ja) * | 1996-11-05 | 1998-05-19 | Fuji Bolt Seisakusho:Kk | 鉄筋の継手構造 |
CN2473252Y (zh) * | 2001-04-04 | 2002-01-23 | 佟春双 | 等强钢筋机械连接用活接头 |
WO2006094362A1 (en) * | 2005-03-11 | 2006-09-14 | Adjusta Pty Ltd | Concrete reinforcement connectors |
CN1715587A (zh) * | 2005-06-27 | 2006-01-04 | 浙江工业大学 | 钢筋连接器 |
CN201343786Y (zh) * | 2008-12-09 | 2009-11-11 | 颜小荣 | 钢筋混凝土预制件连接装置 |
CN203320813U (zh) * | 2013-06-03 | 2013-12-04 | 徐曼 | 一种装配式混凝土构件用钢筋连接件 |
CN203716301U (zh) * | 2014-02-17 | 2014-07-16 | 王睿敏 | 用于钢筋混凝土构件连接的连接件 |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103967220A (zh) * | 2014-05-21 | 2014-08-06 | 王睿敏 | 预制钢筋混凝土构件之间的钢筋连接调整构件、制作方法及施工方法 |
CN103981998A (zh) * | 2014-05-28 | 2014-08-13 | 王睿敏 | 预制剪力墙板及剪力墙和剪力墙的施工方法 |
CN104674946A (zh) * | 2014-12-31 | 2015-06-03 | 王睿敏 | 混凝土预制件连接调整构件及应用 |
CN109322445A (zh) * | 2018-11-24 | 2019-02-12 | 彭昊 | 一种钢筋连接结构 |
CN115306162A (zh) * | 2022-09-01 | 2022-11-08 | 中铁十一局集团有限公司 | 型钢柱与大尺寸截面混凝土梁逆向施工加焊连接施工方法 |
CN115306162B (zh) * | 2022-09-01 | 2023-09-26 | 中铁十一局集团有限公司 | 型钢柱与大尺寸截面混凝土梁逆向施工加焊连接施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103790236A (zh) | 用于钢筋混凝土构件连接的连接件、制作方法及施工方法 | |
CN103255853B (zh) | 装配式剪力墙上下层内墙板齿槽式连接结构 | |
CN204098065U (zh) | 一种可体内张拉的预制拼装综合管廊 | |
AU2014407470B2 (en) | Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall and manufacturing method thereof | |
CN103835441A (zh) | 预制钢筋混凝土构件用钢筋机械连接件及其安装方法 | |
CN104404983B (zh) | 一种用于顶管施工的骑马井装置及其施工方法 | |
CN103485548B (zh) | 装配式空心混凝土叠合剪力墙竖向钢筋连接方法 | |
CN202031108U (zh) | 后浇带型装配式顶管工作井 | |
CN103866921A (zh) | 预制钢筋混凝土构件之间的钢筋连接件、制作方法及施工方法 | |
CN103061357B (zh) | 一种地下室底板与地下连续墙连接节点 | |
CN203701436U (zh) | 装配式墙体竖向钢筋钢套管搭接连接结构 | |
CN103821230A (zh) | 钢筋混凝土结构连接构件、制作方法及施工方法 | |
CN103821281A (zh) | 预制钢筋混凝土结构用钢筋连接体、制作方法及施工方法 | |
CN203716301U (zh) | 用于钢筋混凝土构件连接的连接件 | |
CN203716303U (zh) | 钢筋混凝土结构连接构件 | |
CN105065040A (zh) | 一种顶板预制的地下空间暗挖构筑方法 | |
CN104674946A (zh) | 混凝土预制件连接调整构件及应用 | |
CN203684277U (zh) | 盾构隧道的地下连续墙 | |
CN203742083U (zh) | 预制钢筋混凝土构件用钢筋机械连接件 | |
CN203742085U (zh) | 预制钢筋混凝土结构用钢筋连接体 | |
CN203782981U (zh) | 预制钢筋混凝土构件之间的钢筋连接件 | |
CN204524328U (zh) | 顶管注浆孔制作工装 | |
CN204738446U (zh) | 预制约束混凝土剪力墙墙板 | |
CN104153461A (zh) | 预制混凝土结构构件及构件间建筑施工纵向连接方法 | |
CN203905306U (zh) | 预制钢筋混凝土构件之间的钢筋连接调整构件 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: SHANDONG LIJIU BUILDING TECHNOLOGY CO., LTD. Free format text: FORMER OWNER: WANG RUIMIN Effective date: 20150122 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 250001 JINAN, SHANDONG PROVINCE TO: 250101 JINAN, SHANDONG PROVINCE |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20150122 Address after: High tech Zone of Ji'nan City Industrial Road, No. 59 in Shandong province 250101 Expo International Building 1 unit 1301 room 6 Applicant after: Shandong Lijiu Building Technology Co., Ltd. Address before: 250001 Jianshe Road Century Park, Ji'nan City, Shandong province 15-2-1103 Applicant before: Wang Ruimin |
|
ASS | Succession or assignment of patent right |
Owner name: WANG RUIMIN Free format text: FORMER OWNER: SHANDONG LIJIU BUILDING TECHNOLOGY CO., LTD. Effective date: 20150618 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20150618 Address after: 250001 Jianshe Road Century Park, Ji'nan City, Shandong province 15-2-1103 Applicant after: Wang Ruimin Address before: High tech Zone of Ji'nan City Industrial Road, No. 59 in Shandong province 250101 Expo International Building 1 unit 1301 room 6 Applicant before: Shandong Lijiu Building Technology Co., Ltd. |
|
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20140514 |