CN103771166B - Film material charging equipment - Google Patents
Film material charging equipment Download PDFInfo
- Publication number
- CN103771166B CN103771166B CN201310751575.2A CN201310751575A CN103771166B CN 103771166 B CN103771166 B CN 103771166B CN 201310751575 A CN201310751575 A CN 201310751575A CN 103771166 B CN103771166 B CN 103771166B
- Authority
- CN
- China
- Prior art keywords
- film material
- inhibiting device
- raw materials
- materials ready
- charging equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000463 material Substances 0.000 title claims abstract description 176
- 230000002401 inhibitory effect Effects 0.000 claims abstract description 66
- 239000002994 raw material Substances 0.000 claims abstract description 45
- 230000004888 barrier function Effects 0.000 claims description 10
- 238000009792 diffusion process Methods 0.000 claims description 10
- 238000000034 method Methods 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 230000007423 decrease Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000010521 absorption reaction Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000012512 characterization method Methods 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000033764 rhythmic process Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Abstract
The invention discloses a kind of film material charging equipment, it comprises one or more film material and to get the raw materials ready unit, described film material unit of getting the raw materials ready comprises material loading platform, described material loading platform is provided with the first track and perpendicular two the first inhibiting device, two described first inhibiting device are parallel to each other and can move along described first parallel track, wherein at least one first inhibiting device is provided with the second track and the second inhibiting device, described second inhibiting device can along the second rail moving, described first track and the second track perpendicular.The material loading platform of the present invention by unit of getting the raw materials ready at film material arranges slidably the first inhibiting device and the second inhibiting device, first inhibiting device and the second inhibiting device are matched from the fool-proof design of different film material, so that film material position is uniquely limited, the direction avoiding film material to place or positional fault.
Description
Technical field
The present invention relates to technique of display field, particularly relate to a kind of film material charging equipment.
Background technology
In the backlight manufacturing process of current Liquid Crystal Display, the film materials such as upper diffusion barrier, lower diffusion barrier, upper prism film, lower prism film get the raw materials ready and cleaning process utilizes manual operation usually, not only operation rhythm is slow, waste of manpower, and easily occurs the problem misplacing film material quantity and film material direction.
Summary of the invention
(1) technical matters that will solve
The object of this invention is to provide a kind of film material charging equipment that can prevent film material from misplacing.
(2) technical scheme
For solving the problem, the invention provides a kind of film material charging equipment, it comprises one or more film material and to get the raw materials ready unit, described film material unit of getting the raw materials ready comprises material loading platform, described material loading platform is provided with the first track and perpendicular two the first inhibiting device, two described first inhibiting device are parallel to each other and can move along described first parallel track, wherein at least one first inhibiting device is provided with the second track and the second inhibiting device, described second inhibiting device can along the second rail moving, described first track and the second track perpendicular.
Wherein, described film material unit of getting the raw materials ready also comprises film material connecting gear, and described film material connecting gear comprises multiple material loading arm and is arranged on the sucker on material loading arm, and described material loading arm can move above material loading platform, and described sucker is arranged on material loading arm movably.
Wherein, described film material unit of getting the raw materials ready also comprises lifting mechanism, and described lifting mechanism is fixedly connected with described material loading platform, for driving the rise and fall of described material loading platform.
Wherein, described film material unit of getting the raw materials ready also comprises the inductor be connected with lifting mechanism, and inductor is arranged on material loading arm, and described inductor is used for sense film material height, and sends induced signal to described lifting mechanism.
Wherein, described first track is the straight-line groove be opened on material loading platform, and the first inhibiting device is column, and the length direction of the first inhibiting device is perpendicular to straight-line groove length direction, first inhibiting device bottom surface arranges card convex, and it is interior and removable that card convex embeds straight-line groove.
Wherein, described second track is the groove offered along the first inhibiting device length direction, and the opening direction of groove is towards its another relative first inhibiting device.
Wherein, described second inhibiting device is column block, and side arranges card convex to column block one, and the groove that card convex embeds the second inhibiting device is interior and removable.
Wherein, described film material charging equipment comprises the upper diffusion barrier film material arranged in turn unit, upper prism film film material get the raw materials ready unit and lower diffusion barrier film material of unit, lower prism film film material of getting the raw materials ready of getting the raw materials ready and to get the raw materials ready unit.
Wherein, described film material charging equipment also comprises automatic film tearing mechanism, and the outlet of described automatic film tearing mechanism is positioned at described film material and gets the raw materials ready the material loading platform side of unit.
(3) beneficial effect
The film material charging equipment that technique scheme provides, material loading platform by unit of getting the raw materials ready at film material is arranged slidably the first inhibiting device and the second inhibiting device, first inhibiting device and the second inhibiting device are matched from the fool-proof design of different film material, so that film material position is uniquely limited, the direction avoiding film material to place or positional fault.
Accompanying drawing explanation
Fig. 1 is the integral structure schematic diagram of the film material charging equipment of the embodiment of the present invention;
Fig. 2 is the material loading platform structural representation of the film material charging equipment of the embodiment of the present invention;
Fig. 3 is the decline view of the material loading platform of the film material charging equipment of the embodiment of the present invention;
Fig. 4 is the propradation schematic diagram of the material loading platform of the film material charging equipment of the embodiment of the present invention.
Wherein, 1: film material is got the raw materials ready unit; 2: material loading platform; 3: the first tracks; 4: the first inhibiting device; 5: the second tracks; 6: the second inhibiting device; 7: material loading arm; 8: sucker; 9: conveyor line belt conveyor; 10: dyestripping mechanism; 11: film material.
Detailed description of the invention
Below in conjunction with drawings and Examples, the specific embodiment of the present invention is described in further detail.Following examples for illustration of the present invention, but are not used for limiting the scope of the invention.
In describing the invention, it should be noted that, term " on ", D score, "left", "right", " top ", the orientation of the instruction such as " end " or position relationship be based on orientation shown in the drawings or position relationship, only the present invention for convenience of description and simplified characterization, instead of indicate or imply that the device of indication or element must have specific orientation, with specific azimuth configuration and operation, therefore can not be interpreted as limitation of the present invention.Unless otherwise clearly defined and limited, term " installation ", " being connected ", " connection " should be interpreted broadly, and such as, can be fixedly connected with, also can be removably connect, or connect integratedly; Can be mechanical connection, also can be electrical connection; Can be directly be connected, also indirectly can be connected by intermediary, can be the connection of two element internals.For the ordinary skill in the art, particular case above-mentioned term concrete meaning in the present invention can be understood.In addition, in describing the invention, except as otherwise noted, the implication of " multiple ", " many ", " many groups " is two or more.
For solving the problem, the present invention proposes a kind of film material charging equipment, be provided with at least one film material and get the raw materials ready unit, film material unit of getting the raw materials ready comprises material loading platform and film material connecting gear, material loading platform is arranged spacing fool proof to arrange, to realize film material according to position and orientation are placed accurately.
Particularly, shown in Fig. 4, film material charging equipment described in the present embodiment comprises multiple film material and to get the raw materials ready unit 1, and wherein, the get the raw materials ready quantity of unit of film material also can need adjust according to product line.Described film material unit 1 of getting the raw materials ready comprises material loading platform 2, material loading platform 2 is placed film material 11 to be uploaded, described material loading platform 2 is provided with the first track 3 and perpendicular two the first inhibiting device 4, two described first inhibiting device 4 are parallel to each other and can move in parallel along described first track 3, two the first inhibiting device 4 are for defining length or the width of the film material 11 be placed on material loading platform 2, according to the film material of different model, the distance between two the first inhibiting device 4 can be adjusted, meet the demand of sizes film material; Wherein, at least one first inhibiting device 4 is provided with the second track 5 and the second inhibiting device 6, described second inhibiting device 6 can move along the second track 5, described first track 3 and the second track 5 perpendicular, if the first inhibiting device 4 is for defining the length of film material 11, then the second inhibiting device 6 is for defining the width orientation of film material 11, and vice versa.Moveable first inhibiting device 4 and the second inhibiting device 6, by adjustment position, can meet uniquely defining of different model size film material placement location, avoid misplacing when placing.
The film material charging equipment of the present embodiment is applicable to the film material with fool-proof design, namely film material is while be provided with the gap for fool proof, above-mentioned film material charging equipment in use, first described two the first inhibiting device 4 are moved to the distance consistent with film material 11 length or width along described first track 3, then the second inhibiting device 6 is moved to the position matched with gap, when film material 11 is placed into film material charging equipment by artificial or machine, is only placed on correct position film material and could be successfully laid on described material loading platform 2.Because the second inhibiting device 6 cannot align with gap in other situations, film material can not successfully be laid on described material loading platform 2.
Particularly, described first track 3 is for being opened in the straight-line groove on material loading platform 2, and the first inhibiting device 4 is column, and the length direction of the first inhibiting device 4 is perpendicular to straight-line groove length direction, first inhibiting device 4 bottom surface arranges card convex, and it is interior and removable that card convex embeds straight-line groove; Described second track 5 is the groove offered along the first inhibiting device 4 length direction, and the opening direction of groove is towards its another relative first inhibiting device 4; Described second inhibiting device 6 is column block, side arranges card convex to column block one, the groove that card convex embeds the second inhibiting device 6 is interior and removable, fool proof gap on the shape of the second inhibiting device 6 and film material 11 matches, and the quantity of the second inhibiting device 6 sets according to the fool-proof design of film material.
The sucker 8 that described film material connecting gear comprises multiple material loading arm 7 and is arranged on material loading arm 7, described material loading arm 7 can move above material loading platform 2, and described sucker 8 is arranged on material loading arm 7 movably.Particularly, can material loading arm 7 be arranged on transmission track, it is made to move between transmission track is above material loading platform 2 and above conveyor line driving band, described sucker 8 is for adsorbing the film material 11 be correctly placed on described material loading platform 2, until above material loading arm 7 slides into conveyor line belt conveyor time, remove absorption, film material 11 can drop on conveyor line belt conveyor automatically.
Described film material unit of getting the raw materials ready can also comprise lifting mechanism, and described lifting mechanism is fixedly connected with described material loading platform 2, for driving the rise and fall of described material loading platform 2, to meet the needs that film material 11 drawn by sucker 8.
Described film material unit of getting the raw materials ready can also comprise the inductor be connected with lifting mechanism, such as position transduser, inductor is arranged on material loading arm 7, described inductor is used for sense film material height, and send induced signal to described lifting mechanism, lifting mechanism according to the height at film material place with judge whether drive material loading platform 2 rise or decline.
In one embodiment of the invention, the demand of line is produced in order to meet display panels, described film material charging equipment comprises four film materials and to get the raw materials ready unit, be respectively diffusion barrier film material unit, upper prism film film material get the raw materials ready unit and lower diffusion barrier film material of unit, lower prism film film material of getting the raw materials ready of getting the raw materials ready to get the raw materials ready unit, and described four film materials are got the raw materials ready, unit is arranged in order according to upper diffusion barrier film material unit, upper prism film film material unit, lower prism film film material the get the raw materials ready order of unit of unit and lower diffusion barrier film material of getting the raw materials ready of getting the raw materials ready of getting the raw materials ready.
Described film material charging equipment can also comprise automatic film tearing mechanism 10, and the outlet of described automatic film tearing mechanism 10 connects described film material and to get the raw materials ready material loading platform 2 side of unit, to realize the automatic film tearing to film material.
In sum, the material loading platform of the present invention by unit of getting the raw materials ready at film material arranges slidably the first inhibiting device and the second inhibiting device, first inhibiting device and the second inhibiting device are matched from the fool-proof design of different film material, so that film material position is uniquely limited, the direction avoiding film material to place or positional fault.
Above embodiment is only for illustration of the present invention; and be not limitation of the present invention; the those of ordinary skill of relevant technical field; without departing from the spirit and scope of the present invention; can also make a variety of changes and modification; therefore all equivalent technical schemes also belong to category of the present invention, and scope of patent protection of the present invention should be defined by the claims.
Claims (9)
1. a film material charging equipment, it is characterized in that, comprise one or more film material to get the raw materials ready unit, described film material unit of getting the raw materials ready comprises material loading platform, described material loading platform is provided with the first track and perpendicular two the first inhibiting device, two described first inhibiting device are parallel to each other and can move along described first parallel track, wherein at least one first inhibiting device is provided with the second track and the second inhibiting device, described second inhibiting device can along the second rail moving, described first track and the second track perpendicular.
2. film material charging equipment as claimed in claim 1, it is characterized in that, described film material unit of getting the raw materials ready also comprises film material connecting gear, described film material connecting gear comprises multiple material loading arm and is arranged on the sucker on material loading arm, described material loading arm can move above material loading platform, and described sucker is arranged on material loading arm movably.
3. film material charging equipment as claimed in claim 2, is characterized in that, described film material unit of getting the raw materials ready also comprises lifting mechanism, and described lifting mechanism is fixedly connected with described material loading platform, for driving the rise and fall of described material loading platform.
4. film material charging equipment as claimed in claim 3, it is characterized in that, described film material unit of getting the raw materials ready also comprises the inductor be connected with lifting mechanism, and inductor is arranged on material loading arm, described inductor is used for sense film material height, and sends induced signal to described lifting mechanism.
5. film material charging equipment as claimed in claim 1, it is characterized in that, described first track is the straight-line groove be opened on material loading platform, first inhibiting device is column, the length direction of the first inhibiting device is perpendicular to straight-line groove length direction, first inhibiting device bottom surface arranges card convex, and it is interior and removable that card convex embeds straight-line groove.
6. film material charging equipment as claimed in claim 5, it is characterized in that, described second track is the groove offered along the first inhibiting device length direction, and the opening direction of groove is towards its another relative first inhibiting device.
7. film material charging equipment as claimed in claim 6, it is characterized in that, described second inhibiting device is column block, and side arranges card convex to column block one, and the groove that card convex embeds the second inhibiting device is interior and removable.
8. the film material charging equipment according to any one of claim 1-7, it is characterized in that, described film material charging equipment comprises the upper diffusion barrier film material arranged in turn unit, upper prism film film material get the raw materials ready unit and lower diffusion barrier film material of unit, lower prism film film material of getting the raw materials ready of getting the raw materials ready and to get the raw materials ready unit.
9. film material charging equipment as claimed in claim 8, it is characterized in that, described film material charging equipment also comprises automatic film tearing mechanism, and the outlet of described automatic film tearing mechanism is positioned at described film material and gets the raw materials ready the material loading platform side of unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310751575.2A CN103771166B (en) | 2013-12-31 | 2013-12-31 | Film material charging equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310751575.2A CN103771166B (en) | 2013-12-31 | 2013-12-31 | Film material charging equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103771166A CN103771166A (en) | 2014-05-07 |
CN103771166B true CN103771166B (en) | 2015-12-30 |
Family
ID=50564023
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310751575.2A Expired - Fee Related CN103771166B (en) | 2013-12-31 | 2013-12-31 | Film material charging equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103771166B (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001261174A (en) * | 2000-03-24 | 2001-09-26 | Sony Corp | Sheet sucking method and sheet sucking device |
CN2766279Y (en) * | 2005-03-09 | 2006-03-22 | 佶鸿电子股份有限公司 | CPU positioning jig |
CN101985332A (en) * | 2010-10-26 | 2011-03-16 | 吴江巨丰电子有限公司 | Magazine anti-reverse device used for production line |
WO2011103672A1 (en) * | 2010-02-24 | 2011-09-01 | Errol Sheehy | Gauge and frame for a portable sawmill to make wooden box culvert |
-
2013
- 2013-12-31 CN CN201310751575.2A patent/CN103771166B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001261174A (en) * | 2000-03-24 | 2001-09-26 | Sony Corp | Sheet sucking method and sheet sucking device |
CN2766279Y (en) * | 2005-03-09 | 2006-03-22 | 佶鸿电子股份有限公司 | CPU positioning jig |
WO2011103672A1 (en) * | 2010-02-24 | 2011-09-01 | Errol Sheehy | Gauge and frame for a portable sawmill to make wooden box culvert |
CN101985332A (en) * | 2010-10-26 | 2011-03-16 | 吴江巨丰电子有限公司 | Magazine anti-reverse device used for production line |
Also Published As
Publication number | Publication date |
---|---|
CN103771166A (en) | 2014-05-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2017215120A1 (en) | Drop test instrument | |
CN202533524U (en) | Ageing system for automatically picking and placing electronic products | |
CN103900449B (en) | Flatness checking device | |
CN104443979B (en) | A kind of drug storage and medicine outlet device | |
CN204346938U (en) | Glass collapses the workbench that frontier inspection surveys machine | |
CN205763461U (en) | Power distribution cabinet flanging automatic fetching device | |
CN103771166B (en) | Film material charging equipment | |
CN208531678U (en) | A kind of automatic stacking machine | |
CN204785383U (en) | Screen lifting and horizontal moving centre gripping removes frame | |
CN103231896A (en) | Automatic feeding device | |
CN205029979U (en) | Burn device of flexible circuit board | |
CN103787067A (en) | Substrate conveying device | |
CN207494809U (en) | Loading and unloading equipment and laser marking machine | |
CN203767131U (en) | Packing device for storage battery packaging line | |
CN203921780U (en) | Automatically tonic buffer storage | |
CN203552311U (en) | A rotary card supplying apparatus automatically selecting a card case and a card supplier | |
CN203621857U (en) | Automatic assembly machine for diffuser plate | |
CN206447292U (en) | Feed preparing device | |
CN105984599A (en) | Packaging system and method | |
CN203255661U (en) | Automatic feeding device | |
CN110449370A (en) | Product thickness apparatus for automatically sorting | |
CN205029980U (en) | Input/output equipment of flexible circuit board charging tray | |
CN204924966U (en) | Silica gel key AOI detection device | |
CN207359491U (en) | It is molded automatic charging machine | |
CN203653016U (en) | Lift |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151230 |
|
CF01 | Termination of patent right due to non-payment of annual fee |