CN103699942B - 一种检修工程定额定量评估与预测方法及系统 - Google Patents
一种检修工程定额定量评估与预测方法及系统 Download PDFInfo
- Publication number
- CN103699942B CN103699942B CN201310739686.1A CN201310739686A CN103699942B CN 103699942 B CN103699942 B CN 103699942B CN 201310739686 A CN201310739686 A CN 201310739686A CN 103699942 B CN103699942 B CN 103699942B
- Authority
- CN
- China
- Prior art keywords
- quota
- maintenance
- operation task
- project
- engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310739686.1A CN103699942B (zh) | 2013-12-26 | 2013-12-26 | 一种检修工程定额定量评估与预测方法及系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310739686.1A CN103699942B (zh) | 2013-12-26 | 2013-12-26 | 一种检修工程定额定量评估与预测方法及系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103699942A CN103699942A (zh) | 2014-04-02 |
CN103699942B true CN103699942B (zh) | 2016-06-08 |
Family
ID=50361464
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310739686.1A Active CN103699942B (zh) | 2013-12-26 | 2013-12-26 | 一种检修工程定额定量评估与预测方法及系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103699942B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104931653A (zh) * | 2015-06-04 | 2015-09-23 | 国网河南省电力公司电力科学研究院 | 基于等值盐密参数的悬式绝缘子积污难易程度的标定方法 |
CN106326621B (zh) * | 2015-06-30 | 2019-02-01 | 中国石油化工股份有限公司 | 一种确定油田预测油气储量合理性的方法 |
CN107590553A (zh) * | 2017-08-18 | 2018-01-16 | 南京理工大学 | 一种地铁车辆维修材料定额管理办法 |
CN113379075A (zh) * | 2021-06-09 | 2021-09-10 | 国家能源集团国源电力有限公司 | 一种设备维修定额管理方法和装置 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101866461A (zh) * | 2010-06-25 | 2010-10-20 | 冀中能源峰峰集团有限公司 | 煤炭企业预算定额分解方法和系统 |
CN102222276A (zh) * | 2011-05-16 | 2011-10-19 | 广东电网公司深圳供电局 | 电网二次设备状态检修方法及装置 |
CN102495967A (zh) * | 2011-12-12 | 2012-06-13 | 山东电力集团公司济宁供电公司 | 在运电力变压器检修周期计算方法 |
CN102799959A (zh) * | 2012-06-15 | 2012-11-28 | 上海市电力公司 | 一种供电公司运维成本定额评估体系 |
-
2013
- 2013-12-26 CN CN201310739686.1A patent/CN103699942B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101866461A (zh) * | 2010-06-25 | 2010-10-20 | 冀中能源峰峰集团有限公司 | 煤炭企业预算定额分解方法和系统 |
CN102222276A (zh) * | 2011-05-16 | 2011-10-19 | 广东电网公司深圳供电局 | 电网二次设备状态检修方法及装置 |
CN102495967A (zh) * | 2011-12-12 | 2012-06-13 | 山东电力集团公司济宁供电公司 | 在运电力变压器检修周期计算方法 |
CN102799959A (zh) * | 2012-06-15 | 2012-11-28 | 上海市电力公司 | 一种供电公司运维成本定额评估体系 |
Non-Patent Citations (2)
Title |
---|
北京市电力公司变电设备检修管理模式研究;李国强;《中国优秀硕士学位论文全文库》;20110930;摘要,第6、20、29、35页 * |
基于量价分离下水电站机组检修预算定额的编制;贾立敏等;《广东水利水电》;20130228;全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN103699942A (zh) | 2014-04-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2537222B1 (en) | Energy generating system and control thereof | |
CN104700321B (zh) | 一种输变电设备状态运行趋势分析方法 | |
Zhang et al. | Overhead line preventive maintenance strategy based on condition monitoring and system reliability assessment | |
CN102509018B (zh) | 电力系统设备重要性评价系统及方法 | |
Tanaka et al. | Multiple criteria assessment of substation conditions by pair-wise comparison of analytic hierarchy process | |
CN106054104A (zh) | 一种基于决策树的智能电表故障实时预测方法 | |
CN106384210A (zh) | 一种基于检修风险收益的输变电设备检修优先级排序方法 | |
CN106447522A (zh) | 一种全电压序列一体化电网的可靠性与风险评估方法 | |
CN103150635B (zh) | 电力设备运维方法 | |
CN101309009A (zh) | 基于层次分析法和德尔菲法建立的城市电网综合评价体系 | |
CN103699942B (zh) | 一种检修工程定额定量评估与预测方法及系统 | |
CN102081765A (zh) | 输电设备状态检修的系统性控制方法 | |
Chen et al. | Maintenance schedule optimisation for a railway power supply system | |
CN104299116A (zh) | 一种电网运行安全风险定量评估方法 | |
CN108631295A (zh) | 实测数据的理论线损在线精准计算系统 | |
CN106251045A (zh) | 基于多种主导因素的配电网供电可靠性评估方法 | |
CN106228300A (zh) | 一种分布式电源运营管理系统 | |
CN106529830A (zh) | 基于多维评价的输电线路风险评估系统及其评估方法 | |
CN103630781B (zh) | 有源电子式电流互感器的复合供能非接触在线监测系统及其数据处理方法 | |
CN109784755A (zh) | 一种基于层次分析法的电网智能化水平评估方法 | |
CN103400224B (zh) | Gis设备检修方法和gis设备检修辅助决策系统 | |
CN110348637A (zh) | 一种考虑场-网因素的风电爬坡事件预警方法 | |
CN104880691B (zh) | 一种关口电能计量装置运行状态的评价方法 | |
CN105548779A (zh) | 一种低压配电网无功运行状态的预警方法及系统 | |
Liu et al. | Life cycle cost estimate of power system planning |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Chen Haihan Inventor after: Gao Xinhua Inventor after: Lai Qixuan Inventor after: Pan Fan Inventor after: Zeng Tong Inventor after: You Weiyang Inventor after: Sun Yihui Inventor after: Chen Zihui Inventor before: Chen Haihan Inventor before: Su Dahua Inventor before: Deng Xiaoqiang Inventor before: Gao Xinhua Inventor before: Pan Fan Inventor before: Zeng Tong Inventor before: Lai Qixuan Inventor before: You Weiyang Inventor before: Sun Yihui Inventor before: Ou Lin Inventor before: Ma Chengzhi |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: CHEN HAIHAN GAO XINHUA PAN CENG TONG LAI QIXUAN YOU WEIYANG SUN YIHUI OULIN MA CHENGZHI SU DAHUA DENG XIAOQIANG TO: CHEN HAIHAN GAO XINHUA LAI QIXUAN PAN CENG TONG YOU WEIYANG SUN YIHUI CHEN ZIHUI |
|
C53 | Correction of patent for invention or patent application | ||
CB02 | Change of applicant information |
Address after: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8 Applicant after: ELECTRIC POWER RESEARCH INSTITUTE, GUANGDONG POWER GRID CO., LTD. Address before: 510080 Dongfeng East Road, Dongfeng, Guangdong, Guangzhou, Zhejiang Province, No. 8 Applicant before: Electrical Power Research Institute of Guangdong Power Grid Corporation |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: ELECTRICAL POWER RESEARCH INSTITUTE OF GUANGDONG POWER GRID CORPORATION TO: ELECTRIC POWER RESEARCH INSTITUTE OF GUANGDONG POWER GRID CO., LTD. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |