CN107590553A - 一种地铁车辆维修材料定额管理办法 - Google Patents

一种地铁车辆维修材料定额管理办法 Download PDF

Info

Publication number
CN107590553A
CN107590553A CN201710713378.XA CN201710713378A CN107590553A CN 107590553 A CN107590553 A CN 107590553A CN 201710713378 A CN201710713378 A CN 201710713378A CN 107590553 A CN107590553 A CN 107590553A
Authority
CN
China
Prior art keywords
mrow
maintenance
quota
service material
quotas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710713378.XA
Other languages
English (en)
Inventor
张立
蒋涛
刘思娴
杨继伟
宗佳晨
徐永能
徐文鑫
吴桐
詹炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing University of Science and Technology
Original Assignee
Nanjing University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing University of Science and Technology filed Critical Nanjing University of Science and Technology
Priority to CN201710713378.XA priority Critical patent/CN107590553A/zh
Publication of CN107590553A publication Critical patent/CN107590553A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明公开了一种地铁车辆维修材料定额管理方法,该方法确定并分解车辆维修作业任务,形成检修工序单元模块,界定各检修工序单元模块的计量单位和步距;基于当前检修工程定额数据预案,形成三类原始数群,记录实测项目的初始样本,进行数据偏差分析;通过历史数据测算调整工程定额,根据作业任务性质变化调整项目定额;以项目为单位形成维修材料定额评估体系,进行合理性验证;根据定期检修任务,预测维修材料数量指标。采用本发明的技术方案,能够实现按照平均先进水平原则量化评估并预测车辆维修材料定额,引导地铁运营单位改进现有维修技术,降本增效。

Description

一种地铁车辆维修材料定额管理办法
技术领域
本发明属于地铁维修管理技术领域,涉及一种地铁车辆维修材料定额管理办法。
背景技术
地铁快捷、高效、舒适的运营服务优势,决定了其投资规模发、运营维护成本高的财务特征。通过定额管理,控制维修成本实现资源利用效率提升是地铁运营管理企业重要的维修管理环节。
地铁车辆系统复杂、技术要求高,其维修管理内容多、过程复杂,地铁维修养护通常包括定期计划预防性维修、车辆故障后维修等,维修内容交叉,维修所需材料、备件类型繁多,作业组织比较困难。维修受作业环境、人员配置、资源储备、修程修制等不确定因素影响,缺乏系统维修消耗管理。
传统维修消耗统计与管理由人工记录完成,维修记录粗略,统计维度不够精细,无法实现对应工序的消耗统计与定量管理。维修成本的管理停留于年度或月度维修成本归口,设备单体、工序消耗、维修标准成本考核薄弱,无法精细化管理与控制维修材料。
运营期维修定额管理对于分析企业维修水平、支持企业概预算、挖掘维修作业规律等有着重要意义,标准作业消耗能够有效支持企业维修作业优化,消除资源配置不良、维修资源浪费现象。
因此,需要一种地铁车辆维修材料定额管理方法以解决上述问题。
发明内容
本发明的针对现有技术存在的问题,提供一种能够地铁车辆自主维修材料消耗有效管理,确定作业标准成本消耗,为企业标准作业指导提供依据的地铁车辆维修材料定额管理办法。
为解决上述技术问题,本发明的地铁车辆维修材料定额管理办法所采用的技术方案为:
一种地铁车辆维修材料定额管理办法,其特征在于:包括以下步骤:
步骤一:对维修工序进行划分与编码,并进行工序相似性评定,区分不同维修作业与工序,并利用编码技术实现工序编码。
步骤二:物资编码:对于维修所需耗材、备件和周转备件进行编码,录入物资信息;
步骤三:数据收集:针对不同维修作业工序,通过现场数据采集和历史数据相结合的方法收集数据和信息;
步骤四:建立数学模型:根据物资属性和定额管理类目,建立定额数值预测与管理模型,确定各工序和维修作业维修材料定额指标;
步骤五:对步骤四得到的各工序和维修作业维修材料定额指标进行修正,同时结合设备寿命周期和技术调整因素,完善维修材料定额指标。
2、如权利要求1所述的地铁车辆维修材料定额管理办法,其特征在于,步骤一中,对地铁车辆维修作业包括计划预防修、临时维修和定期维修。
3、如权利要求2所述的地铁车辆维修材料定额管理办法,其特征在于,所述的计划预防修包括日检、月检、半年检和年检,所述定期维修包括架修和大修。
4、如权利要求1所述的地铁车辆维修材料定额管理办法,其特征在于,步骤一中依据检修类型、时间、部门和工序对地铁维修工序进行10位字符编码。
5、如权利要求1所述的地铁车辆维修材料定额管理办法,其特征在于,步骤四中依据属性、类型和批次对于维修所需耗材、备件和周转备件进行9位字符编码。
6、如权利要求1所述的地铁车辆维修材料定额管理办法,其特征在于,还包括作业工序的定额数据处理方法,所述作业工序的定额数据处理方法包括以下步骤:
(1)根据初始样本中项目基本信息和关键工序描述,分析样本是否受样本项目的特殊性、作业水平查一下、施工工艺以及施工环境的差异性影响,剔除无效样板;
(2)计算有效样本数据均值和标准差δ;
(3)根据样本数据均值和标准差δ,计算在线设备维修定额总体均值μ在预设置信水平下的置信区间总体标准差δ在预设置信水平区间其中n为自然数,表示样本容量;t0.025(n-1)查t分布表得到,查X2分布表得到;
(4)令m1和m2分别为:
将m1和m2中的各元素按从小到大排列,取m1中后num/2个元素和m2前num/2个元素形成m'1和m'2,μ=2{sum[m'1(:)]+sum[m'2(:)]}/num,μ即为该作业工序的定额。
有益效果:本发明的地铁车辆维修材料定额管理办法:(1)关注地铁车辆维修材料消耗定额管理,精细化衡量维修作业工序消耗水平;(2)通过维修数据统计模块,优化传统作业工单模式,完善作业数据收集,支持维修定额持续优化;(3)通过工序划分与计量模块,合理划分作业工序,确定定额项目维度,方便企业动态统计与分析作业成本;(4)基于标准作业成本方法,维修材料定额指标并非一成不变,可以持续动态调整;(5)维修材料定额指标可基于作业调整、技术条件变更、设备寿命周期变化等因素进行优化调整,自主完善维修材料定额指标。
附图说明
图1是本发明所述一种地铁车辆维修材料定额管理方法流程图。
具体实施方式
下面结合附图和具体实施例,进一步阐明本发明,应理解这些实施例仅用于说明本发明而不用于限制本发明的范围,在阅读了本发明之后,本领域技术人员对本发明的各种等价形式的修改均落于本申请所附权利要求所限定的范围。
结合附图1,进一步阐述此方法定额管理流程。
本发明的地铁车辆维修定额管理方法,确定并分解任务至具体检修工序,形成最小单元模块(即检修工序单元模块),界定各作业任务单元模块颗粒度,将各工序进行统一编码,具体如下:
(1)按维修作业周期或维修类型划分原则确定作业任务,覆盖到车辆维修检修工程,包含日检、双周检、三月检、年检等4大类384个定期作业任务和临时性维修作业任务。
(2)分解个作业任务至具体检修工序,形成最小单元模块(即检修工序单元模块)。最小单元模块包括作业前准备、材料领取、安全保障、实际检修过程、清理与恢复现场、销点结束作业等模块,各作业任务可根据实际选择模块。
(3)界定作业任务各单元模块的颗粒度。根据工序相似性清晰界定各模块包含的内容,如车门检修、空调拆解、轮对检测等。
(4)依据部门、检修类型、作业工序、时间进行10位字符编码,例如车辆检修日检作业中巡检工序,其编码可以是“CLRJXJ1001”,其中首两位“CL”代表部门,三四位“RJ”代表检修类型为日检,五六位“XJ”标明维修作业工序为巡检,末四位数字编码为作业时间序号,按此规则将所有作业以示区分。
列举维修材料类型,根据材料属性分类,并逐一对材料进行编码,具体如下:
(1)针对各类维修作业环节所需要的维修材料,依据物资采购口径统一收录,根据各自价值、使用场合、物资属性分类,分为消耗性材料、备品配件以及维修周转备件三类。
(2)根据材料属性、类型、批次进行9位字符编码,例如车辆检修中使用的玻璃水材料,其编码可以是“HC0080417”,其中首两位字母“HC”代表物资属性为消耗性材料(耗材),前五位数字“00804”代表物资入库序号(由物资系统自动生成),末两位“17”为使用批次。
确定单元模块计量单位和单元模块步距,基于当前检修工程定额数据源,形成三类原始数据群,具体如下:
(1)按照计算、统计简便的原则,确定单元模块计量单位,通常选取量/次、量/台、量/m为计量单位。
(2)检修工程定额数据采集集合历史维修消耗数据、现场采集数据以及未来预测数据,形成三类原始数据群,各类表单设计思路如下:
①历史数据表的设计遵守真实、完整原则,合理区分不同作业任务交叉影响,通过物资管理系统、历史作业工单、三级库领料记录等途径,确定各维修作业任务消耗材料类型、数量,以及相应作业内容,维护设施设备数量等。通常历史数据精细程度不足以支持到工序消耗情况统计,因此历史数据作为定额数值的校准与参考数据。
②现场实测数据采集遵循易于现场填写和便于数据采集的实用性原则,在表单设计过程中,主要实测项目基本作业工序信息,包括维修内容、维修数量(设施设备数量)以及维修频率等;这边考虑到专业实际生产的特殊性,一些临时维修无法按照规范工序统计,必须特别记录,按照维修项目基本信息设置,如车门工控机维修、信号系统搭接、闸瓦更换等,故障频率较高的应考虑单独设置定额工序;其他影响定额指标的因素也需要考虑周全,例如天气原因、外部干扰原因等。作业统计基础参数除上述作业类型、实施内容、材料统计外,还要设置作业过程描述(关键工序说明),利于数据分析。对于周期性的检修作业,调研其维修周期,确定单位作业标准;对于非周期性的作业,调查所有设备投运后的故障次数,确定其故障频率。
③现场实验类数据采集主要针对典型维修作业内容,按照实验规程和作业表单工序设置的项目基本信息,统计典型维修工序在标准作业强度与水平。实测项目基本信息需要填写至一定深度,准确统计所用维修材料信息,并尽可能描述清楚作业过程的关键工序及方法。
④未来预测数据指维修管理管理部门,针对车辆设施设备运营状况制定的近期维修预算及维修材料采购计划。未来数据填写需注意按工序组成确定其统计路径与步距,遵循科学精确的原则。
检修工程定额数据处理模块,用于基于当前检修定额数据源,形成三类原始数据群,记录实测数据初试样本,对样本数据进行偏差分析,剔除偶然数据,包括以下步骤:
(1)根据初始样本中项目基本信息和关键工序描述,分析样本是否受样本项目的特殊性、作业水平查一下、施工工艺以及施工环境的差异性影响,剔除无效样板;
(2)计算有效样本数据均值标准差δ;
(3)根据样本数据均值和标准差,计算在线设备维修定额总体均值μ在预设置信水平下的置信区间总体标准差δ在预设置信水平区间其中n为自然数,表示样本容量;t0.025(n-1)可查t分布表,可查X2分布表;
(4)令m1和m2分别为:
(5)将m1和m2中的各元素按从小到达排列,取m1中后num/2和m2前num/2元素形成m'1和m'2,μ=2{sum[m'1(:)]+sum[m'2(:)]}/num,μ即为该作业工序的定额。
检修作业定额验证模块,用于通过历史数据和专家意见调整工序定额,以维修项目为单位形成检修工程定额体系,进行合理性验证。一般步骤包括:通过历史数据测算,对于部分作业任务不能按工程量进行简单累加时,通过历史数据测算,确定调整系数,以调整后作业消耗为任务定额。
根据维修变化、技术变化、设备状态变化调整维修定额进一步包括步骤:对于对个作业任务组成的检修工程,则对各作业工序按项目进行组合形成典型项目,通过历史数据测算确定项目调整系数;对于技术变化导致维修效率提升的检修工程,则对作业工序消耗定额通过定期校验确定提升效率,确定调整系数;对于设备寿命周期影响,导致设备故障率提升,通过数据分析得到设备故障率变化情况,从而确定维修消耗定额调整系数。
本发明的技术方案,建立了地铁车辆检维修作业任务的标准单元模块,形成了检修工程生产业务定额测算与调整体系,可指导地铁运营单位合理编制作业定额管理文件,形成规范管理机制,加强概预算管理,达到节约维修成本的目的。

Claims (6)

1.一种地铁车辆维修材料定额管理办法,其特征在于:包括以下步骤:
步骤一:对维修工序进行划分与编码,并进行工序相似性评定,区分不同维修作业与工序,并利用编码技术实现工序编码。
步骤二:物资编码:对于维修所需耗材、备件和周转备件进行编码,录入物资信息;
步骤三:数据收集:针对不同维修作业工序,通过现场数据采集和历史数据相结合的方法收集数据和信息;
步骤四:建立数学模型:根据物资属性和定额管理类目,建立定额数值预测与管理模型,确定各工序和维修作业维修材料定额指标;
步骤五:对步骤四得到的各工序和维修作业维修材料定额指标进行修正,同时结合设备寿命周期和技术调整因素,完善维修材料定额指标。
2.如权利要求1所述的地铁车辆维修材料定额管理办法,其特征在于,步骤一中,对地铁车辆维修作业包括计划预防修、临时维修和定期维修。
3.如权利要求2所述的地铁车辆维修材料定额管理办法,其特征在于,所述的计划预防修包括日检、月检、半年检和年检,所述定期维修包括架修和大修。
4.如权利要求1所述的地铁车辆维修材料定额管理办法,其特征在于,步骤一中依据检修类型、时间、部门和工序对地铁维修工序进行10位字符编码。
5.如权利要求1所述的地铁车辆维修材料定额管理办法,其特征在于,步骤四中依据属性、类型和批次对于维修所需耗材、备件和周转备件进行9位字符编码。
6.如权利要求1所述的地铁车辆维修材料定额管理办法,其特征在于,还包括作业工序的定额数据处理方法,所述作业工序的定额数据处理方法包括以下步骤:
(1)根据初始样本中项目基本信息和关键工序描述,分析样本是否受样本项目的特殊性、作业水平查一下、施工工艺以及施工环境的差异性影响,剔除无效样板;
(2)计算有效样本数据均值和标准差δ;
(3)根据样本数据均值和标准差δ,计算在线设备维修定额总体均值μ在预设置信水平下的置信区间总体标准差δ在预设置信水平区间其中n为自然数,表示样本容量;t0.025(n-1)查t分布表得到,查X2分布表得到;
(4)令m1和m2分别为:
<mrow> <msub> <mi>m</mi> <mn>1</mn> </msub> <mo>=</mo> <mi>n</mi> <mi>o</mi> <mi>r</mi> <mi>m</mi> <mi>r</mi> <mi>n</mi> <mi>d</mi> <mrow> <mo>(</mo> <mover> <mi>x</mi> <mo>&amp;OverBar;</mo> </mover> <mo>-</mo> <mo>(</mo> <mrow> <mi>&amp;delta;</mi> <mo>/</mo> <msqrt> <mi>n</mi> </msqrt> </mrow> <mo>)</mo> <mo>&amp;times;</mo> <msub> <mi>t</mi> <mn>0.025</mn> </msub> <mo>(</mo> <mrow> <mi>n</mi> <mo>-</mo> <mn>1</mn> </mrow> <mo>)</mo> <mo>,</mo> <msqrt> <mrow> <msup> <mi>&amp;delta;</mi> <mn>2</mn> </msup> <mrow> <mo>(</mo> <mi>n</mi> <mo>-</mo> <mn>1</mn> <mo>)</mo> </mrow> <mo>/</mo> <msubsup> <mi>&amp;chi;</mi> <mn>0.025</mn> <mn>2</mn> </msubsup> <mrow> <mo>(</mo> <mi>n</mi> <mo>-</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow> </msqrt> <mo>,</mo> <mn>1</mn> <mo>,</mo> <mi>n</mi> <mi>u</mi> <mi>m</mi> <mo>)</mo> </mrow> </mrow>
<mrow> <msub> <mi>m</mi> <mn>2</mn> </msub> <mo>=</mo> <mi>n</mi> <mi>o</mi> <mi>r</mi> <mi>m</mi> <mi>r</mi> <mi>n</mi> <mi>d</mi> <mrow> <mo>(</mo> <mover> <mi>x</mi> <mo>&amp;OverBar;</mo> </mover> <mo>-</mo> <mo>(</mo> <mrow> <mi>&amp;delta;</mi> <mo>/</mo> <msqrt> <mi>n</mi> </msqrt> </mrow> <mo>)</mo> <mo>&amp;times;</mo> <msub> <mi>t</mi> <mn>0.025</mn> </msub> <mo>(</mo> <mrow> <mi>n</mi> <mo>-</mo> <mn>1</mn> </mrow> <mo>)</mo> <mo>,</mo> <msqrt> <mrow> <msup> <mi>&amp;delta;</mi> <mn>2</mn> </msup> <mrow> <mo>(</mo> <mi>n</mi> <mo>-</mo> <mn>1</mn> <mo>)</mo> </mrow> <mo>/</mo> <msubsup> <mi>&amp;chi;</mi> <mn>0.975</mn> <mn>2</mn> </msubsup> <mrow> <mo>(</mo> <mi>n</mi> <mo>-</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow> </msqrt> <mo>,</mo> <mn>1</mn> <mo>,</mo> <mi>n</mi> <mi>u</mi> <mi>m</mi> <mo>)</mo> </mrow> </mrow>
将m1和m2中的各元素按从小到大排列,取m1中后num/2个元素和m2前num/2个元素形成m'1和m'2,μ=2{sum[m'1(:)]+sum[m'2(:)]}/num,μ即为该作业工序的定额。
CN201710713378.XA 2017-08-18 2017-08-18 一种地铁车辆维修材料定额管理办法 Pending CN107590553A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710713378.XA CN107590553A (zh) 2017-08-18 2017-08-18 一种地铁车辆维修材料定额管理办法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710713378.XA CN107590553A (zh) 2017-08-18 2017-08-18 一种地铁车辆维修材料定额管理办法

Publications (1)

Publication Number Publication Date
CN107590553A true CN107590553A (zh) 2018-01-16

Family

ID=61042402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710713378.XA Pending CN107590553A (zh) 2017-08-18 2017-08-18 一种地铁车辆维修材料定额管理办法

Country Status (1)

Country Link
CN (1) CN107590553A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109903419A (zh) * 2019-02-02 2019-06-18 宁波吉利汽车研究开发有限公司 问题件处理方法、装置和多车型共线的生产控制设备
CN111091202A (zh) * 2018-10-19 2020-05-01 株式会社日立制作所 车辆管理系统、车辆管理装置及车辆管理方法
CN112668679A (zh) * 2020-12-21 2021-04-16 中铁十八局集团第三工程有限公司 一种隧道工程施工定额测定系统以及方法
CN112949907A (zh) * 2021-02-04 2021-06-11 杭州品茗安控信息技术股份有限公司 一种工程造价的定额匹配方法、装置、设备及存储介质
CN113379075A (zh) * 2021-06-09 2021-09-10 国家能源集团国源电力有限公司 一种设备维修定额管理方法和装置
CN113763040A (zh) * 2021-08-27 2021-12-07 中铁十八局集团有限公司 一种房建工程施工定额测定系统及方法
CN114580668A (zh) * 2022-02-16 2022-06-03 四川观想科技股份有限公司 一种基于区块链的器材消耗计算方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002312517A (ja) * 2001-04-11 2002-10-25 San Motors Kk 自動車の超時短車検・一般車検・整備システム
JP2007326563A (ja) * 2006-05-11 2007-12-20 Yamato Auto Works Kk 車両整備点検支援システム及び車両の整備点検方法
CN101996364A (zh) * 2010-11-10 2011-03-30 重庆大学 一种工时定额的修订方法及工时定额管理系统
CN103699942A (zh) * 2013-12-26 2014-04-02 广东电网公司电力科学研究院 一种检修工程定额定量评估与预测方法及系统

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002312517A (ja) * 2001-04-11 2002-10-25 San Motors Kk 自動車の超時短車検・一般車検・整備システム
JP2007326563A (ja) * 2006-05-11 2007-12-20 Yamato Auto Works Kk 車両整備点検支援システム及び車両の整備点検方法
CN101996364A (zh) * 2010-11-10 2011-03-30 重庆大学 一种工时定额的修订方法及工时定额管理系统
CN103699942A (zh) * 2013-12-26 2014-04-02 广东电网公司电力科学研究院 一种检修工程定额定量评估与预测方法及系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
徐雯霏等: ""南京地铁车辆架、大修资源配置优化分析"" *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111091202A (zh) * 2018-10-19 2020-05-01 株式会社日立制作所 车辆管理系统、车辆管理装置及车辆管理方法
CN111091202B (zh) * 2018-10-19 2023-12-05 株式会社日立制作所 车辆管理系统、车辆管理装置及车辆管理方法
CN109903419A (zh) * 2019-02-02 2019-06-18 宁波吉利汽车研究开发有限公司 问题件处理方法、装置和多车型共线的生产控制设备
CN112668679A (zh) * 2020-12-21 2021-04-16 中铁十八局集团第三工程有限公司 一种隧道工程施工定额测定系统以及方法
CN112668679B (zh) * 2020-12-21 2023-04-25 中铁十八局集团有限公司 一种隧道工程施工定额测定系统以及方法
CN112949907A (zh) * 2021-02-04 2021-06-11 杭州品茗安控信息技术股份有限公司 一种工程造价的定额匹配方法、装置、设备及存储介质
CN112949907B (zh) * 2021-02-04 2024-03-19 品茗科技股份有限公司 一种工程造价的定额匹配方法、装置、设备及存储介质
CN113379075A (zh) * 2021-06-09 2021-09-10 国家能源集团国源电力有限公司 一种设备维修定额管理方法和装置
CN113763040A (zh) * 2021-08-27 2021-12-07 中铁十八局集团有限公司 一种房建工程施工定额测定系统及方法
CN114580668A (zh) * 2022-02-16 2022-06-03 四川观想科技股份有限公司 一种基于区块链的器材消耗计算方法

Similar Documents

Publication Publication Date Title
CN107590553A (zh) 一种地铁车辆维修材料定额管理办法
Kirill et al. Estimation methodology of efficiency of production capacity management at textile enterprises
Yuldoshev et al. Use of artificial intelligence methods in operational planning of textile production
Hilorme et al. Formation of risk mitigating strategies for the implementation of projects of energy saving technologies
Vovk et al. Modeling the choice of the innovation and investment strategy for the implementation of modernization potential
CN108108994A (zh) 用于化工企业供应链的计划优化方法
Bulla et al. Manpower requirements forecasting: a case example
CN103268531B (zh) 一种用于能源中心的能源二级管理平台
Kulikova et al. Planning of technological development of new products and its impact on the economic performance of the enterprise
Jiang et al. Transportation system evaluation model based on DEA
Gitelman et al. Asset Management of energy company based on risk-oriented strategy
CN105069546A (zh) 电力企业多业务成本预算需求数据处理方法
Karunarathna et al. A tool to assess construction worker productivity
CN113127538B (zh) 一种高精度的备件需求预测方法
Raiko et al. Evaluation of quality level in managing the development of industrial enterprises
Xiong et al. Design and improvement of KPI system for materials management in Power Group Enterprise
CN106096754A (zh) 一种煤改电布局的优化方法
Stopka et al. Proposal of the functional system for the airline companies financial situation assessment
Shubinsky et al. Resource management of railway transport facilities
Tan et al. Using the analytic hierarchy process (AHP) for supply chain risk management (SCRM): A case study in automotive sector
Yang et al. Design of investment management optimization system for power grid companies under new electricity reform
Ling et al. Study on the cost attribution method of power grid equipment maintenance under multi-dimensional lean management model
Huang et al. Research on the Engineering project cost management and cost control based on data mining method
Li Research on L Company's intelligent performance evaluation system
Martin Aspects of cost control

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180116

RJ01 Rejection of invention patent application after publication