CN103695809A - Travel sleeve of control rod drive mechanism for nuclear power plant and preparation method thereof - Google Patents

Travel sleeve of control rod drive mechanism for nuclear power plant and preparation method thereof Download PDF

Info

Publication number
CN103695809A
CN103695809A CN201310688005.3A CN201310688005A CN103695809A CN 103695809 A CN103695809 A CN 103695809A CN 201310688005 A CN201310688005 A CN 201310688005A CN 103695809 A CN103695809 A CN 103695809A
Authority
CN
China
Prior art keywords
preparation
steel
nuclear power
drive mechanism
rod drive
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310688005.3A
Other languages
Chinese (zh)
Other versions
CN103695809B (en
Inventor
杨春乐
杨孟嘉
陈志强
冉小兵
邓小云
戴长年
刘宝亭
米大为
唐茂
吴昊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Original Assignee
China General Nuclear Power Corp
China Nuclear Power Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China General Nuclear Power Corp, China Nuclear Power Engineering Co Ltd filed Critical China General Nuclear Power Corp
Priority to CN201310688005.3A priority Critical patent/CN103695809B/en
Publication of CN103695809A publication Critical patent/CN103695809A/en
Application granted granted Critical
Publication of CN103695809B publication Critical patent/CN103695809B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Heat Treatment Of Articles (AREA)
  • Forging (AREA)

Abstract

The invention discloses a preparation method of a travel sleeve of a control rod drive mechanism for a nuclear power plant. The preparation method comprises the following steps: 1) selecting raw materials and obtaining molten steel through electric furnace smelting, AOD refining and LF furnace refining; 2) casting the molten steel into an electrode; 3) carrying out electroslag remelting on the electrode to obtain a steel ingot, wherein in percentage by weight, the steel ingot comprises not more than 0.035% of C, not more than 1.00% of Si, not more than 2.00% of Mn, not more than 0.030% of P, not more than 0.015% of S, 18.50-20.00% of Cr, 9.00-10.00% of Ni, not more than 0.080% of N, not more than 1.00% of Cu, not more than 0.10% of Co, not more than 0.001% of B, not more than 0.05% of Al and the balance of Fe; 4) forging the steel ingot and machining the steel ingot after thermal treatment; 5) obtaining the travel sleeve of the control rod drive mechanism for the nuclear power plant after magnetic performance test and non-destructive test are performed. The travel sleeve of the control rod drive mechanism for the nuclear power plant can satisfy the mechanical property and function requirements of the practical use, and the life satisfies the design specification and national standard requirements. Through measurement of magnetic permeability point by point, the relative magnetic permeability is controlled to be below 1.02.

Description

Nuclear power plants rod drive mechanism stroke sleeve pipe and preparation method thereof
Technical field
The invention belongs to nuclear power technology field, more particularly, the present invention relates to a kind of Nuclear power plants rod drive mechanism stroke sleeve pipe and preparation method thereof.
Background technology
Nuclear Power Station safety class equipment--rod drive mechanism (CRDM) is mechanical means important in nuclear power plant reactor system; some as reactor control and protection system; CRDM is extremely important topworks, and its major function is to drive the control rod startup of upper and lower motion realization response heap, hoisting power, maintenance power, Steam Generator in Load Follow, normal shutdown and breakdown in reactor core.
Pressurized-water reactor nuclear power plant CRDM stroke sleeve pipe is the some of the pressure bearing and seal part of magnetic control rod drive mechanism, be operated in the environment of Nuclear power plants one loop high-temperature high pressure water, not only to provide for the motion of drive-rod part stroke space, location and the supporting structure of also serving as stick location probe parts.In order to guarantee the accurate of ferromagnetic bar location probe indication, after requiring stick location probe coil energising, stroke sleeve pipe is nonmagnetic, therefore require the material of stroke sleeve pipe to there is the mechanical property of high temperature high voltage resistant, pure austenite structure, nonmagnetic and corrosion-resistant, belong to core one-level component.
CRDM stroke sleeve pipe is monopolized by external a few countries for a long time, and their long-term control the CRDM stroke sleeve pipe supply of material market of global nuclear power projects.The external minority CRDM device fabrication producer supply of material that places one's entire reliance upon, China not only needs to pay more expensive purchase cost, and delivery cycle is uncertain, has a big risk, and once has influence in various degree the duration progress of China Jian nuclear power new projects.
In view of this, necessary a kind of Nuclear power plants rod drive mechanism stroke sleeve pipe and preparation method thereof that provides.
Summary of the invention
Goal of the invention of the present invention is: a kind of Nuclear power plants rod drive mechanism stroke sleeve pipe and preparation method thereof is provided.
In order to realize foregoing invention object, the invention provides a kind of preparation method of Nuclear power plants rod drive mechanism stroke sleeve pipe, it comprises the following steps:
1) choose raw material and by the refining of electrosmelting+AOD refining+LF stove, obtain molten steel;
2) pouring molten steel is become to electrode;
3) electrode esr is obtained to steel ingot, wherein, by weight percentage, contain≤0.035%C of steel ingot ,≤1.00%Si ,≤2.00%Mn ,≤0.030%P ,≤0.015%S, 18.50~20.00%Cr, 9.00~10.00%Ni ,≤0.080%N ,≤1.00%Cu ,≤0.10%Co ,≤0.001%B ,≤0.05%Al and surplus Fe;
4) forging steel ingot blank, carries out machining after thermal treatment; And
5) after magnetic property check, nondestructive testing, obtain Nuclear power plants rod drive mechanism stroke sleeve pipe.
As a kind of improvement of preparation method of the present invention, step 1) in, described raw material adopts high carbon ferro-chrome, medium carbon ferrochrome, nickel plate, low P raw material, manganese metal, contains nitrogenous ferrochrome, ferrosilicon.
As a kind of improvement of preparation method of the present invention, step 2) in, described in be cast in argon shield atmosphere and carry out.
As a kind of improvement of preparation method of the present invention, step 3) carry out before, electrode surface is cleared up.
As a kind of improvement of preparation method of the present invention, step 3) carry out after, the steel ingot of the demoulding is carried out to surface finish.
As a kind of improvement of preparation method of the present invention, step 4) in, after described Heating Steel Ingots insulation, adopt fast forging cogging and footpath to be forged into blank.
A kind of improvement as preparation method of the present invention, described Heating Steel Ingots heat preservation method is: steel ingot is slowly heated to 900-1000 ℃ from≤700 ℃, 900-1000 ℃ of insulation, after 2 hours, be slowly heated to again 1000-1100 ℃, after 1000-1100 ℃ of insulation 2 hours, the forging of coming out of the stove.
As a kind of improvement of preparation method of the present invention, while carrying out described fast forging cogging, by steel ingot jumping-up secondary or repeatedly, after jumping-up insulation, steel billet is come out of the stove and pull out forging, through repeatedly after forging, steel billet being swaged into required intermediate blank size, excises the exterior part of ingot, tail after cogging.
As a kind of improvement of preparation method of the present invention, described steel billet is forged the temperature 1100 ℃ of > in process furnace and is heated 2.5-4.5 hour in footpath, insulation 1.5-2.5 hour, and steel billet is forged into required intermediate blank size after coming out of the stove on footpath forging machine.
As a kind of improvement of preparation method of the present invention, step 4) after, forging blank is carried out to solution treatment.
As a kind of improvement of preparation method of the present invention, described solution treatment is: forging steel billet is heated to 1000 ℃ of > from≤650 ℃, is incubated water-cooled to billet surface temperature after >=2.5 hours and is less than 40 ℃.
As a kind of improvement of preparation method of the present invention, by choosing raw material and adding alloy material, obtain step 3) in the composition of steel ingot.
In order to realize foregoing invention object, the present invention also provides a kind of Nuclear power plants rod drive mechanism stroke sleeve pipe, by weight percentage, described contain≤0.035%C of Nuclear power plants rod drive mechanism stroke sleeve pipe ,≤1.00%Si ,≤2.00%Mn ,≤0.030%P ,≤0.015%S, 18.50~20.00%Cr, 9.00~10.00%Ni ,≤0.080%N ,≤1.00%Cu ,≤0.10%Co ,≤0.001%B ,≤0.05%Al and surplus Fe.
As a kind of improvement of Nuclear power plants rod drive mechanism stroke sleeve pipe of the present invention, described Nuclear power plants rod drive mechanism stroke sleeve pipe obtains by aforementioned preparation method.
With respect to prior art, Nuclear power plants rod drive mechanism stroke sleeve pipe of the present invention and preparation method thereof has the following advantages:
The control of Chemical Composition in optimization by Chemical Composition and manufacturing processed, CRDM stroke sleeve pipe can reach mechanical property and functional requirement of actual use, and the life-span meets design specifications and the national standard requirement of CRDM.In addition, point-to-point measurement magnetic permeability, relative magnetic permeability can be controlled in below 1.02.Through reality, detect, be arranged on indices excellent property while moving in CRDM, safe and reliable.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, Nuclear power plants rod drive mechanism stroke sleeve pipe of the present invention and preparation method thereof is elaborated, wherein:
Fig. 1 is the fast cogging heating process graphic representation of forging in the preparation method of Nuclear power plants rod drive mechanism stroke sleeve pipe of the present invention.
Fig. 2 is the process curve figure of blank solution treatment in the preparation method of Nuclear power plants rod drive mechanism stroke sleeve pipe of the present invention.
Fig. 3 is the inclusion shape appearance figure of the sample that obtains of the preparation method of the Nuclear power plants rod drive mechanism stroke sleeve pipe according to the present invention.
Fig. 4 is the α phase shape appearance figure of the sample that obtains of the preparation method of the Nuclear power plants rod drive mechanism stroke sleeve pipe according to the present invention.
Fig. 5 is metallographic structure, the grain fineness number shape appearance figure of the sample that obtains of the preparation method of the Nuclear power plants rod drive mechanism stroke sleeve pipe according to the present invention.
Embodiment
In order to make goal of the invention of the present invention, technical scheme and technique effect thereof more clear, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be understood that, the embodiment describing in this specification sheets is only in order to explain the present invention, is not intended to limit the present invention.
The preparation method's of Nuclear power plants rod drive mechanism stroke sleeve pipe of the present invention technical process comprises: picking of raw material → electrosmelting+AOD refining+LF stove refining → casting electrode → surface finish → esr → rough forging → thermal treatment → sampling → physicochemical property check → machining → magnetic property check → nondestructive testing → size, surface quality testing.
1. picking of raw material: raw material adopts high carbon ferro-chrome, medium carbon ferrochrome, nickel plate, low P raw material, manganese metal, containing nitrogenous ferrochrome, ferrosilicon.
2. electrosmelting+AOD refining+LF stove refining: raw material melts in electric furnace, then molten steel is poured into oxygen decarburization, nitrogen flushing in AOD refining furnace, added alloy material, adjust chemical composition, after reaching the target component of process for making regulation and stipulation and liquid steel temperature, tap, molten steel is poured ladle into.
Ladle moves into LF refining furnace and carries out refining for the second time, according to on-the-spot sample analysis result, adds alloy material to adjust chemical composition, adjusts liquid steel temperature simultaneously, until molten steel, reaches after meeting the target chemical composition of process for making code requirement and tapping temperature and taps.
3. casting electrode: not to be oxidized in order protecting in molten steel casting process, few oxidation, to adopt argon shield casting.
4. esr: in order to improve the metallurgical quality of steel, carry out esr secondary smelting, obtain steel ingot.By esr, can improve the purity of steel, reduce steel inclusion, reduce the size of inclusion, the distribution of change inclusion.
Before esr, electrode surface is first cleared up, remove surface scale.In addition,, in order to remove moisture in slag charge, before use, can adopt resistance furnace baking slag charge.
During esr, adopt CaF 2: Al 2o 3: CaO:MgO quaternary slag system, adopt the general electroslag remelting process of stainless steel, by controlling voltage and current, guarantee that esr process steadily carries out.
In order to guarantee that the tissue of steel meets the demands, the main alloy element of steel is carried out to the control of target composition, the main alloy element content of steel sees the following form 1.
The main alloy element content (weight percent) of table 1 steel
Element C Si Mn P S Cr Ni N
Content ≤0.035 ≤1.00 ≤2.00 ≤0.030 ≤0.015 18.50~20.00 9.00~10.00 ≤0.080
Element Cu Co B Al Fe ? ? ?
Content ≤1.00 ≤0.10 ≤0.0010 ≤0.050 Surplus ? ? ?
5. surface finish: steel ingot demoulding rear surface finishing, remove ingot surface defect.
6. rough forging: steel ingot adopts fast forgings+footpath to forge combination forging process, adopts fast forging cogging after Heating Steel Ingots insulation, then forge to finished product blank in footpath.
Heating Steel Ingots heats by Fig. 1 technique in batch-type furnace: steel ingot is slowly heated to 900-1000 ℃ from≤700 ℃, 900-1000 ℃ of insulation, within 2 hours, is slowly heated to 1000-1100 ℃ again; After 1000-1100 ℃ of insulation 2 hours, the forging of coming out of the stove.
Fast forging cogging, steel ingot carries out cogging on 2000 tons of high-speed hydranlic press.
In order to guarantee that rod iron has good tissue to meet mechanical property and flaw detection requirement, steel ingot jumping-up secondary during forging, after jumping-up insulation, steel billet is come out of the stove and is pulled out forging, and after repeatedly forging, steel billet is forged required intermediate blank size.
After cogging, excise the exterior part of ingot, tail, forge compression ratio and be greater than 5, steel billet cooling rear surface finishing, removes steel billet surface defect.
Forge in footpath: steel billet is forged in process furnace and heated in footpath.1100 ℃ of Heating temperature >, heating 2.5-4.5 hour, insulation 1.5-2.5 hour, steel billet is swaged to blank dimension after coming out of the stove on 1300 tons of footpath forging machines.
7. thermal treatment (solution treatment): forging blank carries out solution treatment by Fig. 2.Forging blank is heated to 1000 ℃ of > from≤650 ℃, is incubated and after 2.5 hours, carries out water-cooled (as blank is hung in tank), be less than 40 ℃ to blank surface temperature.
8. sampling and physicochemical property check: obtain sample from blank and test detection, to determine whether blank meets performance requriements and the Functional Requirement of regulation, specifically referring to experiment test section.
9. machining → magnetic property check → nondestructive testing → size, surface quality testing: the stroke sleeve pipe that the steel billet that meets survey requirement is machined to as requested to predetermined size; By the detection of row magnetic property, nondestructive testing and size, surface quality testing, can obtain the Nuclear power plants rod drive mechanism stroke sleeve pipe that meets design specifications and national standard requirement.
Experiment detects
1. the examination of nonmetallic inclusion
By GB/T10561-2005, carry out the examination of nonmetallic inclusion: get stroke sleeve pipe blank 1/2 radius vertical section sample and grind after polishing, check under the microscope non-metallic inclusion, non-metallic inclusion pattern is shown in Fig. 3, and assay is in Table 2.
Table 2 examination of nonmetallic inclusion result
Figure BDA0000438208080000061
2. α checks mutually
By GB/T13305-2008, carrying out α checks mutually: get vertical section, stroke sleeve pipe blank center sample and grind after polishing, by basic iron potassium cyanide aqueous corrosion check α phase.α checks mutually centered by the most serious visual field, measures the ferrite content of adjacent 5 visual fields and quotes, and α phase pattern is shown in Fig. 4, and assay is in Table 3.
Table 3 α phase assay
Figure BDA0000438208080000071
3. grain fineness number grading
By GB/T6394-2002, carry out grain fineness number grading: get stroke sleeve pipe blank 1/2 radius cross section sample and grind after polishing, with 10% oxalic acid aqueous solution electrolytic corrosion, check grain fineness number.Grain fineness number pattern is shown in Fig. 5, and grain fineness number is rated 3.0 grades.
4. Huey test
By RCCC-M MC1310, carry out Huey test: get 2 of stroke sleeve pipe blank 1/2 radius longitudinal test pieces, to after surface finish, according to RCC-M MC1310 method B, carry out sensitization processing, sample after sensitization adds copper scale corrosion 24 hours, 90-degree bent, 2 samples of assay are all inclined to without intergranular corrosion.
5. tension test
By GB/T228.1-2010, carry out room temperature tensile, by GB/T4338-2006, carry out 350 ℃ of stretchings: in stroke sleeve pipe blank 1/2 radial position, get 6 of hoop tension specimens, carry out room temperature and 350 ℃ of high temperature tension tests, sample working portion diameter is Φ 10mm, and stretch test result is in Table 4.
Table 4 stretch test result
Figure BDA0000438208080000072
Figure BDA0000438208080000081
6. low temperature impact test
By GB/T229-2007, carry out 0 ℃ of low temperature impact test: in stroke sleeve pipe blank 1/2 radial position, get 3 of hoop impact specimens, carry out 0 ℃ of low temperature impact test, sample adopts 10mm * 10mm * 55mm standard v-notch sample, breach axis is perpendicular to blank outside surface, and Impulse Test Result is in Table 5.
Table 5 low temperature impact test result
Figure BDA0000438208080000082
From above experiment, detect and can find out, Nuclear power plants rod drive mechanism stroke sleeve pipe of the present invention has the mechanical property of desirable high temperature resistant, high pressure; There is pure austenite structure, point-to-point measurement magnetic permeability, relative magnetic permeability can be controlled in below 1.02; Corrosion-resistant, can meet design specifications and national standard requirement.
In conjunction with above detailed description and actual survey, Nuclear power plants rod drive mechanism stroke sleeve pipe of the present invention and preparation method thereof has following technique effect:
1. realize the production domesticization of CRDM stroke cover pipe manufacturer, broken foreign technology monopolization, there is very high Social benefit and economic benefit;
2. by the optimum combination of Chemical Composition, in process for making, guarantee the control of composition, CRDM stroke sleeve pipe can reach mechanical property and functional requirement, and the life-span meets design specifications and the national standard requirement of CRDM, and quality reaches the advanced level of same kind of products at abroad;
3. can utilize domestic existing processing unit processing and manufacturing, be suitable for batch production;
4. adopt the refining of electric furnace+AOD refining+LF stove, in smelting process, the strict optimization proportioning of controlling chemical composition is to stop ferrite to be separated out, and through point-to-point measurement magnetic permeability, relative magnetic permeability is controlled at below 1.02;
5. through actual survey, be arranged on indices excellent property while moving in equipment CRDM, guarantee safe and reliable.
The announcement of book and instruction according to the above description, those skilled in the art in the invention can also carry out suitable change and modification to above-mentioned embodiment.Therefore, the present invention is not limited to embodiment disclosed and described above, to modifications and changes more of the present invention, also should fall in the protection domain of claim of the present invention.In addition,, although used some specific terms in this specification sheets, these terms just for convenience of description, do not form any restriction to the present invention.

Claims (14)

1. a preparation method for Nuclear power plants rod drive mechanism stroke sleeve pipe, is characterized in that, comprises the following steps:
1) choose raw material and by the refining of electrosmelting+AOD refining+LF stove, obtain molten steel;
2) pouring molten steel is become to electrode;
3) electrode esr is obtained to steel ingot, wherein, by weight percentage, contain≤0.035%C of steel ingot ,≤1.00%Si ,≤2.00%Mn ,≤0.030%P ,≤0.015%S, 18.50~20.00%Cr, 9.00~10.00%Ni ,≤0.080%N ,≤1.00%Cu ,≤0.10%Co ,≤0.001%B ,≤0.05%Al and surplus Fe;
4) forging steel ingot blank, carries out machining after thermal treatment; And
5) after magnetic property check, nondestructive testing, obtain Nuclear power plants rod drive mechanism stroke sleeve pipe.
2. preparation method according to claim 1, is characterized in that step 1) in, described raw material adopts high carbon ferro-chrome, medium carbon ferrochrome, nickel plate, low P raw material, manganese metal, contains nitrogenous ferrochrome, ferrosilicon.
3. preparation method according to claim 1, is characterized in that step 2) in, described in be cast in argon shield atmosphere and carry out.
4. preparation method according to claim 1, is characterized in that step 3) carry out before, electrode surface is cleared up.
5. preparation method according to claim 1, is characterized in that step 3) carry out after, the steel ingot of the demoulding is carried out to surface finish.
6. preparation method according to claim 1, is characterized in that step 4) in, after described Heating Steel Ingots insulation, adopt fast forging cogging and footpath to be forged into blank.
7. preparation method according to claim 6, is characterized in that, the technique of described Heating Steel Ingots insulation is: steel ingot is slowly heated to 900-1000 ℃ from≤700 ℃, 900-1000 ℃ of insulation, within 2 hours, is slowly heated to 1000-1100 ℃ again; After 1000-1100 ℃ of insulation 2 hours, the forging of coming out of the stove.
8. preparation method according to claim 7, is characterized in that, while carrying out described fast forging cogging, by steel ingot jumping-up secondary or repeatedly, after jumping-up insulation, steel billet is come out of the stove and is pulled out forging, after repeatedly forging, steel billet is swaged into required intermediate blank size, excises the exterior part of ingot, tail after cogging.
9. preparation method according to claim 8, it is characterized in that, described steel billet is forged the temperature 1100 ℃ of > in process furnace and is heated 2.5-4.5 hour in footpath, insulation 1.5-2.5 hour, and steel billet is forged into required intermediate blank size after coming out of the stove on footpath forging machine.
10. preparation method according to claim 1, is characterized in that step 4) after, forging blank is carried out to solution treatment.
11. preparation methods according to claim 10, is characterized in that, described solution treatment is: forging steel billet is heated to 1000 ℃ of > from≤650 ℃, is incubated water-cooled to billet surface temperature after >=2.5 hours and is less than 40 ℃.
12. preparation methods according to claim 1, is characterized in that, by choosing raw material and adding alloy material, obtain step 3) in the composition of steel ingot.
13. 1 kinds of Nuclear power plants rod drive mechanism stroke sleeve pipes, it is characterized in that, by weight percentage, described contain≤0.035%C of Nuclear power plants rod drive mechanism stroke sleeve pipe ,≤1.00%Si ,≤2.00%Mn ,≤0.030%P ,≤0.015%S, 18.50~20.00%Cr, 9.00~10.00%Ni ,≤0.080%N ,≤1.00%Cu ,≤0.10%Co ,≤0.001%B ,≤0.05%Al and surplus Fe.
14. Nuclear power plants rod drive mechanism stroke sleeve pipes according to claim 13, is characterized in that, described Nuclear power plants rod drive mechanism stroke sleeve pipe obtains by the preparation method described in any one in claim 1-12.
CN201310688005.3A 2013-12-15 2013-12-15 Nuclear power station CRDM stroke sleeve pipe and preparation method thereof Active CN103695809B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310688005.3A CN103695809B (en) 2013-12-15 2013-12-15 Nuclear power station CRDM stroke sleeve pipe and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310688005.3A CN103695809B (en) 2013-12-15 2013-12-15 Nuclear power station CRDM stroke sleeve pipe and preparation method thereof

Publications (2)

Publication Number Publication Date
CN103695809A true CN103695809A (en) 2014-04-02
CN103695809B CN103695809B (en) 2016-05-11

Family

ID=50357467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310688005.3A Active CN103695809B (en) 2013-12-15 2013-12-15 Nuclear power station CRDM stroke sleeve pipe and preparation method thereof

Country Status (1)

Country Link
CN (1) CN103695809B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105088094A (en) * 2015-08-11 2015-11-25 宝钢特钢有限公司 Manufacturing method of nitrogen-controlled austenitic stainless steel large forging piece
WO2016115821A1 (en) * 2015-01-23 2016-07-28 李泽文 Nickel-based alloy pressure-resistant shell and implementation method thereof
CN106191981A (en) * 2016-08-26 2016-12-07 中航动力股份有限公司 A kind of caustic solution of high-temperature alloy blades surface depleted layer
CN110935827A (en) * 2019-12-02 2020-03-31 抚顺特殊钢股份有限公司 Forging method of large-specification fine-grain austenitic gas valve steel SNCrW
CN110964990A (en) * 2019-11-11 2020-04-07 南京工程学院 High-performance large-diameter thick-wall austenitic stainless steel forged pipe for nuclear power and short-process preparation method thereof
CN114250402A (en) * 2021-12-16 2022-03-29 大冶特殊钢有限公司 Manufacturing method of low-carbon nitrogen-containing austenitic stainless steel bar
CN115747662A (en) * 2022-11-30 2023-03-07 山西太钢不锈钢股份有限公司 Method for refining stainless steel for high-pressure common rail of engine
CN116103574A (en) * 2021-11-10 2023-05-12 宝山钢铁股份有限公司 Steel plate for magnetic shielding and manufacturing method thereof

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2311997A (en) * 1996-04-10 1997-10-15 Sanyo Special Steel Co Ltd Oxide-dispersed powder metallurgically produced alloys.
JPH09310157A (en) * 1996-05-22 1997-12-02 Kawasaki Steel Corp Austenitic stainless hot rolled steel sheet excellent in deep drawability and its production

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2311997A (en) * 1996-04-10 1997-10-15 Sanyo Special Steel Co Ltd Oxide-dispersed powder metallurgically produced alloys.
JPH09310157A (en) * 1996-05-22 1997-12-02 Kawasaki Steel Corp Austenitic stainless hot rolled steel sheet excellent in deep drawability and its production

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016115821A1 (en) * 2015-01-23 2016-07-28 李泽文 Nickel-based alloy pressure-resistant shell and implementation method thereof
CN105088094A (en) * 2015-08-11 2015-11-25 宝钢特钢有限公司 Manufacturing method of nitrogen-controlled austenitic stainless steel large forging piece
CN106191981A (en) * 2016-08-26 2016-12-07 中航动力股份有限公司 A kind of caustic solution of high-temperature alloy blades surface depleted layer
CN110964990A (en) * 2019-11-11 2020-04-07 南京工程学院 High-performance large-diameter thick-wall austenitic stainless steel forged pipe for nuclear power and short-process preparation method thereof
CN110964990B (en) * 2019-11-11 2021-06-01 南京工程学院 High-performance large-diameter thick-wall austenitic stainless steel forged pipe for nuclear power and short-process preparation method thereof
CN110935827A (en) * 2019-12-02 2020-03-31 抚顺特殊钢股份有限公司 Forging method of large-specification fine-grain austenitic gas valve steel SNCrW
CN110935827B (en) * 2019-12-02 2021-06-08 抚顺特殊钢股份有限公司 Forging method of large-specification fine-grain austenitic stainless steel SNCrW bar
CN116103574A (en) * 2021-11-10 2023-05-12 宝山钢铁股份有限公司 Steel plate for magnetic shielding and manufacturing method thereof
CN116103574B (en) * 2021-11-10 2024-05-14 宝山钢铁股份有限公司 Steel plate for magnetic shielding and manufacturing method thereof
CN114250402A (en) * 2021-12-16 2022-03-29 大冶特殊钢有限公司 Manufacturing method of low-carbon nitrogen-containing austenitic stainless steel bar
EP4245880A4 (en) * 2021-12-16 2024-04-03 Daye Special Steel Co., Ltd. Manufacturing method for low-carbon nitrogen-containing austenitic stainless steel bar
CN115747662A (en) * 2022-11-30 2023-03-07 山西太钢不锈钢股份有限公司 Method for refining stainless steel for high-pressure common rail of engine

Also Published As

Publication number Publication date
CN103695809B (en) 2016-05-11

Similar Documents

Publication Publication Date Title
CN103695809B (en) Nuclear power station CRDM stroke sleeve pipe and preparation method thereof
CN103667991B (en) Nuclear power plants rod drive mechanism sealed shell and preparation method thereof
CN103789684A (en) Driving rod of driving mechanism of nuclear power station control rod and preparation method thereof
CN103695810B (en) Nuclear power station CRDM quill and preparation method thereof
CN104694832B (en) Martensitic stainless steel for nuclear reactor and preparation method of stainless steel
CN110484836B (en) Hafnium zirconium titanium molybdenum reinforced austenitic stainless steel and preparation method thereof
CN107747027A (en) High resistivity, high magnetic permeability 1Cr12Mo martensitic stain less steel rotating shaft process for manufacturing forging
CN101691641B (en) Smelting process for steel ingot of main pipe line of primary loop in AP1000 nuclear power technology
CN105483323A (en) Manufacturing method of 12Cr13 pipe blank for nuclear power plant reactor control rod drive mechanism
CN104178648A (en) Preparation method of nonmagnetic corrosion-resistant nickel-chromium-base bearing alloy
CN106480253A (en) A kind of supercritical turbine preparation method of valve forging and valve forging
CN110029290A (en) A kind of manufacturing method of ultralow temperature HIGH STRENGTH NON-MAGNETIC STAINLESS STEEL impeller shaft
CN102059271A (en) Manufacture method of seamless steel tube for (ultra-)supercritical boiler
Guo et al. Morphology tailoring of metal pool and eutectic carbides in magnetic-controlled electroslag remelted M2 high-speed steel
Yang et al. Formation of non-metallic inclusion and acicular ferrite in Ti–Zr deoxidized steel
Venkatraman et al. Manufacturing and critical applications of stainless steel–An Overview
CN103469051A (en) Duplex stainless steel master alloy and preparation method thereof
Tanaka Reactor pressure vessel (RPV) components: processing and properties
Li et al. Effect of magnesium on microstructure and properties of 440C stainless bearing steel melted under pressurized conditions
LIN et al. Effect of annealing on microstructure of thermally aged 308L stainless steel weld metal
CN102554570B (en) Manufacturing method for non-magnetic stainless steel adapter lug
CN103436763B (en) A kind of method adopting internal oxidation to prepare magnesium oxide particle dispersion strengthened iron powder
CN104532161B (en) Magnetic separator end cap and manufacturing method thereof
CN106756247B (en) A kind of Spent Radioactive liquid processing device making material and preparation method thereof
Levkov et al. Electroslag remelting as a promising direction for producing hollow and shaped objects of steel 10Kh9MFB-Sh

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant