CN103692684A CN201310704446.8A CN201310704446A CN103692684A CN 103692684 A CN103692684 A CN 103692684A CN 201310704446 A CN201310704446 A CN 201310704446A CN 103692684 A CN103692684 A CN 103692684A
Authority
CN
China
Prior art keywords
die
mould
translation
die clamp
unloading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310704446.8A
Other languages
Chinese (zh)
Other versions
CN103692684B (en
Inventor
付立华
王金业
李景生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
22MCC GROUP PRECISION FORGING Co Ltd
Original Assignee
22MCC GROUP PRECISION FORGING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 22MCC GROUP PRECISION FORGING Co Ltd filed Critical 22MCC GROUP PRECISION FORGING Co Ltd
Priority to CN201310704446.8A priority Critical patent/CN103692684B/en
Publication of CN103692684A publication Critical patent/CN103692684A/en
Application granted granted Critical
Publication of CN103692684B publication Critical patent/CN103692684B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mounting, Exchange, And Manufacturing Of Dies (AREA)

Abstract

The invention relates to a die replacing method used in large hydraulic device die forming production, in particular to a quick die replacing method. The quick die replacing method comprises the steps of manufacturing die clamps consisting of connecting plates and bearing plates; manufacturing translation tools consisting of transportation trolleys and frame structures; unloading a die, namely hoisting two die clamps to the front and rear sides of a die respectively and then connecting the die clamps to the die through bolts; respectively pushing two translation tools to the positions of the die clamps on the front and rear sides of the die and then locking the translation tools and the die clamps through upper and lower fasteners; pushing and pulling the translation tools and pulling down the die from a working table; finishing pre-assembly of the other die clamp, the translation tools and a new die to be replaced by using a die unloading method while die unloading, and quickly pushing the new die to be replaced onto the working table after unloading the first die. The problems of long traditional die replacement time and complicated steps are solved, and the quick die replacing method has the advantages that the method is simple and convenient, the time is saved, the dies are not easily damged, and continuous production is ensured.

Description

The method of quickly replacing mould
Technical field
The present invention relates to Large Hydraulic Equipment mould molding produce in the more method of mold exchange, specifically a kind of method of quickly replacing mould.
Background technology
In using formed in mould Large Hydraulic Equipment production, unanimously there are suitable distinct issues in the die change for mould, because of die quality larger, when die change, should be noted that and can not collide production equipment and mould simultaneously, cause equipment fault or mould to damage, so die change process time is longer, complex steps, has had a strong impact on the continuous production of Large Hydraulic Equipment.
Summary of the invention
The present invention is intended to solve the problem of length, complex steps of above-mentioned die change process time, and provide a kind of simple and convenient, reduce mould replacing time, the stability that can guarantee mould in die change process simultaneously, is difficult for mold damage, guarantees the method for quantity-produced quickly replacing mould.
The technical scheme that the present invention solves described problem employing is:
A method for quickly replacing mould, carry out in the steps below:
A. make die clamp, the main body of described die clamp is comprised of connecting plate and the bearing plate that is fixed on connecting plate outside, and on connecting plate, corresponding mould lifting has through hole with bolt hole position, and connecting plate bottom is fixed with buckle, die clamp is made four, and two is a set of;
B. make translation frock, the main body of described translation frock is comprised of travelling bogie and the frame structure frame being fixed on travelling bogie, in frame structure frame, be fixed with jack, frame structure frame side be fixed with die clamp described in step a on the locked lower buckle of upper buckle, four of translation frock makings, two is a set of;
C. mould unloading: (I) is lifted into both sides before and after mould with overhead traveling crane respectively by two die clamps, then die clamp is connected on mould with bolt by the through hole on die clamp connecting plate and the hole for hoist on mould; (II) shifts two translation frocks respectively onto the die clamp place of both sides, mould front and back, then the lower buckle in translation frock is buckled in the upper buckle on die clamp, use the bearing plate on the jack jacking die clamp in translation frock, by die clamp and mould while jack-up, until upper and lower buckle is locked; (III) push-and-pull translation frock, leaves behind mould from workbench;
D. new die changes the outfit: mould unloading simultaneously, is assembled completely by other two die clamps and other two translation frocks and new die to be changed by unloading modeling method in advance, after first set mould mould unloading, fast new die to be changed is shifted onto on workbench.
Adopt the present invention of technique scheme, compared with prior art, its outstanding feature is:
Can realize the quick die change work of on-the-spot mould.Simultaneously the method to mould and frock require low, can be in workshop direct processing and fabricating, do not need to carry out loaded down with trivial details improvement and complicated job step, can effectively reduce the workload of mould die change, effectively reduce mould replacing time, save production cost.In addition, the method highly versatile, applied widely, safe coefficient is high, suitable popularization.
Accompanying drawing explanation
Fig. 1 is mould structure schematic diagram in the embodiment of the present invention.
Fig. 2 is die clamp structural representation front view in the embodiment of the present invention.
Fig. 3 is die clamp structural representation side view in the embodiment of the present invention.
Fig. 4 is translation tool structure schematic diagram in the embodiment of the present invention.
Fig. 5 is embodiment of the present invention die change view front view.
Fig. 6 is embodiment of the present invention die change view side view.
In figure: mould 1, bolt hole 2 for lifting, connecting plate 3, bearing plate 4, through hole 5, upper buckle 6, travelling bogie 7, frame structure frame 8, jack 9, lower buckle 10, bolt 11, press column 12.
The specific embodiment
Below in conjunction with embodiment in detail the present invention is described in detail, object is only to understand better content of the present invention.Therefore, the cited case does not limit the scope of the invention.
The method of quickly replacing mould described in the present embodiment, carry out in the steps below:
(1) mould 1 shown in Fig. 1 is carried out to DATA REASONING.Mould 1, in when design, for the ease of lifting, is provided with bolt hole 2 for lifting in mould 1 both sides, need to measure this hole for hoist position and size, so that the manufacturing and designing of follow-up die clamp.
(2) after lifting is determined by bolt hole 2 positions and size, start to make die clamp.Referring to Fig. 2, Fig. 3, the main body of die clamp is comprised of connecting plate 3 and the bearing plate 4 being welded on connecting plate 3 outer panel faces, and the lifting on connecting plate 3 on corresponding mould 1 is offered corresponding through hole 5 with bolt hole 2 positions, and buckle 6 on fixing in connecting plate 3 bottoms.Die clamp is made four, and two is a set of, is respectively used to quick mould unloading and quick die change.
(3) make translation frock.Referring to Fig. 4, the main body of translation frock forms by travelling bogie 7 and with the frame structure frame 8 that travelling bogie 7 is welded as a whole, and the interior employing framework of frame structure frame 8 fixed form is jack 9 fixedly, to facilitate dismounting.Frame structure frame 8 sides are fixed with the upper buckle 6 on die clamp and coordinate locked lower buckle 10.Translation frock quantity is identical with die clamp quantity, makes equally four, and two is a set of being used in conjunction with.
(4) mould unloading (referring to Fig. 5, Fig. 6):
(I) aborning, the lifting of mould 1 is positioned at both sides, overall press front and back with bolt hole 2 positions.Therefore, the first step, is first lifted into respectively the both sides, front and back of mould 1 by two die clamps with overhead traveling crane, then, by the through hole 5 on the connecting plate 3 of die clamp and the bolt hole 2 for lifting on mould 1, with bolt 11, die clamp is connected on mould 1;
(II) second step, shifts two translation frocks respectively onto the die clamp place of mould 1 both sides, front and back, then the lower buckle 10 in translation frock is buckled in the upper buckle 6 on die clamp.Because upper buckle 6 gaps are greater than lower buckle 10, so now translation frock and die clamp integral body are in released state.So use the bearing plate 4 on the jack 9 jacking die clamps in translation frock, by die clamp and 1 while of mould jack-up, until upper and lower buckle is locked.
(III) the 3rd step, is used jack or additive method push-and-pull translation frock, utilizes travelling bogie 7 to take turns right rolling, and mould 1 is left behind from workbench.
(5) new die that changes the outfit: in mould unloading, other two die clamps and other two translation frocks and new die to be changed are assembled completely by unloading modeling method in advance, after first set mould mould unloading, fast new die to be changed is shifted onto on workbench.

Claims (1)

1. a method for quickly replacing mould, is characterized in that, carries out in the steps below:
A. make die clamp, the main body of described die clamp is comprised of connecting plate and the bearing plate that is fixed on connecting plate outside, and on connecting plate, corresponding mould lifting has through hole with bolt hole position, and connecting plate bottom is fixed with buckle, die clamp is made four, and two is a set of;
B. make translation frock, the main body of described translation frock is comprised of travelling bogie and the frame structure frame being fixed on travelling bogie, in frame structure frame, be fixed with jack, frame structure frame side be fixed with die clamp described in step a on the locked lower buckle of upper buckle, four of translation frock makings, two is a set of;
C. mould unloading: (I) is lifted into both sides before and after mould with overhead traveling crane respectively by two die clamps, then die clamp is connected on mould with bolt by the through hole on die clamp connecting plate and the hole for hoist on mould; (II) shifts two translation frocks respectively onto the die clamp place of both sides, mould front and back, then the lower buckle in translation frock is buckled in the upper buckle on die clamp, use the bearing plate on the jack jacking die clamp in translation frock, by die clamp and mould while jack-up, until upper and lower buckle is locked; (III) push-and-pull translation frock, leaves behind mould from workbench;
D. new die changes the outfit: mould unloading simultaneously, is assembled completely by other two die clamps and other two translation frocks and new die to be changed by unloading modeling method in advance, after first set mould mould unloading, fast new die to be changed is shifted onto on workbench.
CN201310704446.8A 2013-12-20 2013-12-20 The method of quickly replacing mould Active CN103692684B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310704446.8A CN103692684B (en) 2013-12-20 2013-12-20 The method of quickly replacing mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310704446.8A CN103692684B (en) 2013-12-20 2013-12-20 The method of quickly replacing mould

Publications (2)

Publication Number Publication Date
CN103692684A true CN103692684A (en) 2014-04-02
CN103692684B CN103692684B (en) 2015-11-04

Family

ID=50354429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310704446.8A Active CN103692684B (en) 2013-12-20 2013-12-20 The method of quickly replacing mould

Country Status (1)

Country Link
CN (1) CN103692684B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105170961A (en) * 2015-09-28 2015-12-23 无锡蠡湖增压技术股份有限公司 Rapid metal die switcher for gravity casting machine
CN107214824A (en) * 2017-07-23 2017-09-29 长沙远大住宅工业集团股份有限公司 A kind of prefabricated components flat-die quick die change device
CN107598056A (en) * 2017-10-20 2018-01-19 二十二冶集团精密锻造有限公司 Hydropress mold changing car longitudinal direction micromatic setting

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4160372A (en) * 1977-11-28 1979-07-10 The Minster Machine Company Transfer press having quick change die sets
JPS5897437A (en) * 1981-12-08 1983-06-09 Komatsu Ltd Die exchanging device for press
US5582062A (en) * 1995-04-28 1996-12-10 Midwest Brake Bond Company Die changing system including moving bolsters
JP2000246373A (en) * 1999-02-26 2000-09-12 Kurimoto Ltd Die exchanger
CN1970283A (en) * 2005-11-21 2007-05-30 天津市天锻压力机有限公司 Double-work position automatic die-changing system for hydraulic press
CN201342454Y (en) * 2008-12-14 2009-11-11 天水锻压机床有限公司 Quick changer of die
CN202623073U (en) * 2012-04-17 2012-12-26 无锡飞石控制系统有限公司 Quick die-changing bogie

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4160372A (en) * 1977-11-28 1979-07-10 The Minster Machine Company Transfer press having quick change die sets
JPS5897437A (en) * 1981-12-08 1983-06-09 Komatsu Ltd Die exchanging device for press
US5582062A (en) * 1995-04-28 1996-12-10 Midwest Brake Bond Company Die changing system including moving bolsters
JP2000246373A (en) * 1999-02-26 2000-09-12 Kurimoto Ltd Die exchanger
CN1970283A (en) * 2005-11-21 2007-05-30 天津市天锻压力机有限公司 Double-work position automatic die-changing system for hydraulic press
CN201342454Y (en) * 2008-12-14 2009-11-11 天水锻压机床有限公司 Quick changer of die
CN202623073U (en) * 2012-04-17 2012-12-26 无锡飞石控制系统有限公司 Quick die-changing bogie

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105170961A (en) * 2015-09-28 2015-12-23 无锡蠡湖增压技术股份有限公司 Rapid metal die switcher for gravity casting machine
CN105170961B (en) * 2015-09-28 2018-01-12 无锡蠡湖增压技术股份有限公司 A kind of gravity force casting machine is switched fast device with metal pattern
CN107214824A (en) * 2017-07-23 2017-09-29 长沙远大住宅工业集团股份有限公司 A kind of prefabricated components flat-die quick die change device
CN107598056A (en) * 2017-10-20 2018-01-19 二十二冶集团精密锻造有限公司 Hydropress mold changing car longitudinal direction micromatic setting
CN107598056B (en) * 2017-10-20 2024-04-02 中冶重工(唐山)有限公司 Longitudinal fine adjustment device of hydraulic press die changing trolley

Also Published As

Publication number Publication date
CN103692684B (en) 2015-11-04

Similar Documents

Publication Publication Date Title
CN201143722Y (en) Hydraulic integral assembling-disassembling type box beam steel external mold
CN103692684A (en) Quick die replacing method
CN201881095U (en) Framework assembling base of frame structure
CN204769884U (en) Retooling frock of roll shape mould
CN204799762U (en) Special quick retooling mechanism
CN105436384B (en) One kind mold changing car
CN205221467U (en) Crane end beam puts frame
CN204912671U (en) Lathe foundry goods model device
CN204657366U (en) A kind of shaped device for forging annulus
CN203283276U (en) Refractory brick die installation transfer car
CN202498159U (en) Thick-walled rectangular tube expanding and position limiting device
CN203556816U (en) Mold closing device for iron-mold sand-coated casting
CN208542870U (en) Small-size multi-function hydraulic holds bender
CN204583930U (en) A kind of U-shaped beam forming machine with piston flange seat and die strip liner plate
CN203889919U (en) Hoist trolley frame device with joint box
CN203889914U (en) Hoist trolley frame device with composite end beams
CN204728709U (en) wall construction system
CN204503859U (en) A kind of U-shaped beam forming machine with rack-and-pinion blank centering device
CN204609286U (en) A kind of aluminium wood is in conjunction with template
CN205275117U (en) Pressure steel pipe's rack of unloading
CN204602919U (en) A kind of U-shaped beam forming machine with electronic centralising device and mould fitted lining plate
CN204383278U (en) Be arranged on the turnover plate type service platform on Phase of Electric Power Projects wrecking car
CN203580201U (en) Novel multifunctional hydraulic press machine
CN203843815U (en) Movable working table for unit plate machining
CN216359967U (en) Transfer trolley for die machining

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant