CN103692684B - The method of quickly replacing mould - Google Patents

The method of quickly replacing mould Download PDF

Info

Publication number
CN103692684B
CN103692684B CN201310704446.8A CN201310704446A CN103692684B CN 103692684 B CN103692684 B CN 103692684B CN 201310704446 A CN201310704446 A CN 201310704446A CN 103692684 B CN103692684 B CN 103692684B
Authority
CN
China
Prior art keywords
mould
die
die clamp
pieces
unloading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310704446.8A
Other languages
Chinese (zh)
Other versions
CN103692684A (en
Inventor
付立华
王金业
李景生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
22MCC GROUP PRECISION FORGING Co Ltd
Original Assignee
22MCC GROUP PRECISION FORGING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 22MCC GROUP PRECISION FORGING Co Ltd filed Critical 22MCC GROUP PRECISION FORGING Co Ltd
Priority to CN201310704446.8A priority Critical patent/CN103692684B/en
Publication of CN103692684A publication Critical patent/CN103692684A/en
Application granted granted Critical
Publication of CN103692684B publication Critical patent/CN103692684B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Mounting, Exchange, And Manufacturing Of Dies (AREA)

Abstract

The present invention relates to the method for more mold exchange in the production of Large Hydraulic Equipment mould molding, a kind of specifically method of quickly replacing mould.Step is: make the die clamp be made up of connecting plate and bearing plate; Make the translation frock be made up of travelling bogie and frame structure frame; Mould unloading: two pieces die clamp is lifted into both sides before and after mould respectively, is then connected on mould with bolt by die clamp; Two pieces translation frock is shifted respectively onto the die clamp place of both sides before and after mould, then translation frock and die clamp are passed through upper and lower buckle locked; Push-and-pull translation frock, leaves behind mould from workbench; Other one set of die fixture, translation frock and new die to be changed simultaneously, being assembled complete by unloading modeling method, after first set mould mould unloading, being shifted onto on workbench by new die to be changed fast by mould unloading in advance.The invention solves that traditional die change process time is longer, complex steps problem, have simple and convenient, save time, not easily mold damage, ensure quantity-produced advantage.

Description

The method of quickly replacing mould
Technical field
The present invention relates to the method for more mold exchange in the production of Large Hydraulic Equipment mould molding, a kind of specifically method of quickly replacing mould.
Background technology
In the formed in mould Large Hydraulic Equipment of use is produced, unanimously there are suitable distinct issues in the die change for mould, because die quality is larger, should be noted that when die change simultaneously and can not collide production equipment and mould, cause equipment fault or burn failure, so die change process time is longer, complex steps, has had a strong impact on the continuous seepage of Large Hydraulic Equipment.
Summary of the invention
The present invention is intended to solve that above-mentioned die change process time is longer, the problem of complex steps, and a kind of simple and convenient, minimizing mould replacing time is provided, the stability of mould in die change process can be ensured, not easily mold damage simultaneously, ensure the method for quantity-produced quickly replacing mould.
The technical scheme that the present invention solves the employing of described problem is:
A method for quickly replacing mould, carry out in the steps below:
A. die clamp is made, the main body of described die clamp is made up of connecting plate and the bearing plate be fixed on outside connecting plate, and on connecting plate, corresponding mould lifting bolt hole position has through hole, and connecting plate bottom is fixed with buckle, die clamp makes four, and two pieces is a set of;
B. translation frock is made, the main body of described translation frock is made up of travelling bogie and the frame structure frame be fixed on travelling bogie, frame structure frame internal fixtion has jack, frame structure frame side is fixed with the lower buckle locked with the upper buckle on die clamp described in step a, translation frock making four, two pieces is a set of;
C. mould unloading: two pieces die clamp is lifted into both sides before and after mould with overhead traveling crane by (I) respectively, is then connected on mould by the through hole on die clamp connecting plate and the hole for hoist bolt on mould by die clamp; (II) shifts two pieces translation frock the die clamp place of both sides before and after mould onto respectively, then the lower buckle in translation frock is buckled in the upper buckle on die clamp, use the bearing plate on the jack jacking die clamp in translation frock, by die clamp and mould jack-up simultaneously, until upper and lower buckle is locked; (III) push-and-pull translation frock, leaves behind mould from workbench;
D. change the outfit new die: other two pieces die clamp and other two pieces translation frock and new die to be changed simultaneously, being assembled complete by unloading modeling method, after first set mould mould unloading, being shifted onto on workbench by new die to be changed fast by mould unloading in advance.
Adopt the present invention of technique scheme, compared with prior art, its outstanding feature is:
The quick die change work of on-the-spot mould can be realized.The simultaneously requirement of the method to mould and frock is low, can in workshop direct processing and fabricating, do not need the job step of carrying out loaded down with trivial details improvement and complexity, effectively can reduce the workload of mould die change, effectively reduce mould replacing time, save production cost.In addition, the method highly versatile, applied widely, safe coefficient is high, suitable popularization.
Accompanying drawing explanation
Fig. 1 is mould structure schematic diagram in the embodiment of the present invention.
Fig. 2 is die clamp structural representation front view in the embodiment of the present invention.
Fig. 3 is die clamp structural representation side view in the embodiment of the present invention.
Fig. 4 is translation tool structure schematic diagram in the embodiment of the present invention.
Fig. 5 is embodiment of the present invention die change view front view.
Fig. 6 is embodiment of the present invention die change view side view.
In figure: mould 1, lifting bolt hole 2, connecting plate 3, bearing plate 4, through hole 5, upper buckle 6, travelling bogie 7, frame structure frame 8, jack 9, lower buckle 10, bolt 11, press column 12.
Detailed description of the invention
Below in conjunction with embodiment in detail the present invention is described in detail, object is only to understand content of the present invention better.Therefore, the cited case does not limit the scope of the invention.
The method of quickly replacing mould described in the present embodiment, carry out in the steps below:
(1) DATA REASONING is carried out to the mould 1 shown in Fig. 1.Mould 1, when designing, for the ease of lifting, is provided with lifting bolt hole 2 in mould 1 both sides, needs to measure this hole for hoist position and size, so that the manufacturing and designing of follow-up die clamp.
(2), after lifting bolt hole 2 position and size are determined, start to make die clamp.See Fig. 2, Fig. 3, the main body of die clamp is made up of connecting plate 3 and the bearing plate 4 be welded on connecting plate 3 outer panel face, and corresponding through hole 5 is offered in lifting bolt hole 2 position on connecting plate 3 on corresponding mould 1, and on connecting plate 3 bottom is fixing buckle 6.Die clamp makes four, and two pieces is a set of, is respectively used to quick mould unloading and quick die change.
(3) translation frock is made.See Fig. 4, the main body of translation frock forms by travelling bogie 7 and with the frame structure frame 8 that travelling bogie 7 is welded as a whole, and adopts framework fixed form to fix jack 9, to facilitate dismounting in frame structure frame 8.Frame structure frame 8 side is fixed with and coordinates locked lower buckle 10 with the upper buckle 6 on die clamp.Translation frock quantity is identical with die clamp quantity, same makes four, two pieces be a set of with the use of.
(4) mould unloading (see Fig. 5, Fig. 6):
(I) aborning, lifting bolt hole 2 position of mould 1 is positioned at both sides before and after overall press.Therefore, the first step, is first lifted into the both sides, front and back of mould 1 respectively with overhead traveling crane by two pieces die clamp, then by the through hole 5 on the connecting plate 3 of die clamp and the lifting bolt hole 2 on mould 1, is connected on mould 1 with bolt 11 by die clamp;
(II) second step, shifts the die clamp place of both sides before and after mould 1 respectively onto by two pieces translation frock, then buckled into by the lower buckle 10 in translation frock in the upper buckle 6 on die clamp.Because upper buckle 6 gap is greater than lower buckle 10, so now translation frock and die clamp entirety are in released state.So the bearing plate 4 on the jack 9 jacking die clamp in translation frock will be used, by die clamp and mould 1 jack-up simultaneously, until upper and lower buckle is locked.
(III) the 3rd step, uses jack or additive method push-and-pull translation frock, utilizes travelling bogie 7 to take turns right rolling, left behind by mould 1 from workbench.
(5) change the outfit new die: while mould unloading, assembling complete in advance, after first set mould mould unloading, being shifted onto other two pieces die clamp and other two pieces translation frock and new die to be changed on workbench by new die to be changed fast by unloading modeling method.

Claims (1)

1. a method for quickly replacing mould, is characterized in that, carries out in the steps below:
A. die clamp is made, the main body of described die clamp is made up of connecting plate and the bearing plate be fixed on outside connecting plate, and on connecting plate, corresponding mould lifting bolt hole position has through hole, and connecting plate bottom is fixed with buckle, die clamp makes four, and two pieces is a set of;
B. translation frock is made, the main body of described translation frock is made up of travelling bogie and the frame structure frame be fixed on travelling bogie, frame structure frame internal fixtion has jack, frame structure frame side is fixed with the lower buckle locked with the upper buckle on die clamp described in step a, translation frock making four, two pieces is a set of;
C. mould unloading: two pieces die clamp is lifted into both sides before and after mould with overhead traveling crane by (I) respectively, then by the through hole on die clamp connecting plate and the lifting bolt hole on mould, is connected on mould with bolt by die clamp; (II) shifts two pieces translation frock the die clamp place of both sides before and after mould onto respectively, then the lower buckle in translation frock is buckled in the upper buckle on die clamp, use the bearing plate on the jack jacking die clamp in translation frock, by die clamp and mould jack-up simultaneously, until upper and lower buckle is locked; (III) push-and-pull translation frock, leaves behind mould from workbench;
D. change the outfit new die: other two pieces die clamp and other two pieces translation frock and new die to be changed simultaneously, being assembled complete by unloading modeling method, after first set mould mould unloading, being shifted onto on workbench by new die to be changed fast by mould unloading in advance.
CN201310704446.8A 2013-12-20 2013-12-20 The method of quickly replacing mould Active CN103692684B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310704446.8A CN103692684B (en) 2013-12-20 2013-12-20 The method of quickly replacing mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310704446.8A CN103692684B (en) 2013-12-20 2013-12-20 The method of quickly replacing mould

Publications (2)

Publication Number Publication Date
CN103692684A CN103692684A (en) 2014-04-02
CN103692684B true CN103692684B (en) 2015-11-04

Family

ID=50354429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310704446.8A Active CN103692684B (en) 2013-12-20 2013-12-20 The method of quickly replacing mould

Country Status (1)

Country Link
CN (1) CN103692684B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105170961B (en) * 2015-09-28 2018-01-12 无锡蠡湖增压技术股份有限公司 A kind of gravity force casting machine is switched fast device with metal pattern
CN107214824A (en) * 2017-07-23 2017-09-29 长沙远大住宅工业集团股份有限公司 A kind of prefabricated components flat-die quick die change device
CN107598056B (en) * 2017-10-20 2024-04-02 中冶重工(唐山)有限公司 Longitudinal fine adjustment device of hydraulic press die changing trolley

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4160372A (en) * 1977-11-28 1979-07-10 The Minster Machine Company Transfer press having quick change die sets
US5582062A (en) * 1995-04-28 1996-12-10 Midwest Brake Bond Company Die changing system including moving bolsters
CN1970283A (en) * 2005-11-21 2007-05-30 天津市天锻压力机有限公司 Double-work position automatic die-changing system for hydraulic press
CN201342454Y (en) * 2008-12-14 2009-11-11 天水锻压机床有限公司 Quick changer of die
CN202623073U (en) * 2012-04-17 2012-12-26 无锡飞石控制系统有限公司 Quick die-changing bogie

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5897437A (en) * 1981-12-08 1983-06-09 Komatsu Ltd Die exchanging device for press
JP3540188B2 (en) * 1999-02-26 2004-07-07 株式会社栗本鐵工所 Mold changing device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4160372A (en) * 1977-11-28 1979-07-10 The Minster Machine Company Transfer press having quick change die sets
US5582062A (en) * 1995-04-28 1996-12-10 Midwest Brake Bond Company Die changing system including moving bolsters
CN1970283A (en) * 2005-11-21 2007-05-30 天津市天锻压力机有限公司 Double-work position automatic die-changing system for hydraulic press
CN201342454Y (en) * 2008-12-14 2009-11-11 天水锻压机床有限公司 Quick changer of die
CN202623073U (en) * 2012-04-17 2012-12-26 无锡飞石控制系统有限公司 Quick die-changing bogie

Also Published As

Publication number Publication date
CN103692684A (en) 2014-04-02

Similar Documents

Publication Publication Date Title
CN103692684B (en) The method of quickly replacing mould
CN201881095U (en) Framework assembling base of frame structure
CN204769884U (en) Retooling frock of roll shape mould
CN103193153B (en) Barrel transformation preventing vertical lifting device
CN105798515A (en) Flexible lap welding mold for oil tank bodies for forklift truck
CN204171159U (en) A kind of high temperature alloy shaped as frame ring forming frock
CN103658321B (en) A kind of wheel spoke processing technology
CN204370502U (en) A kind of counter weight of excavator sand core rod
CN204912671U (en) Lathe foundry goods model device
CN202447841U (en) Tool for fixing winch connecting plates for marine crane
CN201645556U (en) Die bracket
CN204639485U (en) A kind of adjustable universal type welding tooling
CN203854297U (en) Workbench for activation machine
CN206465236U (en) A kind of internal model opening-closing locking device
CN203751161U (en) Die assembling and disassembling device of large die
CN204182859U (en) Wax pattern assemblies limb
CN203889919U (en) Hoist trolley frame device with joint box
CN203438384U (en) Vertical demolding overhang roller die with one open side
CN203171367U (en) Fixing frame for X-axis slide block of flat-stone mill
CN203527778U (en) Die for dash panel of automobile
CN204524818U (en) A kind of locking device of fixing milling machine ram
CN204077731U (en) There is the station tote cart of dismountable pallet supporting construction
CN207643788U (en) A kind of abnormity arc plate making mold
CN204052693U (en) A kind of couple yoke brake forming settles device stripper apparatus at one go
CN206898365U (en) A kind of movable half gear casting pressure case platen

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant