CN107214824A - A kind of prefabricated components flat-die quick die change device - Google Patents

A kind of prefabricated components flat-die quick die change device Download PDF

Info

Publication number
CN107214824A
CN107214824A CN201710603457.5A CN201710603457A CN107214824A CN 107214824 A CN107214824 A CN 107214824A CN 201710603457 A CN201710603457 A CN 201710603457A CN 107214824 A CN107214824 A CN 107214824A
Authority
CN
China
Prior art keywords
rib
pressing plate
die
prefabricated components
change device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710603457.5A
Other languages
Chinese (zh)
Inventor
张剑
王雅明
徐雷
朱彦哲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha Broad Homes Industrial Group Co Ltd
Original Assignee
Changsha Broad Homes Industrial Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Broad Homes Industrial Group Co Ltd filed Critical Changsha Broad Homes Industrial Group Co Ltd
Priority to CN201710603457.5A priority Critical patent/CN107214824A/en
Publication of CN107214824A publication Critical patent/CN107214824A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/26Assemblies of separate moulds, i.e. of moulds or moulding space units, each forming a complete mould or moulding space unit independently from each other
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • B28B7/0014Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps
    • B28B7/002Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps using magnets

Abstract

A kind of prefabricated components flat-die quick die change device, including a benchmark rib being fixedly arranged on magnetic chassis face, several positioning ribs being flexibly connected with magnetic chassis face and holding down assembly for stationary positioned rib, benchmark rib encloses to form flat-die structure with positioning rib, hold down assembly including pressing plate and magnetic holder, one side pressure of pressing plate is on positioning rib, and the other end is fixed by magnetic holder.The prefabricated components flat-die quick die change device that the present invention is provided can not only greatly shorten mould replacing time, versatility is stronger, beneficial to reduction production cost, improve production efficiency, and the fixation reliability of rib is higher, it is less prone to offset phenomena, service life is also longer, after being used for multiple times, and the decay of its fixed performance is less.

Description

A kind of prefabricated components flat-die quick die change device
Technical field
The present invention relates to a kind of building material production facility, particularly a kind of prefabricated components flat-die quick die change device.
Background technology
Now widely used precast concrete, including floor, wallboard etc., when precast concrete production scale is smaller When, generally will not design specialized mould, in manufacturing process, it is general using the rib with certain altitude will on all around, then Rib is fixed by various off-gauge simple fixtures, and poured.For precast concrete production scale compared with When big, manufacturer can specially design and develop particular manufacturing craft, but the usual specification of such a mould is relatively simple, can only a kind of mould A kind of precast concrete of correspondence production., be present time and effort consuming in either interim modeling, or design specialized mould, produce Cost is higher and the problems such as relatively low versatility, and after the completion of once-cast, the process for clearing up table top is also cumbersome.
CN204525721U discloses a kind of fixture and prefabricated-member mould for side mould, including fixed plate, chuck body And magnetic holder, fixed plate is used to be removably secured and be connected with side mould, and chuck body is detachable by fixture and the fixed plate Ground is fixedly connected, and magnetic holder, which is removably secured, to be arranged in chuck body, though the utility model can be advised according to the difference of prefabricated component Lattice size, adjusts the position of chuck body, is secured to the diverse location of side mould, so that different size of mould is formed, can It is a set of without being equipped with for each precast concrete to realize that one set of die produces a variety of different size of precast concretes Mould, with time saving and energy saving, the low advantage of production cost, but the fixation of the utility model side mould is all compared numerous with form removal process Trivial, positioning is also inconvenient, can extend installation time, and because the fixation of side mould has used more bolt arrangement, repeatedly make With rear, it is easy to occur loosening phenomenon, the fixed effect of side mould is had a greatly reduced quality, cause the service life of the utility model to drop It is low.
The content of the invention
The purpose of the present invention is to overcome the above-mentioned not enough of prior art and provide a kind of prefabricated components flat-die with quick mold changing Device, it can not only greatly shorten mould replacing time, and versatility is stronger, beneficial to reduction production cost, improve production efficiency, and The fixation reliability of rib is higher, is less prone to offset phenomena, and service life is also longer, after being used for multiple times, and its fixed performance declines Subtract less.
The technical scheme is that:A kind of prefabricated components flat-die quick die change device, including one be fixedly arranged on magnetic Benchmark rib, several positioning ribs being flexibly connected with magnetic chassis face on chassis face and the pressure for stationary positioned rib Tight component, benchmark rib encloses to form flat-die structure with positioning rib, holds down assembly including pressing plate and magnetic holder, a side pressure of pressing plate On positioning rib, the other end is fixed by magnetic holder.
Further technical scheme is the present invention:The fixed form of benchmark rib is welding, welded and bolted group Close, be bonded and one kind in bolted combination.
Further, magnetic holder is flexibly connected with pressing plate, or magnetic holder is welded with pressing plate.
Further, pressing plate, which is provided with, is used to press the seal face located at positioning rib upper surface.
Further, pressing plate, which is provided with, is used to press the hold-down mechanism located at positioning rib.
Further, pressing plate is in Z-shaped configuration, and the bending place of pressing plate is in 90 degree, and the top of pressing plate is formed with to be set for pressure The location division coordinated with the side of positioning rib is formed with the middle part of the seal face of positioning rib, pressing plate, the bottom of pressing plate is set There is horizontal U-type groove body, the side of magnetic holder is installed in cell body by bolt assembly.
Further, pressing plate is used in combination including the first supporting part, the second supporting part and the first supporting part of connection with the second supporting part In the location division with the cooperation of the side of template, hold-down mechanism is installed on the first supporting part, and hold-down mechanism includes press rods, press rods Top is provided with action bars, and action bars is passed through from the top of press rods and is fixedly connected with press rods, and the middle part of press rods is screw rod Screwed hole is offered on structure, the first supporting part, press rods are passed through from screwed hole, the press rods above the first supporting part Locking nut is provided with, the pressure boom end below the first supporting part is provided with taper positioning disk.
Further, on the first supporting part of each pressing plate hold-down mechanism quantity for one, two or more, compress Mechanism is set up in parallel along the length direction of template.
Further, benchmark rib in the flat-die structure of positioning rib formation with being provided with opening mould plate.
Further, the supporting structure quantity of each positioning rib top board and magnetic holder composition is no less than two.
The present invention has following features compared with prior art:
(1)The present invention, can be according to the sizes of prefabricated components in the benchmark rib of chassis upper surface side edge, and selection is closed The benchmark rib of suitable length, the planar structure of all round closure is constituted together with other positioning ribs, that is, forms flat-die structure, can Reduce when needing mold changing every time to the finding accurately of benchmark rib, the process such as fix, can effectively save mould replacing time, moreover it is possible to ensure every time The accuracy of mold changing is higher, the material used when also can save each mold changing, is additionally favorable for increasing economic efficiency to a certain extent;
(2)Present invention employs a benchmark rib and several positioning rib, pass through fast quick-detach, installation, replacing, combination Detachable rib, can both realize quick mold changing, the versatility of flat-die can be improved again, can be closed according to the sizes of prefabricated components, selection Positioning rib is overlapped combination and used cooperatively with benchmark rib by the positioning rib of suitable size, realizes benchmark rib with positioning The fast tunable of the area for the closure plane that rib is surrounded, versatility is stronger, greatlys save mould replacing time, is produced into beneficial to saving This, beneficial to raising production efficiency;
(3)Carry out stationary positioned rib present invention employs pressing plate and magnetic holder, it is not necessary to open up the measures such as more screwed hole, both may be used The fixation of positioning rib, quick fixed and fast quick-detach are realized, any adverse effect will not be caused to trolley surface again, clearly Reason gets up also very convenient, can be achieved after repeatedly mold changing, the attribute such as planarization, cleanliness factor on chassis is constant, beneficial to guarantee institute The quality for obtaining prefabricated components is preferable;
(4)The structure of pressing plate of the present invention also very simple, materials are relatively saved, and material, to make processing cost relatively low, material therefor Intensity is also higher, beneficial to the cost of the whole mould changing device of reduction, and uses pressing plate stationary positioned rib, positions the fixation of rib Reliability is higher, is less prone to offset phenomena, and service life is also longer, after being used for multiple times, and the decay of its fixed performance is less, is beneficial to The batch production of prefabricated components, and can ensure that the qualification rate of prefabricated components is higher.
The detailed construction of the present invention is further described below in conjunction with the drawings and specific embodiments.
Brief description of the drawings
Fig. 1 is the structural representation of the embodiment of the present invention 1;
Fig. 2 is the combining structure schematic diagram of the center platen of the embodiment of the present invention 1 and magnetic holder;
Fig. 3 is the structural representation of the embodiment of the present invention 2;
The combining structure schematic diagram of the center platen of Fig. 4 embodiment of the present invention 2 and magnetic holder;
The combining structure schematic diagram of the center platen of Fig. 5 embodiment of the present invention 3 and magnetic holder;
Fig. 6 is the structural representation of the embodiment of the present invention 4.
Embodiment
Embodiment 1:
As shown in accompanying drawing 1, accompanying drawing 2:A kind of prefabricated components flat-die quick die change device, including one on magnetic chassis 1 Individual benchmark rib 2 and three positioning ribs 3, benchmark rib 2 and three positioning ribs 3 constitute a closed plane, as needed Prefabricated components length and width higher size, selection appropriate length, height positioning rib 3 with interception appropriate length benchmark keep off Side 2 is combined into closed plane, and the height of benchmark rib 2 and length typically can all have reserved, so be easy to the general of benchmark rib 2 Property, concrete cast is carried out in closed plane herein, you can obtain satisfactory prefabricated components;In actual mechanical process, One layer of water bar can be set up between positioning rib 3 and chassis 1, to increase the sealing between positioning rib 3 and chassis 1, Prevent the phenomenons such as sepage between positioning rib 3 and chassis 1 and pollute chassis 1 and influence the quality of prefabricated components, it is prefabricated Component can be floor, wallboard etc..
Benchmark rib 2 is arranged on the upper surface side edge of chassis 1 to weld with bolted combination, first in base Be uniformly arranged screwed hole on quasi- rib 2, and according to benchmark rib upper screwed hole size and spacing in the upper surface side of chassis 1 Benchmark baffle plate 2, is fixed on chassis 1, then using at two by the corresponding screwed hole of setting of edge using bolt 6 Junction reuse bead-welding technology and welded, reinforce benchmark rib 2 again using welding manner, can both be further ensured that The reliability of benchmark rib 2 is higher, moreover it is possible to which the contact surface for ensureing benchmark rib 2 and chassis 1 is not in the spillage imagination;By benchmark Rib 2 is fixed on the edge of the upper surface of chassis 1, beneficial to the extension of flat-die, is easy to improve the versatility of benchmark rib 2, can expire The making requirement of the prefabricated components of sufficient large-size, the lateral surface of benchmark rib 2 is provided with scale(Not shown in figure), it is easy to quick The benchmark rib 2 of certain length is intercepted, the tie point being quickly found out between positioning rib 3 and benchmark rib 2 is also allowed for, beneficial to section Save the production time.
Positioning rib 3 is fixed by pressing plate 4, and pressing plate 4 is fixed on chassis 1 by magnetic holder 5, and magnetic holder 5 is existing There is conventional magnetic holder structure;Pressing plate 4, which is provided with, to be used to press the seal face located at positioning rib 3 upper surface, pressing plate 4 and positioning rib 3 directly connect by the way of face pressure is tight, pressing plate 4 and positioning rib 3 between countless compression points in the same plane, The center of gravity of fixing point and positioning rib 3 between pressing plate 4 and magnetic holder 5 constitutes the fixed pivot being not arranged on the same straight line at three, It can ensure that the positional stability for positioning rib 3 is higher.Pressing plate 4 is in Z-shaped configuration, and the bending place of pressing plate 4 is in 90 degree, pressing plate 4 Top be formed with for pressing the seal face located at positioning rib, the middle part of pressing plate 4 is formed with to be coordinated with the side of positioning rib 3 Location division, the bottom of pressing plate 4 is provided with horizontal U-type groove body 4-1, and the side of magnetic holder 5 is installed in cell body 4- by bolt assembly 6 In 1, this kind of connected mode can conveniently change the pressing plate 4 of different height according to demand, facilitate the recycling of magnetic holder 5.
The supporting structure quantity that each the positioning top board 4 of rib 3 and magnetic holder 5 are constituted is no less than two, according to 2 points of compositions The principle of straight line, using the supporting structure of the pressing plate 4 no less than two and magnetic holder 5, is presented horizontal flat perpendicular beneficial to positioning rib 3 Straight state, it is higher beneficial to the stress balance of positioning rib 3 when ensureing prefabricated components cast, can be according to the length of prefabricated components Come reasonable selection pressing plate 4 and the number of the supporting structure of magnetic holder 5, the distance between general two neighboring pressing plate 4 is not more than 1m.
Pressing plate 4 is that stainless steel plate is made through bending or welding processing, because the intensity of steel plate is higher, therefore pressing plate 4 Deformation quantity it is smaller and easy to process,, can be by certain thickness for the pressing plate 4 in the present embodiment with higher firm effect Pressing plate intercept one section of long list structure, be then bent into Z-shaped configuration using instrument, it is ensured that two bending places into an angle of 90 degrees, Then one block of steel plate is welded above Z-shaped configuration bottom edge structure again, you can form U-type groove body 4-1, will using bolt assembly 6 One end of magnetic holder 5 is fixed in U-type groove body 4-1.
The present embodiment is in use, first linked together the pressing plate 4 of proper height and magnetic holder 5 using bolt assembly 6, then select The length for the benchmark rib 2 that fixed two positioning ribs 3 are used with the junction of benchmark rib 2 and selection, uses suitable dimension Three positioning ribs 3 surround a quadrangle closure plane structure with benchmark rib 2, are close to positioning rib 3 using pressing plate 4 and press Tightening position rib 3, the middle part sliding button bar 7 of magnetic holder 5 is tapped using rubber hammer, makes the magnet assembly in magnetic holder 5 and box body top Separation, and adsorb on chassis 1, fixation clip 4, and then the purpose of stationary positioned rib 3 are reached, is finally carried out concrete prefabricated The cast of component both can, after casting complete, make desorption between magnetic holder 5 and chassis 1, can will positioning rib 3 quickly enter with chassis 1 Row separation, the cleaning on the surface of chassis 1 is very convenient, further according to the prefabricated components for needing to carry out next similar and different size Preparation section, realizes the effect quickly changed the mold, when preparing various sizes of prefabricated components, it is only necessary to change the pressure of different height Plate 4 and various sizes of positioning rib 3, very save the preparation time of prefabricated components, for different length or width Prefabricated components, it is only necessary to which reasonable selection positions the tie point of rib 3, you can quickly produce various sizes of plane prefabricated structure Part, also achieves the versatility of flat-die, realizes the ability of " flexible production ", saves production cost, shortens the production cycle, carry The high mobility of chassis, beneficial to increasing economic efficiency.
Embodiment 2:
As shown in accompanying drawing 3, accompanying drawing 4:A kind of prefabricated components flat-die quick die change device, including one on magnetic chassis 1 Individual benchmark rib 2 and six positioning ribs 3, benchmark rib 2 and positioning rib 3 can constitute two closed planes, and two planes are total to With the length of a benchmark rib 2, as needed the benchmark rib 2 needed for interception, while being carried out into two planes surrounded Concrete is poured into a mould, and prepared by prefabricated components that can be simultaneously identical or different to two, benchmark rib 2 is pacified in a welding manner Mounted in the upper surface side edge of chassis 1, it is ensured that positional stability of the benchmark rib 2 on chassis 1 is higher, outside benchmark rib 2 Side is provided with scale(Not shown in figure), it is easy to the benchmark rib 2 of quick interception certain length, also allows for being quickly found out positioning Tie point between rib 3 and benchmark rib 2, beneficial to the saving production time.
Positioning rib 3 is fixed by pressing plate 4, and pressing plate 4 is fixed by magnetic holder 5, is adopted between magnetic holder 5 and pressing plate 4 An entirety is connected as with the mode of welding, on the premise of the convenient dismounting of pressing plate 4 is ensured, it is ensured that between magnetic holder 5 and pressing plate 4 The stability of connection is higher, is less prone to relaxation, and then can ensure that the fixation of pressing plate 4 is higher.Each positioning rib 3 The supporting structure quantity that top board 4 and magnetic holder 5 are constituted is no less than two, according to the principle of 2 points of composition straight lines, using not The supporting structure of pressing plate 4 and magnetic holder 5 less than two, smooth vertical and horizontal state is presented beneficial to positioning rib 3, prefabricated beneficial to ensureing The stress balance of positioning rib 3 is higher when component is poured into a mould, can be according to the length of prefabricated components come reasonable selection pressing plate 4 and magnetic holder The number of 5 supporting structure, typically the distance between two neighboring pressing plate 4 are not more than 1m.
Pressing plate 4, which is provided with, to be used to press the hold-down mechanism 8 located at positioning rib, and pressing plate 4 includes the first supporting part, the second support Portion and connection the first supporting part and the second supporting part are simultaneously used for the location division with the side cooperation of template, and hold-down mechanism is installed on the One supporting part, hold-down mechanism 8 includes press rods 9, and the top of press rods 9 is provided with action bars 10, and action bars 10 is from the top of press rods 9 Pass through and be fixedly connected with press rods 9, the middle part of press rods 9 is to offer screwed hole, pressure on screw-rod structure, the first supporting part Bar 9 is passed through from screwed hole, and the press rods 9 above the first supporting part are provided with locking nut 11, in the first supporting part The end of press rods 9 of lower section is provided with taper positioning disk 12.Pressing plate 4 is that stainless steel plate is made through bending or welding processing, by It is higher in the intensity of steel plate, therefore the deformation quantity of pressing plate 4 is smaller, and it is easy to process, with higher firm effect.
The pressing plate 4 of proper height and magnetic holder 5 in use, be first welded together, then selected six are determined by the present embodiment The length for the benchmark rib 2 that position rib 3 is used with the junction of benchmark rib 2 and selection, uses six positioning of suitable dimension Rib 3 shares a benchmark rib 2 and surrounds two quadrangle closure plane structures, the two planar structure sizes can with identical, Obtain identical prefabricated components, can also size it is different, while obtaining different prefabricated components(Shown in accompanying drawing 3 for size Different situations, the situation that size is differed is not enumerated), it is close to positioning rib 3 using pressing plate 4 and compresses positioning rib 3, makes Magnetic holder 5 is fixed together with pressing plate 4 with bolt 6, sliding button bar in the middle part of magnetic holder is tapped using rubber hammer, makes in magnetic holder 5 Magnet assembly is adsorbed on chassis 1 with being separated at the top of box body, reaches fixation clip 2, and then the purpose of stationary positioned rib 3, Finally carry out concrete the progress of two prefabricated components is poured into a mould simultaneously both can, after casting complete, make between magnetic holder 5 and chassis 1 Desorption, can will positioning rib 3 quickly be separated with chassis 1, the cleaning in the face of chassis 1 is very convenient, further according to need progress The preparation section of the prefabricated components of the similar and different size of next round, realizes the effect quickly changed the mold, prepares various sizes of During prefabricated components, it is only necessary to change the pressing plate and various sizes of positioning rib 3 of different height, extremely save prefabricated components Preparation time, for different length or the prefabricated components of width, it is only necessary to reasonable selection position rib 3 tie point, you can Various sizes of plane prefabricated component is quickly produced, the versatility of template is also achieved, the ability of " flexible production " is realized, Production cost is saved, the production cycle is shortened, improves the mobility of chassis, beneficial to increasing economic efficiency.
Embodiment 3:
As shown in accompanying drawing 3, accompanying drawing 5:Pressing plate and the difference of embodiment 2 in the present embodiment are:First of each pressing plate 4 The quantity of hold-down mechanism 8 is two on support part, and the locking of press rods 9 is in opposite direction in two hold-down mechanisms 8, so when receiving one During stress on individual direction, at least one press rods 9 is not influenceed by external force, beneficial to the stability for improving template.It is this Way can effectively save the consumption of magnetic holder 5, beneficial to saving while increase point compresses number and ensures to position 3 stability of rib Production cost.
Embodiment 4:
As shown in Figure 6:In the present embodiment, the quantity of positioning rib 3 is four, but is constituted on chassis 1 with benchmark rib 2 Plane be quadrilateral structure, the shorter positioning rib 3 of two of which is superimposed in length, two positioning ribs 3 Junction adds sealing strip.This way effectively can complete the prefabricated structure to large-size using multiple positioning ribs 3 The cast preparation process of part, the positioning rib 3 without preparing large-size in advance further enriches positioning rib 3 Versatility feature.
Structure, the supporting structure and use principle and embodiment 1 or same of pressing plate 4 and magnetic holder 5 of pressing plate 4 in the present embodiment Any one of embodiment 2 is identical(Situation same as Example 2 is only listed in the present embodiment accompanying drawing 6).

Claims (10)

1. a kind of prefabricated components flat-die quick die change device, it is characterised in that:It is fixedly arranged on including one on magnetic chassis face Benchmark rib, several positioning ribs being flexibly connected with magnetic chassis face and holding down assembly for stationary positioned rib, base Quasi- rib encloses to form flat-die structure with positioning rib, holds down assembly including pressing plate and magnetic holder, a side pressure of pressing plate is located at positioning On rib, the other end is fixed by magnetic holder.
2. prefabricated components flat-die quick die change device according to claim 1, it is characterised in that:The fixation of benchmark rib Mode for welding, welding with it is bolted combine, be bonded and bolted combination in one kind.
3. prefabricated components flat-die quick die change device according to claim 1, it is characterised in that:Magnetic holder and pressing plate activity Connection, or magnetic holder are welded with pressing plate.
4. the prefabricated components flat-die quick die change device according to any one of claim 1-3, it is characterised in that:Pressing plate Being provided with is used to press the seal face located at positioning rib upper surface.
5. the prefabricated components flat-die quick die change device according to any one of claim 1-3, it is characterised in that:Pressing plate Being provided with is used to press the hold-down mechanism located at positioning rib.
6. prefabricated components flat-die quick die change device according to claim 4, it is characterised in that:Pressing plate is in Z-shaped knot Structure, the bending place of pressing plate is in 90 degree, and the top of pressing plate is formed with for pressing the seal face located at positioning rib, the middle part of pressing plate The location division coordinated with the side of positioning rib is formed with, the bottom of pressing plate is provided with horizontal U-type groove body, and the side of magnetic holder passes through Bolt assembly is installed in cell body.
7. prefabricated components flat-die quick die change device according to claim 5, it is characterised in that:Pressing plate includes first Support part, the second supporting part and the first supporting part of connection and the second supporting part and the location division for coordinating with the side of template, pressure Tight mechanism is installed on the first supporting part, and hold-down mechanism includes press rods, and press rods top is provided with action bars, and action bars is from press rods Top pass through and be fixedly connected with press rods, the middle parts of press rods is to offer screwed hole on screw-rod structure, the first supporting part, Press rods are passed through from screwed hole, and the press rods above the first supporting part are provided with locking nut, in the first supporting part The pressure boom end of lower section is provided with taper positioning disk.
8. prefabricated components flat-die quick die change device according to claim 7, it is characterised in that:The first of each pressing plate On supporting part the quantity of hold-down mechanism be one, two or more, hold-down mechanism is set up in parallel along the length direction of template.
9. the prefabricated components flat-die quick die change device according to any one of claim 1-3, it is characterised in that:Benchmark Rib in the flat-die structure of positioning rib formation with being provided with opening mould plate.
10. prefabricated components flat-die quick die change device according to claim 9, it is characterised in that:Each positioning rib The supporting structure quantity of top board and magnetic holder composition is no less than two.
CN201710603457.5A 2017-07-23 2017-07-23 A kind of prefabricated components flat-die quick die change device Pending CN107214824A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710603457.5A CN107214824A (en) 2017-07-23 2017-07-23 A kind of prefabricated components flat-die quick die change device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710603457.5A CN107214824A (en) 2017-07-23 2017-07-23 A kind of prefabricated components flat-die quick die change device

Publications (1)

Publication Number Publication Date
CN107214824A true CN107214824A (en) 2017-09-29

Family

ID=59954666

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710603457.5A Pending CN107214824A (en) 2017-07-23 2017-07-23 A kind of prefabricated components flat-die quick die change device

Country Status (1)

Country Link
CN (1) CN107214824A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108032411A (en) * 2017-12-29 2018-05-15 远大住宅工业(上海)有限公司 A kind of die fixture
CN108145834A (en) * 2018-02-26 2018-06-12 长沙远大住宅工业集团股份有限公司 A kind of adjustable mold and its installation method for being used to produce prefabricated components
CN109227895A (en) * 2018-01-02 2019-01-18 太空智造股份有限公司 A kind of adjustment devices and methods therefor of building board frame

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4424447C1 (en) * 1994-07-12 1995-12-14 Georg Weidner Magnetic clamping system for fixing wooden articles in position
CN103692684A (en) * 2013-12-20 2014-04-02 二十二冶集团精密锻造有限公司 Quick die replacing method
CN204525721U (en) * 2015-04-15 2015-08-05 中民筑友有限公司 A kind of fixture for limit mould and prefabricated-member mould
CN106182356A (en) * 2016-07-29 2016-12-07 中民筑友科技投资有限公司 A kind of assembling die
CN206287300U (en) * 2016-07-29 2017-06-30 中民筑友科技投资有限公司 A kind of assembling die
CN206953256U (en) * 2017-07-23 2018-02-02 长沙远大住宅工业集团股份有限公司 A kind of prefabricated components flat-die quick die change device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4424447C1 (en) * 1994-07-12 1995-12-14 Georg Weidner Magnetic clamping system for fixing wooden articles in position
CN103692684A (en) * 2013-12-20 2014-04-02 二十二冶集团精密锻造有限公司 Quick die replacing method
CN204525721U (en) * 2015-04-15 2015-08-05 中民筑友有限公司 A kind of fixture for limit mould and prefabricated-member mould
CN106182356A (en) * 2016-07-29 2016-12-07 中民筑友科技投资有限公司 A kind of assembling die
CN206287300U (en) * 2016-07-29 2017-06-30 中民筑友科技投资有限公司 A kind of assembling die
CN206953256U (en) * 2017-07-23 2018-02-02 长沙远大住宅工业集团股份有限公司 A kind of prefabricated components flat-die quick die change device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108032411A (en) * 2017-12-29 2018-05-15 远大住宅工业(上海)有限公司 A kind of die fixture
CN109227895A (en) * 2018-01-02 2019-01-18 太空智造股份有限公司 A kind of adjustment devices and methods therefor of building board frame
CN109227895B (en) * 2018-01-02 2024-04-09 立方数科股份有限公司 Adjusting device and method for building board frame
CN108145834A (en) * 2018-02-26 2018-06-12 长沙远大住宅工业集团股份有限公司 A kind of adjustable mold and its installation method for being used to produce prefabricated components

Similar Documents

Publication Publication Date Title
CN107214824A (en) A kind of prefabricated components flat-die quick die change device
CN206264433U (en) A kind of casting die backform stamping machine
CN206953256U (en) A kind of prefabricated components flat-die quick die change device
CN210589831U (en) Concrete engineering mould
CN108582426B (en) Manufacturing device and manufacturing method of stiff column
CN109505263A (en) A kind of adjustable bent cap mold
CN103252838B (en) The preparation method of one-shot forming glass magnesium smoke exhaust pipe and mould thereof
CN202974736U (en) Stretching test piece die
CN102009130B (en) Lost foam casting model anti-deformation technical clamp and using method
CN202272818U (en) Plaster die for producing quartz crucibles
CN104153386B (en) Pile foundation support table periphery facade bed course tool-type punching block and construction method thereof
CN208100677U (en) Concrete formation mold
CN113356090A (en) Processing method of support base stone template of highway bridge
CN201124523Y (en) Cloth grille
CN219882770U (en) Concrete test piece forming die
CN204622671U (en) Pressing machine fixture
CN209615873U (en) Assembled wallboard mold suitable for pipelining
CN205138856U (en) A suppression forming die for making test block of experiment soil matrix material
CN217372773U (en) Forming die
CN220184620U (en) Template system for wet joint pouring of laminated slab
CN218787944U (en) Auxiliary positioning structure for mold test installation of fluidity diving table
CN219219845U (en) Superimposed sheet slab band reinforcing apparatus
CN107378519B (en) A kind of stainless steel welded formula combined platform production method
CN220650324U (en) Coarse aggregate crushing value detection equipment
CN2598725Y (en) Leak proof ditch plate shaping mould and vibration platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170929