CN103669925A - Steel-structure charging station - Google Patents

Steel-structure charging station Download PDF

Info

Publication number
CN103669925A
CN103669925A CN201210353455.2A CN201210353455A CN103669925A CN 103669925 A CN103669925 A CN 103669925A CN 201210353455 A CN201210353455 A CN 201210353455A CN 103669925 A CN103669925 A CN 103669925A
Authority
CN
China
Prior art keywords
steel
changing station
electrical changing
fills
steel work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210353455.2A
Other languages
Chinese (zh)
Inventor
张帆
邓光斌
林晓斌
郑正仙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Da You Science Technology Development Co ltd
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Hangzhou Electric Power Bureau
Hangzhou Dayou Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Electric Power Bureau, Hangzhou Dayou Technology Development Co Ltd filed Critical Hangzhou Electric Power Bureau
Priority to CN201210353455.2A priority Critical patent/CN103669925A/en
Publication of CN103669925A publication Critical patent/CN103669925A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种钢结构充换电站,包括钢体框架和通过紧固件可拆卸地固定设置在钢体框架上的侧封板、顶板、门板和底板;钢体框架包括基座和与基座通过紧固件可拆卸地固定相连的框架本体,框架本体包括多根通过紧固件可拆卸地固定相连的钢梁。本发明所提供的钢结构充换电站中的各部件均为预先制成的具有一定规格的部件,在建造充换电站时,只需使用紧固件将这些部件拼装组合即可,提高了建造充换电站的速度;同时,在发现已建好的充换电站位置不当时,可以将其拆除并转移到合适位置进行再次组装,减小了经济损失,也减少了在建造充换电站时所需的调研工作,进一步缩短了建造充换电站所需的时间。

The invention discloses a steel structure charging and replacing station, which comprises a steel body frame and a side sealing plate, a top plate, a door plate and a bottom plate detachably fixed on the steel body frame by fasteners; the steel body frame includes a base and a The base is detachably fixed to the connected frame body through fasteners, and the frame body includes multiple steel beams detachably connected to each other through fasteners. All components in the steel structure charging and swapping station provided by the present invention are prefabricated parts with certain specifications. When building the charging and swapping station, it is only necessary to use fasteners to assemble and combine these components, which improves the construction efficiency. The speed of the charging and swapping station; at the same time, when the location of the built charging and swapping station is found to be inappropriate, it can be dismantled and transferred to a suitable location for reassembly, reducing economic losses and reducing the cost of building the charging and swapping station. The required research work further shortens the time required to build charging and swapping stations.

Description

Steel work fills electrical changing station
Technical field
The present invention relates to new-energy automobile technical field, more particularly, relate to a kind of steel work and fill electrical changing station.
Background technology
New-energy automobile has that discharge amount of exhaust gas is low, the advantage of clean environment firendly.But the hysteresis that electrical changing station is built of filling owing to matching with new-energy automobile, causes the popularization of new-energy automobile to receive serious restriction.
The existing electrical changing station that fills is generally reinforced concrete structure, in building course, need to first accomplish fluently ground, then weaves cage of reinforcement, then after concreting, finally utilizes masonry or color steel sealing surrounding and top.
In above-mentioned tradition, fill in the building course of electrical changing station, the links such as braiding cage of reinforcement and concreting need to expend the longer time, and the construction that causes filling electrical changing station is slow.
Meanwhile, due to above-mentioned tradition, filling electrical changing station is permanent construction, and after being removed, the material of gained generally cannot utilize again.Therefore, need to carry out perfect investigation before electrical changing station is filled in construction, in order to avoid there is addressing error, cause serious economic loss, this has also caused obstruction to filling the Fast Construction of electrical changing station.
By the above, how to provide a kind of can fast construction and can after dismounting, again assemble fill electrical changing station, become the technical problem that those skilled in the art need solution badly.
Summary of the invention
In view of this, the invention provides a kind of steel work and fill electrical changing station, to realize, fill the fast construction of electrical changing station, can be in the object of this assembling after removing.
For achieving the above object, the invention provides following technical scheme:
Steel work fills an electrical changing station, comprises steel body framework and is removably fixedly installed on side seal board, top board, door-plate and the base plate on described steel body framework by securing member;
Described steel body framework comprises pedestal and the frame body being fixedly linked by bolt and described pedestal, and described frame body comprises that many are bolted connected girder steel.
Preferably, at above-mentioned steel work, fill in electrical changing station, described frame body is two-layer equation framework, also comprises the movable floor that is horizontally set on described frame body middle part.
Preferably, at above-mentioned steel work, fill in electrical changing station, described movable floor comprises steel plate layer and the insulation floor layer from bottom to top setting gradually.
Preferably, at above-mentioned steel work, fill in electrical changing station, also comprise the steel structure staircase being removably fixedly connected with described steel body framework by securing member.
Preferably, at above-mentioned steel work, fill in electrical changing station, described steel structure staircase is for adopting the steel structure staircase of detachable splicing structure between each parts.
Preferably, at above-mentioned steel work, fill in electrical changing station, described in two described door-plates are arranged on, fill the front and back of electrical changing station.
Preferably, at above-mentioned steel work, fill in electrical changing station, described door-plate is electric rolling door.
Preferably, at above-mentioned steel work, fill in electrical changing station the top board that described top board is tilting.
Preferably, at above-mentioned steel work, fill in electrical changing station, described pedestal is cement pedestal.
A kind of steel work provided by the present invention fills electrical changing station, comprises steel body framework and is removably fixedly installed on side seal board, top board, door-plate and the base plate on steel body framework by securing member; Steel body framework comprises pedestal and the frame body being removably fixedly linked by securing member with pedestal, and frame body comprises the many girder steels that are removably fixedly linked by securing member.
Compare with traditional electrical changing station that fills, each parts that steel work provided by the present invention fills in electrical changing station are the ready-made parts with certain specification, when electrical changing station is filled in construction, only need to use securing member by these parts assembly combinations, saved when construction tradition is filled electrical changing station and need to work out the operations such as reinforcing bar, joints cement, improved the speed of filling electrical changing station of building; Simultaneously, because filling between each parts of electrical changing station, steel work provided by the present invention utilize securing member removably to connect, therefore, when what find to have built up, filled electrical changing station position not at that time, can and transfer to correct position and again assemble its dismounting, reduced economic loss, also reduced research work required when electrical changing station is filled in construction, further shortened to build and filled the required time of electrical changing station.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, to the accompanying drawing of required use in embodiment or description of the Prior Art be briefly described below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skills, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
The steel work that Fig. 1 provides for the embodiment of the present invention fills the structural representation of electrical changing station;
The steel work that Fig. 2 provides for the embodiment of the present invention fills the internal construction schematic diagram of electrical changing station;
Fig. 3 is for adopting the steel work of the top board of tilting to fill the structural representation of electrical changing station.
In above Fig. 1-3:
Steel body framework 1, side seal board 2, top board 3, door-plate 4, base plate 5, pedestal 10, frame body 11.
The specific embodiment
The embodiment of the invention discloses a kind of steel work and fill electrical changing station, to realize, fill the fast construction of electrical changing station, can be in the object of this assembling after removing
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is only the present invention's part embodiment, rather than whole embodiment.Embodiment based in the present invention, those of ordinary skills, not making the every other embodiment obtaining under creative work prerequisite, belong to the scope of protection of the invention.
Please refer to Fig. 1, steel work provided by the present invention fills electrical changing station and comprises steel body framework 1 and be removably fixed on side seal board 2, top board 3, door-plate 4 and the base plate 5 on steel body framework 1 by securing member.
Steel body framework 1 comprises pedestal 10 and is detachably arranged on the frame body 11 on pedestal 10 by securing member, and frame body 11 is comprised of with girder steel the mistake connecting by securing member.
When using steel work provided by the present invention to fill electrical changing station, first, pedestal 10 is fixed on the ground; Then, utilize securing member that frame body 11 is fixed on pedestal 10, form steel body framework 1; Finally the parts such as side seal board 2, top board 3, door-plate 4 and base plate 5 are respectively fixed on steel body framework 1.
Compare with traditional electrical changing station that fills, each parts that steel work provided by the present invention fills in electrical changing station are the ready-made parts with certain specification, when electrical changing station is filled in construction, only need to use securing member by these parts assembly combinations, saved when construction tradition is filled electrical changing station and need to work out the operations such as reinforcing bar, joints cement, improved the speed of filling electrical changing station of building; Simultaneously, because filling between each parts of electrical changing station, steel work provided by the present invention utilize securing member removably to connect, therefore, when what find to have built up, filled electrical changing station position not at that time, can and transfer to correct position and again assemble its dismounting, reduced economic loss, also reduced research work required when electrical changing station is filled in construction, further shortened to build and filled the required time of electrical changing station.
Further, in order further to improve the utilization ratio to soil, with less floor space, obtain higher utilization benefit, the steel work providing at the present embodiment fills in electrical changing station, and frame body 11 is two-layer equation framework.Please refer to Fig. 2, at the middle part of frame body 11 vertical direction, be horizontally disposed with many brace summers, meanwhile, on brace summer, be equipped with movable floor.By steel work, filling electrical changing station inside is set to two-layer up and down, can place and be full of electric battery module at bottom, for replacing the battery module that has exhausted electric energy in new-energy automobile, simultaneously, on upper strata, arrange and fill the charging module in electrical changing station, be used to the charging battery module that has exhausted electric energy in new-energy automobile, by making full use of vertical space, improve the utilization ratio in soil, realized the object of obtaining higher utilization benefit with less floor space.
It will be appreciated by persons skilled in the art that on the basis of above-described embodiment, can also further increase the height that steel work fills electrical changing station, so that the 3rd layer, the 4th layer even more multi-layered space to be set therein.
Preferably, the steel work providing at above-described embodiment fills in electrical changing station, and movable floor comprises steel plate layer and the insulation floor layer from bottom to top setting gradually.At steel work, fill a large amount of electric fixturess is installed in electrical changing station, therefore be necessary to adopt insulation floor to avoid when meeting accident accident because steel work conduction is brought larger loss, consider that again general insulation materials intensity is limited, therefore, adopt the method for steel plate layer and insulation floor layer stack use, taken into account intensity and the electrical security of movable floor.
The steel work providing at above-described embodiment fills in electrical changing station, is provided with two-layer even more multi-layered space, and on this basis, the steel work that the present embodiment provides fills electrical changing station and also comprises the steel structure staircase being removably fixedly connected with steel body framework 1 by securing member.By steel structure staircase is set, staff can enter the maintenance of carrying out equipment in the upper space that steel work fills electrical changing station easily.
Preferably, the steel work providing at above-described embodiment fills in electrical changing station, and steel structure staircase is between all parts, to adopt dismountable splicing structure to be connected.Be understandable that, it is Demountable that steel work provided by the present invention fills electrical changing station, adopts dismountable steel structure staircase can reduce the volume of steel structure staircase when transportation.
For the ease of changing to store with steel work, fill the battery module in electrical changing station, on the basis of above-described embodiment, the steel work that the present embodiment provides fills electrical changing station and is provided with door-plate above with back, and staff can enter steel work nearby and fill and in electrical changing station, carry out work.Preferably, the door-plate that the steel work that above-described embodiment provides fills in electrical changing station is partly or entirely electric rolling door.
Because steel work fills electrical changing station, conventionally will be arranged in outdoor environment, if adopt flat-tope structure, when rainfall, snowfall, its top may have water and accumulates, and this can increase the weight of the corrosion that steel work fills electrical changing station.Therefore, on the basis of above-described embodiment, the steel work that the present embodiment provides fills in electrical changing station, the top board that top board 3 is tilting, as shown in Figure 3.Because top board 3 tilts, after having water to drop on top board 3, can flow along the incline direction of top board 3, make steel work fill not water of electrical changing station top, reduced corrosion.
Concrete, the steel work providing at above-described embodiment fills in electrical changing station, and pedestal 10 is cement pedestal.
In this manual, each embodiment adopts the mode of going forward one by one to describe, and each embodiment stresses is the difference with other embodiment, between each embodiment identical similar part mutually referring to.
Above-mentioned explanation to the disclosed embodiments, makes professional and technical personnel in the field can realize or use the present invention.To the multiple modification of these embodiment, will be apparent for those skilled in the art, General Principle as defined herein can, in the situation that not departing from the spirit or scope of the present invention, realize in other embodiments.Therefore, the present invention will can not be restricted to these embodiment shown in this article, but will meet the widest scope consistent with principle disclosed herein and features of novelty.

Claims (9)

1. steel work fills an electrical changing station, it is characterized in that, comprises steel body framework and is removably fixedly installed on side seal board, top board, door-plate and the base plate on described steel body framework by securing member;
Described steel body framework comprises pedestal and the frame body being fixedly linked by bolt and described pedestal, and described frame body comprises that many are bolted connected girder steel.
2. steel work according to claim 1 fills electrical changing station, it is characterized in that, described frame body is two-layer equation framework, also comprises the movable floor that is horizontally set on described frame body middle part.
3. steel work according to claim 2 fills electrical changing station, it is characterized in that, described movable floor comprises steel plate layer and the insulation floor layer from bottom to top setting gradually.
4. steel work according to claim 3 fills electrical changing station, it is characterized in that, also comprises the steel structure staircase being removably fixedly connected with described steel body framework by securing member.
5. steel work according to claim 4 fills electrical changing station, it is characterized in that, described steel structure staircase is for adopting the steel structure staircase of detachable splicing structure between each parts.
6. steel work according to claim 1 fills electrical changing station, it is characterized in that, fills the front and back of electrical changing station described in two described door-plates are arranged on.
7. steel work according to claim 1 fills electrical changing station, it is characterized in that, described door-plate is electric rolling door.
8. steel work according to claim 1 fills electrical changing station, it is characterized in that, the top board that described top board is tilting.
9. steel work according to claim 1 fills electrical changing station, it is characterized in that, described pedestal is cement pedestal.
CN201210353455.2A 2012-09-21 2012-09-21 Steel-structure charging station Pending CN103669925A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210353455.2A CN103669925A (en) 2012-09-21 2012-09-21 Steel-structure charging station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210353455.2A CN103669925A (en) 2012-09-21 2012-09-21 Steel-structure charging station

Publications (1)

Publication Number Publication Date
CN103669925A true CN103669925A (en) 2014-03-26

Family

ID=50308634

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210353455.2A Pending CN103669925A (en) 2012-09-21 2012-09-21 Steel-structure charging station

Country Status (1)

Country Link
CN (1) CN103669925A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060693A (en) * 2014-05-30 2014-09-24 当代节能置业股份有限公司 Steel structural building and assembling method thereof
CN108442638A (en) * 2018-05-22 2018-08-24 蔚来汽车有限公司 Exterior panel assembly, power conversion station and exterior panel assembly mounting method
WO2022199705A1 (en) * 2021-03-26 2022-09-29 奥动新能源汽车科技有限公司 Battery swap station or energy storage station
CN115122997A (en) * 2021-03-26 2022-09-30 奥动新能源汽车科技有限公司 Assembling method of power changing station or energy storage station
CN115891746A (en) * 2021-09-30 2023-04-04 上海电巴新能源科技有限公司 Assembly method of steel-concrete structure battery replacement station

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201714126U (en) * 2010-05-18 2011-01-19 佛山市三浦重工钢构有限公司 Mechanical stereo garage double as vehicle charging station

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201714126U (en) * 2010-05-18 2011-01-19 佛山市三浦重工钢构有限公司 Mechanical stereo garage double as vehicle charging station

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104060693A (en) * 2014-05-30 2014-09-24 当代节能置业股份有限公司 Steel structural building and assembling method thereof
CN108442638A (en) * 2018-05-22 2018-08-24 蔚来汽车有限公司 Exterior panel assembly, power conversion station and exterior panel assembly mounting method
WO2022199705A1 (en) * 2021-03-26 2022-09-29 奥动新能源汽车科技有限公司 Battery swap station or energy storage station
CN115122997A (en) * 2021-03-26 2022-09-30 奥动新能源汽车科技有限公司 Assembling method of power changing station or energy storage station
CN115891746A (en) * 2021-09-30 2023-04-04 上海电巴新能源科技有限公司 Assembly method of steel-concrete structure battery replacement station

Similar Documents

Publication Publication Date Title
CN106193286B (en) The production method of assembling frame beam based on 3D printing
CN107419824A (en) The full precast shear wall structural system of regenerative steel skeleton and construction method
CN204826348U (en) Compound floor board of three -dimensional light steel frame structure
CN103669925A (en) Steel-structure charging station
CN102605858A (en) Building structure and construction method
CN205743077U (en) Pin-connected panel sentry box
CN106013455A (en) Prefabricated combination reinforcement cage member and reinforcement arrangement assembling method thereof
CN202831705U (en) Steel structure electricity charging and switching station
CN105952060A (en) Precast beam reinforcement cage component and assembling method thereof
CN205444984U (en) Pin -connected panel sanitation room
CN207017483U (en) The full precast shear wall structural system of regenerative steel skeleton
CN108385871A (en) The precast wall body of fabricated structure
CN109680841A (en) Hybrid prefabricated multi-cavity reinforced concrete wall, underground space structure system and construction method
CN206052964U (en) Prefabricated composite steel reinforcement cage component and structure
CN203834738U (en) T-shaped prefabricated mixed coupled wall
CN108411763B (en) Pre-spliced bridge and construction method thereof
CN103362235B (en) Integrally-poured building house with wallboards integrating thermal insulating and templates
CN205875520U (en) Precast beam steel reinforcement cage component and reinforced concrete roof beam
CN106368445B (en) Existing building reinforces self-supporting heat-insulating integral system and construction method
CN107435375A (en) Civilian assembling, assembled building
CN103482493A (en) Internal climbing tower crane
CN216713564U (en) Assembled villa small plate structure
CN203377226U (en) Counterweight type solar frame
CN106480997A (en) The modular assembly connection limb steel plate shear force wall of replaceable core module
CN110258642A (en) A kind of combined assembled underground structure of cut and cover method and its construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HANGZHOU POWER SUPPLY COMPANY,STATE GRID ZHEJIANG

Free format text: FORMER OWNER: HANGZHOU DAYOU TECHNOLOGY DEVELOPMENT CO., LTD.

Effective date: 20150105

Owner name: STATE GRID CORPORATION OF CHINA

Free format text: FORMER OWNER: HANGZHOU POWER SUPPLY COMPANY,STATE GRID ZHEJIANG ELECTRIC POWER COMPANY

Effective date: 20150105

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 310009 No. 219, Jianguo Middle Road, Hangzhou, Zhejiang

Applicant after: HANGZHOU POWER SUPPLY COMPANY OF STATE GRID ZHEJIANG ELECTRIC POWER Co.

Applicant after: HANGZHOU DA YOU SCIENCE TECHNOLOGY DEVELOPMENT Co.,Ltd.

Address before: 310009 No. 291, Jianguo Middle Road, Hangzhou, Zhejiang

Applicant before: Hangzhou Electric Power Bureau

Applicant before: HANGZHOU DA YOU SCIENCE TECHNOLOGY DEVELOPMENT Co.,Ltd.

COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 310009 HANGZHOU, ZHEJIANG PROVINCE TO: 100031 XICHENG, BEIJING

Free format text: CORRECT: APPLICANT; FROM: HANGZHOU ELECTRIC POWER BUREAU TO: HANGZHOU POWER SUPPLY COMPANY,STATE GRID ZHEJIANG ELECTRIC POWER COMPANY

TA01 Transfer of patent application right

Effective date of registration: 20150105

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: HANGZHOU POWER SUPPLY COMPANY OF STATE GRID ZHEJIANG ELECTRIC POWER Co.

Applicant after: HANGZHOU DA YOU SCIENCE TECHNOLOGY DEVELOPMENT Co.,Ltd.

Address before: 310009 No. 219, Jianguo Middle Road, Hangzhou, Zhejiang

Applicant before: HANGZHOU POWER SUPPLY COMPANY OF STATE GRID ZHEJIANG ELECTRIC POWER Co.

Applicant before: HANGZHOU DA YOU SCIENCE TECHNOLOGY DEVELOPMENT Co.,Ltd.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20140326