CN103669368A - Reverse building board construction structure and construction method thereof - Google Patents

Reverse building board construction structure and construction method thereof Download PDF

Info

Publication number
CN103669368A
CN103669368A CN201310729328.2A CN201310729328A CN103669368A CN 103669368 A CN103669368 A CN 103669368A CN 201310729328 A CN201310729328 A CN 201310729328A CN 103669368 A CN103669368 A CN 103669368A
Authority
CN
China
Prior art keywords
contrary
framed bent
plate
bed course
short framed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310729328.2A
Other languages
Chinese (zh)
Other versions
CN103669368B (en
Inventor
邱晨斌
顾阳华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201310729328.2A priority Critical patent/CN103669368B/en
Publication of CN103669368A publication Critical patent/CN103669368A/en
Application granted granted Critical
Publication of CN103669368B publication Critical patent/CN103669368B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a reverse building board construction structure and a construction method thereof. The structure comprises temporary steel supports and further comprises a cushion layer, a short framed bent and a formwork which are arranged inside a foundation pit from bottom to top in sequence. The temporary steel supports penetrate through the short framed bent at intervals in the horizontal direction. The two ends of the temporary steel supports are respectively and fixedly connected with a vertical structure of the foundation pit. The foundation pit is excavated to the elevation X, and the formula X=Y-r-d is met, wherein Y represents the board bottom elevation of a reverse building board, r represents the sum of the height of the short framed bent and the height of the formwork, and d represents the thickness of the cushion layer. The temporary steel supports are utilized and can effectively control the deformation of the foundation pit before the reverse building board is achieved, and due to the fact that the method that the combination of the short framed bent and the cushion layer is used for supporting the reverse building board is utilized, the integral pouring of the reverse building board and a board underbeam can be achieved, the horizontal supporting force of the reverse building board and the beam integral can be improved, and the deformation of the foundation pit can be effectively controlled. Due to the fact that the short framed bent does not need to be erected from a first layer of floor on the lower portion, the erecting time of the short framed bent can be greatly shortened, needed materials can be greatly reduced, and construction efficiency is improved.

Description

Contrary plate constructing structure and the construction method thereof done
Technical field
The invention belongs to the realm of building construction, relate in particular to a kind of contrary do plate constructing structure and construction method thereof.
Background technology
At present the floor construction method of main flow has two kinds: the first is directly on bed course, to water build floor (as base plate etc.), the fairly simple economy of constructing; The second is on one deck floor, to set up framed bent below, and support shuttering finally waters build floor and beam, and the complicated time of construction is long and potential safety hazard is high.
First kind of way is directly built on bed course, and this construction technology is to meet the requirements of for the suitable practice completely.But when relating to contrary sequence method or semi-inverse method floor slab construction, building contraryly while making plate, directly on bed course, building and cannot meet contrary the do requirement of plated construction and the structural requirement that beam slab is done simultaneously.For contrary sequence method, contrary while building as plate below first floor plate also do not start building, therefore, stack arrangement cannot meet its execution conditions.
Therefore, how to provide a kind of can meet contrary make plate and beam slab is constructed simultaneously, and can control effectively to the distortion of foundation ditch contraryly efficiently make plate constructing structure and construction method is those skilled in the art's technical problems urgently to be resolved hurrily.
Summary of the invention
The object of the present invention is to provide and a kind ofly contrary make plate constructing structure and construction method thereof, can meet and contraryly make plate and beam slab is constructed and can control effectively to the distortion of foundation ditch simultaneously, and can the reduction of erection time, efficiency of construction effectively improved.
To achieve the above object, the present invention adopts following technical scheme:
A kind of contrary plate constructing structure of doing, for realizing the contrary construction of making plate of contrary sequence method or semi-inverse method, comprise temporary steel support and be set in turn in from the bottom to top the bed course in foundation ditch, short framed bent and template, described temporary steel support along continuous straight runs interval is arranged in described short framed bent, the two ends of described temporary steel support are fixedly connected with the vertical structure of described foundation ditch respectively, described excavation of foundation pit is to absolute altitude X, meet X=Y-r-d, wherein Y is the contrary absolute altitude at the bottom of plate plate of doing, r is the height sum of short framed bent and template, and d is the thickness of bed course.
Preferably, the altitude range of described short framed bent is between 1600-2000mm.
Preferably, the thickness range of described bed course is 80-120mm, and described bed course is built and formed by C25 element concrete.
Preferably, the diameter range of described interim Horizontal steelwork bracing is 500-700mm, and thickness range is 14-20mm.
Preferably, described interim Horizontal steelwork bracing adopts diameter phi 609mm, the steel pipe of thickness t=16mm.
Preferably, to establish spaced wood stupefied for described template below pad.
Accordingly, the invention also discloses and a kind ofly contrary make board construction method, comprise the steps:
The first step, is excavated to absolute altitude X, X=Y-r-d, and wherein, Y is the contrary absolute altitude at the bottom of plate plate of doing, and r is the height sum of short framed bent and template, and d is the thickness of bed course;
Second step, lays bed course;
The 3rd step, usings bed course as short framed bent supporting surface, at interval, bed course overhead, some roads temporary steel support is installed;
The 4th step is set up short framed bent on bed course
The 5th step arranges template on short framed bent;
The 6th step, assembling reinforcement, concreting form contrary do plate and plate underbeam.
Preferably, above-mentioned contrary work in board construction method, the altitude range of described short framed bent is between 1600-2000mm.
Preferably, above-mentioned contrary work in board construction method, the thickness range of described bed course is 80-120mm, and described bed course is built and formed by C25 element concrete.
Preferably, above-mentioned contrary work in board construction method, it is stupefied that described template below pad is established spaced wood.
Contrary do plate constructing structure and construction method thereof provided by the invention, comprise temporary steel support and be set in turn in from the bottom to top the bed course in foundation ditch, short framed bent and template, described temporary steel support along continuous straight runs interval is arranged in described short framed bent, the two ends of described temporary steel support are fixedly connected with the vertical structure of described foundation ditch respectively, described excavation of foundation pit is to absolute altitude X, meet X=Y-r-d, wherein Y is the contrary absolute altitude at the bottom of plate plate of doing, r is the height sum of short framed bent and template, d is the thickness of bed course, utilize temporary steel support, can before doing plate completion, effectively control foundation pit deformation, guarantee the contrary safety of doing plated construction construction, utilize short framed bent and bed course in conjunction with supporting the contrary method of making plate, can realize the contrary monobloc cast of making plate and plate underbeam, so effectively improve the contrary globality of making plate and plate underbeam, and then improved against the horizontal support power of making plate and plate underbeam integral body, thereby can effectively control the distortion of foundation ditch, and because short framed bent is without setting up on one deck floor below, therefore, the height of short framed bent is much smaller than along required framed bent height in way construction, therefore, can greatly reduce the time of setting up of short framed bent and required material, can the reduction of erection time, effectively improved efficiency of construction, meeting under the prerequisite of structure construction requirement, there is significant economic effect.
Accompanying drawing explanation
Of the present inventionly contrary make plate constructing structure and construction method is provided by following embodiment and accompanying drawing.
Fig. 1 is the contrary structural representation of making plate constructing structure of the embodiment of the present invention 1;
Fig. 2 is the contrary construction process schematic diagram of making board construction method of the embodiment of the present invention 2;
In figure, 1-bed course, the short framed bent of 2-, 3-template, 4-temporary steel support, 5-plate underbeam, 6-be contrary, and to make plate, 7-diaphragm wall, 8-wood stupefied.
The specific embodiment
Below will contrary make plate constructing structure and construction method is described in further detail to of the present invention.
Embodiment 1
Refer to Fig. 1, the present embodiment discloses a kind of contrary plate constructing structure of doing, for realizing the contrary construction of making plate 6 of contrary sequence method or semi-inverse method, comprise temporary steel support 4 and be set in turn in from the bottom to top the bed course 1 in foundation ditch, short framed bent 2 and template 3, described temporary steel support 4 along continuous straight runs intervals are arranged in described short framed bent 2, the two ends of described temporary steel support 4 are for example that diaphragm wall 7 is fixedly connected with the vertical structure of described foundation ditch respectively, described excavation of foundation pit is to absolute altitude X, meet X=Y-r-d, wherein Y is the contrary absolute altitude at the bottom of plate 6 plates of doing, r is the height sum of short framed bent 2 and template 3, d is the thickness of bed course 1.The present embodiment utilizes temporary steel support 4, can before plate 6 completions, effectively control foundation pit deformation contrary work, guarantee the contrary safety of making plate 6 structure constructions, utilize short framed bent 2 and bed course 1 in conjunction with supporting the contrary method of making plate 6, can realize the contrary monobloc cast of making plate 6 and plate underbeam 5, can improve the contrary globality of making plate 6 and plate underbeam 5, and then improved against the horizontal support power of making plate 6 and plate underbeam 5 integral body, thereby can effectively control the distortion of foundation ditch, in addition, because short framed bent 2 is without setting up on one deck floor below, therefore, the height of short framed bent 2 is much smaller than along required framed bent height in way construction, so, can greatly reduce the time of setting up of short framed bent 2 and required material, can the reduction of erection time, effectively improved efficiency of construction, meeting under the prerequisite of structure construction requirement, there is significant economic effect.
Preferably, the altitude range of described short framed bent 2 is between 1600-2000mm.In the present embodiment, the height of described short framed bent 2 is 1800mm.The short framed bent 2 of above-mentioned altitude range is providing enough and suitable construction operation space for the contrary construction of making plate 6 and plate underbeam 5, shortened to greatest extent the height of short framed bent 2, thereby can reduce the time of setting up of short framed bent 2 and required material, effectively the reduction of erection time, improve efficiency of construction.
Preferably, the thickness range of described bed course 1 is 80-120mm, and described bed course 1 is built and formed by C25 element concrete.
Preferably, the diameter range of described interim Horizontal steelwork bracing 4 is 500-700mm, and thickness range is 14-20mm.In the present embodiment, described interim Horizontal steelwork bracing 4 adopts diameter phi 609mm, the steel pipe of thickness t=16mm.The interim Horizontal steelwork bracing 4 of said structure does, in plate 6 work progresss, to have enough horizontal support power contrary, can effectively control foundation ditch and do the distortion in plate 6 work progresss contrary.
Preferably, described template 3 adopts wood based panel.Described template 3 below pads are established spaced wood stupefied 8.Described wood stupefied 8 adopts the batten of 40mm * 90mm.
Embodiment 2
Accordingly, refer to Fig. 2, and incorporated by reference to Fig. 1, the present embodiment discloses, and comprises the steps: a kind of against making board construction method
The first step, is excavated to absolute altitude X, X=Y-r-d, and wherein, Y is the contrary absolute altitude at the bottom of plate 6 plates of doing, and r is the height sum of short framed bent 2 and template 3, and d is the thickness of bed course 1;
Second step, lays bed course 1.Preferably, the thickness range of described bed course 1 is 80-120mm, and described bed course 1 is built and formed by C25 element concrete.
The 3rd step, usings bed course 1 as short framed bent 2 supporting surfaces, at bed course 1 interval, overhead, some roads temporary steel support 4 is installed.In the present embodiment, can described temporary steel support 4 be highly set at bed course 1 overhead 600-1000mm, concrete, at bed course, 1 800mm place, overhead arranges described temporary steel support 4.The arrangement pitch of described temporary steel support 4 supports according to other each road steel.Preferably, the diameter range of described interim Horizontal steelwork bracing 4 is 500-700mm, and thickness range is 14-20mm.In the present embodiment, described interim Horizontal steelwork bracing 4 adopts diameter phi 609mm, the steel pipe of thickness t=16mm.
The 4th step is set up short framed bent 2 on bed course 1.Preferably, the altitude range of described short framed bent 2 is between 1600-2000mm.In the present embodiment, the height of described short framed bent 2 is between 1800mm.The short framed bent 2 of above-mentioned altitude range is providing enough and suitable construction operation space for the contrary construction of making plate 6 and plate underbeam 5, shortened to greatest extent the height of short framed bent 2, thereby can reduce the time of setting up of short framed bent 2 and required material, effectively the reduction of erection time, improve efficiency of construction
The 5th step arranges template 3 on short framed bent 2, and described template 3 below pads are established spaced wood stupefied 8.Described template 3 adopts wood based panel.Described wood stupefied 8 adopts the batten of 40mm * 90mm.
The 6th step, assembling reinforcement, concreting form contrary do plate 6 and plate underbeam 5.The described contrary thickness of making plate 6 is 500mm.
In sum, contrary do plate constructing structure and construction method thereof provided by the invention, utilize short framed bent 2 and bed course 1 in conjunction with supporting the contrary method of making plate 6, can realize the contrary monobloc cast of making plate 6 and plate underbeam 5, so effectively improve the contrary globality of making plate 6 and plate underbeam 5, and then improved against the horizontal support power of making plate 6 and plate underbeam 5 integral body, thereby can effectively control the distortion of foundation ditch, in addition, because short framed bent 2 is without setting up on one deck floor below, therefore, can greatly reduce the time of setting up of short framed bent 2 and required material, can the reduction of erection time, effectively improved efficiency of construction, meeting under the prerequisite of structure construction requirement, there is significant economic effect.

Claims (10)

1. the contrary plate constructing structure of doing, for realizing the contrary construction of making plate of contrary sequence method or semi-inverse method, it is characterized in that, comprise temporary steel support and be set in turn in from the bottom to top the bed course in foundation ditch, short framed bent and template, described temporary steel support along continuous straight runs interval is arranged in described short framed bent, the two ends of described temporary steel support are fixedly connected with the vertical structure of described foundation ditch respectively, described excavation of foundation pit is to absolute altitude X, meet X=Y-r-d, wherein Y is the contrary absolute altitude at the bottom of plate plate of doing, r is the height sum of short framed bent and template, and d is the thickness of bed course.
2. according to claim 1ly contrary make plate constructing structure, it is characterized in that, the altitude range of described short framed bent is between 1600-2000mm.
3. according to claim 1ly contrary make plate constructing structure, it is characterized in that, the thickness range of described bed course is 80-120mm, and described bed course is built and formed by C25 element concrete.
4. according to claim 1ly contrary make plate constructing structure, it is characterized in that, the diameter range of described interim Horizontal steelwork bracing is 500-700mm, and thickness range is 14-20mm.
5. according to claim 4ly contrary make plate constructing structure, it is characterized in that, it is stupefied that described template below pad is established spaced wood.
6. against making a board construction method, it is characterized in that, comprise the steps:
The first step, is excavated to absolute altitude X, X=Y-r-d, and wherein, Y is the contrary absolute altitude at the bottom of plate plate of doing, and r is the height sum of short framed bent and template, and d is the thickness of bed course;
Second step, lays bed course;
The 3rd step, usings bed course as short framed bent supporting surface, at interval, bed course overhead, some roads temporary steel support is installed;
The 4th step is set up short framed bent on bed course
The 5th step arranges template on short framed bent;
The 6th step, assembling reinforcement, concreting form contrary do plate and plate underbeam.
7. according to claim 6ly contrary make board construction method, it is characterized in that, the altitude range of described short framed bent is between 1600-2000mm.
8. according to claim 6ly contrary make board construction method, it is characterized in that, the thickness range of described bed course is 80-120mm, and described bed course is built and formed by C25 element concrete.
9. according to claim 6ly contrary make board construction method, it is characterized in that, the diameter range of described interim Horizontal steelwork bracing is 500-700mm, and thickness range is 14-20mm.
10. according to claim 9ly contrary make board construction method, it is characterized in that, it is stupefied that described template below pad is established spaced wood.
CN201310729328.2A 2013-12-26 2013-12-26 Contrary plate constructing structure and the construction method thereof done Active CN103669368B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310729328.2A CN103669368B (en) 2013-12-26 2013-12-26 Contrary plate constructing structure and the construction method thereof done

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310729328.2A CN103669368B (en) 2013-12-26 2013-12-26 Contrary plate constructing structure and the construction method thereof done

Publications (2)

Publication Number Publication Date
CN103669368A true CN103669368A (en) 2014-03-26
CN103669368B CN103669368B (en) 2016-05-11

Family

ID=50308082

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310729328.2A Active CN103669368B (en) 2013-12-26 2013-12-26 Contrary plate constructing structure and the construction method thereof done

Country Status (1)

Country Link
CN (1) CN103669368B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563497A (en) * 2014-12-31 2015-04-29 上海市机械施工集团有限公司 Novel beam slab supported construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100699040B1 (en) * 2004-10-26 2007-03-27 주식회사 한진중공업 Connecting Structure of Supporting Beams
CN101372865A (en) * 2008-09-17 2009-02-25 浙江中成建工集团有限公司 Stay suspender multispan beam structure highly hollow-out formwork system and construction method
CN102031785A (en) * 2009-09-24 2011-04-27 上海市第一建筑有限公司 Foundation pit supporting technique for replacing temporary enclosing purlin by using plate belt of permanent structure
CN102817372A (en) * 2011-06-09 2012-12-12 五冶集团上海有限公司 Construction method of underground deep foundation concrete by reverse formworks
CN203654292U (en) * 2013-12-26 2014-06-18 上海建工二建集团有限公司 Reverse building plate construction structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100699040B1 (en) * 2004-10-26 2007-03-27 주식회사 한진중공업 Connecting Structure of Supporting Beams
CN101372865A (en) * 2008-09-17 2009-02-25 浙江中成建工集团有限公司 Stay suspender multispan beam structure highly hollow-out formwork system and construction method
CN102031785A (en) * 2009-09-24 2011-04-27 上海市第一建筑有限公司 Foundation pit supporting technique for replacing temporary enclosing purlin by using plate belt of permanent structure
CN102817372A (en) * 2011-06-09 2012-12-12 五冶集团上海有限公司 Construction method of underground deep foundation concrete by reverse formworks
CN203654292U (en) * 2013-12-26 2014-06-18 上海建工二建集团有限公司 Reverse building plate construction structure

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104563497A (en) * 2014-12-31 2015-04-29 上海市机械施工集团有限公司 Novel beam slab supported construction method
CN104563497B (en) * 2014-12-31 2016-10-19 上海市机械施工集团有限公司 One has beam-slab bracing system construction method

Also Published As

Publication number Publication date
CN103669368B (en) 2016-05-11

Similar Documents

Publication Publication Date Title
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
WO2020118563A1 (en) Design and rapid construction methods for flush assembly of prefabricated steel beams and floor
CN203654294U (en) Foundation pit supporting structure used in reverse building method
CN103321421A (en) Construction method for one-time formation of concrete pool wall
CN109797755B (en) Steel pipe Larsen steel sheet pile enclosure structure supported by steel mesh frame and construction method thereof
CN107327050B (en) Disassembly-free basement exterior wall flanging unilateral formwork supporting device and construction method
CN103790295A (en) Reinforced concrete stair structure and construction method thereof
CN103469732B (en) Construction method of preformed holes for foundation bolts of bridge support
CN202202412U (en) Rectangular steel pipe concrete special-shaped column-steel beam framework middle node
CN203834926U (en) Formwork erecting structure for bare concrete basement exterior wall
CN103790393A (en) Construction method for integrated replacement of existing building structure
CN210395119U (en) Face novel bridge beam supports frame that combines forever
CN203654292U (en) Reverse building plate construction structure
CN202202413U (en) Rectangular steel tube concrete special-shaped column and steel beam frame corner node
CN204001705U (en) Outer wall of basement single surface formwork constructing structure based on earth anchor truss
CN103669368B (en) Contrary plate constructing structure and the construction method thereof done
CN204919932U (en) Assemble integral non -reinforced concrete ribbed floor
CN104895221B (en) Assembled shaped steel confined concrete shear wall structure
CN109610707B (en) Assembly structure with parallel and level prefabricated steel beams and floor slab and rapid construction method
CN207244633U (en) Brick retaining wall steel bar girder hardened system on foundation pit enclosure top beam
CN102828616A (en) High-formwork support system for roof
CN216194892U (en) Subway upper cover project construction elevator foundation structure
CN108104506A (en) It is a kind of to be used for structural demolition and the temporary facility rebuilded and its construction method
CN204000936U (en) Outer wall of basement single surface formwork system based on fastener type steel pipe earth anchor truss
CN103711132A (en) Cylindrical reinforcing steel bar connecting method and connecting structure in reverse building method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information

Inventor after: Qiu Chenbin

Inventor after: Gu Yanghua

Inventor after: Chen Xin

Inventor before: Qiu Chenbin

Inventor before: Gu Yanghua

COR Change of bibliographic data