CN103628877A - Multilayer gentle dip thin-medium ore deposit filling and mining method - Google Patents

Multilayer gentle dip thin-medium ore deposit filling and mining method Download PDF

Info

Publication number
CN103628877A
CN103628877A CN201310605791.6A CN201310605791A CN103628877A CN 103628877 A CN103628877 A CN 103628877A CN 201310605791 A CN201310605791 A CN 201310605791A CN 103628877 A CN103628877 A CN 103628877A
Authority
CN
China
Prior art keywords
ore
hill
filling
back production
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310605791.6A
Other languages
Chinese (zh)
Other versions
CN103628877B (en
Inventor
叶义成
姚囝
王其虎
刘艳章
王文杰
张红军
柯丽华
施耀斌
鲁方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Science and Engineering WUSE
Original Assignee
Wuhan University of Science and Engineering WUSE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Science and Engineering WUSE filed Critical Wuhan University of Science and Engineering WUSE
Priority to CN201310605791.6A priority Critical patent/CN103628877B/en
Publication of CN103628877A publication Critical patent/CN103628877A/en
Application granted granted Critical
Publication of CN103628877B publication Critical patent/CN103628877B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention relates to a multilayer gentle dip thin-medium ore deposit filling and mining method. According to the technical scheme, the method comprises the following steps: dividing ore blocks, arranging mining and cutting projects, transporting, mining and filling. The step of dividing an ore deposit comprises the following sub-steps: dividing an ore body in the stage into a disc area, tunneling to uphill (2) at the bottom of an ore layer (1) along the inclined direction of the ore body, dividing the ore body on two sides into ore chambers (15) and ore columns (14) along the uphill (2), and reserving uphill ore columns (18) by taking the uphill (2) as the center. Three-step recovery is adopted in the disc area and comprises a first step of recovering the ore chambers (15), a second step of recovering the ore columns (14) and a third step of recovering the uphill ore columns (18); after the ore chambers (15) or the ore columns (14) are totally recovered, a goaf area (11) is downwards filled through the uphill (2) on the upper layer and via filling ventilation holes (10) communicated with a stope; finally, the uphill ore columns (18) are recovered within three steps from bottom to top along the uphill (2) by taking the disc area as a unit, and the uphill ore columns (18) in the next disc area are recovered after filling. The method has the characteristics of high mining intensity, high ore recovery rate, low ore dilution ratio and low mining cost.

Description

A kind of multilayer gentle dip is thin-in thick mineral deposit filling mining method
Technical field
The invention belongs to thin-in Cut-and-fill Mining Technology field, thick mineral deposit.Relate in particular to a kind of multilayer gentle dip thin-in thick mineral deposit filling mining method.
Background technology
A large amount of gentle dips are thin-in the exploitation in thick mineral deposit mainly adopt room-and-pillar method and Caving Method with Large Space.The outstanding shortcoming of room-and-pillar method is to stay to establish the very difficult recovery in time of ore pillar, and ore losses is larger, and the top board that bring out large area dead zone collapses and emits and can form major safety risks to subsequent production.The outstanding shortcoming of Caving Method with Large Space is to cause surface subsidence, is unfavorable for ground surface environment protection.Therefore, people adopt traditional method of mining by the way of filling, and first production ore, builds filling counterfort by laying bricks or stones at stope edge, behind tailing cemented filling goaf, then continue production ore, and ore recovery ratio and stoping safety are high.But traditional filling method mining intensity is low, produce linking complex management, causes also corresponding increase of mining cost.
For multilayer gentle dip thin-in thick mineral deposit, generally along ore bed layer-by-layer mining, for the feature in multilayer mineral deposit, do not carry out the mining design of applicability, each layering is all tunneled a large amount of adopting and is cut tunnel, each layering independently working, the contact between layering is less, causes adopting cutting than greatly, adopt cut journey long construction period, mining cost is higher.Part mine adopts open stope afterwards filling mining method, packing job and the interlaced impact of actual mining operation, and the poor continuity of exploitation, causes mining rate low, and production capacity is not high.
Summary of the invention
The present invention is intended to overcome the deficiencies in the prior art, object be to provide the multilayer gentle dip that a kind of ore recovery ratio is high, the rate of dilution is low, mining cost is low thin-in thick mineral deposit filling mining method; The method, when guaranteeing stope job safety, can reduce to adopt and cut tunnelling amount and guarantee the continuous high strength exploitation in panel.
For achieving the above object, the technical solution used in the present invention is:
1) cut journey layout is divided and adopted to nugget
1. nugget is divided
Mineral deposit is divided into the stage, and each layering ore body division in the stage is panel.Along orebody strike, at the bottom of ore layer driving, going up a hill, is mineral building and ore pillar along going up a hill both sides ore body division, and mineral building and ore pillar are interlaced arrangement.
2. adopting cut journey arranges
By driving rock drilling lane in the middle of the direction which a grave faces stope on each, within the stage undermost going up a hill, the base plate of going up a hill in all the other each layerings creeps into respectively filling gravity vent downwards, and each each filling gravity vent being drilled with of going up a hill is communicated with stope at the peak of each corresponding stope end top board through dirt band.In stage, in the dirt band of the stage that the is arranged in interior the superiors ore body top of going up a hill of the superiors, in the stage, the superiors goes up a hill apart from the superiors' ore body 4 ~ 6m in the stage.Within the stage, the going up a hill of the superiors, centered by respectively going up a hill, all the other stay respectively the ore pillar of going up a hill.Panel drop shaft is arranged in and is arranged in the go up a hill ore pillar of bottom of panel, and drop shaft bottom in panel is communicated with belt road, and panel drop shaft extends upward with going up a hill of each layering in the stage and is communicated with.Belt road is arranged in undermost below of going up a hill in the stage, and the lower disposed in belt road has main chute, and main chute bottom is communicated with stage transportation lane.Ramp is arranged in the two ends of going up a hill, and ramp is communicated with the going up a hill of each layering, belt road and stage transportation lane from top to bottom.
2) transportation
Ore in stope is transported to panel drop shaft by scraper, by the vibration ore dumping machine in the drop shaft of panel to the belt ore drawing in belt road, then through belt-conveying to main chute, then by the vibration ore dumping machine in main chute to the mine car ore drawing in stage transportation lane.
3) exploitation and filling
Three step back production are divided in panel: a step rooming, two step stooping pillarings after tailing cemented filling, then the three step back production ore pillar of going up a hill after tailing cemented filling, last tailing cemented filling three step stopes.A step back production in panel and two step back production are carried out from the bottom to top successively along going up a hill, and three step back production in panel are carried out from the bottom to top along going up a hill.Three step back production are carried out after all step back production in each corresponding panel of same layering and filling and two step back production and filling complete.
If a plurality of stopes in a plurality of panels of multi-segment are exploited simultaneously: 1. the exploitation in higher slice panel is carried out after a step back production corresponding to two corresponding panels of lower leaf and filling and two step back production and filling complete; 2. the three step back production in the higher slice panel equal back production of all stopes and filling in the corresponding panel of lower leaf carried out after completing.
Described a step back production and filling are: during a step back production, by going up a hill, enter mineral building, by mineral building end to the direction drawing back of going up a hill.Take rock drilling lane as working space, to both sides and top board direction, creep into shallow bore hole, after shallow blasting, transport ore.When if orebody thickness is less than 3.5 ~ 4m, once adopt entirely thickly, if when orebody thickness is greater than 3.5 ~ 4m, first undercut, more upwards caunch.When back production is near the drop shaft of panel time, stay drop shaft safety pillar.If the stope that back production meeting causes drop shaft connection lane to use, carries out when three step back production is stayed in the back production of described stope.When back production is during to stope border, shutoff rock drilling lane, pre-buried filter pipe in the filling counterfort in shutoff rock drilling lane, carries out tailing cemented filling by going up a hill of higher slice downwards through filling gravity vent.
Described two step back production and filling are: except mineral building is ore pillar, all the other are identical with filling with a step back production.
Described three step back production and filling are: during three step back production, will go up a hill as drilling drift, take panel as unit, and back production from the bottom to top, ore is transported to panel drop shaft.When back production is near the drop shaft of panel time, stay drop shaft safety pillar, shutoff drop shaft connection lane.After the pillar recovery of going up a hill in panel completes, shutoff is gone up a hill, by going up a hill, upper ramps road carries out tailing cemented filling to goaf, form obturation, the ventilating duct of going up a hill during pillar recovery in pre-buried filter pipe and pre-buried next panel in obturation, after obturation final set, along the ore pillar of going up a hill in the next panel of working to the rise of going up a hill.
Owing to adopting technique scheme, the present invention compared with prior art has following good effect:
The present invention is panel by each layering ore body division, and mineral building and ore pillar interlaced arrangement can a plurality of panels, a plurality of stope exploits simultaneously.Meanwhile, in panel, the back production of different stopes and the parallel operations of filling energy, do not interfere with each other.Adopt scraper ore removal, realized continuous high strength exploitation, improved mine capacity.
The present invention divides three step back production by panel, and classifying rationally mineral building and ore pillar only leave a little drop shaft safety pillar, and ore recovery ratio is high; Rock drilling lane is all tunneled along ore body base plate with going up a hill, and adopts shallow bore hole driling explosion, can control well ore limits, and ore dilution rate is low.
The fresh distinguished and admirable ramp by the bottom of going up a hill in the present invention joins lane to going up a hill through ramp, enter each stope again and wash away work plane, dirty wind is after filling gravity vent enters going up a hill of higher slice, and the ramp through the top of going up a hill enters return aircourse, ventilation circuit is simple, and ventilation effect is better.
Ramp in the present invention, go up a hill and all there are the multiple uses such as pedestrian, ventilation and trackless equipment walking in rock drilling lane, article one, go up a hill and serve a plurality of stopes in both sides, the filling gravity vent creeping into downwards at the base plate of going up a hill of higher slice do to ventilate and filling dual-purpose, going up a hill as ventilation and the stowboard use of lower leaf of higher slice, adopt the transportation of belt road can avoid tunneling a large amount of haulage drifts, by these rational tunnels, arrange, meeting under the requirement of exploitation, adopt that to cut tunnelling amount little, reduced to adopt and cut ratio.
Of the present inventionly adopt the minimizing of cutting tunnelling amount, the raising of mining rate and ore recovery ratio, and the reduction of the rate of dilution, all reduced mining cost.
Therefore, the present invention, when guaranteeing stope job safety, can reduce to adopt and cut tunnelling amount and guarantee the continuous high strength exploitation in panel, and packing job and actual mining are independent of each other, therefore have the advantages that ore recovery ratio is high, the rate of dilution is low and mining cost is low.The present invention is mainly used in orebody thickness 2.5 ~ 6m, dirt band thickness 5 ~ 15m, multilayer gentle dip that inclination angle is 5 ~ 30 ° is thin-in the underground mining in thick mineral deposit.
Accompanying drawing explanation
Fig. 1 is that the present invention is for the schematic diagram in a certain panel;
Fig. 2 be in Fig. 1 A-A to generalized section;
Fig. 3 be in Fig. 1 B-B to generalized section;
Fig. 4 be in Fig. 1 C-C to generalized section;
Fig. 5 be in Fig. 1 D-D to generalized section.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the present invention is described further non-limiting the scope of the present invention.
embodiment 1
A kind of multilayer gentle dip is thin-in thick mineral deposit filling mining method.The multilayer ore body in this mineral deposit is stratiform or like the parallel output of stratiform, 5 ~ 25 °, the slanting angle of ore body, and ore body length is generally 224 ~ 670m, inclination deepening 87 ~ 204m, ore layer thickness is generally 0.81 ~ 5.54m, dirt band thickness 5 ~ 12m.This mineral deposit ore-rock stability is better, and Mine Area Engineering Geology condition belongs to simple-medium type.
The concrete steps of this mineral deposit filling mining method are:
1) cut journey layout is divided and adopted to nugget
1. nugget is divided
Mineral deposit is divided into the stage, and as depicted in figs. 1 and 2, each layering ore body division in the stage is panel.Along orebody strike, at the bottom driving of ore layer 1, going up a hill 2,2 is mineral building 15 and ore pillar 14 by both sides ore body division along going up a hill, and mineral building 15 and ore pillar 14 are interlaced arrangement.
2. adopting cut journey arranges
As shown in Figure 1 and Figure 5, by each, go up a hill 2 to the middle driving of stope rock drilling lane 17, undermost going up a hill 2 within the stage, 2 the base plate of going up a hill in all the other each layerings creeps into respectively filling gravity vent 10 downwards, and each 2 each filling gravity vent 10 that are drilled with of going up a hill is communicated with stope at the peak of each corresponding stope end top board through dirt band 8.Going up a hill of the superiors 2 is arranged in the dirt band 8 of the superiors' ore body top in the stage in stage, and in the stage, the superiors goes up a hill 2 apart from the superiors' ore body 4 ~ 6m in the stage.The going up a hill 2 of the superiors within the stage, respectively goes up a hill centered by 2 and stays respectively the ore pillar 18 of going up a hill by all the other.Panel drop shaft 12 is arranged in and is arranged in the go up a hill ore pillar 14 of 2 bottoms of panel, and drop shaft 12 bottoms in panel are communicated with belt roads 7, and panel drop shaft 12 extends upward with going up a hill of each layering in the stage and 2 is communicated with.Belt road 7 is arranged in undermost 2 the below of going up a hill in the stage, and the lower disposed in belt road 7 has main chute 5, and main chute 5 bottoms are transported lane 6 with the stage and are communicated with.Ramp 4 is arranged in 2 the two ends of going up a hill, ramp 4 be from top to bottom communicated with each layering go up a hill 2, belt road 7 and stage transportation lane 6.
2) transportation
Ore 16 in stope is transported to panel drop shaft 12 by scraper, by the vibration ore dumping machine in panel drop shaft 12 to the belt ore drawing in belt road 7, again through belt-conveying to main chute 5, then by the vibration ore dumping machine in main chute 5 to the mine car ore drawing in stage transportation lane 6.
3) exploitation and filling
Three step back production are divided in panel: as shown in Figure 1 and Figure 5, and a step rooming 15, two step stooping pillarings 14 after tailing cemented filling, then the three step back production ore pillar 18 of going up a hill after tailing cemented filling, last tailing cemented filling three step stopes.A step back production in panel and two step back production 2 are carried out from the bottom to top successively along going up a hill, and three step back production in panel 2 are carried out from the bottom to top along going up a hill.Three step back production are carried out after all step back production in each corresponding panel of same layering and filling and two step back production and filling complete.
If a plurality of stopes in a plurality of panels of multi-segment are exploited simultaneously: 1. the exploitation in higher slice panel is carried out after a step back production corresponding to two corresponding panels of lower leaf and filling and two step back production and filling complete; 2. the three step back production in the higher slice panel equal back production of all stopes and filling in the corresponding panel of lower leaf carried out after completing.
Described a step back production and filling are: during a step back production, as shown in Figure 2, by going up a hill, 2 enter mineral building 15, by mineral building 15 ends to the 2 direction drawing back of going up a hill.Take rock drilling lane 17 as working space, to both sides and top board direction, creep into shallow bore hole, after shallow blasting, transport ore 16.The ore body that is less than 3.5 ~ 4m for thickness is once adopted entirely thick, and the ore body that is greater than 3.5 ~ 4m for thickness first undercuts, more upwards caunches.When back production is neighbouring to panel drop shaft 12, as shown in Figure 4, stay drop shaft safety pillar 20.The stope that causes drop shaft connection lane 13 to use for back production meeting, carries out when three step back production is stayed in the back production of described stope.When back production is during to stope border, shutoff rock drilling lane 17, the interior pre-buried filter pipe of filling counterfort 19 in shutoff rock drilling lane 17,2 carries out tailing cemented filling downwards through filling gravity vent 10 by going up a hill of higher slice.
Described two step back production and filling are: as shown in Figure 3, except mineral building 15 is ore pillar 14, all the other are identical with filling with a step back production.
Described three step back production and filling are: during three step back production, as shown in Figure 4, will go up a hill 2 as drilling drift, take panel as unit, and back production from the bottom to top, ore 16 is transported to panel drop shaft 12.When back production is neighbouring to panel drop shaft 12, stay drop shaft safety pillar 20, shutoff drop shaft connection lane 13.After ore pillar 18 back production of going up a hill in panel complete, shutoff goes up a hill 2, by going up a hill, tailing cemented filling is carried out in goaf, 4 pairs, 2 upper ramps road 11, form obturation 9, the ventilating duct of going up a hill during ore pillar 18 back production in the interior pre-buried filter pipe of obturation 9 and pre-buried next panel, after obturation 9 final set, along the ore pillar 18 of going up a hill in the next panel of 2 working to the rises of going up a hill.
embodiment 2
A kind of multilayer gentle dip is thin-in thick mineral deposit filling mining method.This mineral deposit is that level is to gentle dip multi-layer thin mineral deposit, 0 ~ 18 °, the slanting angle of ore body, orebody trend length 620 ~ 1100m, tendency is extended 460 ~ 856m, orebody thickness is generally 2.3 ~ 3.4m, dirt band thickness is generally 6 ~ 10m, and this mineral deposit ore-rock stability is medium to better, and Mine Area Engineering Geology condition belongs to simple-medium type.
This mineral deposit filling mining method is with embodiment 1.
This specific embodiment compared with prior art has following good effect:
This specific embodiment is panel by each layering ore body division, and mineral building 15 and ore pillar 14 interlaced arrangement can a plurality of panels, a plurality of stope exploits simultaneously.Meanwhile, in panel, the back production of different stopes and the parallel operations of filling energy, do not interfere with each other.Adopt scraper ore removal, realized continuous high strength exploitation, improved mine capacity.
This specific embodiment is divided three step back production by panel, and classifying rationally mineral building 15 and ore pillar 14 only leave a little drop shaft safety pillar 20, and ore recovery ratio is high; Rock drilling lane 17 and go up a hill 2 all along ore body base plate driving, adopts shallow bore hole driling explosion, can control well ore limits, and ore dilution rate is low.
The fresh distinguished and admirable ramp 4 by 2 bottoms of going up a hill in this specific embodiment joins lane 3 to going up a hill 2 through ramp, enter again each stope and wash away work plane, dirty wind enters going up a hill after 2 of higher slice through filling gravity vent 10, ramp 4 through 2 tops of going up a hill enters return aircourse, ventilation circuit is simple, and ventilation effect is better.
Ramp 4 in this specific embodiment, go up a hill 2 and rock drilling lane 17 all have the multiple uses such as pedestrian, ventilation and trackless equipment walking, article one, go up a hill and 2 serve a plurality of stopes in both sides, the filling gravity vent 10 creeping into downwards at 2 base plates of going up a hill of higher slice do to ventilate and filling dual-purpose, go up a hill 2 ventilations as lower leaf and the stowboard use of higher slice, adopt 7 transportations of belt road can avoid tunneling a large amount of haulage drifts, by these rational tunnels, arrange, meeting under the requirement of exploitation, adopt that to cut tunnelling amount few, reduced to adopt and cut ratio.
This specific embodiment adopt the minimizing of cutting tunnelling amount, the raising of mining rate and ore recovery ratio, and the reduction of the rate of dilution, all reduced mining cost.
Therefore, this specific embodiment is when guaranteeing stope job safety, can reduce to adopt and cut tunnelling amount and guarantee the continuous high strength exploitation in panel, packing job and actual mining are independent of each other, therefore have the advantages that ore recovery ratio is high, the rate of dilution is low and mining cost is low.This specific embodiment is mainly used in orebody thickness 2.5 ~ 6m, dirt band thickness 5 ~ 15m, multilayer gentle dip that inclination angle is 5 ~ 30 ° is thin-in the underground mining in thick mineral deposit.

Claims (4)

  1. Multilayer gentle dip thin-in a thick mineral deposit filling mining method, it is characterized in that the step of described mining methods is:
    1) cut journey layout is divided and adopted to nugget
    1. nugget is divided
    Mineral deposit is divided into the stage, and each layering ore body division in the stage is panel; Along orebody strike, at the bottom of ore layer (1) driving, going up a hill (2), is mineral building (15) and ore pillar (14) along go up a hill (2) by both sides ore body division, and mineral building (15) and ore pillar (14) are interlaced arrangement;
    2. adopting cut journey arranges
    By each go up a hill (2), in the middle of stope, tunnel rock drilling lane (17), except undermost going up a hill (2) in the stage, base plate in go up a hill (2) of all the other each layerings creeps into respectively filling gravity vent (10) downwards, and each filling gravity vent (10) that each go up a hill (2) are drilled with is communicated with stope at the peak of each corresponding stope end top board through dirt band (8); In stage, go up a hill (2) of the superiors are arranged in the dirt band (8) of the superiors' ore body top in the stage, and in the stage, go up a hill (2) of the superiors are apart from the superiors' ore body 4 ~ 6m in the stage; Except going up a hill (2) of the superiors in the stage, centered by respectively going up a hill (2), all the other stay respectively the ore pillar of going up a hill (18); Panel drop shaft (12) is arranged in and is arranged in the go up a hill ore pillar (14) of (2) bottom of panel, panel drop shaft (12) bottom is communicated with belt road (7), and panel drop shaft (12) extends upward with go up a hill (2) of each layering in the stage and is communicated with; Belt road (7) is arranged in the below of undermost going up a hill (2) in the stage, and the lower disposed of belt road (7) has main chute (5), and main chute (5) bottom is communicated with stage transportation lane (6); Ramp (4) is arranged in the two ends of go up a hill (2), and ramp (4) is communicated with go up a hill (2), belt road (7) and the stage transportation lane (6) of each layering from top to bottom;
    2) transportation
    Ore in stope (16) is transported to panel drop shaft (12) by scraper, by the vibration ore dumping machine in panel drop shaft (12) to the belt ore drawing in belt road (7), again through belt-conveying to main chute (5), then by the vibration ore dumping machine in main chute (5), transport the mine car ore drawing in lane (6) to the stage;
    3) exploitation and filling
    Three step back production are divided in panel: a step rooming (15), two step stooping pillarings (14) after tailing cemented filling, then the three step back production ore pillar (18) of going up a hill after tailing cemented filling, last tailing cemented filling three step stopes; A step back production in panel and two step back production are carried out from the bottom to top successively along go up a hill (2), and three step back production in panel are carried out from the bottom to top along go up a hill (2); Three step back production are carried out after all step back production in each corresponding panel of same layering and filling and two step back production and filling complete;
    If a plurality of stopes in a plurality of panels of multi-segment are exploited simultaneously: 1. the exploitation in higher slice panel is carried out after a step back production corresponding to two corresponding panels of lower leaf and filling and two step back production and filling complete; 2. the three step back production in the higher slice panel equal back production of all stopes and filling in the corresponding panel of lower leaf carried out after completing.
  2. Multilayer gentle dip according to claim 1 thin-in thick mineral deposit filling mining method, it is characterized in that described a step back production and filling are: during a step back production, by go up a hill (2), enter mineral building (15), by mineral building (15) end to (2) the direction drawing back of going up a hill; Take rock drilling lane (17) is working space, to both sides and top board direction, creeps into shallow bore hole, transports ore (16) after shallow blasting; When if orebody thickness is less than 3.5 ~ 4m, once adopt entirely thickly, if when orebody thickness is greater than 3.5 ~ 4m, first undercut, more upwards caunch; When back production is neighbouring to panel drop shaft (12), stay drop shaft safety pillar (20); If the stope that back production meeting causes drop shaft connection lane (13) to use, carries out when three step back production is stayed in the back production of described stope; When back production is during to stope border, shutoff rock drilling lane (17), pre-buried filter pipe in the filling counterfort (19) in shutoff rock drilling lane (17), carries out tailing cemented filling by go up a hill (2) of higher slice downwards through filling gravity vent (10).
  3. Multilayer gentle dip according to claim 1 thin-in thick mineral deposit filling mining method, it is characterized in that described two step back production and filling are: except mineral building (15) is ore pillar (14), all the other are identical with filling with a step back production.
  4. Multilayer gentle dip according to claim 1 thin-in thick mineral deposit filling mining method, it is characterized in that described three step back production and filling are: during three step back production, to go up a hill (2) as drilling drift, take panel as unit, back production from the bottom to top, ore (16) is transported to panel drop shaft (12); When back production is neighbouring to panel drop shaft (12), stay drop shaft safety pillar (20), shutoff drop shaft connection lane (13); After the ore pillar of going up a hill (18) back production in panel completes, shutoff is gone up a hill (2), by (2) the upper ramps road (4) of going up a hill, goaf (11) is carried out to tailing cemented filling, forms obturation (9); Ventilating duct in obturation (9) during the ore pillar of going up a hill (18) back production in pre-buried filter pipe and pre-buried next panel, after obturation (9) final set, along the ore pillar of going up a hill (18) in the next panel of (2) working to the rise of going up a hill.
CN201310605791.6A 2013-11-26 2013-11-26 A kind of multilayer gentle dip is thin-in thick mineral deposit filling mining method Active CN103628877B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310605791.6A CN103628877B (en) 2013-11-26 2013-11-26 A kind of multilayer gentle dip is thin-in thick mineral deposit filling mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310605791.6A CN103628877B (en) 2013-11-26 2013-11-26 A kind of multilayer gentle dip is thin-in thick mineral deposit filling mining method

Publications (2)

Publication Number Publication Date
CN103628877A true CN103628877A (en) 2014-03-12
CN103628877B CN103628877B (en) 2015-09-02

Family

ID=50210291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310605791.6A Active CN103628877B (en) 2013-11-26 2013-11-26 A kind of multilayer gentle dip is thin-in thick mineral deposit filling mining method

Country Status (1)

Country Link
CN (1) CN103628877B (en)

Cited By (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967493A (en) * 2014-05-23 2014-08-06 山东黄金矿业(莱州)有限公司三山岛金矿 Pillar mining method for gentle dip thin ores
CN104358573A (en) * 2014-09-04 2015-02-18 广东安元矿业勘察设计有限公司 Block open-stope and block caving combined mining method of thick orebody
CN104695960A (en) * 2015-02-10 2015-06-10 山东黄金矿业(玲珑)有限公司 Air column well completion back coming subsequent filling mining method
CN104727820A (en) * 2015-04-07 2015-06-24 长沙有色冶金设计研究院有限公司 Two-step sublevel open-stop and delayed filling mining method
CN104895566A (en) * 2015-06-15 2015-09-09 武汉科技大学 Mining method with residual ore recovery function
CN105649631A (en) * 2016-03-02 2016-06-08 大冶有色金属有限责任公司 Efficient mechanical mining method for gently-inclined thin ore bodies
CN105673072A (en) * 2016-01-21 2016-06-15 华北理工大学 Filling mining model after section-wise drilling flat bottom ore removal
CN105927225A (en) * 2016-06-29 2016-09-07 安徽理工大学 Full-seam extraction method for stoping bottom layering of shallow extremely thick loose coal seam
CN106522954A (en) * 2016-12-26 2017-03-22 山东瑞源钾盐工程技术股份有限公司 Vertical comprehensive mechanical mining method for super-thick potassium salt deposit
CN106989618A (en) * 2017-04-26 2017-07-28 贵州理工学院 Cooling system inside large volume goaf filling body
CN107420103A (en) * 2017-07-06 2017-12-01 中国煤炭科工集团太原研究院有限公司 A kind of machine is adopted adopts the special thick solid potassium salt ore deposit recovery method being combined with big gun
CN107762515A (en) * 2017-11-15 2018-03-06 中冶沈勘秦皇岛工程设计研究总院有限公司 A kind of gently inclined medium thick orebody panel filling mining method
CN108894783A (en) * 2018-07-11 2018-11-27 鄂托克旗乌仁都西煤焦有限责任公司 A kind of half-edge coal seam paste body filling coal-mining technique
CN109025996A (en) * 2018-07-24 2018-12-18 周伟永 A kind of underground mine successively squeezes, photoface exploision mining methods
CN110374601A (en) * 2019-07-25 2019-10-25 长沙矿山研究院有限责任公司 A kind of safe and efficient mining codes of high-dipping bilayer ore body
CN110656968A (en) * 2019-09-11 2020-01-07 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 Method for retaining ventilation channels in filling mining method and embedded member
CN110905515A (en) * 2019-11-25 2020-03-24 南华大学 Combined filling mining method for complex ore body
CN110952981A (en) * 2019-11-14 2020-04-03 南华大学 Residual ore mining method for gently inclined medium-thick and large ore body
CN111088979A (en) * 2019-12-03 2020-05-01 南华大学 Downward access filling mining method
CN111927452A (en) * 2020-09-25 2020-11-13 矿冶科技集团有限公司 Ore body upper and lower tray cooperative downward continuous mining method
CN112855159A (en) * 2021-01-15 2021-05-28 山东黄金归来庄矿业有限公司 Sector recovery method for gently inclined ore pillar
CN113605919A (en) * 2021-08-17 2021-11-05 山西晋煤集团技术研究院有限责任公司 Method for reusing upper layered working face roadway reserved as lower layered working face

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101487392A (en) * 2008-01-16 2009-07-22 中国神华能源股份有限公司 House pillar type coal mining method
RU2364722C1 (en) * 2008-04-16 2009-08-20 Государственное образовательное учреждение высшего профессионального образования "Сибирский государственный индустриальный университет" Developing method of heavy abrupt layer with cast solid stowing
CN101956556A (en) * 2009-07-16 2011-01-26 中国瑞林工程技术有限公司 Roof and bottom pillar-free stage upward continuous filling and mining method
CN102635356A (en) * 2012-04-26 2012-08-15 中南大学 Medium-length hole mining method in multiple blasting free faces of high dipping thin veins
CN103104258A (en) * 2013-01-28 2013-05-15 西南科技大学 Method for improving ore recovery rate of gentle dip ore body by non-pillar sublevel caving
CN103397906A (en) * 2013-08-05 2013-11-20 北京科技大学 Grouting type filling retaining wall, construction method of grouting type filling retaining wall and goaf filling system and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101487392A (en) * 2008-01-16 2009-07-22 中国神华能源股份有限公司 House pillar type coal mining method
RU2364722C1 (en) * 2008-04-16 2009-08-20 Государственное образовательное учреждение высшего профессионального образования "Сибирский государственный индустриальный университет" Developing method of heavy abrupt layer with cast solid stowing
CN101956556A (en) * 2009-07-16 2011-01-26 中国瑞林工程技术有限公司 Roof and bottom pillar-free stage upward continuous filling and mining method
CN102635356A (en) * 2012-04-26 2012-08-15 中南大学 Medium-length hole mining method in multiple blasting free faces of high dipping thin veins
CN103104258A (en) * 2013-01-28 2013-05-15 西南科技大学 Method for improving ore recovery rate of gentle dip ore body by non-pillar sublevel caving
CN103397906A (en) * 2013-08-05 2013-11-20 北京科技大学 Grouting type filling retaining wall, construction method of grouting type filling retaining wall and goaf filling system and method

Cited By (35)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967493B (en) * 2014-05-23 2015-12-02 山东黄金矿业(莱州)有限公司三山岛金矿 A kind of slight slope and thin ore body ore pillar mining codes
CN103967493A (en) * 2014-05-23 2014-08-06 山东黄金矿业(莱州)有限公司三山岛金矿 Pillar mining method for gentle dip thin ores
CN104358573A (en) * 2014-09-04 2015-02-18 广东安元矿业勘察设计有限公司 Block open-stope and block caving combined mining method of thick orebody
CN104695960A (en) * 2015-02-10 2015-06-10 山东黄金矿业(玲珑)有限公司 Air column well completion back coming subsequent filling mining method
CN104695960B (en) * 2015-02-10 2016-11-02 山东黄金矿业(玲珑)有限公司 Air column becomes well back coming afterwards filling mining method
CN104727820A (en) * 2015-04-07 2015-06-24 长沙有色冶金设计研究院有限公司 Two-step sublevel open-stop and delayed filling mining method
CN104895566A (en) * 2015-06-15 2015-09-09 武汉科技大学 Mining method with residual ore recovery function
CN104895566B (en) * 2015-06-15 2017-03-08 武汉科技大学 A kind of remnant reclaiming mining codes
CN105673072A (en) * 2016-01-21 2016-06-15 华北理工大学 Filling mining model after section-wise drilling flat bottom ore removal
CN105673072B (en) * 2016-01-21 2018-03-23 华北理工大学 The flat ore removal afterwards filling mining model of sublevel drilling
CN105649631B (en) * 2016-03-02 2017-09-26 大冶有色金属有限责任公司 A kind of efficient mining methods of the mechanization of slight slope and thin ore body
CN105649631A (en) * 2016-03-02 2016-06-08 大冶有色金属有限责任公司 Efficient mechanical mining method for gently-inclined thin ore bodies
CN105927225A (en) * 2016-06-29 2016-09-07 安徽理工大学 Full-seam extraction method for stoping bottom layering of shallow extremely thick loose coal seam
CN106522954A (en) * 2016-12-26 2017-03-22 山东瑞源钾盐工程技术股份有限公司 Vertical comprehensive mechanical mining method for super-thick potassium salt deposit
CN106522954B (en) * 2016-12-26 2019-03-08 山东瑞源钾盐工程技术股份有限公司 The vertical comprehensive mechanical mining method of special thickness sylvite deposit
CN106989618A (en) * 2017-04-26 2017-07-28 贵州理工学院 Cooling system inside large volume goaf filling body
CN107420103A (en) * 2017-07-06 2017-12-01 中国煤炭科工集团太原研究院有限公司 A kind of machine is adopted adopts the special thick solid potassium salt ore deposit recovery method being combined with big gun
CN107762515A (en) * 2017-11-15 2018-03-06 中冶沈勘秦皇岛工程设计研究总院有限公司 A kind of gently inclined medium thick orebody panel filling mining method
CN108894783A (en) * 2018-07-11 2018-11-27 鄂托克旗乌仁都西煤焦有限责任公司 A kind of half-edge coal seam paste body filling coal-mining technique
CN108894783B (en) * 2018-07-11 2019-06-21 鄂托克旗乌仁都西煤焦有限责任公司 A kind of half-edge coal seam paste body filling coal-mining technique
CN109025996A (en) * 2018-07-24 2018-12-18 周伟永 A kind of underground mine successively squeezes, photoface exploision mining methods
CN109025996B (en) * 2018-07-24 2019-12-10 周伟永 Underground mine layer-by-layer extrusion and smooth blasting mining method
CN110374601B (en) * 2019-07-25 2020-06-02 长沙矿山研究院有限责任公司 Safe and efficient mining method for steeply inclined double-layer ore body
CN110374601A (en) * 2019-07-25 2019-10-25 长沙矿山研究院有限责任公司 A kind of safe and efficient mining codes of high-dipping bilayer ore body
CN110656968A (en) * 2019-09-11 2020-01-07 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 Method for retaining ventilation channels in filling mining method and embedded member
CN110656968B (en) * 2019-09-11 2022-01-11 深圳市中金岭南有色金属股份有限公司凡口铅锌矿 Method for retaining ventilation channels in filling mining method and embedded member
CN110952981A (en) * 2019-11-14 2020-04-03 南华大学 Residual ore mining method for gently inclined medium-thick and large ore body
CN110905515A (en) * 2019-11-25 2020-03-24 南华大学 Combined filling mining method for complex ore body
CN111088979A (en) * 2019-12-03 2020-05-01 南华大学 Downward access filling mining method
CN111088979B (en) * 2019-12-03 2021-05-04 南华大学 Downward access filling mining method
CN111927452A (en) * 2020-09-25 2020-11-13 矿冶科技集团有限公司 Ore body upper and lower tray cooperative downward continuous mining method
CN111927452B (en) * 2020-09-25 2021-01-08 矿冶科技集团有限公司 Ore body upper and lower tray cooperative downward continuous mining method
CN112855159A (en) * 2021-01-15 2021-05-28 山东黄金归来庄矿业有限公司 Sector recovery method for gently inclined ore pillar
CN113605919A (en) * 2021-08-17 2021-11-05 山西晋煤集团技术研究院有限责任公司 Method for reusing upper layered working face roadway reserved as lower layered working face
CN113605919B (en) * 2021-08-17 2023-09-08 山西晋煤集团技术研究院有限责任公司 Method for setting upper layered working face roadway as lower layered working face multiplexing

Also Published As

Publication number Publication date
CN103628877B (en) 2015-09-02

Similar Documents

Publication Publication Date Title
CN103628877B (en) A kind of multilayer gentle dip is thin-in thick mineral deposit filling mining method
CN107869349B (en) A kind of mechanized mining method of gently inclined medium thick orebody
CN104727820B (en) Two-step sublevel open-stop and delayed filling mining method
CN108612530B (en) Mining method for hanging wall surrounding rock crushing inclined medium-thickness ore body
CN105587318B (en) A kind of method of mining by the way of filling of the parallel middle thickness orebody group continuous stoping of low-angle dip
CN107339104B (en) Security personnel's curtain wall recovery method
CN103557002B (en) A kind of mechanized concentrates drop shaft filling-up method
CN103527200B (en) Bottom-column-free sectional Rhombic room afterwards filling mining method
CN103089266B (en) Drift-pillar-free sublevel barnyard caving mining method of open pit transferred underground transitional period
CN103437769B (en) Combination is reproduced structure medium-length hole ore blast and is worked in coordination with cable bolting afterwards filling mining method
CN106223958A (en) The slant middle thick orebody subregion rock drilling stage ore deposit afterwards filling that falls works in coordination with mining codes
CN108547618A (en) A kind of two steps mining methods leave the recovery process of studding
CN103032070A (en) Boundary-controlled room column type sublevel open stoping subsequent stage filling mining method
CN102953733A (en) Central outside-vein house pillar type combined crosscut two-end inside-vein continuous segment filling mining method
CN107687341A (en) A kind of Upward slicing point pillar filling mining method of extremely thick big unstable ore body
CN111550244B (en) Mining method for layered strips of gently inclined ore body
CN102953732A (en) Room-and-pillar major-diameter longhole inverted-step-like segmented lateral caving subsequent filling mining method
CN106761912A (en) It is a kind of be suitable for unstable formation efficiently on to route slicing and filling mining methods
CN110905516B (en) High-sublevel cut-and-fill mining method with downward layered horizontal access
CN104373125A (en) Two-step upward high-layering bagging cut-and-filling stoping method
CN109869150B (en) Mine resource subsection full-mining local-charging mining method
CN104358574B (en) The horizontal room-and-pillar stoping of gently inclined orebody
CN108825237A (en) A kind of special thick coal continuous milling machine divides excavating technology with the layering combined is filled
CN103147759B (en) Prospecting and short-hole shrinkage mining method of small inclined ore body
CN106194188A (en) The quick-fried power of scraper collaborative carrying puppet tilts room and pillar stoping

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant