CN103628486A - Later-construction method for inner wall of basement - Google Patents

Later-construction method for inner wall of basement Download PDF

Info

Publication number
CN103628486A
CN103628486A CN201310618152.3A CN201310618152A CN103628486A CN 103628486 A CN103628486 A CN 103628486A CN 201310618152 A CN201310618152 A CN 201310618152A CN 103628486 A CN103628486 A CN 103628486A
Authority
CN
China
Prior art keywords
inwall
floor
wall
basement
joint bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310618152.3A
Other languages
Chinese (zh)
Other versions
CN103628486B (en
Inventor
龚寅
陈军
朱王怡
宋一帆
尤雪春
张欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No 7 Construction Co Ltd
Original Assignee
Shanghai No 7 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No 7 Construction Co Ltd filed Critical Shanghai No 7 Construction Co Ltd
Priority to CN201310618152.3A priority Critical patent/CN103628486B/en
Publication of CN103628486A publication Critical patent/CN103628486A/en
Application granted granted Critical
Publication of CN103628486B publication Critical patent/CN103628486B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a later-construction method for an inner wall of a basement. The later-construction method comprises the steps that during structure storey construction, inner wall inverse-inserting ribs are inserted into hidden beams of the later-made inner wall; the later-made inner wall and the hidden beams of floors are provided with water stopping strips which swell with water; bottom templates of the hidden beams are provided with inner wall inverse-inserting rib holes, and the inverse-inserting ribs are inserted into the inner wall inverse-inserting rib holes; water stopping steel boards are arranged in inner wall construction gaps in the floor where the later-made inner wall is located and the floor above the later-made inner wall; concrete conveying holes are formed from a floor plate of the floor above the later-made inner wall to a floor plate of the floor where the later-made inner wall is located; stuffy demolition supports are disassembled, the inner wall inverse-inserting ribs are connected, and lack supply is conducted on the inner wall. By means of the method, construction quality of the inner wall is effectively improved, and a construction period is shortened.

Description

A kind of method of constructing after basement inwall
Technical field
The present invention relates to Building Engineering Design field, relate in particular to a kind of method of constructing after basement inwall.
Background technology
At present, along with deep-foundation pit engineering more and more occurs, go along with sb. to guard him the way of diaphragm wall and the two wall unifications of structure outer wall of basement and also used widely.Above-mentioned structure outer wall of basement is known as again inwall, generally take along the mode done from bottom to top isostructure floor construct successively; But go along with sb. to guard him the more special engineering of operating mode for some, local support cannot need to retain certain hour rear dismountable along tearing open, cause the construction that cannot make progress smoothly of the inwall of support zone.Fig. 1 is the foundation pit structure schematic top plan view near the base pit engineering of subway.With reference to Fig. 1, this project foundation ditch is divided I-1, I-2, II-1, II-2 and five pittings of II-3 altogether, and constructs successively according to the order of I-1 → I-2 → II-2 → II-1/II-3, and the order of supporting removal is just in time contrary; I-1, I-2 Ge She tri-road concrete supports, due to I-2 basement floor large area disappearance, therefore I-2 second concrete support is torn open after need retaining, and corresponding I-1 second concrete support is torn open after also needing to retain, and causes the inwall of I-1 second concrete support respective side suitable to do.
If take the method for first pre-buried inwall reinforcing bar when Construction of Supporting to reach the once object of construction, also will cause a series of problem, the one, when support and excavation and construction, embedded bar easily damages; The 2nd, support with the waterproof of inwall interface and be prone to problem; In addition, different from the concrete grade of inwall owing to supporting, embedded bar is once constructed and cannot be guaranteed the construction quality of inwall.
Summary of the invention
The invention provides a kind of method of constructing after basement inwall, to solve, support vexed tearing open in situation, the problem that the inwall of support zone cannot make progress smoothly and construct.
The invention provides a kind of method of constructing after basement inwall, comprising: structure floor when construction, after insert inwall in doing the dark beam of inwall and fall joint bar; After do inwall and the dark Liang Chu of floor arranges water-swellable sealing rod; Dark beam bottom mother plate is outputed the inwall hole of falling joint bar, inwall is fallen to joint bar and insert the described inwall hole of falling joint bar; After do inwall floor and above steel plate for sealing water is set in the inwall constuction joint of floor; After do floor above inwall until stay and establish concrete haul hole in doing the floor of inwall floor after described; Remove the vexed support of tearing open, connect described inwall and fall joint bar, the described inwall of filling a vacancy.
Preferably, after described, do inwall and the dark Liang Chu of described floor also arranges the pre-buried Grouting Pipe that repeats.
Preferably, on described dark beam bottom mother plate, pad is established extruded sheet.
Preferably, the quantity of described extruded sheet is two, and the thickness of described two extruded sheets is different, forms stairstepping.
Preferably, the thickness of a described extruded sheet is 100cm, and the thickness of extruded sheet is 30cm described in another piece.
Preferably, fall before joint bar described inwall to be fallen to joint bar and described steel plate for sealing water to clear up connecting described inwall.
Preferably, described inwall falls the employing straight thread connector suitable for reading of joint bar, and described inwall falls the end opening of joint bar and adopts colligation to connect.
Compare with the method that supports interior pre-buried inwall bar one-time construction, the present invention has following beneficial effect:
1. method provided by the invention can effectively improve the construction quality of inwall, and the reduction of erection time;
2. compared to cutting the earth and driving phase, it is that embedded bar is not easy to be damaged that the inwall in structure construction stage falls joint bar;
3. the waterproof effect of inwall upper and lower constuction joint can be guaranteed by embedded water stop steel plate, expansion sealing strip, and has lacked the constuction joint supporting together with inwall, has lacked an infiltration hidden danger;
4. can guarantee that inwall concrete adopts same label, guarantee architecture quality.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the invention will be further described:
Fig. 1 is the foundation pit structure schematic top plan view near the base pit engineering of subway;
The flow chart of steps of the method for constructing after the basement inwall that Fig. 2 provides for the embodiment of the present invention;
The cross-sectional view of constructing after the basement inwall that Fig. 3 provides for the embodiment of the present invention;
The part partial enlarged drawing of Fig. 3 that Fig. 4 provides for the embodiment of the present invention;
The dark beam bottom mother plate cross-sectional view of inwall that Fig. 5 provides for the embodiment of the present invention;
The inwall haul mouth plane structure schematic diagram that Fig. 6 provides for the embodiment of the present invention.
In Fig. 3 to Fig. 6,
1: concrete haul hole; 2: diaphragm wall; 3: steel plate for sealing water; 4: after do inwall; 5: the pre-buried Grouting Pipe that repeats; 6: water-swellable sealing rod; 7: vexedly tear support open; 8: inwall falls joint bar; 9: the dark beam of floor; 10: the first extruded sheets; 11: the second extruded sheets; 12: dark beam bottom mother plate.
The specific embodiment
The method of constructing after basement inwall the present invention being proposed below in conjunction with the drawings and specific embodiments is described in further detail.According to the following describes and claims, advantages and features of the invention will be clearer.It should be noted that, accompanying drawing all adopts very the form of simplifying and all uses non-ratio accurately, only in order to convenient, the object of the aid illustration embodiment of the present invention lucidly.
Core concept of the present invention is, when underground chamber liner wall, cannot once construct or once construct under the prerequisite that cannot ensure the quality of products, and method provided by the invention can effectively improve the construction quality of inwall, and the reduction of erection time; Compared to cutting the earth and driving phase, it is that embedded bar is not easy to be damaged that the inwall in structure construction stage falls joint bar; The waterproof effect of inwall upper and lower constuction joint can be guaranteed by embedded water stop steel plate, expansion sealing strip, and has lacked the constuction joint supporting together with inwall, has lacked an infiltration hidden danger; Can guarantee that inwall concrete adopts same label, guarantees architecture quality.
The flow chart of steps of the method for constructing after the basement inwall that Fig. 2 provides for the embodiment of the present invention.With reference to Fig. 2, the method for constructing after basement inwall comprises the following steps:
During the construction of S21, structure floor, after insert inwall in doing the dark beam of inwall and fall joint bar;
S22, after do inwall and the dark Liang Chu of floor arranges water-swellable sealing rod;
S23, dark beam bottom mother plate are outputed the inwall hole of falling joint bar, inwall is fallen to joint bar and insert the described inwall hole of falling joint bar;
S24, after do inwall floor and above steel plate for sealing water is set in the inwall constuction joint of floor;
S25, after described, do floor above inwall until after do in the floor of inwall floor and stay and establish concrete haul hole;
S26, remove the vexed support of tearing open, connect described inwall and fall joint bar, the described inwall of filling a vacancy.
The cross-sectional view of constructing after the basement inwall that Fig. 3 provides for the embodiment of the present invention.With reference to Fig. 3, in the present embodiment, need to be to carrying out rear construction near the basement inwall of diaphragm wall 2, need to carry out comprising in the basement inwall of rear construction that vexed tearing open support 7.Can support 7 and reach after dismounting condition vexed tearing open, remove and support.
The part partial enlarged drawing of Fig. 3 that Fig. 4 provides for the embodiment of the present invention; The dark beam bottom mother plate cross-sectional view of inwall that Fig. 5 provides for the embodiment of the present invention; The inwall haul mouth plane structure schematic diagram that Fig. 6 provides for the embodiment of the present invention.With reference to Fig. 3 to Fig. 6, do inwall 4 after described, with the dark Liang9Chu of described floor, the pre-buried Grouting Pipe 5 that repeats be also set, pre-buried repeat Grouting Pipe 5 and water-swellable sealing rod 6 all to after do inwall 4 upper and lower constuction joint play waterproof effect.In addition, after do inwall floor and above the steel plate for sealing water 3 that arranges in the inwall constuction joint of floor also played waterproof effect.
In the present embodiment, for preventing perforate after-pouring concrete spillage, on described dark beam bottom mother plate 12, pad is established extruded sheet, and the quantity of described extruded sheet is two, for convenience of description, two extruded sheets are divided into the first extruded sheet 10 and the second extruded sheet 11, the thickness of two extruded sheets is different, forms stairstepping, particularly, the thickness of the first extruded sheet 10 is 100cm, and the thickness of the second extruded sheet 11 is 30cm.
Preferably, fall that joint bar 8 is front to fall joint bar 8 and described steel plate for sealing water 3 to described inwall and clear up connecting described inwall.Described inwall falls the employing straight thread connector suitable for reading of joint bar 8, and described inwall falls the end opening of joint bar 8 and adopts colligation to connect.
With reference to Fig. 5, for building inwall concrete, after described, do floor above inwall until after do in the floor of inwall floor and stay and establish concrete haul hole 1, and mend after completing inwall concrete.
Obviously, those skilled in the art can carry out various changes and distortion and not depart from the spirit and scope of the present invention the present invention.Like this, if within of the present invention these are revised and modification belongs to the scope of the claims in the present invention and equivalent technologies thereof, the present invention is also intended to comprise these changes and modification interior.

Claims (7)

1. a method of constructing after basement inwall, is characterized in that, comprising:
Structure floor when construction, after insert inwall in doing the dark beam of inwall and fall joint bar;
After do inwall and the dark Liang Chu of floor arranges water-swellable sealing rod;
Dark beam bottom mother plate is outputed the inwall hole of falling joint bar, inwall is fallen to joint bar and insert the described inwall hole of falling joint bar;
After do inwall floor and above steel plate for sealing water is set in the inwall constuction joint of floor;
After do floor above inwall until stay and establish concrete haul hole in doing the floor of inwall floor after described;
Remove the vexed support of tearing open, connect described inwall and fall joint bar, the described inwall of filling a vacancy.
2. the method for constructing after basement inwall according to claim 1, is characterized in that, does inwall after described and the dark Liang Chu of described floor also arranges the pre-buried Grouting Pipe that repeats.
3. the method for constructing after basement inwall according to claim 1, is characterized in that, on described dark beam bottom mother plate, pad is established extruded sheet.
4. the method for constructing after basement inwall according to claim 3, is characterized in that, the quantity of described extruded sheet is two, and the thickness of described two extruded sheets is different, forms stairstepping.
5. the method for constructing after basement inwall according to claim 4, is characterized in that, the thickness of a described extruded sheet is 100cm, and the thickness of extruded sheet is 30cm described in another piece.
6. according to the method for constructing after the basement inwall described in any one in claim 1 to 5, it is characterized in that, fall before joint bar described inwall to be fallen to joint bar and described steel plate for sealing water to clear up connecting described inwall.
7. according to the method for constructing after the basement inwall described in any one in claim 1 to 5, described inwall falls the employing straight thread connector suitable for reading of joint bar, and described inwall falls the end opening of joint bar and adopts colligation to connect.
CN201310618152.3A 2013-11-27 2013-11-27 A kind of method of construction after basement inwall Active CN103628486B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310618152.3A CN103628486B (en) 2013-11-27 2013-11-27 A kind of method of construction after basement inwall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310618152.3A CN103628486B (en) 2013-11-27 2013-11-27 A kind of method of construction after basement inwall

Publications (2)

Publication Number Publication Date
CN103628486A true CN103628486A (en) 2014-03-12
CN103628486B CN103628486B (en) 2016-08-31

Family

ID=50209913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310618152.3A Active CN103628486B (en) 2013-11-27 2013-11-27 A kind of method of construction after basement inwall

Country Status (1)

Country Link
CN (1) CN103628486B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421497A (en) * 2015-09-14 2016-03-23 上海建工七建集团有限公司 Water-proof construction method for connected nodes of foundation slab and ground wall in composite surround system
CN105887922A (en) * 2015-12-28 2016-08-24 上海建工七建集团有限公司 Truss supporting device and method for constructing lining wall by means of truss supporting device
CN106168035A (en) * 2016-08-17 2016-11-30 广州地铁设计研究院有限公司 The subassembly formula construction method of subassembly formula underground structure and underground structure
CN112240033A (en) * 2019-07-18 2021-01-19 重庆建工第七建筑工程有限责任公司 Construction method of unconventional reverse construction outer wall structure in high slope area

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09268583A (en) * 1996-03-29 1997-10-14 Tokyu Koken Kk Structural steel embedded half precast concrete member and construction method of underground structure using the same member
CN201933514U (en) * 2010-12-17 2011-08-17 上海市电力公司 Leakage-prevention structure for 500KV underground substation

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09268583A (en) * 1996-03-29 1997-10-14 Tokyu Koken Kk Structural steel embedded half precast concrete member and construction method of underground structure using the same member
CN201933514U (en) * 2010-12-17 2011-08-17 上海市电力公司 Leakage-prevention structure for 500KV underground substation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王新: "铁皮沉淀池施工技术", 《建筑技术开发》, vol. 37, no. 7, 31 July 2010 (2010-07-31), pages 50 - 52 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421497A (en) * 2015-09-14 2016-03-23 上海建工七建集团有限公司 Water-proof construction method for connected nodes of foundation slab and ground wall in composite surround system
CN105887922A (en) * 2015-12-28 2016-08-24 上海建工七建集团有限公司 Truss supporting device and method for constructing lining wall by means of truss supporting device
CN105887922B (en) * 2015-12-28 2018-06-22 上海建工七建集团有限公司 A kind of method that inwall construction is carried out using truss support device
CN106168035A (en) * 2016-08-17 2016-11-30 广州地铁设计研究院有限公司 The subassembly formula construction method of subassembly formula underground structure and underground structure
CN112240033A (en) * 2019-07-18 2021-01-19 重庆建工第七建筑工程有限责任公司 Construction method of unconventional reverse construction outer wall structure in high slope area

Also Published As

Publication number Publication date
CN103628486B (en) 2016-08-31

Similar Documents

Publication Publication Date Title
CN103628486A (en) Later-construction method for inner wall of basement
CN204983662U (en) To drawing screw rod and steel pipe framed bent combination unilateral formwork device
CN2926319Y (en) Rooted foundation and anchored topped-push construction set apparatus
CN208072706U (en) A kind of connection structure of the prefabricated steel shear wall horizontal joint of slip installation
CN203925523U (en) Close to repair to dividing and repair tunnel greatly across the asymmetric temporary lining structure of changeover portion
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
KR102215505B1 (en) Construction method of internal pre-support tunnel for complete blocking water of all directions of the tunnel
CN201261950Y (en) Open pore structure on steel reinforced concrete pond wall
CN102587660A (en) Method for reinforcing rear wall body formwork of adjacent walls of plant
CN204212177U (en) A kind of double doing in the hole of stand column pile cheats diaphragm wall structure
CN205617445U (en) Structure is handled to percolating water of construction joint
CN103334771A (en) Concrete pouring method of side wall and joint of middle plate and vault by means of underground excavation reverse construction method
CN103469736A (en) Template supporting device of diaphragm plate of T-shaped bridge surface and template supporting and removing method
CN208184230U (en) Self-stabilising combined triangular frame single side formwork system
CN203808281U (en) Shock isolation structure for shaft bottom-hung conversion brackets
CN203782544U (en) Combined bracket for river-crossing section of elevated bridge
CN103397661B (en) The construction technology of combined exterior wall structure under shaped steel-concrete ground
JP2010275708A (en) Method for forming building
CN205046560U (en) Muscle formula bracket
CN204252084U (en) The plate device at position, slope is played for arch dam bracket
CN202520315U (en) Tunnel ventilation shaft wall lining-supporting system
CN210597398U (en) Dog-ear type two-phase underground continuous wall cold joint waterproof construction
CN207228155U (en) One kind wears dividing wall support changing structure for use
CN207512751U (en) The collar beam construction that the time phasing foundation pit complete period shares
CN105756067B (en) A kind of method of horizontal temporary support support replacement in deep basal pit

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant