CN205046560U - Muscle formula bracket - Google Patents

Muscle formula bracket Download PDF

Info

Publication number
CN205046560U
CN205046560U CN201520821291.0U CN201520821291U CN205046560U CN 205046560 U CN205046560 U CN 205046560U CN 201520821291 U CN201520821291 U CN 201520821291U CN 205046560 U CN205046560 U CN 205046560U
Authority
CN
China
Prior art keywords
muscle
capping beam
anchor
bar
anchoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520821291.0U
Other languages
Chinese (zh)
Inventor
赵军
涂同喜
王永峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhong Kai Construction Co Ltd
ZHEJIANG XINJIE CONSTRUCTION CO Ltd
Original Assignee
Zhong Kai Construction Co Ltd
ZHEJIANG XINJIE CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhong Kai Construction Co Ltd, ZHEJIANG XINJIE CONSTRUCTION CO Ltd filed Critical Zhong Kai Construction Co Ltd
Priority to CN201520821291.0U priority Critical patent/CN205046560U/en
Application granted granted Critical
Publication of CN205046560U publication Critical patent/CN205046560U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a muscle formula bracket, it includes that two anchor reinforcing bar (1), a U -shaped hold in the palm muscle (2) and one block pre -buried steel sheet (3), the perpendicular muscle (1.1) of anchor and anchor diagonal bar (1.2) of anchor reinforcing bar (1) lie in the roof beam that bears down on one (4), the U -shaped hold in the palm muscle (2) two to erect section (2.1) upper end fixed with the lower extreme of the exposing of two anchor reinforcing bar (1) perpendicular muscle (1.4) respectively, pre -buried steel sheet (3) are fixed at the roof beam that bears down on one (4) medial surface, and pre -buried steel sheet (3) say with the top that the steel pipe supports the one end welded fastening of (5), top way steel pipe supports the one end of (5) and shelves on the U -shaped holds in the palm crosspiece (2.2) of muscle (2). This bracket can not block that the reinforcing bar of basement roof (9) and retaining pile wall (6) be connected, can satisfy again the needs of shelving that way steel pipe supported (5).

Description

Muscle formula bracket
Technical field
The utility model relates to the foundation pit construction technology in field of civil engineering, be specifically a kind of when pushing up road steel pipe support and needing to be embedded in concrete of basement top board for connecting the muscle formula bracket of top road steel pipe support and foundation pit bracing piling wall.
Background technology
Along with the extensive rise of subway engineering and underground space engineering construction, the construction technology also development of foundation ditch and basement structure.Traditional foundation ditch and the construction method of basement structure are, piling wall is gone along with sb. to guard him in first construction, then capping beam is built going along with sb. to guard him on piling wall, again at capping beam with road, fixing top, absolute altitude place steel pipe support, dig foundation ditch under then starting, excavate lower one deck and enclose purlin height this layer of then constructing and enclose purlin and the inner support with absolute altitude, then dig under continuing, until under dig the end, hole, build the base plate of basement structure, then up to construct outer wall of basement from base plate.When outer wall of basement constructs capping beam absolute altitude, in two kinds of situation, first is also in most cases, pre-sets support replacement beam in the below of capping beam height, and Ze Jiangding road steel pipe support is dismantled, then at capping beam absolute altitude place construction basement roof.But, at some in particular cases, support replacement beam cannot be set, such as this basement side is the soil body and opposite side is the Metro Space having hollowed out and built up, cannot stress balance be reached due to both sides therefore support replacement beam cannot be set, now, just can not only remove top road steel pipe support but imbed permanent for road, top steel pipe support in basement roof.But this generates following technical barrier.
First the connected mode between top road steel pipe support and two capping beams at its two ends is analyzed, first capping beam is fixed with steel corbel, and the two ends of Mei Gending road steel pipe support are first shelved on two steel corbels, again be positioned at that two capping beams that support two ends are welded and fixed, the volume of steel corbel is large, if do not remove steel corbel and basement roof of directly constructing, so basement roof reinforcing bar can be stopped and and cannot go along with sb. to guard him piling wall and be connected and fixed with capping beam by steel corbel; And installation and removal steel corbel all can cause, and efficiency of construction reduces, expense increases.
Utility model content
The technical problems to be solved in the utility model is, provides a kind of and is connected when needing can not to stop when top road steel pipe support is imbedded basement roof the reinforcing bar of basement roof and capping beam and going along with sb. to guard him piling wall, can meets again the muscle formula bracket pushing up the needs shelved safely when road steel pipe support is installed.
Technical solution of the present utility model is, one effective reinforcement formula bracket is provided, it comprises two anchor bars, a U-shaped holder muscle and one piece of pre-embedded steel slab, every root anchor bar erects muscle, anchoring diagonal bar by anchoring, exposes horizontal bar and exposes perpendicular muscle and is connected in sequence, and muscle is erected in anchoring and anchoring diagonal bar is positioned at capping beam concrete; U-shaped holder muscle comprises two perpendicular sections and a crosspiece, and crosspiece two ends are erected a section lower end with two respectively and fixed; Two perpendicular section upper ends of U-shaped holder muscle are fixed with the lower end of exposing perpendicular muscle of two anchor bars respectively; Pre-embedded steel slab is fixed on capping beam medial surface, and pre-embedded steel slab is welded and fixed with one end of road, top steel pipe support; One end of road, top steel pipe support is shelved on the crosspiece of U-shaped holder muscle.
Utilize this muscle formula bracket to construct and push up the method for road steel pipe support and top board, its step comprises:
Piling wall is gone along with sb. to guard him in a, construction;
B, colligation capping beam reinforcing bar set up each side template, and the anchoring of two anchor bars is erected in muscle and anchoring diagonal bar insertion template, and exposing horizontal bar and exposing perpendicular muscle of anchor bar is all positioned at outside template, and inner side template pre-embedded steel slab being touched capping beam is placed;
C, build capping beam concrete, make the anchoring of anchor bar erect muscle and anchoring diagonal bar is anchored in capping beam concrete, and at capping beam end face and the gap of exposing between horizontal bar and capping beam medial surface and the gap place mat asphaltic felt that exposes between perpendicular muscle;
Each side template of d, capping beam of dismantling, makes pre-embedded steel slab be exposed to the inner surface of capping beam;
E, the upper end of U-shaped holder muscle two section of erecting and two of two anchor bars are exposed perpendicular muscle lower end be spirally connected or weld;
F, the two ends of top road steel pipe support are shelved on the crosspiece of U-shaped holder muscle of two muscle formula brackets respectively, insert wedge shape band iron in gap between the pre-embedded steel slab of the muscle formula bracket that every one end of steel pipe support, Bing Ding road and this end are shelved, Bing Jiangding road steel pipe support, pre-embedded steel slab and wedge shape band iron are between the two welded and fixed;
G, under dig foundation ditch, construction basement bottom board;
H, set up roof plate template, colligation roof steel bar, and the steel reinforcement abutting joints of roof steel bar and capping beam is fixed; Build concrete roof.
The utility model muscle formula bracket compared with prior art, has the following advantages and effect:
First, this muscle formula bracket is installed more obvious than steel corbel simpler, only needs when building capping beam, the anchoring of anchor bar to be erected muscle and imbed capping beam concrete together with anchoring diagonal bar and pre-embedded steel slab, then be connected with anchor bar by U-shaped holder muscle, save man-hour, raise the efficiency; And the more important thing is, muscle formula bracket is meeting under the prerequisite of shelving intensity required by the road steel pipe support of top and bearing capacity, and volume ratio steel corbel is much little, can not stop the reinforcing bar of basement roof, facilitates the main muscle of basement roof and the steel reinforcement abutting joints of capping beam; And muscle formula bracket is permanent imbeds basement roof for this, without the need to removing, raises the efficiency further, shortening man-hour; Moreover cost and the consumable quantity of this muscle formula bracket are starkly lower than steel corbel, save construction costs, economical rationality.
Accompanying drawing explanation
Fig. 1 be the utility model muscle formula bracket face sectional structure schematic diagram.
Fig. 2 is the side-looking structural representation of the utility model muscle formula bracket.
Shown in figure 1, anchor bar, 1.1, anchoring erects muscle, 1.2, anchoring diagonal bar, 1.3, horizontal bar is exposed, 1.4, expose perpendicular muscle, 2, U-shaped holder muscle, 2.1, perpendicular section, 2.2, crosspiece, 3, pre-embedded steel slab, 4, capping beam, 5, top road steel pipe support, 6, go along with sb. to guard him piling wall, 7, asphaltic felt, 8, wedge shape band iron, 9, top board, 10, inner thread sleeve, 11, anchor connection muscle.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
As shown in Figure 1 and Figure 2, the utility model muscle formula bracket, it comprises two anchor bars, 1, U-shaped holder muscle 2 and one piece of pre-embedded steel slab 3.Every root anchor bar 1 erects muscle 1.1, anchoring diagonal bar 1.2 by anchoring, exposes horizontal bar 1.3 and exposes perpendicular muscle 1.4 and forms, specifically, muscle 1.1 upper end is erected in anchoring and anchoring diagonal bar 1.2 lower end is fixed, anchoring diagonal bar 1.2 upper end with expose horizontal bar 1.3 rear end and fix, expose horizontal bar 1.3 front end and expose perpendicular muscle 1.4 upper end and fix, and above-mentioned four sections of reinforcing bars are formed by same straight reinforcing bar bending.Muscle 1.1 is erected in anchoring and anchoring diagonal bar 1.2 is positioned at capping beam 4 concrete; And expose horizontal bar 1.3 and expose perpendicular muscle 1.4 and be positioned at outside capping beam 4 concrete.
U-shaped holder muscle 2 comprises two perpendicular sections 2.1 and a crosspiece 2.2, and crosspiece 2.2 two ends are erected section 2.1 lower end with two respectively and fixed; Above-mentioned three lengths of rebar are bent by same straight reinforcing bar and form.Knuckle is provided with between the every root section of erecting 2.1 lower end and crosspiece 2.2 one end.Two perpendicular section 2.1 upper ends of U-shaped holder muscle 2 are fixed with the lower end of exposing perpendicular muscle 1.4 of two anchor bars 1 respectively; As adopted inner thread sleeve 10 to be spirally connected, or adopt weld seam welding, the length of welding is 10 times of perpendicular section 2.1 diameter.
Pre-embedded steel slab 3 is fixed on capping beam 4 medial surface, pre-embedded steel slab 3 inner surface is welded with anchor connection muscle 11, anchor connection muscle 11 is anchored in capping beam 4 concrete and anchor connection muscle 11 and the inner reinforcing bar binding of capping beam 4 are fixed, and pre-embedded steel slab 3 to be also anchored in capping beam 4 concrete and the exposed medial surface at capping beam 4 of the inner surface of pre-embedded steel slab 3.Pre-embedded steel slab 3 is welded and fixed with the end face of one end of road, top steel pipe support 5; The two ends of road, top steel pipe support 5 are shelved on the crosspiece 2.2 of two U-shaped holder muscle 2 respectively.
As shown in Figure 1 and Figure 2, utilize the method for this muscle formula bracket construction foundation pit top road steel pipe support and basement roof, its step is as follows.
A, construction sequence conventionally go construction to go along with sb. to guard him piling wall 6;
B, colligation capping beam 4 reinforcing bar also sets up each side template of capping beam 4, and muscle 1.1 is erected in the anchoring of two anchor bars 1 and anchoring diagonal bar 1.2 is placed in template, and reinforcing bar binding anchoring being erected muscle 1.1 and anchoring diagonal bar 1.2 and capping beam 4 inside is fixed, and exposing horizontal bar 1.3 and exposing perpendicular muscle 1.4 of anchor bar 1 is all stretched out beyond template scope, make to expose horizontal bar 1.3 in subsequent step and expose perpendicular muscle 1.4 all to stretch out capping beam 4 concrete, and inner side template pre-embedded steel slab 3 being touched capping beam 4 is placed and pre-embedded steel slab 3 and inner side template is clenched with nail, and the anchor connection muscle 11 being welded on pre-embedded steel slab 3 inner surface is in advance fixed with the reinforcing bar of capping beam 4 inside,
C, build capping beam 4 concrete, the anchoring of anchor bar 1 is made to erect muscle 1.1 and anchoring diagonal bar 1.2 is anchored in capping beam 4 concrete, and at capping beam 4 end face and the gap of exposing between horizontal bar 1.3 and capping beam 4 medial surface and the gap place mat asphaltic felt 7 that exposes between perpendicular muscle 1.4;
Each side template of d, capping beam 4 of dismantling, makes pre-embedded steel slab 3 be exposed to the inner surface of capping beam 4;
E, the upper end of perpendicular for 2 liang, U-shaped holder muscle section 2.1 and two of two anchor bars 1 are exposed perpendicular muscle 1.4 lower end be spirally connected or weld; Now, muscle formula bracket installation on capping beam 4.
F, be shelved on the crosspiece 2.2 of U-shaped holder muscle 2 of two muscle formula brackets respectively by the two ends of top road steel pipe support 5, above-mentioned two muscle formula brackets lay respectively on different capping beams 4.Insert the termination of wedge shape band iron 8, Bing Jiangding road steel pipe support 5, pre-embedded steel slab 3 and wedge shape band iron 8 between the two in gap between the pre-embedded steel slab 3 of the muscle formula bracket that the every one end of Bing Ding road steel pipe support 5 and this end are shelved to be welded and fixed;
Dig foundation ditch under g, construction method conventionally, construction basement bottom board, then up to construct outer wall of basement from base plate;
H, set up top board 9 falsework and on support installation form, colligation top board 9 reinforcing bar, and the steel reinforcement abutting joints of top board 9 reinforcing bar and capping beam 4 is fixed, specifically, the reinforcing bar of capping beam 4 can be the bar planting on capping beam 4 concrete, also can be the part of reinforcing bar protrusion capping beam 4 medial surface of capping beam 4 itself, fix with the steel reinforcement abutting joints of connector by the reinforcing bar of top board 9 and capping beam 4; Build top board 9 concrete again, and moisture-keeping maintaining.

Claims (1)

1. an effective reinforcement formula bracket, it is characterized in that: it comprises two anchor bars (1), a U-shaped holder muscle (2) and one piece of pre-embedded steel slab (3), every root anchor bar (1) is erected muscle (1.1), anchoring diagonal bar (1.2) by anchoring, exposes horizontal bar (1.3) and is exposed perpendicular muscle (1.4) and is connected in sequence, and muscle (1.1) is erected in anchoring and anchoring diagonal bar (1.2) is positioned at capping beam (4) concrete; U-shaped holder muscle (2) comprises two perpendicular sections (2.1) and a crosspiece (2.2), and crosspiece (2.2) two ends are erected section (2.1) lower end with two respectively and fixed; Two perpendicular section (2.1) upper ends of U-shaped holder muscle (2) are fixed with the lower end of exposing perpendicular muscle (1.4) of two anchor bars (1) respectively; Pre-embedded steel slab (3) is fixed on capping beam (4) medial surface, and pre-embedded steel slab (3) is welded and fixed with the one end on road steel pipe support, top (5); The one end on road steel pipe support, top (5) is shelved on the crosspiece (2.2) of U-shaped holder muscle (2).
CN201520821291.0U 2015-10-22 2015-10-22 Muscle formula bracket Withdrawn - After Issue CN205046560U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520821291.0U CN205046560U (en) 2015-10-22 2015-10-22 Muscle formula bracket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520821291.0U CN205046560U (en) 2015-10-22 2015-10-22 Muscle formula bracket

Publications (1)

Publication Number Publication Date
CN205046560U true CN205046560U (en) 2016-02-24

Family

ID=55340157

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520821291.0U Withdrawn - After Issue CN205046560U (en) 2015-10-22 2015-10-22 Muscle formula bracket

Country Status (1)

Country Link
CN (1) CN205046560U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105274997A (en) * 2015-10-22 2016-01-27 浙江欣捷建设有限公司 Rib type brackets and method for constructing top way steel pipe support and top plate through brackets
CN107386299A (en) * 2017-08-21 2017-11-24 中国二十冶集团有限公司 Foundation ditch supports concrete construction method
CN110258582A (en) * 2019-06-20 2019-09-20 通州建总集团有限公司 Bearing diagonal foundation pit supporting construction and construction method based on steel-pipe pile Yu Larsen steel plate

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105274997A (en) * 2015-10-22 2016-01-27 浙江欣捷建设有限公司 Rib type brackets and method for constructing top way steel pipe support and top plate through brackets
CN105274997B (en) * 2015-10-22 2017-05-31 浙江欣捷建设有限公司 Muscle formula bracket and the method for pushing up road steel pipe support and top board using bracket construction
CN107386299A (en) * 2017-08-21 2017-11-24 中国二十冶集团有限公司 Foundation ditch supports concrete construction method
CN110258582A (en) * 2019-06-20 2019-09-20 通州建总集团有限公司 Bearing diagonal foundation pit supporting construction and construction method based on steel-pipe pile Yu Larsen steel plate
CN110258582B (en) * 2019-06-20 2024-07-12 通州建总集团有限公司 Inclined support foundation pit supporting structure based on steel pipe pile and Lassen steel plate and construction method

Similar Documents

Publication Publication Date Title
JP4812324B2 (en) Retaining wall and its construction method
KR101058520B1 (en) Earth retaining wall using phc pile and construction method of the same
KR101648704B1 (en) Underground wall structure
JP2012107479A (en) Method for constructing underground and aboveground structure
JP2011157812A (en) Retaining wall and construction method therefor
KR20130006420A (en) Method of constructing underground structure to be newly built
CN205046560U (en) Muscle formula bracket
JP2011099231A (en) Inverted construction method for building
CN105274997A (en) Rib type brackets and method for constructing top way steel pipe support and top plate through brackets
KR102286225B1 (en) Method for constructing underground structure busing PC integrating method without support
KR101521556B1 (en) Underground wall construction method using wall members
KR101348339B1 (en) The pressing device of underground strucyure for non-excavation method and its construccting methods thereof
KR101057003B1 (en) Post Tension Tunnel Method
KR20120048134A (en) Retaining wall using corrugated steel plate and construction method thereof
CN212316934U (en) Supporting member and foundation pit supporting system
CN211948447U (en) Foundation pit supporting device
KR20060048843A (en) Reinforcement structure for a foundation pile
KR101305357B1 (en) Underground structure construction method using the pc beam unit connection structure for expensive space
KR102098141B1 (en) A method of constructing an underground wall structure using an earth retaining wall and an underground wall structure
KR200451731Y1 (en) Concrete Filed Tube
CN113174962A (en) Foundation pit bottom plate force transmission structure and construction method thereof
KR20090083497A (en) Earth anchor bracket and construction method of concrete wall using the same
JP2016199915A (en) Foundation structure and foundation construction method
JP3705496B2 (en) Building foundation construction method
KR102633929B1 (en) Casing for retaining wall construction and method for retaining wall construction using the same

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160224

Effective date of abandoning: 20170531