CN203925523U - Close to repair to dividing and repair tunnel greatly across the asymmetric temporary lining structure of changeover portion - Google Patents

Close to repair to dividing and repair tunnel greatly across the asymmetric temporary lining structure of changeover portion Download PDF

Info

Publication number
CN203925523U
CN203925523U CN201420300567.6U CN201420300567U CN203925523U CN 203925523 U CN203925523 U CN 203925523U CN 201420300567 U CN201420300567 U CN 201420300567U CN 203925523 U CN203925523 U CN 203925523U
Authority
CN
China
Prior art keywords
greatly
changeover portion
tunnel
temporarily
perpendicular support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420300567.6U
Other languages
Chinese (zh)
Inventor
范圣明
唐进才
张慧玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201420300567.6U priority Critical patent/CN203925523U/en
Application granted granted Critical
Publication of CN203925523U publication Critical patent/CN203925523U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Close to repair to dividing and repair tunnel greatly across the asymmetric temporary lining structure of changeover portion, the impact full tunnel duration being caused to reduce the construction of complicated geological paragraph large-span structure.Comprise: shaped form is erected support system, by its upper end, lower end respectively with greatly across the preliminary bracing of changeover portion arch wall and the first excavation base tunnel being fixedly connected with across the preliminary bracing of changeover portion inverted arch greatly perpendicular support, rear excavation base tunnel perpendicular support temporarily temporarily form, the profile that wherein first excavates base tunnel perpendicular support temporarily or excavate afterwards base tunnel perpendicular support is temporarily with point to repair tunnel excavation outline line basically identical; Top false stull system, with greatly across the preliminary bracing of changeover portion arch wall, first excavate base tunnel perpendicular support, rear excavation base tunnel perpendicular support temporarily temporarily and removably connect.

Description

Close to repair to dividing and repair tunnel greatly across the asymmetric temporary lining structure of changeover portion
Technical field
The utility model relates to construction of tunnel temporary lining structure, and particularly one is closed to repair to dividing and repaiied tunnel greatly across the asymmetric temporary lining structure of changeover portion.
Background technology
Tunnel is subject to the control of the technical standards such as station setting, complicated geological and sweep, part tunnel inevitably need in hole, arrange be connected close repair Yu Fenxiu tunnel, tunnel greatly across changeover portion.Greatly across changeover portion because its cross dimensions is large, especially in the time that it is positioned at complicated geological paragraph, need to adopt partial excavation method to reduce the construction safety risk of engineering.
At present, the common double side wall pilot tunnel method routinely of the large-span structure of complicated geological paragraph performs temporary lining.This kind of support form at construction large-span structure when point repairing tunnel junction, be subject to limit across section both sides size of heading greatly, can cause because the reason of the aspects such as ventilation airduct, transport causes directly repairing tunnel by the preferential construction point of the one-sided base tunnel of large-span structure, thereby have influence on the perforation duration of full tunnel.In addition, because large-span structure both sides size of heading conventionally will be much smaller than point repairing tunnel cross-section size, cause to dig while point repairing tunnel segment, to have certain difficulty.
Utility model content
Technical problem to be solved in the utility model is to provide one and closes and repair to point repairing tunnel greatly across the asymmetric temporary lining structure of changeover portion, the impact full tunnel duration being caused to reduce the construction of complicated geological paragraph large-span structure.
It is as follows that the utility model solves the technical scheme that its technical problem adopts:
The utility model closes to repair to dividing repaiies tunnel greatly across the asymmetric temporary lining structure of changeover portion, comprise along arrange across changeover portion excavation contour line greatly greatly across the preliminary bracing of changeover portion arch wall with greatly across the preliminary bracing of changeover portion inverted arch, it is characterized in that it also comprises: shaped form is erected support system, by its upper end, support is erected across the preliminary bracing of changeover portion arch wall and the large first excavation base tunnel being fixedly connected with across the preliminary bracing of changeover portion inverted arch respectively with greatly in lower end temporarily, rear excavation base tunnel temporarily perpendicular support forms, the profile that wherein first excavates base tunnel perpendicular support temporarily or excavate afterwards base tunnel perpendicular support is temporarily with point to repair tunnel excavation outline line basically identical, top false stull system, with greatly across the preliminary bracing of changeover portion arch wall, first excavate base tunnel perpendicular support, rear excavation base tunnel perpendicular support temporarily temporarily and removably connect.
In technique scheme, the height of top false stull system meets below movement requirement.
The beneficial effects of the utility model are, can be directly by the one-sided base tunnel Fen Xiu tunnel, front of directly constructing, speed up the work; The formwork jumbo of point repairing tunnel can be closing the section of repairing in after assembling, progressively chassis pushed to and point repaiied in tunnel by demolition, installation waler system, satisfiedly excavates step pitch requirement; One-sided base tunnel section, with point to repair tunnel cross-section substantially close, reduce the abrupt change of cross section and causes engineering quantity in advance, saves construction investment.
Brief description of the drawings
This manual comprises following width accompanying drawing:
Fig. 1 is that the utility model closes and repaiies to point repairing tunnel greatly across the asymmetric temporary lining structure of changeover portion schematic cross-sectional view.
Member shown in figure, toponym and corresponding mark: greatly across changeover portion excavation contour line 10, greatly across headroom outline line 11 in changeover portion, point repair tunnel excavation outline line 20, point repair headroom outline line 21 in tunnel, greatly across changeover portion arch wall preliminary bracing 31, greatly across changeover portion inverted arch preliminary bracing 32, first excavate base tunnel perpendicular support 40, rear excavation base tunnel perpendicular support 41 temporarily temporarily, first excavate base tunnel top false stull 42, common top false stull 43.
Detailed description of the invention
Below in conjunction with accompanying drawing and example, the utility model is further described.
With reference to Fig. 1, of the present utility model closing repaiied to point repairing tunnel greatly across the asymmetric temporary lining structure of changeover portion, comprise along arrange across changeover portion excavation contour line 10 greatly greatly across changeover portion arch wall preliminary bracing 31 with greatly across changeover portion inverted arch preliminary bracing 32.It also comprises: shaped form is erected support system, by its upper end, lower end respectively with greatly across changeover portion arch wall preliminary bracing 31 and the first excavation base tunnel being fixedly connected with across changeover portion inverted arch preliminary bracing 32 greatly perpendicular support 40, rear excavation base tunnel perpendicular support 41 temporarily temporarily form, the profile that wherein first excavates base tunnel perpendicular support 40 temporarily or excavate afterwards base tunnel perpendicular support 41 is temporarily with point to repair tunnel excavation outline line 20 basically identical; Top false stull system, with greatly across changeover portion arch wall preliminary bracing 31, first excavate base tunnel perpendicular support 40, rear excavation base tunnel perpendicular support 41 temporarily temporarily and removably connect.The vertical deformation across changeover portion arch preliminary bracing 31 greatly is effectively controlled in base tunnel perpendicular support 40, the rear excavation base tunnel perpendicular support 41 temporarily temporarily of first excavating that the utility model erects in support system by shaped form.By top false stull system will be greatly across changeover portion arch wall preliminary bracing 31, first excavate base tunnel perpendicular support 40, rear excavation base tunnel perpendicular support 41 temporarily temporarily and be firmly connected, form overall structure, effectively control the horizontal convergence across changeover portion arch wall preliminary bracing 31 greatly.
The profile that first excavates base tunnel perpendicular support 40 temporarily or excavate afterwards base tunnel perpendicular support 41 is temporarily with point to repair tunnel excavation outline line 20 basically identical, and the setting height(from bottom) of top false stull system meets the arrangement requirement of below movement requirement and top ventilation airduct.First excavate base tunnel and complete greatly across continuing after changeover portion and excavate forward by point repairing tunnel excavation outline line 20, to accelerate full tunnel construction speed.Point repair tunneling formwork chassis and closing after the section of repairing assembling, in tunnel, push location by base tunnel in advance to point repairing, thereby ensure that point repairing constructing tunnel is not subject to the large impact across changeover portion.
With reference to Fig. 1, as a kind of Typical Disposition form, described top false stull system is conplanely first excavated base tunnel top false stull 42 and common top false stull 43 forms by being positioned at, first excavate base tunnel top false stull 42 and removably connect across changeover portion arch wall preliminary bracing 31 greatly with first excavating base tunnel perpendicular support 40 temporarily and this side, common top false stull 43 and rear excavation base tunnel temporarily perpendicular support 41, this side greatly across changeover portion arch wall preliminary bracing 31 with first excavate base tunnel perpendicular support 40 temporarily and removably connect.
The above the utility model that just explains through diagrams closes to repair to dividing repaiies some principles that construct across the asymmetric temporary lining of changeover portion greatly in tunnel, be not the utility model to be confined to shown in and in described concrete structure and usage range, therefore the corresponding modify being likely utilized every and equivalent, all belong to the scope of the claims that the utility model is applied for.

Claims (2)

1. close to repair to dividing and repair tunnel greatly across the asymmetric temporary lining structure of changeover portion, comprise along greatly across changeover portion excavation contour line (10) arrange greatly across changeover portion arch wall preliminary bracing (31) with greatly across changeover portion inverted arch preliminary bracing (32), it is characterized in that it also comprises: shaped form is erected support system, by its upper end, support (40) is erected across changeover portion arch wall preliminary bracing (31) and the first excavation base tunnel being fixedly connected with across changeover portion inverted arch preliminary bracing (32) greatly respectively with greatly in lower end temporarily, rear excavation base tunnel temporarily perpendicular support (41) forms, wherein first excavate base tunnel perpendicular support (40) temporarily or excavate afterwards base tunnel temporarily the profile of perpendicular support (41) divide that to repair tunnel excavation outline line (20) basically identical, top false stull system, with greatly across changeover portion arch wall preliminary bracing (31), first excavate base tunnel perpendicular support (40), rear excavation base tunnel perpendicular support (41) temporarily temporarily and removably connect.
2. as claimed in claim 1 closing repaiied to point repairing tunnel greatly across the asymmetric temporary lining structure of changeover portion, it is characterized in that: described top false stull system is by being positioned at conplane base tunnel top false stull (42) and common top false stull (43) formation first excavated, first excavate base tunnel top false stull (42) and first excavate base tunnel perpendicular support (40) temporarily and this side and removably connect across changeover portion arch wall preliminary bracing (31) greatly, common top false stull (43) and the perpendicular support (41) temporarily of rear excavation base tunnel, this side is greatly across changeover portion arch wall preliminary bracing (31) with first excavate base tunnel perpendicular support (40) temporarily and removably connect.
CN201420300567.6U 2014-06-06 2014-06-06 Close to repair to dividing and repair tunnel greatly across the asymmetric temporary lining structure of changeover portion Expired - Fee Related CN203925523U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420300567.6U CN203925523U (en) 2014-06-06 2014-06-06 Close to repair to dividing and repair tunnel greatly across the asymmetric temporary lining structure of changeover portion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420300567.6U CN203925523U (en) 2014-06-06 2014-06-06 Close to repair to dividing and repair tunnel greatly across the asymmetric temporary lining structure of changeover portion

Publications (1)

Publication Number Publication Date
CN203925523U true CN203925523U (en) 2014-11-05

Family

ID=51821352

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420300567.6U Expired - Fee Related CN203925523U (en) 2014-06-06 2014-06-06 Close to repair to dividing and repair tunnel greatly across the asymmetric temporary lining structure of changeover portion

Country Status (1)

Country Link
CN (1) CN203925523U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106246190A (en) * 2016-08-12 2016-12-21 中铁二十局集团第四工程有限公司 A kind of nine base tunnel construction methods of tunnel and Double sidewall
CN107060772A (en) * 2017-03-23 2017-08-18 中铁五局集团成都工程有限责任公司 Large section construction method is mutated for Line for Passenger Transportation standard section
CN107587878A (en) * 2015-02-05 2018-01-16 新汶矿业集团有限责任公司 Pit shaft and shaft station attachment structure
CN110242321A (en) * 2019-06-21 2019-09-17 云南建投第四建设有限公司 A kind of construction of offspur tunnel large section asymmetric double side wall
CN110259387A (en) * 2019-04-28 2019-09-20 中铁大桥局集团有限公司 A kind of hollow out impact drill

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107587878A (en) * 2015-02-05 2018-01-16 新汶矿业集团有限责任公司 Pit shaft and shaft station attachment structure
CN106246190A (en) * 2016-08-12 2016-12-21 中铁二十局集团第四工程有限公司 A kind of nine base tunnel construction methods of tunnel and Double sidewall
CN106246190B (en) * 2016-08-12 2018-05-15 中铁二十局集团第四工程有限公司 A kind of nine base tunnel construction methods of tunnel and Double side wall
CN107060772A (en) * 2017-03-23 2017-08-18 中铁五局集团成都工程有限责任公司 Large section construction method is mutated for Line for Passenger Transportation standard section
CN110259387A (en) * 2019-04-28 2019-09-20 中铁大桥局集团有限公司 A kind of hollow out impact drill
CN110242321A (en) * 2019-06-21 2019-09-17 云南建投第四建设有限公司 A kind of construction of offspur tunnel large section asymmetric double side wall

Similar Documents

Publication Publication Date Title
CN203925523U (en) Close to repair to dividing and repair tunnel greatly across the asymmetric temporary lining structure of changeover portion
CN104047623B (en) A kind of big across cavern excavation construction method
CN100487224C (en) Rapid-construction method for rapid change of small-section into large-section tunnel
CN109372518B (en) Reverse excavation construction method for tunnel abrupt-change section
CN103603679B (en) For arch crown steel frame and the method for tunnel construction of arch, supporting tunnel
CN104963689A (en) Three-step seven-procedure excavation method for tunnel
CN104653197A (en) Method for constructing extra-large variable cross section tunnel
CN104131821B (en) A kind of shield tunnel plug-in conduit grooving structure and fixing means thereof
CN110486021B (en) Construction method for converting large-section tunnel into two small-section tunnels
CN104234749A (en) Surrounding rock control method for large-section dismantling tunnel of fully-mechanized mining face
CN104929649A (en) Tunnel transverse cave-to-master cave top brushing construction method and top brushing structure
CN105781597A (en) Method for performing anchoring and grouting reinforcement inside deep well soft rock gob-side entry retaining
CN104632227A (en) Subway station excavation technology of single-layer beam arch structure
CN105156114A (en) Enlarging repair and reinforcement method of roadways at crossing
CN102146797A (en) Short-section temporary gob-side entry retaining method
CN104453948A (en) Vertical prestress steel pipe supporting structure for large-section subsurface tunnel and construction process
CN104295301A (en) Shallow-buried excavation construction method for cataclastic rock subway tunnel intersection
CN103244129B (en) Construction method for three-dimensional intersection concave-convex fulcrums
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN103806916A (en) Process for constructing shield rapid inspection shaft
CN204716248U (en) Tunnel Heng Dong enters main hole and to caunch structure
CN104500071B (en) Seam mining avoids the gob-side entry retaining method of dynamic pressure impact
CN204436407U (en) The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs
CN103628890A (en) Soft phyllite tunnel excavation deformation control method
CN111810184A (en) Variable cross-section tunnel construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141105