CN103615893A - Method for mounting dust settling flue of sintering chamber - Google Patents
Method for mounting dust settling flue of sintering chamber Download PDFInfo
- Publication number
- CN103615893A CN103615893A CN201310547076.1A CN201310547076A CN103615893A CN 103615893 A CN103615893 A CN 103615893A CN 201310547076 A CN201310547076 A CN 201310547076A CN 103615893 A CN103615893 A CN 103615893A
- Authority
- CN
- China
- Prior art keywords
- flue
- flue body
- bellows
- dust
- mounting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
- Manufacture And Refinement Of Metals (AREA)
Abstract
The invention relates to a method for mounting a dust settling flue of a sintering chamber. The method includes steps of (1), integrally manufacturing a flue body 1 and a bottom air box 3 of the flue body 1; (2), integrally mounting the flue body and the bottom air box of the flue body; (3), mounting a dust collecting hopper. The method has the advantages that the flue body and the bottom air box of the flue body are integrally manufactured by a mounting process, two mounting procedures replace the original four mounting procedures, and accordingly mounting safety risks can be reduced; the mounting procedures can be carried out alternately, and the dust collecting hopper can be mounted after a part of the flue body is completely mounted; a hole is formed in the bottom of the flue when the flue body and the bottom air box of the flue body are integrally manufactured, cut steel plates can be used on other components after being processed by a processing plant, and accordingly steel plates can be saved.
Description
Technical field
The invention belongs to flue dust's construction field, flue dust of especially a kind of agglomerating chamber installation method.
Background technology
In Sinter Machines Project, flue dust is one of capital equipment of agglomerating chamber's depositing dust recovery.The concrete frame Shang, flue dust agent structure that this flue dust is positioned at agglomerating chamber comprises bellows and the flue-dust retainer of flue body, flue body bottom.Traditional installation method step is: the installation of flue body, flue body bottom opening, flue body bottom bellows are installed, flue-dust retainer is installed, and the method continues into the present at metallurgy industry always.The weak point of the method: 1, installation procedure is many, increases the security risk of installing; 2, every procedure can not intert installation, and the whole installations of a procedure, just can carry out next process; 3, during flue body bottom opening, fabrication completes, and a large amount of steel plates that cut down do not have the place that utilizes, can only work as waste disposal; 4, construction cost is large; 5, long in time limit.
Summary of the invention
The object of the invention is to overcome prior art deficiency, flue dust of a kind of agglomerating chamber installation method is provided, the method technique is simple, reduce operation, reduce costs, the construction period is short, safe.
The present invention solves its technical problem and is achieved through the following technical solutions:
Flue dust of an agglomerating chamber installation method, the step of its installation method is as follows:
(1), flue body and bottom bellows integral manufacturing thereof: by 2 interim conduit saddles, position, super flat, check and adjust concentricity, interim conduit saddle is carried out to reinforcement of weld, then flue body is hung on conduit saddle, cross messenger wire measured center, adjust the position that checks flue body, on flue body, find out longitudinal centre line, throw the contact wheel profile of surveying bellows, throw and survey flue perforate outline line, bellows are inverted to 180 ° to be arranged on flue body, through measuring, levelling, centering, gap is adjusted, four jiaos of lock welderings, after centre is symmetrically welded and fixes, start the flue body of bellows one side to carry out gas cutting perforate,
(2), flue body and bottom bellows integral installation thereof: adopt crane to add the installation method of guide chain, by flue body, turn to, draw high, draw, parallel is to design attitude, flue body slowly lands, the axis that guarantees each axis and flue body coincides, meanwhile, with spirit level, check flue body bottom bellow port levelness, reach code requirement;
(3), flue-dust retainer installs: adopt crane to add jack and install, flue-dust retainer is lifted on the position of connection of bellows, by measuring after centering, carry out counterpart installation, flue dust of agglomerating chamber installs.
Above-mentioned gap adjustment adopts jack to draw receipts.
The distance of four jiaos of above-mentioned lock welderings is 150mm.
Advantage of the present invention and beneficial effect are:
In the present invention, the bellows of flue body and bottom thereof adopt integral manufacturing mounting process, and installation procedure is reduced to two procedures by four procedures, and the security risk of installation reduces.Installation procedure can intert and carries out, and the installation of part flue body, just can install flue-dust retainer, the bellows of flue body and bottom thereof are when integral manufacturing, and flue bottom is with regard to perforate, the steel plate cutting down, in processing factory after treatment, be used on other member, saved steel plate.The steel plate that flue bottom opening cuts down, often opens a hole by 19m
2calculate, steel plate 1.49t is saved in a hole.According to 13 sections of flue body perforates, calculate, save steel plate 19.37t.Installation period can be saved about 20 days.Construction cost is reduced greatly, and the steel plate that gas cutting gets off after treatment, is used as other positions such as lower hawk.
Accompanying drawing explanation
Fig. 1 is flue structure schematic diagram of the present invention;
Fig. 2 is flue body of the present invention and bellows assembly drawing.
The specific embodiment
Below by specific embodiment, the invention will be further described, and following examples are descriptive, is not determinate, can not limit protection scope of the present invention with this.
Flue dust of an agglomerating chamber installation method, the step of its installation method is as follows:
(1), flue body 1 and bottom bellows 3 integral manufacturings thereof: on steel platform 6 by 2 interim conduit saddles 5, position, super flat, check and adjust concentricity, interim conduit saddle is carried out to reinforcement of weld, then flue body is hung on conduit saddle, cross messenger wire measured center, adjust the position that checks flue body, on flue body, find out longitudinal centre line, throw the contact wheel profile of surveying bellows, throw and survey flue perforate outline line, bellows are inverted to 180 ° to be arranged on flue body, through measuring, levelling, centering, gap is adjusted, gap adjustment adopts jack to draw receipts, four jiaos of lock welderings, the distance of four jiaos of lock welderings is 150mm, after centre is symmetrically welded and fixes, start the flue body of bellows one side to carry out gas cutting perforate 2,
(2), flue body and bottom bellows integral installation thereof: adopt crane to add the installation method of guide chain, by flue body, turn to, draw high, draw, parallel is to design attitude, flue body slowly lands, the axis that guarantees each axis and flue body coincides, meanwhile, with spirit level, check flue body bottom bellow port levelness, reach code requirement;
(3), flue-dust retainer installs: adopt crane to add jack and install, flue-dust retainer 4 is lifted on the position of connection of bellows, by measuring after centering, carry out counterpart installation, flue dust of agglomerating chamber installs.
Claims (3)
- Flue dust of 1.Yi Zhong agglomerating chamber installation method, is characterized in that: the step of this installation method is as follows:(1), flue body and bottom bellows integral manufacturing thereof: by 2 interim conduit saddles, position, super flat, check and adjust concentricity, interim conduit saddle is carried out to reinforcement of weld, then flue body is hung on conduit saddle, cross messenger wire measured center, adjust the position that checks flue body, on flue body, find out longitudinal centre line, throw the contact wheel profile of surveying bellows, throw and survey flue perforate outline line, bellows are inverted to 180 ° to be arranged on flue body, through measuring, levelling, centering, gap is adjusted, four jiaos of lock welderings, after centre is symmetrically welded and fixes, start the flue body of bellows one side to carry out gas cutting perforate,(2), flue body and bottom bellows integral installation thereof: adopt crane to add the installation method of guide chain, by flue body, turn to, draw high, draw, parallel is to design attitude, flue body slowly lands, the axis that guarantees each axis and flue body coincides, meanwhile, with spirit level, check flue body bottom bellow port levelness, reach code requirement;(3), flue-dust retainer installs: adopt crane to add jack and install, flue-dust retainer is lifted on the position of connection of bellows, by measuring after centering, carry out counterpart installation, flue dust of agglomerating chamber installs.
- 2. flue dust of agglomerating chamber according to claim 1 installation method, is characterized in that: described gap adjustment adopts jack to draw receipts.
- 3. flue dust of agglomerating chamber according to claim 1 installation method, is characterized in that: the distance of four jiaos of described lock welderings is 150mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310547076.1A CN103615893A (en) | 2013-11-06 | 2013-11-06 | Method for mounting dust settling flue of sintering chamber |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310547076.1A CN103615893A (en) | 2013-11-06 | 2013-11-06 | Method for mounting dust settling flue of sintering chamber |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103615893A true CN103615893A (en) | 2014-03-05 |
Family
ID=50166600
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310547076.1A Pending CN103615893A (en) | 2013-11-06 | 2013-11-06 | Method for mounting dust settling flue of sintering chamber |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103615893A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104764327A (en) * | 2015-03-26 | 2015-07-08 | 中国五冶集团有限公司 | Indoor smoke channel mounting process of sintering engineering |
CN110542312A (en) * | 2019-07-19 | 2019-12-06 | 五冶集团上海有限公司 | Method for mounting lower ash bucket of environment-friendly sintering machine |
CN111521028A (en) * | 2020-04-30 | 2020-08-11 | 上海二十冶建设有限公司 | Ground assembling installation method for ash discharge pipe of air box of chain grate |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102494536A (en) * | 2011-12-05 | 2012-06-13 | 中冶天工集团有限公司 | Construction method for dust-fall pipe of sintering chamber |
CN202401026U (en) * | 2011-12-31 | 2012-08-29 | 中平能化建工集团有限公司土建处 | Construction equipment for installing flue elbow pipe through pulley lifting |
CN202752792U (en) * | 2012-06-29 | 2013-02-27 | 中国一冶集团有限公司 | Installing centering device for large flue pipe |
-
2013
- 2013-11-06 CN CN201310547076.1A patent/CN103615893A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102494536A (en) * | 2011-12-05 | 2012-06-13 | 中冶天工集团有限公司 | Construction method for dust-fall pipe of sintering chamber |
CN202401026U (en) * | 2011-12-31 | 2012-08-29 | 中平能化建工集团有限公司土建处 | Construction equipment for installing flue elbow pipe through pulley lifting |
CN202752792U (en) * | 2012-06-29 | 2013-02-27 | 中国一冶集团有限公司 | Installing centering device for large flue pipe |
Non-Patent Citations (1)
Title |
---|
吕雪琳: "特大型降尘烟道整体安装施工技术", 《山西建筑》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104764327A (en) * | 2015-03-26 | 2015-07-08 | 中国五冶集团有限公司 | Indoor smoke channel mounting process of sintering engineering |
CN104764327B (en) * | 2015-03-26 | 2016-06-29 | 中国五冶集团有限公司 | A kind of sintering engineering internal flue mounting process |
CN110542312A (en) * | 2019-07-19 | 2019-12-06 | 五冶集团上海有限公司 | Method for mounting lower ash bucket of environment-friendly sintering machine |
CN110542312B (en) * | 2019-07-19 | 2021-07-27 | 五冶集团上海有限公司 | Method for mounting lower ash bucket of environment-friendly sintering machine |
CN111521028A (en) * | 2020-04-30 | 2020-08-11 | 上海二十冶建设有限公司 | Ground assembling installation method for ash discharge pipe of air box of chain grate |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103615893A (en) | Method for mounting dust settling flue of sintering chamber | |
CN103173582A (en) | Method for integral in-position mounting of blast-furnace five-way ball and eduction tubes thereof aloft | |
CN107097062B (en) | A kind of stacker-reclaimer revolution intersects the replacing options of bearing | |
CN106836836A (en) | A kind of Flue Gas Desulphurization for Coal-burning Power Plant tower transforms secondary hydraulic lifting installation method | |
CN106011366A (en) | Combination mounting method for complete equipment of converter tapping hole | |
CN202963332U (en) | Device for manufacturing pile foundation reinforcement cage by using simple portal frame | |
CN207223290U (en) | A kind of floor welded fixture for eliminating burr | |
CN103486330B (en) | Either inside high-altitude pipeline mounting construction method | |
CN205290460U (en) | Spline shaft centering positioning fixture | |
CN204588421U (en) | A kind of pile tube vacuum cup hoisting crane | |
CN209163592U (en) | A kind of chimney band cigarette aperture transformation protective device | |
CN204238443U (en) | A kind of detachable suspension column fastening devices | |
CN207259022U (en) | One discharge plate cabinet installs ancillary equipment | |
CN104100094B (en) | Steel containment vessel of nuclear power station access lock installation method | |
CN203924659U (en) | Hanging frame type construction platform device | |
CN208666990U (en) | A kind of lifting equipment | |
CN207413107U (en) | Portable gluing waste gas collecting system | |
CN203337348U (en) | A simple pressure testing apparatus for a large valve | |
CN104613842B (en) | It is a kind of for checking and accepting the tool and its application method of filter element replacing system | |
CN205421049U (en) | Box culvert equipment leveling machine | |
CN102921248A (en) | Splitting combined type dust collector | |
CN204584605U (en) | Large ladle furnace hanging axis apparatus for welding and positioning | |
CN104358355A (en) | Detachable column base fixing device and construction method thereof | |
CN204913129U (en) | Frame joint dish welding frock behind explosion -proof diesel engine trackless rubber -tyred car | |
CN208946073U (en) | A kind of collars attaching/detaching apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140305 |