CN103615601A - Locomotive pipeline and cable composite assembling method - Google Patents

Locomotive pipeline and cable composite assembling method Download PDF

Info

Publication number
CN103615601A
CN103615601A CN201310564315.4A CN201310564315A CN103615601A CN 103615601 A CN103615601 A CN 103615601A CN 201310564315 A CN201310564315 A CN 201310564315A CN 103615601 A CN103615601 A CN 103615601A
Authority
CN
China
Prior art keywords
framework
bearing beam
pipeline
locomotive
cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310564315.4A
Other languages
Chinese (zh)
Other versions
CN103615601B (en
Inventor
李国栋
王聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Dalian Co Ltd
Original Assignee
CNR Dalian Locomotive and Rolling Stock Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNR Dalian Locomotive and Rolling Stock Co Ltd filed Critical CNR Dalian Locomotive and Rolling Stock Co Ltd
Priority to CN201310564315.4A priority Critical patent/CN103615601B/en
Publication of CN103615601A publication Critical patent/CN103615601A/en
Application granted granted Critical
Publication of CN103615601B publication Critical patent/CN103615601B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/22Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals
    • F16L3/223Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals each support having one transverse base for supporting the pipes
    • F16L3/227Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals each support having one transverse base for supporting the pipes each pipe being supported by a separate element fastened to the base
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/02Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing
    • F16L3/06Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing with supports for wires
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Installation Of Indoor Wiring (AREA)

Abstract

The invention relates to a locomotive pipeline and cable composite assembling method. A locomotive pipeline and cable composite support comprises frames, bearing crossbeams and floor beams. The frames are longitudinally arranged and positioned to an assembling table, control pipelines and cables are respectively laid on two layers of bearing cross beams, the assembled pipeline and cable components are integrally hoisted to the corridor position of a locomotive body, and a floor is laid.

Description

Locomotive pipeline and cable combined type assembly method
Technical field
The present invention relates to a kind of locomotive pipeline and cable combined type assembly method, belong to railway locomotive technical field.
Background technique
In the assembling process of locomotive, in the middle of car body, locomotive cable need to be laid by place, corridor, and locomotive pilot line is installed, and corridor joist and floor, corridor also will be installed above the two.Existing wiring stringing scheme is: first at position, car body corridor cable laying, under car, adopt a plurality of horizontal connecting plates to coordinate pipe clamp that a plurality of pipelines are fixed into the row row of pipe longitudinally, on car body, be welded with in advance column, after cable laying work completes, utilize the hole at cross connecting plate two ends to be fixed on the column welding in advance on car body pipe row, and then above cross connecting plate laying floor.This scheme not only needs cable laying on car body in advance, takies the space in car, when being unfavorable for other operations, launches, but also need to be on car body prewelding column, cross connecting plate is fixed on column as joist, then carries out floor installment work, efficiency is lower.
Summary of the invention
Object of the present invention overcomes the deficiency of above-mentioned prior art exactly, a kind of locomotive pipeline and cable combined type assembly method are provided, save the assembling space of car body, realize the modularization of locomotive control pipeline, cable, joist and pre-assembled, improve assembling quality and the packaging efficiency of locomotive.
The object of the present invention is achieved like this: a kind of locomotive pipeline and cable combined type assembly method, is characterized in that taking the following step:
A. prepare locomotive pipeline and cable composite carrier, this support is comprised of framework, bearing beam, joist, and the two ends of bearing beam can be bolted on the lateral column of framework, and joist can be bolted the top of framework lateral column;
B. by framework longitudinal arrangement, navigate on assembly or fitting table;
C. first layer bearing beam is installed on framework;
D. pipe clamp is installed on first layer bearing beam;
E. on first layer bearing beam, lay pilot line, pipeline is fastened on pipe clamp;
F. second layer bearing beam is installed on framework;
G. cable laying on second layer bearing beam;
H. joist is fixed to the top of framework lateral column;
I. positioning device is dismantled from assembly or fitting table, the position, corridor by the pipeline assembling and cable assembly integral hoisting to locomotive car body;
J. laying floor.
The solution of the present invention, has realized the pre-assembled of cable laying and line arrangement, does not take the space of car body, is convenient to synchronize and carry out with other installation procedures, has improved the packaging efficiency of locomotive.Adopt tower structure, locomotive control pipeline and cable are integrated together, can under car, joist be fixed on framework, pipe row bond to after vehicle body bottom frame by bonding mode, floor directly can be installed on joist, improve the packaging efficiency of locomotive.
Accompanying drawing explanation
Fig. 1 is locomotive pipeline and the cable combined type assembling principle schematic of the embodiment of the present invention.
Fig. 2 is framework schematic diagram
Fig. 3 is bearing beam schematic diagram
Fig. 4 is the assembling of framework bearing beam, i.e. step C schematic diagram
Fig. 5 is pipe clamp installation diagram, i.e. step D schematic diagram
Fig. 6 is braking line installation diagram, i.e. step e schematic diagram
Fig. 7 is second layer bearing beam installation diagram, i.e. step F schematic diagram
Fig. 8 is cable scheme of installation, i.e. step G schematic diagram
Fig. 9 is joist installation diagram, i.e. step H schematic diagram
In figure, be labeled as: 1-framework, 2-bearing beam, 3-pipe clamp, 4-joist, 5-pilot line, 6-cable.
Embodiment
For making object, technological scheme and the advantage of the embodiment of the present invention clearer, below in conjunction with the accompanying drawing in the embodiment of the present invention, technological scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is the present invention's part embodiment, rather than whole embodiments.Embodiment based in the present invention, those of ordinary skills, not making the every other embodiment who obtains under creative work prerequisite, belong to the scope of protection of the invention.
Referring to Fig. 1, locomotive pipeline and cable composite carrier are frame structure, two bearing beams 2 are installed on each framework 1, pipe clamp 3 is installed on the bearing beam of lower floor, by the fixing pilot line 5 of pipe clamp, the bearing beam on upper strata is used for cable laying 6, and the upper end of framework lateral column is provided with joist 4.
Framework 1 can be by steel plate through punching press, and bending forms, and two heel posts have two oval strip holes, for bearing beam 2 is installed; Two place's bending parts in upper end respectively have a horizontal slotted hole, for installing floor board beam 4.
Bearing beam 2 can be by aluminium sheet through stamping-out, bending and molding, and intermediate portion has several apertures for weight reduction; Bottom midline has strip hole, and for pipe clamp 3 is installed, and pipe clamp can laterally adjusted direction.
Pipe clamp 3 is finished parts.Backing plate is arranged at top, has unthreaded hole; Intermediate portion is nylon material, is divided into upper and lower two-part, and middle aperture ratio pipeline diameter is identical, and lower end is threaded cushion block.
During assembling, first by framework 1 according to the size longitudinal arrangement of drawing, navigate on assembly or fitting table (not shown).Then first layer bearing beam 2 is installed on framework, then pipe clamp 3 is installed on first layer crossbeam 2.Lay pilot line 5, the bolt on tight pipe clamp 3, is fastened to pipeline 5 on pipe clamp 3.Second layer bearing beam 2 is installed on framework 1.Cable laying 6.Joist 4 is fixed to the top of framework 1 lateral column.Positioning device is dismantled from assembly or fitting table, the position, corridor by the pipeline assembling and cable assembly integral hoisting to locomotive car body.Last laying floor.
Finally it should be noted that: above embodiment only, in order to technological scheme of the present invention to be described, is not intended to limit; Although the present invention is had been described in detail with reference to previous embodiment, those of ordinary skill in the art is to be understood that: its technological scheme that still can record aforementioned each embodiment is modified, or part technical characteristics is wherein equal to replacement; And these modifications or replacement do not make the essence of appropriate technical solution depart from the spirit and scope of various embodiments of the present invention technological scheme.

Claims (1)

1. locomotive pipeline and a cable combined type assembly method, is characterized in that taking the following step:
A. prepare locomotive pipeline and cable composite carrier, this support is comprised of framework, bearing beam, joist, and the two ends of bearing beam can be bolted on the lateral column of framework, and joist can be bolted the top of framework lateral column;
B. by framework longitudinal arrangement, navigate on assembly or fitting table;
C. first layer bearing beam is installed on framework;
D. pipe clamp is installed on first layer bearing beam;
E. on first layer bearing beam, lay pilot line, pipeline is fastened on pipe clamp;
F. second layer bearing beam is installed on framework;
G. cable laying on second layer bearing beam;
H. joist is fixed to the top of framework lateral column;
I. positioning device is dismantled from assembly or fitting table, the position, corridor by the pipeline assembling and cable assembly integral hoisting to locomotive car body;
J. laying floor.
CN201310564315.4A 2013-11-11 2013-11-11 Locomotive pipeline and cable composite assembling method Expired - Fee Related CN103615601B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310564315.4A CN103615601B (en) 2013-11-11 2013-11-11 Locomotive pipeline and cable composite assembling method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310564315.4A CN103615601B (en) 2013-11-11 2013-11-11 Locomotive pipeline and cable composite assembling method

Publications (2)

Publication Number Publication Date
CN103615601A true CN103615601A (en) 2014-03-05
CN103615601B CN103615601B (en) 2015-06-17

Family

ID=50166312

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310564315.4A Expired - Fee Related CN103615601B (en) 2013-11-11 2013-11-11 Locomotive pipeline and cable composite assembling method

Country Status (1)

Country Link
CN (1) CN103615601B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105620502A (en) * 2016-03-10 2016-06-01 中车株洲电力机车有限公司 Central corridor floor supporting structure among rail vehicle equipment
CN106114537A (en) * 2016-07-27 2016-11-16 中车大连机车车辆有限公司 Drivers' cab double floor beam
CN107781505A (en) * 2016-08-27 2018-03-09 中国二十冶集团有限公司 The integrated installation method of aerial pipeline
CN108083110A (en) * 2017-11-22 2018-05-29 中国二十冶集团有限公司 Trolley installation method and method for dismounting
CN109895795A (en) * 2019-03-15 2019-06-18 中车青岛四方机车车辆股份有限公司 Rail vehicle pipeline arragement construction and rail vehicle with it
CN113937693A (en) * 2021-10-21 2022-01-14 中车大同电力机车有限公司 Combined installation rack for line and pipeline

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3787016A (en) * 1972-04-20 1974-01-22 C Laval Rack for supporting cables and the like
GB2383109A (en) * 2001-12-13 2003-06-18 John Adams Adjustable pipe support
CN201582494U (en) * 2010-01-26 2010-09-15 薛国强 Combined composite material cable support
US20110062292A1 (en) * 2009-09-14 2011-03-17 Mccoy Donald P Non-metallic support stanchion
CN202094545U (en) * 2011-04-01 2011-12-28 河南省电力公司商丘供电公司 Fixing clamp for control cable in switchboard
CN102946077A (en) * 2012-11-19 2013-02-27 中国北车集团大连机车车辆有限公司 Railbound vehicle and vehicle body wire casing thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3787016A (en) * 1972-04-20 1974-01-22 C Laval Rack for supporting cables and the like
GB2383109A (en) * 2001-12-13 2003-06-18 John Adams Adjustable pipe support
US20110062292A1 (en) * 2009-09-14 2011-03-17 Mccoy Donald P Non-metallic support stanchion
CN201582494U (en) * 2010-01-26 2010-09-15 薛国强 Combined composite material cable support
CN202094545U (en) * 2011-04-01 2011-12-28 河南省电力公司商丘供电公司 Fixing clamp for control cable in switchboard
CN102946077A (en) * 2012-11-19 2013-02-27 中国北车集团大连机车车辆有限公司 Railbound vehicle and vehicle body wire casing thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105620502A (en) * 2016-03-10 2016-06-01 中车株洲电力机车有限公司 Central corridor floor supporting structure among rail vehicle equipment
CN105620502B (en) * 2016-03-10 2018-01-12 中车株洲电力机车有限公司 Central corridor floor support structure between a kind of railway vehicle device
CN106114537A (en) * 2016-07-27 2016-11-16 中车大连机车车辆有限公司 Drivers' cab double floor beam
CN107781505A (en) * 2016-08-27 2018-03-09 中国二十冶集团有限公司 The integrated installation method of aerial pipeline
CN108083110A (en) * 2017-11-22 2018-05-29 中国二十冶集团有限公司 Trolley installation method and method for dismounting
CN109895795A (en) * 2019-03-15 2019-06-18 中车青岛四方机车车辆股份有限公司 Rail vehicle pipeline arragement construction and rail vehicle with it
CN113937693A (en) * 2021-10-21 2022-01-14 中车大同电力机车有限公司 Combined installation rack for line and pipeline

Also Published As

Publication number Publication date
CN103615601B (en) 2015-06-17

Similar Documents

Publication Publication Date Title
CN103615601B (en) Locomotive pipeline and cable composite assembling method
CN104908149A (en) Template system of magnetic-levitation linear track beam and application method
CN110304095B (en) Straddle type monorail framework
CN104015745A (en) Chassis of body of hundred-percent modern city tramcar
CN101948060A (en) Elevator cabin guide rail bracket for expresselevator
CN103917476A (en) Escalator or moving walkway having sheet material that can be seen from below
CN203920759U (en) A kind of 100% modern city tramway train vehicle body bottom frame
CN102896602B (en) Method and tool for mounting brake system pipeline of aluminum alloy vehicle
CN201922912U (en) Electric pile mounting support for cars adopting hydrogen fuel cells
CN203022365U (en) Structure enabling brackets to be arranged on concrete support
CN202527929U (en) Roof preassembling unit of railway vehicle
CN202790933U (en) Cable bracket
CN109808730B (en) Brake control integrated device and train
CN203974844U (en) A kind of guideway vehicle and mounting seat of air cylinder thereof
CN101644357B (en) Bracket for supporting cables or pipe systems on semi-submersible type drilling platform
CN103537845A (en) Turnover tool for installing and welding headwall assembly
CN209112114U (en) A kind of bracket component
CN203062192U (en) Arc-shaped plate frame assembling technique device
US20150210297A1 (en) Multifunctional fastening profile
CN206927439U (en) Car combined type Knapsack-rack and its top auxiliary stand
CN207328127U (en) Integrated exhaust suspension hook support assembly
CN206856642U (en) A kind of new-energy automobile electric control element modular rack
CN107264373B (en) Supporting seat structure of mining dump truck platform
CN201443652U (en) Bracket used for supporting cables or piping lines on semisubmersible drilling platform
CN201568638U (en) Special cable bracket for subway

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150617

Termination date: 20191111