CN103615601B - Locomotive pipeline and cable composite assembling method - Google Patents
Locomotive pipeline and cable composite assembling method Download PDFInfo
- Publication number
- CN103615601B CN103615601B CN201310564315.4A CN201310564315A CN103615601B CN 103615601 B CN103615601 B CN 103615601B CN 201310564315 A CN201310564315 A CN 201310564315A CN 103615601 B CN103615601 B CN 103615601B
- Authority
- CN
- China
- Prior art keywords
- framework
- pipeline
- bearing beam
- locomotive
- cable
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/22—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals
- F16L3/223—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals each support having one transverse base for supporting the pipes
- F16L3/227—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals each support having one transverse base for supporting the pipes each pipe being supported by a separate element fastened to the base
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F16—ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
- F16L—PIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
- F16L3/00—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
- F16L3/02—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing
- F16L3/06—Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets partly surrounding the pipes, cables or protective tubing with supports for wires
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G3/00—Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
- H02G3/02—Details
- H02G3/04—Protective tubing or conduits, e.g. cable ladders or cable troughs
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Installation Of Indoor Wiring (AREA)
Abstract
The invention relates to a locomotive pipeline and cable composite assembling method. A locomotive pipeline and cable composite support comprises frames, bearing crossbeams and floor beams. The frames are longitudinally arranged and positioned to an assembling table, control pipelines and cables are respectively laid on two layers of bearing cross beams, the assembled pipeline and cable components are integrally hoisted to the corridor position of a locomotive body, and a floor is laid.
Description
Technical field
The present invention relates to a kind of locomotive pipeline and cable composite assembly method, belong to railway locomotive technical field.
Background technique
In the assembling process of locomotive, in the middle of car body, corridor place needs to lay locomotive cable, installs locomotive pilot line, above the two, also will install porch decks beam and porch decks.Existing wiring stringing scheme is: first at position, car body corridor cable laying, under car, adopt multiple horizontal connecting plate to coordinate pipe clamp multiple pipeline to be fixed into the pipe row of a row longitudinal direction, car body is welded with column in advance, after cable laying work completes, on the column that pipe row is utilized the hole at cross connecting plate two ends to be fixed to car body welds in advance, and then above cross connecting plate laying floor.This scheme not only needs cable laying on car body in advance, takies the space in car, launches while being unfavorable for other operations, but also need prewelding column on car body, be fixed to cross connecting plate as joist on column, then carry out floor installment work, efficiency is lower.
Summary of the invention
Object of the present invention overcomes the deficiency of above-mentioned prior art exactly, a kind of locomotive pipeline and cable composite assembly method are provided, save the assembling space of car body, realize locomotive control pipeline, cable, the modularization of joist and pre-assembled, improve assembling quality and the packaging efficiency of locomotive.
The object of the present invention is achieved like this: a kind of locomotive pipeline and cable composite assembly method, is characterized in that taking the following step:
A. prepare locomotive pipeline and cable composite support, this support is made up of framework, bearing beam, joist, and the two ends of bearing beam are by being bolted on the lateral column of framework, and joist is by being bolted to the top of framework lateral column;
B. by framework longitudinal arrangement, navigate on assembly or fitting table;
C. first layer bearing beam is installed on framework;
D. pipe clamp is installed on first layer bearing beam;
E. on first layer bearing beam, lay pilot line, pipeline is fastened on pipe clamp;
F. second layer bearing beam is installed on framework;
G. cable laying on second layer bearing beam;
H. joist is fixed to the top of framework lateral column;
I. positioning device is dismantled from assembly or fitting table, by the pipeline that assembles and the cable assembly integral hoisting position, corridor to locomotive car body;
J. laying floor.
The solution of the present invention, achieves the pre-assembled of cable laying and line arrangement, does not take the space of car body, is convenient to synchronously carry out with other installation procedures, improves the packaging efficiency of locomotive.Adopt tower structure, locomotive control pipeline and cable are integrated together, can under car, joist are fixed on framework, after pipe row bonds to vehicle body bottom frame by bonding mode, floor directly can be installed on joist, improve the packaging efficiency of locomotive.
Accompanying drawing explanation
Fig. 1 is locomotive pipeline and the cable composite assembling principle schematic of the embodiment of the present invention.
Fig. 2 is block schematic illustration
Fig. 3 is bearing beam schematic diagram
Fig. 4 is the assembling of framework bearing beam, i.e. step C schematic diagram
Fig. 5 is pipe clamp installation diagram, i.e. step D schematic diagram
Fig. 6 is braking line installation diagram, i.e. step e schematic diagram
Fig. 7 is second layer bearing beam installation diagram, i.e. step F schematic diagram
Fig. 8 is cable scheme of installation, i.e. step G schematic diagram
Fig. 9 is joist installation diagram, i.e. step H schematic diagram
Be labeled as in figure: 1-framework, 2-bearing beam, 3-pipe clamp, 4-joist, 5-pilot line, 6-cable.
Embodiment
For making the object of the embodiment of the present invention, technological scheme and advantage clearly, below in conjunction with the accompanying drawing in the embodiment of the present invention, technological scheme in the embodiment of the present invention is clearly and completely described, obviously, described embodiment is the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
Referring to Fig. 1, locomotive pipeline and cable composite support are frame structure, each framework 1 is provided with two bearing beams 2, the bearing beam of lower floor is provided with pipe clamp 3, pilot line 5 is fixed by pipe clamp, the bearing beam on upper strata is then used for cable laying 6, and the upper end of framework lateral column is then provided with joist 4.
Framework 1 can by steel plate through punching press, and bending is formed, and two heel posts have two Oval strips holes, for installing bearing beam 2; The slotted hole of a transverse direction is respectively had, for installing floor board beam 4 at two place's bending parts of upper end.
Bearing beam 2 can by aluminium sheet through stamping-out, bending and molding, and intermediate portion has several aperture for weight reduction; Bottom midline has strip hole, and for installing pipe clamp 3, and pipe clamp can at horizontal adjustment direction.
Pipe clamp 3 is finished parts.Backing plate is arranged at top, has unthreaded hole; Intermediate portion is nylon material, is divided into upper and lower two-part, and middle aperture is more identical than pipeline diameter, and lower end is threaded cushion block.
During assembling, first by framework 1 according to drawing size longitudinal arrangement, navigate on assembly or fitting table (not shown).Then first layer bearing beam 2 is installed on framework, then pipe clamp 3 is installed on first layer crossbeam 2.Lay pilot line 5, the bolt on tight pipe clamp 3, pipeline 5 is fastened on pipe clamp 3.Second layer bearing beam 2 is installed on framework 1.Cable laying 6.Joist 4 is fixed to the top of framework 1 lateral column.Positioning device is dismantled from assembly or fitting table, by the pipeline that assembles and the cable assembly integral hoisting position, corridor to locomotive car body.Last laying floor.
Last it is noted that above embodiment is only in order to illustrate technological scheme of the present invention, be not intended to limit; Although with reference to previous embodiment to invention has been detailed description, those of ordinary skill in the art is to be understood that: it still can be modified to the technological scheme described in foregoing embodiments, or carries out equivalent replacement to wherein portion of techniques feature; And these amendments or replacement, do not make the essence of appropriate technical solution depart from the spirit and scope of various embodiments of the present invention technological scheme.
Claims (1)
1. locomotive pipeline and a cable composite assembly method, is characterized in that taking the following step:
A. prepare locomotive pipeline and cable composite support, this support is made up of framework, bearing beam, joist, and the two ends of bearing beam are by being bolted on the lateral column of framework, and joist is by being bolted to the top of framework lateral column;
B. by framework longitudinal arrangement, navigate on assembly or fitting table;
C. first layer bearing beam is installed on framework;
D. pipe clamp is installed on first layer bearing beam;
E. on first layer bearing beam, lay pilot line, pipeline is fastened on pipe clamp;
F. second layer bearing beam is installed on framework;
G. cable laying on second layer bearing beam;
H. joist is fixed to the top of framework lateral column;
I. positioning device is dismantled from assembly or fitting table, by the pipeline that assembles and the cable assembly integral hoisting position, corridor to locomotive car body;
J. laying floor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310564315.4A CN103615601B (en) | 2013-11-11 | 2013-11-11 | Locomotive pipeline and cable composite assembling method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310564315.4A CN103615601B (en) | 2013-11-11 | 2013-11-11 | Locomotive pipeline and cable composite assembling method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103615601A CN103615601A (en) | 2014-03-05 |
CN103615601B true CN103615601B (en) | 2015-06-17 |
Family
ID=50166312
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310564315.4A Expired - Fee Related CN103615601B (en) | 2013-11-11 | 2013-11-11 | Locomotive pipeline and cable composite assembling method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103615601B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105620502B (en) * | 2016-03-10 | 2018-01-12 | 中车株洲电力机车有限公司 | Central corridor floor support structure between a kind of railway vehicle device |
CN106114537A (en) * | 2016-07-27 | 2016-11-16 | 中车大连机车车辆有限公司 | Drivers' cab double floor beam |
CN107781505A (en) * | 2016-08-27 | 2018-03-09 | 中国二十冶集团有限公司 | The integrated installation method of aerial pipeline |
CN108083110A (en) * | 2017-11-22 | 2018-05-29 | 中国二十冶集团有限公司 | Trolley installation method and method for dismounting |
CN109895795B (en) * | 2019-03-15 | 2020-09-22 | 中车青岛四方机车车辆股份有限公司 | Rail vehicle pipeline arrangement structure and rail vehicle with same |
CN113937693A (en) * | 2021-10-21 | 2022-01-14 | 中车大同电力机车有限公司 | Combined installation rack for line and pipeline |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3787016A (en) * | 1972-04-20 | 1974-01-22 | C Laval | Rack for supporting cables and the like |
GB2383109A (en) * | 2001-12-13 | 2003-06-18 | John Adams | Adjustable pipe support |
CN201582494U (en) * | 2010-01-26 | 2010-09-15 | 薛国强 | Combined composite material cable support |
CN202094545U (en) * | 2011-04-01 | 2011-12-28 | 河南省电力公司商丘供电公司 | Fixing clamp for control cable in switchboard |
CN102946077A (en) * | 2012-11-19 | 2013-02-27 | 中国北车集团大连机车车辆有限公司 | Railbound vehicle and vehicle body wire casing thereof |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8567734B2 (en) * | 2009-09-14 | 2013-10-29 | Underground Devices, Inc | Cable support system |
-
2013
- 2013-11-11 CN CN201310564315.4A patent/CN103615601B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3787016A (en) * | 1972-04-20 | 1974-01-22 | C Laval | Rack for supporting cables and the like |
GB2383109A (en) * | 2001-12-13 | 2003-06-18 | John Adams | Adjustable pipe support |
CN201582494U (en) * | 2010-01-26 | 2010-09-15 | 薛国强 | Combined composite material cable support |
CN202094545U (en) * | 2011-04-01 | 2011-12-28 | 河南省电力公司商丘供电公司 | Fixing clamp for control cable in switchboard |
CN102946077A (en) * | 2012-11-19 | 2013-02-27 | 中国北车集团大连机车车辆有限公司 | Railbound vehicle and vehicle body wire casing thereof |
Also Published As
Publication number | Publication date |
---|---|
CN103615601A (en) | 2014-03-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103615601B (en) | Locomotive pipeline and cable composite assembling method | |
CN101341067B (en) | Method for producing a fuselage cell of an aircraft | |
CN104908149A (en) | Template system of magnetic-levitation linear track beam and application method | |
CN110304095B (en) | Straddle type monorail framework | |
CN105443871A (en) | Novel support hanger and construction process for butting connection of horizontal multiple pipelines | |
CN102699604A (en) | Positioning tool for railway vehicle framework side frame | |
CN101948060A (en) | Elevator cabin guide rail bracket for expresselevator | |
CN104527691A (en) | Mounting method and mounting bases for locomotive underframe parts | |
CN103917476A (en) | Escalator or moving walkway having sheet material that can be seen from below | |
CN104245468A (en) | Structurally stable arrangement and method for forming a structurally stable arrangement | |
CN102896602B (en) | Method and tool for mounting brake system pipeline of aluminum alloy vehicle | |
CN201922912U (en) | Electric pile mounting support for cars adopting hydrogen fuel cells | |
CN203022365U (en) | Structure enabling brackets to be arranged on concrete support | |
CN202527929U (en) | Roof preassembling unit of railway vehicle | |
CN203974844U (en) | A kind of guideway vehicle and mounting seat of air cylinder thereof | |
CN109808730B (en) | Brake control integrated device and train | |
US20150210297A1 (en) | Multifunctional fastening profile | |
CN202363819U (en) | Tool for prewiring of wire slot on roof of railway vehicle | |
CN113771893A (en) | Vehicle body and magnetic levitation vehicle | |
CN206856642U (en) | A kind of new-energy automobile electric control element modular rack | |
CN206927439U (en) | Car combined type Knapsack-rack and its top auxiliary stand | |
CN207328127U (en) | Integrated exhaust suspension hook support assembly | |
CN104787063A (en) | Vehicle guide hood installation technology | |
CN105151003A (en) | Wiper motor system assembly structure | |
CN206202489U (en) | The integrated assembling structure of fascia and the mechanical arm for the structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150617 Termination date: 20191111 |