CN103615088B - Shaped stone material point hanging hang structure - Google Patents
Shaped stone material point hanging hang structure Download PDFInfo
- Publication number
- CN103615088B CN103615088B CN201310540590.2A CN201310540590A CN103615088B CN 103615088 B CN103615088 B CN 103615088B CN 201310540590 A CN201310540590 A CN 201310540590A CN 103615088 B CN103615088 B CN 103615088B
- Authority
- CN
- China
- Prior art keywords
- steel part
- stone material
- shape
- expansion bolt
- hanging hang
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004575 stone Substances 0.000 title claims abstract description 34
- 239000000463 material Substances 0.000 title claims abstract description 32
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 54
- 239000010959 steel Substances 0.000 claims abstract description 54
- 238000005246 galvanizing Methods 0.000 claims description 6
- 238000010276 construction Methods 0.000 abstract description 12
- 238000009434 installation Methods 0.000 description 5
- 230000035939 shock Effects 0.000 description 3
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000007634 remodeling Methods 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 230000001808 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000000354 decomposition reaction Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000000275 quality assurance Methods 0.000 description 1
- 239000000565 sealant Substances 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
Abstract
The invention discloses a kind of shaped stone material point hanging hang structure, it comprises steel part one (1), steel part two (5); Described steel part one (1) is inverted F shape, and the levels of F shape side is provided with screw, and upper strata is fixed by expansion bolt (2) and metope, and lower floor is fixed with metope by adding long screw expansion bolt (3); Steel part two (5) is the anti-F shape in side, F shape side, above be provided with screw, side is fixed with steel part one (1) by adding long screw expansion bolt (3), and above by the corner brace (6) that bolt (7) is provided with, corner brace (6) articulated end is all connected with stone material up and down.The present invention significantly can reduce difficulty of construction, improves construction quality, solves the problems such as efficiency of construction is low, later period maintenance amount large, effective antidetonation.
Description
Technical field
The present invention relates to a kind of shaped stone material point hanging hang structure.
Background technology
There is following drawback in tradition dry-hang stone: 1, limitation is little, is only limitted to the installation of simple body of wall, and the stone material that cannot meet special-shaped body of wall is installed.2, overall stressed, stone material dynamics is more weak for control.3, later period maintenance difficulty is larger.4, anti-seismic performance is less.
Summary of the invention
The object of the invention is: a kind of shaped stone material point hanging hang structure is provided, it achieve cell cube stressed separately, non-interference between cell cube and cell cube, shock resistance and opposing blast very competent, stability is high, high safety, construction intensity is low, mechanized construction degree is high, and can complete the installation of arc or intensive special-shaped metope, stone material plate is easy for installation, flexible.
Technical scheme of the present invention is: a kind of shaped stone material point hanging hang structure, and it comprises steel part one, steel part two; Described steel part one is inverted F shape, and the levels of F shape side is provided with screw, and upper strata is fixed by expansion bolt and metope, and lower floor is by adding long screw expansion bolt and metope is fixed; Described steel part two is the anti-F shape in side, F shape side, above be provided with screw, side is by adding long screw expansion bolt and steel part one is fixed, and above by the corner brace that bolt is provided with, corner brace articulated end is all connected with stone material up and down.
Below technique scheme is further expalined:
Described steel part two F shape side with add long screw expansion bolt junction and be provided with pipe, add long screw expansion bolt sleeve in pipe, pipe outer race is connected to brute spring, and brute spring is between steel part one and steel part two.
Described steel part one is connected with knuckle part with steel part two at two plane of structure ends of F shape, and by knuckle part, steel part one and steel part two are strengthened fixing.
Described corner brace is the T-shaped corner brace of installing of lying on one's side, and articulated end is embedded in the groove of stone material side.
Described steel part one is 150mm × 90mm × 40mm galvanizing steel part.
Described steel part two is 100mm × 50mm × 50mm galvanizing steel part.
Advantage of the present invention is: shaped stone material point hanging hang structure of the present invention, and it considerably reduces difficulty of construction, improves construction quality, solves the problems such as efficiency of construction is low, later period maintenance amount large, effective antidetonation; Stone material for large-scale public market, hotel and multiple polymorphic structure is installed and is provided quality assurance.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is described further:
Fig. 1 is the STRUCTURE DECOMPOSITION schematic diagram of the embodiment of the present invention;
Fig. 2 is the structure assembling decomposing schematic representation of the embodiment of the present invention;
Fig. 3 is the structural representation of the embodiment of the present invention;
Wherein: 1 steel part one; 2 expansion bolts; 3 add long screw expansion bolt; Semi-finals power spring; 5 steel parts two; 6 corner braces; 7 bolts.
Detailed description of the invention
Embodiment: as shown in Figure 1: a kind of shaped stone material point hanging hang structure, it comprises steel part 1; Expansion bolt 2; Add long screw expansion bolt 3; Brute spring 4; Steel part 25; Corner brace 6; Bolt 7.
As shown in Figure 2 and Figure 3, according to the typesetting size of metope, basic suspension member is started to be fixed in basic unit from one end in order, adjust the planeness between stone material and suspension member basic unit, angularity.Steel part 1 is 150mm × 90mm × 40mm galvanizing steel part, and thick 4mm is inverted F shape, the levels of F shape side is provided with screw, and upper strata is fixed by expansion bolt 2 and metope, and lower floor is fixed with metope by adding long screw expansion bolt 3.
Steel part 25 is 100mm × 50mm × 50mm galvanizing steel part, thick 4mm, is the F shape that side is anti-, F shape side, above be provided with screw, steel part 1 and steel part 25 are connected with knuckle part at two plane of structure ends of F shape, are mutually linked by knuckle part, and steel part 1 and steel part 25 are strengthened fixing.Steel part 25 F shape side with add long screw expansion bolt 3 junction and be provided with pipe, add long screw expansion bolt 3 and be placed in pipe, pipe outer race is connected to brute spring 4, and brute spring 4 is between steel part 1 and steel part 25.
Steel part 25 side is fixed with steel part 1 by adding long screw expansion bolt 3, and above by the corner brace 6 that bolt 7 is provided with, corner brace 6 articulated end is all connected M6 with stone material up and down, and bolt 7 is stainless steel bolt.Corner brace 6 is the T-shaped corner brace of installing of lying on one's side, and articulated end is embedded in the groove of stone material side, and makes it to coincide, tightens fixing, has good structural stability, aesthetic property after ensureing to install, thus forms the coupling assembling entirety of wall body structure and stone material.
Adopt the vertical faces of stone materials that point type dry-hang stone connects, fluid sealant is not generally broken in gap between stone material plate, be a kind of vertical faces of stone materials of ventilated type, also can accomplish that cell cube is stressed separately, non-interference between cell cube and cell cube, shock resistance and opposing blast very competent, stability is high, high safety, and construction intensity is low, mechanized construction degree is high, and stone material plate is flexibly easy for installation.The New technical use of the present embodiment, achieve cell cube stressed separately, non-interference between cell cube and cell cube, shock resistance and opposing blast very competent, stability is high, high safety, construction intensity is low, mechanized construction degree is high, and the flexible Application completing arc or intensive special-shaped metope of science, stone material plate is easy for installation, flexible.
It should be pointed out that for the present invention through absolutely proving, also can have the embodiment of multiple conversion and remodeling, be not limited to above-mentioned specific embodiment.Above-described embodiment is as just explanation of the present invention, instead of restriction.In a word, protection scope of the present invention should comprise those apparent conversion or alternative and remodeling to those skilled in the art.
Claims (6)
1. a shaped stone material point hanging hang structure, is characterized in that: it comprises steel part one (1), steel part two (5); Described steel part one (1) is inverted F shape, and the levels of F shape side is provided with screw, and upper strata is fixed by expansion bolt (2) and metope, and lower floor is fixed with metope by adding long screw expansion bolt (3); Described steel part two (5) is the anti-F shape in side, F shape side, above be provided with screw, side is fixed with steel part one (1) by adding long screw expansion bolt (3), and be provided with corner brace (6) by bolt (7) above, corner brace (6) articulated end is all connected with stone material up and down.
2. shaped stone material point hanging hang structure according to claim 1, it is characterized in that: described steel part two (5) F shape side with add long screw expansion bolt (3) junction and be provided with pipe, adding long screw expansion bolt (3) is placed in pipe, pipe outer race is connected to brute spring (4), and brute spring (4) is between steel part one (1) and steel part two (5).
3. shaped stone material point hanging hang structure according to claim 1, it is characterized in that: described steel part one (1) is connected with knuckle part with steel part two (5) at two plane of structure ends of F shape, and mutually linked by knuckle part, steel part one (1) and steel part two (5) are strengthened fixing.
4. shaped stone material point hanging hang structure according to claim 1, is characterized in that: described corner brace (6) is the T-shaped corner brace of installing of lying on one's side, and articulated end is embedded in the groove of stone material side.
5. shaped stone material point hanging hang structure according to claim 1, is characterized in that: described steel part one (1) is 150mm × 90mm × 40mm galvanizing steel part.
6. shaped stone material point hanging hang structure according to claim 1, is characterized in that: described steel part two (5) is 100mm × 50mm × 50mm galvanizing steel part.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310540590.2A CN103615088B (en) | 2013-11-06 | 2013-11-06 | Shaped stone material point hanging hang structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310540590.2A CN103615088B (en) | 2013-11-06 | 2013-11-06 | Shaped stone material point hanging hang structure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103615088A CN103615088A (en) | 2014-03-05 |
CN103615088B true CN103615088B (en) | 2016-03-23 |
Family
ID=50165803
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310540590.2A Active CN103615088B (en) | 2013-11-06 | 2013-11-06 | Shaped stone material point hanging hang structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103615088B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104060797B (en) * | 2014-04-15 | 2017-01-04 | 苏州金螳螂建筑装饰股份有限公司 | Wood facing fastener mounting structure |
CN104088409A (en) * | 2014-06-23 | 2014-10-08 | 湖州织里华樑门窗有限公司 | Sunlight room |
CN111395684B (en) * | 2020-03-24 | 2021-05-25 | 浙江世贸装饰股份有限公司 | Bracket for special-shaped wall construction and mounting method thereof |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201598759U (en) * | 2009-12-31 | 2010-10-06 | 中建城市建设发展有限公司 | Honeycomb aluminum plate stone composite plate curtain wall |
CN201933661U (en) * | 2010-12-31 | 2011-08-17 | 苏州柯利达建筑装饰工程有限公司 | Honeycomb stone curtain wall system |
KR20130003909A (en) * | 2011-07-01 | 2013-01-09 | 최경희 | Method for fixing wall panel |
CN102828601B (en) * | 2012-09-18 | 2014-06-11 | 苏州苏明装饰股份有限公司 | Wood veneer hanging and mounting system |
CN203783050U (en) * | 2013-11-06 | 2014-08-20 | 苏州金螳螂建筑装饰股份有限公司 | Special-shaped stone point hanging structure |
-
2013
- 2013-11-06 CN CN201310540590.2A patent/CN103615088B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN103615088A (en) | 2014-03-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206555567U (en) | A kind of antidetonation suspension and support | |
CN106594395A (en) | Anti-seismic support-hanger | |
CN103615088B (en) | Shaped stone material point hanging hang structure | |
CN206874971U (en) | A kind of gate antidetonation suspension and support | |
CN203783050U (en) | Special-shaped stone point hanging structure | |
CN206070343U (en) | The pier prefabricated K supports of reinforced on a kind of tubular arch bridge arch | |
CN206448546U (en) | Architectural engineering seismic hardening plate | |
CN201652388U (en) | Inner cylinder tiling chimney of reinforced concrete inner-outer cylinder | |
CN204385984U (en) | Back of the body bolt suspension member group formula shaped steel keel stone curtain wall | |
CN205875655U (en) | Scaffold | |
CN205371830U (en) | Heating power pipeline direct -burried fixed establishment | |
CN204164607U (en) | A kind of para-seismic support of building interior electromechanical equipment | |
CN203569841U (en) | Novel special-shaped stone point hanging structure | |
CN208396009U (en) | A kind of steel structure connection component being easily installed connection | |
CN103615091B (en) | Shaped stone material point hanging hang structure | |
CN203583781U (en) | Composite beam for manufacturing greenhouse framework | |
CN205063044U (en) | Incomparable V -arrangement connecting piece for steel | |
CN206741831U (en) | A kind of construction site warning sign being easily installed | |
CN204983335U (en) | Furred ceiling is staple bolt device for conversion layer | |
CN203257115U (en) | Tool-type welding steel pipe border protection frame fixing piece | |
CN204753932U (en) | Can assemble into floor that ceiling takes shape | |
CN204337585U (en) | The mounting structure of the non-reservoir pressure fire extinguisher of a kind of suspension type | |
CN210002947U (en) | Support rod of steel structures | |
CN204139522U (en) | A kind of pottery plate metope cladding system | |
CN203022332U (en) | Connecting member between scaffold for construction and wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |