KR20130003909A - Method for fixing wall panel - Google Patents

Method for fixing wall panel Download PDF

Info

Publication number
KR20130003909A
KR20130003909A KR1020110065552A KR20110065552A KR20130003909A KR 20130003909 A KR20130003909 A KR 20130003909A KR 1020110065552 A KR1020110065552 A KR 1020110065552A KR 20110065552 A KR20110065552 A KR 20110065552A KR 20130003909 A KR20130003909 A KR 20130003909A
Authority
KR
South Korea
Prior art keywords
building
bracket
wall
finishing material
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
KR1020110065552A
Other languages
Korean (ko)
Inventor
최경희
Original Assignee
최경희
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 최경희 filed Critical 최경희
Priority to KR1020110065552A priority Critical patent/KR20130003909A/en
Publication of KR20130003909A publication Critical patent/KR20130003909A/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0801Separate fastening elements
    • E04F13/0832Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
    • E04F13/0833Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable
    • E04F13/0839Separate fastening elements without load-supporting elongated furring elements between wall and covering elements not adjustable the fastening elements situated at the corners of the covering elements, not extending through the covering
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0862Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements composed of a number of elements which are identical or not, e.g. carried by a common web, support plate or grid
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/0885Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements specially adapted for being adhesively fixed to the wall; Fastening means therefor; Fixing by means of plastics materials hardening after application
    • E04F13/0887Adhesive means specially adapted therefor, e.g. adhesive foils or strips
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/08Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
    • E04F13/14Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Finishing Walls (AREA)

Abstract

본 발명은 건물의 내벽 등을 장식하기 위해서 벽에 건축 마감재를 부착하는데 필요한 공간이 축소될 수 있도록 하기 위한 건축 마감재 시공방법에 관한 것이다. 본 발명에 따른 건축 마감재 시공방법은 건물의 벽에 드릴로 일정 간격을 두고 앵커 설치구멍을 뚫는 앵커 설치구멍 형성 단계; 수직부와 수평부가 ㄴ자 형태로 형성된 브래킷의 수직부를 상기 건물의 벽에 댄 상태에서 상기 수직부에 형성된 체결구멍이 상기 앵커 설치구멍에 일치되도록 하는 브래킷 위치 설정 단계; 상기 체결구멍을 통해 플라스틱 앵커가 상기 앵커 설치구멍에 끼워지게 하되 상기 플라스틱 앵커의 머리부는 상기 브래킷의 수직부 밖으로 노출되게 하는 플라스틱 앵커 설치 단계; 상기 플라스틱 앵커에 나사를 조립하여 상기 브래킷이 건물의 벽에 대해 고정되게 하는 나사 조립 단계; 상기 브래킷의 수평부에 건축 마감재의 하단이 지탱되도록 하는 건축 마감재 위치 설정 단계; 및 상기 건물의 벽과 건축 마감재 사이에 위치된 상기 브래킷의 수평부 상에 에폭시 본드를 도포하여 상기 건축 마감재와 상기 브래킷을 접합하는 접합 단계; 를 포함하여 이루어진다.The present invention relates to a construction finish construction method for reducing the space required to attach the building finish to the wall for decorating the inner wall of the building, and the like. Building finishing material construction method according to the present invention comprises the steps of forming an anchor installation hole for drilling the anchor installation hole at a predetermined interval with a drill on the wall of the building; A bracket positioning step of causing a fastening hole formed in the vertical part to coincide with the anchor installation hole in a state in which the vertical part of the bracket having the vertical part and the horizontal part is formed on the wall of the building; A plastic anchor installation step of allowing the plastic anchor to be fitted into the anchor installation hole through the fastening hole, but having the head of the plastic anchor exposed out of the vertical part of the bracket; Assembling screws to the plastic anchors so that the brackets are fixed to the wall of the building; Building finishing material positioning step of supporting the lower end of the building finishing material in the horizontal portion of the bracket; And bonding the building finish to the bracket by applying an epoxy bond on a horizontal portion of the bracket located between the wall of the building and the building finish. It is made, including.

Description

건축 마감재 시공방법{METHOD FOR FIXING WALL PANEL}Construction finish construction method {METHOD FOR FIXING WALL PANEL}

본 발명은 건축 마감재 시공방법에 관한 것으로서, 더욱 상세하게는 건물의 내벽 등을 장식하기 위해서 벽에 건축 마감재를 부착하는데 필요한 공간이 축소될 수 있을 뿐만 아니라 시공시간이 단축될 수 있도록 하는 건축 마감재 시공방법에 관한 것이다.The present invention relates to a method for constructing a building finishing material, and more particularly, a building finishing material construction that can reduce the space required for attaching a building finishing material to a wall to decorate an inner wall of a building, and also shorten the construction time. It is about a method.

일반적인 건축물의 내벽 및 외벽은 건축물의 수명을 연장할 뿐만 아니라 미적인 장식을 위해서 다양한 방식으로 마감이 되고 있다.The inner and outer walls of a typical building not only extend the life of the building, but are also finished in various ways for aesthetic decoration.

건축물의 내벽 및 외벽을 마감하는 방식의 예로는 페인트 칠, 벽지 부착, 건축 마감재 부착 등이 있다. 한편, 건축물의 내벽 및 외벽을 마감하기 위한 건축 마감재로는 타일, 석재 패널, 목재 패널, 금속 패널 등 다양한 건축 자재들이 있다. 특히, 건축 마감재로 많이 쓰이는 석재 패널에는 석재 대리석, 인조 대리석, 대리석 복합판 등이 있다.Examples of finishing the inner and outer walls of a building include painting, wallpapering, and building finishing. On the other hand, there are various building materials such as tiles, stone panels, wood panels, metal panels as a building finishing material for finishing the inner and outer walls of the building. In particular, the stone panels commonly used as architectural finishing materials include stone marble, artificial marble, and marble composite board.

도 1은 종래 건축 마감재 시공방법의 한 예에 의해서 건축 마감재가 시공된 상태를 보인 도면이다. 도 1에 도시된 바와 같이, ㄴ자 형태로 성형된 고정 브래킷(20)의 수직부(22)는 고정 볼트(40)에 의해 건물의 벽(W)에 설치되고, 고정 브래킷(20)의 수평부(24)와 조절 브래킷(30)의 한쪽 끝 부분이 조절 볼트(50)에 의해 결합된다. 고정 브래킷(20)에 대해서 조절 브래킷(30)은 소정의 범위 내에서 위치조절이 가능하도록 구성된다. 한편, 조절 브래킷(30)의 다른 한쪽 끝 부분에는 고정핀(32)이 돌출 형성되는데, 이 고정핀(32)은 건축 마감재(10)의 하단과 상단에 형성된 고정홈(12)에 끼워져 건축 마감재(10)가 건물의 벽(W)을 기준으로 전후방향 또는 좌우방향으로 움직이지 않도록 하는 기능을 하게 된다.1 is a view showing a state in which a building finishing material construction by an example of a conventional building finishing method construction method. As shown in FIG. 1, the vertical portion 22 of the fixing bracket 20 formed in the shape of the letter N is installed on the wall W of the building by the fixing bolt 40, and the horizontal portion of the fixing bracket 20 is formed. 24 and one end of the adjustment bracket 30 are joined by the adjustment bolt 50. With respect to the fixing bracket 20, the adjustment bracket 30 is configured to enable position adjustment within a predetermined range. On the other hand, the other end of the adjustment bracket 30 is formed with a fixing pin 32 protruding, the fixing pin 32 is fitted into the fixing groove 12 formed in the lower and top of the building finishing material 10, the building finishing material The function of the 10 to move in the front and rear or left and right directions with respect to the wall (W) of the building.

그런데 전술한 바와 같은 종래 건축 마감재 시공방법에 의해서 건축 마감재가 시공이 될 경우에 건물의 벽과 건축 마감재 사이의 공간이 크게 형성되는 문제점이 있었다. 따라서, 건물의 내벽에 건축 마감재를 붙일 경우에 내부 공간이 상대적으로 좁아지게 된다.However, there is a problem in that a large space is formed between the wall of the building and the building finish when the building finish is constructed by the conventional building finishing method as described above. Therefore, the interior space is relatively narrow when attaching the building finishing material to the inner wall of the building.

또한, 건축 마감재의 시공 과정에서 작업자는 고정홈이 고정핀에 정확하게 끼워질 수 있도록 하기 위해서 고정 브래킷에 대해 조절 브래킷의 위치를 조정해야 하기 때문에 시공시간이 오래 걸리게 되는 등의 문제점이 있었다.In addition, in the construction process of the building finishing material, the worker had to adjust the position of the adjustment bracket with respect to the fixing bracket so that the fixing groove can be accurately fitted to the fixing pin, there was a problem such that the construction time takes a long time.

대한민국특허청 등록실용신안공보 20-0334463호Utility Model Registration of Korea Patent Office 20-0334463 대한민국특허청 등록실용신안공보 20-0368180호Utility Model Registration of Korea Patent Office 20-0368180

따라서 본 발명은 전술한 바와 같은 종래기술의 제반 문제점을 해결하기 위해서 창안이 된 것으로서, 건물의 내벽 등을 장식하기 위해서 벽에 건축 마감재를 부착하는데 필요한 공간이 축소될 수 있도록 하기 위한 건축 마감재 시공방법을 제공하는 데 목적이 있다.Therefore, the present invention has been made in order to solve the problems of the prior art as described above, building construction material construction method for reducing the space required to attach the building finishing material to the wall to decorate the inner wall of the building, etc. The purpose is to provide.

본 발명의 다른 목적은 건물이 내벽 등에 건축 마감재를 부착시키는 데 걸리는 시공시간이 단축될 뿐만 아니라 시공이 용이하게 이루어질 수 있도록 하는 건축 마감재 시공방법을 제공하는 데 있다.It is another object of the present invention to provide a construction finish construction method that can shorten the construction time required for attaching a construction finish to an inner wall and the like, and can be easily constructed.

본 발명의 목적은 이상에서 언급한 것으로 제한되지 않으며, 언급되지 않은 또 다른 목적들은 아래의 기재로부터 본 발명이 속하는 기술 분야의 통상의 지식을 가진 자에게 명확하게 이해될 수 있을 것이다.The object of the present invention is not limited to those mentioned above, and other objects not mentioned will be clearly understood by those skilled in the art from the following description.

상기 과제를 해결하기 위한 본 발명의 일 실시 예에 따른 건축 마감재 시공방법은 건물의 벽에 드릴로 일정 간격을 두고 앵커 설치구멍을 뚫는 앵커 설치구멍 형성 단계; 수직부와 수평부가 ㄴ자 형태로 형성된 브래킷의 수직부를 상기 건물의 벽에 댄 상태에서 상기 수직부에 형성된 체결구멍이 상기 앵커 설치구멍에 일치되도록 하는 브래킷 위치 설정 단계; 상기 체결구멍을 통해 플라스틱 앵커가 상기 앵커 설치구멍에 끼워지게 하되 상기 플라스틱 앵커의 머리부는 상기 브래킷의 수직부 밖으로 노출되게 하는 플라스틱 앵커 설치 단계; 상기 플라스틱 앵커에 나사를 조립하여 상기 브래킷이 건물의 벽에 대해 고정되게 하는 나사 조립 단계; 상기 브래킷의 수평부에 건축 마감재의 하단이 지탱되도록 하는 건축 마감재 위치 설정 단계; 및 상기 건물의 벽과 건축 마감재 사이에 위치된 상기 브래킷의 수평부 상에 에폭시 본드를 도포하여 상기 건축 마감재와 상기 브래킷을 접합하는 접합 단계; 를 포함하여 이루어진다.Building finishing material construction method according to an embodiment of the present invention for solving the above problem is the anchor installation hole forming step of drilling the anchor installation hole at a predetermined interval with a drill on the wall of the building; A bracket positioning step of causing a fastening hole formed in the vertical part to coincide with the anchor installation hole in a state in which the vertical part of the bracket having the vertical part and the horizontal part is formed on the wall of the building; A plastic anchor installation step of allowing the plastic anchor to be fitted into the anchor installation hole through the fastening hole, but having the head of the plastic anchor exposed out of the vertical part of the bracket; Assembling screws to the plastic anchors so that the brackets are fixed to the wall of the building; Building finishing material positioning step of supporting the lower end of the building finishing material in the horizontal portion of the bracket; And bonding the building finish to the bracket by applying an epoxy bond on a horizontal portion of the bracket located between the wall of the building and the building finish. It is made, including.

상기 브래킷의 수평부 하면은 하층에 위치된 건축 마감재의 상단을 접하도록 설치될 수 있다.The bottom of the horizontal portion of the bracket may be installed to contact the top of the building finishing material located in the lower floor.

상기 브래킷은 두께가 0.8 ~ 1.5mm인 금속판으로 이루어질 수 있다.The bracket may be made of a metal plate having a thickness of 0.8 ~ 1.5mm.

상기 건축 마감재는 2 ~ 5mm 두께의 외부층과 7 ~ 15mm의 내부층으로 형성된 대리석 복합판으로 이루어질 수 있다.The building finishing material may be made of a marble composite plate formed of an outer layer of 2 ~ 5mm thickness and an inner layer of 7 ~ 15mm.

본 발명의 실시 예에 따른 건축 마감재 시공방법에 의하면 특히 건물의 내벽에 건축 마감재를 붙이는 과정에서 건물의 벽으로부터 건축 마감재 사이의 간격이 좁기 때문에 건물 내부공간을 상대적으로 넓게 유지할 수 있게 된다.According to the building finishing material construction method according to an embodiment of the present invention, in particular, in the process of attaching the building finishing material to the inner wall of the building, the space between the building wall and the building finishing material is narrow, so that the interior space of the building can be kept relatively wide.

또한, 본 발명의 실시 예에 따른 건축 마감재 시공방법에 의하면 건물의 벽에 건축 마감재를 부착하는데 따른 작업시간이 덜 소요될 수 있을 뿐만 아니라 작업이 용이하게 이루어질 수 있는 효과가 있다.In addition, according to the construction finishing method construction method according to an embodiment of the present invention can take less time required for attaching the building finish to the wall of the building, as well as the effect can be easily made.

본 발명의 효과는 이상에서 언급한 것으로 제한되지 않으며, 언급되지 않은 또 다른 효과들은 아래의 기재로부터 본 발명이 속하는 기술 분야의 통상의 지식을 가진 자에게 명확하게 이해될 수 있을 것이다.The effects of the present invention are not limited to those mentioned above, and other effects that are not mentioned will be clearly understood by those skilled in the art from the following description.

도 1은 종래 건축 마감재 시공방법의 한 예를 설명하기 위한 도면이다.
도 2는 본 발명의 실시 예에 따른 건축 마감재 시공방법의 공정도이다.
도 3은 본 발명의 실시 예에 따른 건축 마감재 시공방법에 적용되는 브래킷의 사시도이다.
도 4는 본 발명의 실시 예에 따라 건물의 벽에 앵커 설치구멍이 형성된 상태의 도면이다.
도 5는 본 발명의 실시 예에 따른 브래킷의 위치가 설정되고 플라스틱 앵커가 설치되기 전의 상태를 보인 도면이다.
도 6 및 도 7은 본 발명의 실시 예에 따라 플라스틱 앵커에 나사못이 조립되는 상태를 보인 도면이다.
도 8은 본 발명의 실시 예에 따른 브래킷의 수평부에 의해서 건축 마감재가 지탱되고 있는 상태를 보인 도면이다.
도 9는 본 발명의 실시 예에 따른 건축 마감재 시공방법에 의해서 건축 마감재가 시공된 상태를 보인 도면이다.
1 is a view for explaining an example of a conventional construction finish construction method.
2 is a process chart of the building finishing material construction method according to an embodiment of the present invention.
3 is a perspective view of a bracket applied to the building finishing method construction method according to an embodiment of the present invention.
4 is a view showing a state in which the anchor installation hole is formed in the wall of the building according to an embodiment of the present invention.
5 is a view showing a state before the position of the bracket is set and the plastic anchor is installed according to an embodiment of the present invention.
6 and 7 are views showing a state in which the screw is assembled to the plastic anchor according to an embodiment of the present invention.
8 is a view showing a state in which the building finishing material is supported by the horizontal portion of the bracket according to an embodiment of the present invention.
9 is a view showing a state in which the building finishing material construction by the building finishing material construction method according to an embodiment of the present invention.

본 발명의 목적 및 효과, 그리고 그것들을 달성하기 위한 기술적 구성들은 첨부되는 도면과 함께 상세하게 뒤에 설명이 되는 실시 예들을 참조하면 명확해질 것이다. 본 발명을 설명함에 있어서 공지 기능 또는 구성에 대한 구체적인 설명이 본 발명의 요지를 불필요하게 흐를 수 있다고 판단되는 경우에는 그 상세한 설명을 생략할 것이다. 그리고 뒤에 설명되는 용어들은 본 발명에서의 구조, 역할 및 기능 등을 고려하여 정의된 용어들로서 이는 사용자, 운용자의 의도 또는 관례 등에 따라 달라질 수 있다.BRIEF DESCRIPTION OF THE DRAWINGS The above and other objects, features and advantages of the present invention will be more apparent from the following detailed description taken in conjunction with the accompanying drawings, in which: FIG. In the following description of the present invention, a detailed description of known functions and configurations incorporated herein will be omitted when it may make the subject matter of the present invention rather unnecessary. The terms described below are defined in consideration of the structure, role and function of the present invention, and may be changed according to the intention of the user, the intention of the operator, or the custom.

그러나 본 발명은 이하에서 개시되는 실시 예들에 한정되는 것이 아니라 서로 다른 다양한 형태로 구현될 수 있다. 단지 본 실시 예들은 본 발명의 개시가 완전하도록 하고, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자에게 발명의 범주를 완전하게 알려주기 위해 제공되는 것이며, 본 발명은 오로지 특허청구범위에 기재된 청구항의 범주에 의하여 정의될 뿐이다. 그러므로 그 정의는 본 명세서 전반에 걸친 내용을 토대로 내려져야 할 것이다.The present invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein. These embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the invention to those skilled in the art to which the present invention pertains, It is only defined by the scope of the claims. Therefore, the definition should be based on the contents throughout this specification.

명세서 전체에서, 어떤 부분이 어떤 구성요소를 "포함"한다고 할 때, 이는 특별히 반대되는 기재가 없는 한 다른 구성요소를 제외하는 것이 아니라 다른 구성요소를 더 포함할 수 있는 것을 의미한다. 또한, 명세서에 기재된 "…유닛", "…부" 등의 용어는 적어도 하나의 기능이나 동작을 처리하는 단위를 의미한다.Throughout the specification, when a part is said to "include" a certain component, it means that it can further include other components, without excluding other components unless specifically stated otherwise. In addition, the terms "... unit", "... part", etc. described in this specification mean a unit which processes at least one function or operation.

이하에서는 본 발명의 실시 예에 따른 건축 마감재 시공방법에 대해서 첨부된 도면을 참고하면서 더욱 구체적으로 설명하기로 한다.Hereinafter, with reference to the accompanying drawings for the building finishing material construction method according to an embodiment of the present invention will be described in more detail.

도면 중에 표시된 도면부호 100은 본 발명의 실시 예에 따른 건축 마감재를 지시하는 것이며, 도면부호 200은 본 발명의 실시 예에 따른 브래킷을 지시하는 것이다.Reference numeral 100 denoted in the drawings indicates a building finishing material according to an embodiment of the present invention, reference numeral 200 indicates a bracket according to an embodiment of the present invention.

본 발명의 실시 예에 따른 건축 마감재 시공방법은 도 2에 도시된 바와 같이 앵커 설치구멍 형성 단계(S110), 브래킷 위치 설정 단계(S120), 플라스틱 앵커 설치 단계(S130), 나사 조립 단계(S140), 건축 마감재 위치 설정 단계(S150) 및 접합 단계(S160)를 포함하여 이루어진다.Building finishing material construction method according to an embodiment of the present invention as shown in Figure 2 anchor installation hole forming step (S110), bracket positioning step (S120), plastic anchor installation step (S130), screw assembly step (S140) , Building finishing material positioning step (S150) and bonding step (S160) is made.

도 3은 본 발명의 실시 예에 따른 건축 마감재 시공방법에 적용되는 브래킷의 사시도이다.3 is a perspective view of a bracket applied to the building finishing method construction method according to an embodiment of the present invention.

도 3은 도시된 바와 같이 본 발명의 실시 예에 따른 브래킷(200)은 건물의 벽(W)에 접하는 수직부(210)와 건축 마감재(100)의 하단 또는 상단에 접하는 수평부(220)가 대략 ㄴ자 형태로 형성된 것이 사용될 수 있다. 브래킷(200)의 수직부(210) 상에는 도면에 도시된 바와 같이 플라스틱 앵커(300)가 통과하기 위한 체결구멍(230)이 형성된다.3 is a bracket 200 according to an embodiment of the present invention as shown is a vertical portion 210 in contact with the wall (W) of the building and the horizontal portion 220 in contact with the bottom or top of the building finishing material 100 One formed in the roughly C shape may be used. A fastening hole 230 through which the plastic anchor 300 passes is formed on the vertical portion 210 of the bracket 200 as shown in the drawing.

특히, 본 발명의 실시 예에 따른 건축 마감재 시공방법에 적용되는 브래킷(200)은 두께가 0.8 ~ 1.5mm 범위 내인 금속판으로 이루어질 수 있다.In particular, the bracket 200 applied to the building finishing material construction method according to an embodiment of the present invention may be made of a metal plate having a thickness of 0.8 ~ 1.5mm range.

도 4는 본 발명의 실시 예에 따라 건물의 벽에 앵커 설치구멍이 형성된 상태의 도면이다.4 is a view showing a state in which the anchor installation hole is formed in the wall of the building according to an embodiment of the present invention.

도 4에 도시된 바와 같이 작업자는 우선 건물의 벽(W)에 드릴 등을 이용하여 앵커 설치구멍(H)이 형성되도록 작업한다(S110). 이때 앵커 설치구멍(H)은 지름이 5 ~ 15mm 인 플라스틱 앵커(300)가 설치될 수 있는 크기와 깊이로 형성된다.As shown in Figure 4, the worker first works to form an anchor installation hole (H) using a drill or the like on the wall (W) of the building (S110). At this time, the anchor installation hole (H) is formed with a size and depth that can be installed plastic anchor 300 having a diameter of 5 ~ 15mm.

작업자는 도 5에 도시된 바와 같이 브래킷(200)의 수직부(210)에 형성된 체결구멍(230)이 건물의 벽(W)에 형성된 앵커 설치구멍(H)에 일치되도록 한 후(S120), 체결구멍(H)을 통해서 플라스틱 앵커(300)가 앵커 설치구멍(H)에 끼워지도록 한다(S130). 이때, 플라스틱 앵커(300)의 머리부(310)는 도 6에 도시된 바와 같이 브래킷(200)의 수직부(210) 밖으로 노출된 상태가 된다.After the worker makes the fastening hole 230 formed in the vertical portion 210 of the bracket 200 to be aligned with the anchor installation hole H formed in the wall W of the building (S120), as shown in FIG. 5, The plastic anchor 300 is fitted into the anchor installation hole H through the fastening hole H (S130). At this time, the head 310 of the plastic anchor 300 is exposed to the outside of the vertical portion 210 of the bracket 200 as shown in FIG.

그리고 작업자는 도 6 및 도 7에 도시된 바와 같이 브래킷(200)의 수직부(210)를 건물의 벽(W)에 밀착시킨 상태에서 공구 등을 이용하여 나사(400)가 플라스틱 앵커(300)의 내부로 강제로 삽입되도록 한다(S140). 나사(400)가 플라스틱 앵커(300)에 강제로 삽입이 되는 과정에서 플라스틱 앵커(300)의 절개부(320)가 확장되면서 걸림턱(330)은 앵커 설치구멍(H)의 내면에 강하게 밀착이 된다. 이와 같이 플라스틱 앵커(300)는 나사(400)가 삽입되면서 앵커 설치구멍(H)에 밀착되어 빠지지 않게 된다. 특히, 플라스틱 앵커(300)의 머리부(310)가 브래킷(200)의 수직부(210)와 나사(400)의 머리부분 사이에 개재됨으로써 외부 충격을 완충하고 나사(400)의 풀림 방지를 하는 와셔의 기능을 하게 된다.6 and 7, the screw 400 is a plastic anchor 300 using a tool or the like in a state in which the vertical portion 210 of the bracket 200 is in close contact with the wall W of the building as shown in FIGS. 6 and 7. It is forced to be inserted into the (S140). In the process of forcibly inserting the screw 400 into the plastic anchor 300, the cutout portion 320 of the plastic anchor 300 expands and the locking jaw 330 is strongly adhered to the inner surface of the anchor installation hole H. do. In this way, the plastic anchor 300 is in close contact with the anchor installation hole (H) while the screw 400 is inserted so as not to fall out. In particular, the head 310 of the plastic anchor 300 is interposed between the vertical portion 210 of the bracket 200 and the head of the screw 400 to cushion the external shock and prevent loosening of the screw 400. It will function as a washer.

또한, 나사(400)는 플라스틱 앵커(300)의 내부에 대해서 나사 결합이 됨에 따라서 쉽게 빠지지 않게 되고, 브래킷(200)이 건물의 벽(W)에 안정되게 고정된 상태가 유지된다.In addition, as the screw 400 is screwed to the inside of the plastic anchor 300 is not easily removed, the bracket 200 is maintained in a stable state fixed to the wall (W) of the building.

도 8은 본 발명의 실시 예에 따른 브래킷의 수평부에 의해서 건축 마감재가 지탱되고 있는 상태를 보인 도면이다.8 is a view showing a state in which the building finishing material is supported by the horizontal portion of the bracket according to an embodiment of the present invention.

도 8에 도시된 바와 같이, 작업자는 브래킷(200)의 수평부(220)에 건축 마감재(100)의 상단 및/또는 하단이 접하도록 하는데(S150), 이 과정에서 하층에 위치된 건축 마감재(100)의 전면과 상층에 위치된 건축 마감재(100)의 전면이 일치되도록 한다.As shown in Figure 8, the worker is to contact the top and / or bottom of the building finishing material 100 to the horizontal portion 220 of the bracket 200 (S150), building finishing material located in the lower layer (in this process ( The front of the 100 and the front of the building finishing material (100) located on the upper floor is to match.

그 후, 작업자는 도 9에 도시된 바와 같이 브래킷(200)의 수평부(220)에 건축 마감재(100)의 하단이 지탱되도록 한 상태에서 건물의 벽(W)과 건축 마감재(100) 사이에 위치된 브래킷(200)의 수평부(220)에 에폭시 본드(500)를 도포함으로써 건축 마감재(100)와 브래킷(200)이 접착되도록 한다(S160). 브래킷(200)에 에폭시 본드(500)가 도포되는 과정에서 건물의 벽에도 에폭시 본드가 닿게 될 수 있다. 따라서, 건물의 벽(W), 브래킷(200), 건축 마감재(100)가 에폭시 본드(500)로써 일체로 결합됨으로써 건축 마감재(100)는 건물의 벽(W)에 안정되게 부착된 상태가 유지된다.Thereafter, the worker is placed between the wall (W) of the building and the building finish 100 in a state that the lower end of the building finish 100 is supported on the horizontal portion 220 of the bracket 200 as shown in FIG. By applying the epoxy bond 500 to the horizontal portion 220 of the bracket 200 is positioned so that the building finishing material 100 and the bracket 200 is bonded (S160). In the process of applying the epoxy bond 500 to the bracket 200, the epoxy bond may also touch the wall of the building. Therefore, the wall (W) of the building, the bracket 200, the building finish 100 is integrally combined with the epoxy bond 500, so that the building finish 100 is stably attached to the wall (W) of the building. do.

본 발명의 실시 예에 따른 브래킷(200)이 하층에 위치된 건축 마감재(100)와 상층에 위치된 건축 마감재(100) 사이에 위치될 경우에는 도 9에 도시된 바와 같이 브래킷(200)의 수평부(220) 하면이 하층에 위치된 건축 마감재(100)의 상단에 접하도록 한 상태에서 브래킷(200)의 수평부(220) 아래쪽에도 에폭시 본드(500)를 도포하여 접착시킨다.When the bracket 200 according to the embodiment of the present invention is located between the building finish 100 positioned on the lower floor and the building finish 100 positioned on the upper floor, the horizontal of the bracket 200 is illustrated in FIG. 9. Epoxy bond 500 is also applied to the lower portion of the horizontal portion 220 of the bracket 200 in a state in which the lower surface of the part 220 is in contact with the upper end of the building finishing material 100 positioned in the lower layer.

한편, 본 발명의 실시 예에 따른 건축 마감재 시공방법에 적용되는 건축 마감재(100)는 도면에 도시된 바와 같이 외부층(110)과 내부층(120)으로 구분된 형태의 것이 사용될 수 있다. 이때, 건축 마감재(100)의 외부층(110)은 2 ~ 5mm의 두께로 이루어지는 한편 내부층(120)은 7 ~15mm의 두께로 이루어질 수 있다. 특히, 건축 마감재(100)의 외부층(110)은 석재 또는 석분으로 이루어질 수 있다.On the other hand, the building finishing material 100 applied to the building finishing material construction method according to an embodiment of the present invention may be of a type divided into the outer layer 110 and the inner layer 120 as shown in the figure. At this time, the outer layer 110 of the building finishing material 100 is made of a thickness of 2 ~ 5mm while the inner layer 120 may be made of a thickness of 7 ~ 15mm. In particular, the outer layer 110 of the building finishing material 100 may be made of stone or stone powder.

본 발명의 실시 예에 따른 건축 마감재 시공방법을 이용하여 특히 건물의 내벽에 건축 마감재(100)를 붙이게 될 경우에는 건물의 내벽과 건축 마감재 사이의 간격이 상대적으로 좁기 때문에 내부공간을 충분히 확보할 수 있게 된다.Using the building finishing material construction method according to an embodiment of the present invention in particular when the building finishing material 100 is attached to the inner wall of the building because the distance between the inner wall of the building and the building finishing material is relatively narrow enough to secure the interior space Will be.

특히, 건물의 내벽이 타일로 마감이 되어 있던 상태, 페인트로 칠해져 있던 상태 또는 벽지로 마감되어 있던 상태에서 건물 내부를 리모델링을 하는 경우에는 건물 내부공간이 축소되는 현상을 최대한 줄일 수 있게 된다.In particular, when the interior wall of the building is finished in tiles, painted or wallpaper, the interior space of the building can be reduced as much as possible.

또한, 본 발명의 실시 예에 따른 건축 마감재 시공방법을 이용하여 건물의 벽에 건축 마감재를 붙이게 되면 시공기간이 짧을 뿐만 아니라 시공이 용이하게 이루어질 수 있게 된다.In addition, when the building finishing material is attached to the wall of the building using the building finishing material construction method according to an embodiment of the present invention, the construction period may be short and the construction may be easily performed.

이상에서는 첨부된 도면들을 참조하면서 본 발명의 실시 예를 설명하였지만, 본 발명이 속하는 기술분야에서 통상의 지식을 가진 자는 본 발명이 그 기술적 사상이나 필수적인 특징을 변경하지 않고서 다른 구체적인 형태로 실시될 수 있다는 것을 이해할 수 있을 것이다. 예를 들어, 당업자는 각 구성요소의 재질, 크기 등을 적용 분야에 따라 변경하거나, 개시된 실시 형태들을 조합 또는 치환하여 본 발명의 실시 예에 명확하게 개시되지 않은 형태로 실시할 수 있으나, 이 역시 본 발명의 범위를 벗어나지 않는 것이다. 그러므로 이상에서 기술한 실시 예들은 모든 면에서 예시적인 것으로 한정적인 것으로 이해해서는 안 되며, 이러한 변형된 실시 예들은 본 발명의 특허청구범위에 기재된 기술사상에 포함된다고 하여야 할 것이다.In the above described embodiments of the present invention with reference to the accompanying drawings, those skilled in the art to which the present invention pertains can be carried out in other specific forms without changing the technical spirit or essential features of the present invention. You will understand that. For example, those skilled in the art can change the material, size, etc. of each component according to the application field, or combine or replace the disclosed embodiments in a form that is not clearly disclosed in the embodiments of the present invention, but this too It does not depart from the scope of the invention. Therefore, it should be understood that the above-described embodiments are to be considered in all respects as illustrative and not restrictive, and that these modified embodiments are included in the technical idea described in the claims of the present invention.

100 : 건축 마감재 110 : 외부층
120 : 내부층 200 : 브래킷
210 : 수직부 220 : 수평부
230 : 체결구멍 300 : 플라스틱 앵커
310 : 머리부 320 : 절개부
330 : 걸림턱 400 : 나사
500 : 에폭시 본드 W : 벽
H : 앵커 설치구멍
100: building finishing material 110: outer layer
120: inner layer 200: bracket
210: vertical part 220: horizontal part
230: fastening hole 300: plastic anchor
310: head 320: incision
330: engaging jaw 400: screw
500: Epoxy Bond W: Wall
H: Anchor mounting hole

Claims (4)

건물의 벽에 드릴로 일정 간격을 두고 앵커 설치구멍을 뚫는 앵커 설치구멍 형성 단계;
수직부와 수평부가 ㄴ자 형태로 형성된 브래킷의 수직부를 상기 건물의 벽에 댄 상태에서 상기 수직부에 형성된 체결구멍이 상기 앵커 설치구멍에 일치되도록 하는 브래킷 위치 설정 단계;
상기 체결구멍을 통해 플라스틱 앵커가 상기 앵커 설치구멍에 끼워지게 하되 상기 플라스틱 앵커의 머리부는 상기 브래킷의 수직부 밖으로 노출되게 하는 플라스틱 앵커 설치 단계;
상기 플라스틱 앵커에 나사를 조립하여 상기 브래킷이 건물의 벽에 대해 고정되게 하는 나사 조립 단계;
상기 브래킷의 수평부에 건축 마감재의 하단이 지탱되도록 하는 건축 마감재 위치 설정 단계; 및
상기 건물의 벽과 건축 마감재 사이에 위치된 상기 브래킷의 수평부 상에 에폭시 본드를 도포하여 상기 건축 마감재와 상기 브래킷을 접합하는 접합 단계; 를 포함하여 이루어지는
건축 마감재 시공방법.
Forming an anchor installation hole for drilling the anchor installation hole at a predetermined interval with a drill on the wall of the building;
A bracket positioning step of causing a fastening hole formed in the vertical part to coincide with the anchor installation hole in a state in which the vertical part of the bracket having the vertical part and the horizontal part is formed on the wall of the building;
A plastic anchor installation step of allowing the plastic anchor to be fitted into the anchor installation hole through the fastening hole, but having the head of the plastic anchor exposed out of the vertical part of the bracket;
Assembling screws to the plastic anchors so that the brackets are fixed to the wall of the building;
Building finishing material positioning step of supporting the lower end of the building finishing material in the horizontal portion of the bracket; And
Bonding the building finish to the bracket by applying an epoxy bond on a horizontal portion of the bracket located between the wall of the building and the building finish; It comprises a
Construction finishes construction method.
제 1 항에 있어서,
상기 브래킷의 수평부 하면은 하층에 위치된 건축 마감재의 상단을 접하도록 설치되는
건축 마감재 시공방법.
The method of claim 1,
The bottom of the horizontal portion of the bracket is installed to contact the top of the building finishing material located on the lower floor
Construction finishes construction method.
제 1 항에 있어서,
상기 브래킷은 두께가 0.8 ~ 1.5mm인 금속판으로 이루어지는
건축마감재 시공방법.
The method of claim 1,
The bracket is made of a metal plate having a thickness of 0.8 ~ 1.5mm
Construction Finishing Material Construction Method.
제 1 항에 있어서,
상기 건축 마감재는 2 ~ 5mm 두께의 외부층과 7 ~ 15mm의 내부층으로 형성된 대리석 복합판으로 이루어진
건축마감재 시공방법.
The method of claim 1,
The building finish is made of a marble composite plate formed of an outer layer of 2 ~ 5mm thickness and an inner layer of 7 ~ 15mm
Construction Finishing Material Construction Method.
KR1020110065552A 2011-07-01 2011-07-01 Method for fixing wall panel Abandoned KR20130003909A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110065552A KR20130003909A (en) 2011-07-01 2011-07-01 Method for fixing wall panel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110065552A KR20130003909A (en) 2011-07-01 2011-07-01 Method for fixing wall panel

Publications (1)

Publication Number Publication Date
KR20130003909A true KR20130003909A (en) 2013-01-09

Family

ID=47835967

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110065552A Abandoned KR20130003909A (en) 2011-07-01 2011-07-01 Method for fixing wall panel

Country Status (1)

Country Link
KR (1) KR20130003909A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615088A (en) * 2013-11-06 2014-03-05 苏州金螳螂建筑装饰股份有限公司 Special-shaped stone point-suspension structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615088A (en) * 2013-11-06 2014-03-05 苏州金螳螂建筑装饰股份有限公司 Special-shaped stone point-suspension structure

Similar Documents

Publication Publication Date Title
US7997043B1 (en) System and method for installation of decorative molding
US8887460B1 (en) System and method for installation of decorative molding
KR200480877Y1 (en) Fixing device of stone panel for architectures
CN109162582A (en) A kind of installation method of doorframe
KR100760334B1 (en) Panel assembly set and construction method
US20160192777A1 (en) Retrofit shower corner shelf assembly
CN109594735A (en) Kitchen assembly and installation method
KR101696779B1 (en) Connection type outer structure of outer wall for building
PL1761371T3 (en) Method for coating panel-like materials and materials coated in this manner
KR20130003909A (en) Method for fixing wall panel
CN104405103A (en) Installation method and structure of indoor wood veneer of decoration engineering
KR100832039B1 (en) Tempered Glass Installation Structure and Installation Method
CN204645498U (en) Wood facing dry-hang mounting structure
KR101808281B1 (en) The method for building exterior panels mounting bracket and bracket thereof
KR20110043113A (en) Installation method of wall finishing panel using wall finishing panel and fixed mounting bracket and the fixed mounting bracket
KR102818649B1 (en) A fixing device for a out side panel of building
KR200419563Y1 (en) Picture Bar and Corner Bar for Ceiling Molding
KR100669810B1 (en) Construction Structure of Foamed Polystyrene Sculpture and Its Construction Method
JP2009249989A (en) Fixing structure for outer wall surface material
JP2008121327A (en) On-site manufacture type furniture which is stored on wall surface and manufacturing method therefor
CN204940780U (en) Dry-hanging structure of architectural decorative panels that can be freely assembled and disassembled and combined in size
KR200398409Y1 (en) Construction structure of expanded polystyrene moulding
CN213205353U (en) Elevator door pocket assembling structure
KR100947164B1 (en) Exterior wall surface structure of building
JP2010013872A (en) Exterior wall structure

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 20110701

PA0201 Request for examination
E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

Comment text: Notification of reason for refusal

Patent event date: 20130104

Patent event code: PE09021S01D

PG1501 Laying open of application
PC1902 Submission of document of abandonment before decision of registration
SUBM Surrender of laid-open application requested