CN103605079B - 公交电动汽车及其梯次利用电池集群的v2g可用容量评估方法 - Google Patents
公交电动汽车及其梯次利用电池集群的v2g可用容量评估方法 Download PDFInfo
- Publication number
- CN103605079B CN103605079B CN201310586709.XA CN201310586709A CN103605079B CN 103605079 B CN103605079 B CN 103605079B CN 201310586709 A CN201310586709 A CN 201310586709A CN 103605079 B CN103605079 B CN 103605079B
- Authority
- CN
- China
- Prior art keywords
- battery
- electric vehicles
- public electric
- echelon
- period
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Secondary Cells (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
Description
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310586709.XA CN103605079B (zh) | 2013-11-20 | 2013-11-20 | 公交电动汽车及其梯次利用电池集群的v2g可用容量评估方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310586709.XA CN103605079B (zh) | 2013-11-20 | 2013-11-20 | 公交电动汽车及其梯次利用电池集群的v2g可用容量评估方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103605079A CN103605079A (zh) | 2014-02-26 |
CN103605079B true CN103605079B (zh) | 2015-10-07 |
Family
ID=50123319
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310586709.XA Active CN103605079B (zh) | 2013-11-20 | 2013-11-20 | 公交电动汽车及其梯次利用电池集群的v2g可用容量评估方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103605079B (zh) |
Families Citing this family (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104600729B (zh) * | 2014-08-19 | 2016-12-07 | 浙江工业大学 | 基于v2g技术的电动汽车参与经济调度优化控制方法 |
CN104325872A (zh) * | 2014-11-03 | 2015-02-04 | 宁德时代新能源科技有限公司 | 电池模组梯次利用系统及其使用方法 |
CN104461689B (zh) * | 2014-12-02 | 2017-06-16 | 重庆大学 | 基于蒙特卡洛的电力系统调频可控电动汽车数量动态变化模拟方法 |
CN104993535A (zh) * | 2015-07-02 | 2015-10-21 | 国家电网公司 | 电动公交车充换电站电池储存及集中充电优化方法 |
CN106159360B (zh) * | 2016-06-28 | 2018-08-03 | 合肥工业大学 | 一种基于移动充电器模式的电动汽车充电方法 |
CN109190812B (zh) * | 2018-08-21 | 2022-08-30 | 中国电力科学研究院有限公司 | 一种基于电动汽车的虚拟储能可用容量预测方法及系统 |
CN109508826B (zh) * | 2018-11-13 | 2022-01-07 | 合肥工业大学 | 基于梯度提升决策树的电动汽车集群可调度容量预测方法 |
CN110406422B (zh) * | 2019-08-01 | 2021-12-28 | 国网江苏省电力有限公司苏州供电分公司 | 一种计及多方利益的电动公交车电池参与v2g控制方法 |
CN112651603B (zh) * | 2020-12-04 | 2023-10-17 | 苏州电力设计研究院有限公司 | 考虑电动汽车充电站耦合作用的容量评估方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1488954A (zh) * | 2002-10-07 | 2004-04-14 | 陈清泉 | 电动车蓄电池剩余容量的估计方法 |
CN101176010A (zh) * | 2005-03-25 | 2008-05-07 | 高通股份有限公司 | 用于管理无线装置的电池性能的设备和方法 |
CN101692583A (zh) * | 2009-09-21 | 2010-04-07 | 惠州市亿能电子有限公司 | 一种纯电动公交车用电池管理系统 |
CN101902063A (zh) * | 2009-05-28 | 2010-12-01 | 通用汽车环球科技运作公司 | 用于电动车辆充电的系统和方法 |
CN102180096A (zh) * | 2010-01-15 | 2011-09-14 | 通用汽车环球科技运作有限责任公司 | 监控车辆电池的方法 |
CN102520366A (zh) * | 2011-12-23 | 2012-06-27 | 上海交通大学 | 电动车电池安全与健康评估系统及其方法 |
CN102755966A (zh) * | 2012-07-31 | 2012-10-31 | 河南电力试验研究院 | 一种动力电池梯级利用分选评估方法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4845066B1 (ja) * | 2010-08-18 | 2011-12-28 | 古河電気工業株式会社 | 蓄電デバイスの状態検知方法及びその装置 |
JP5659967B2 (ja) * | 2011-06-24 | 2015-01-28 | ソニー株式会社 | 監視装置 |
JP5830971B2 (ja) * | 2011-06-30 | 2015-12-09 | ソニー株式会社 | 電池モニタ回路、蓄電装置、電動車両および電力システム |
JP2013132147A (ja) * | 2011-12-22 | 2013-07-04 | Sony Corp | 蓄電装置、電子機器、電力システムおよび電動車両 |
-
2013
- 2013-11-20 CN CN201310586709.XA patent/CN103605079B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1488954A (zh) * | 2002-10-07 | 2004-04-14 | 陈清泉 | 电动车蓄电池剩余容量的估计方法 |
CN101176010A (zh) * | 2005-03-25 | 2008-05-07 | 高通股份有限公司 | 用于管理无线装置的电池性能的设备和方法 |
CN101902063A (zh) * | 2009-05-28 | 2010-12-01 | 通用汽车环球科技运作公司 | 用于电动车辆充电的系统和方法 |
CN101692583A (zh) * | 2009-09-21 | 2010-04-07 | 惠州市亿能电子有限公司 | 一种纯电动公交车用电池管理系统 |
CN102180096A (zh) * | 2010-01-15 | 2011-09-14 | 通用汽车环球科技运作有限责任公司 | 监控车辆电池的方法 |
CN102520366A (zh) * | 2011-12-23 | 2012-06-27 | 上海交通大学 | 电动车电池安全与健康评估系统及其方法 |
CN102755966A (zh) * | 2012-07-31 | 2012-10-31 | 河南电力试验研究院 | 一种动力电池梯级利用分选评估方法 |
Non-Patent Citations (3)
Title |
---|
电动汽车V2G技术综述;刘晓飞 等;《电工技术学报》;20120229;第27卷(第2期);第121至127页 * |
考虑动力电池梯次利用的光伏换电站容量优化配置方法;刘念 等;《中国电机工程学报》;20130205;第33卷(第4期);第34至44页 * |
车网互联V2G支持高峰电力的技术经济分析;廖强强 等;《中国电力》;20120430;第45卷(第4期);第92至95页 * |
Also Published As
Publication number | Publication date |
---|---|
CN103605079A (zh) | 2014-02-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103605079B (zh) | 公交电动汽车及其梯次利用电池集群的v2g可用容量评估方法 | |
CN103241130B (zh) | 一种电动公交车充换电站的能量管理方法及系统 | |
Mozafar et al. | A simultaneous approach for optimal allocation of renewable energy sources and electric vehicle charging stations in smart grids based on improved GA-PSO algorithm | |
CN105322559B (zh) | 一种基于v2g技术的电动汽车配电调度控制方法 | |
Erol-Kantarci et al. | Prediction-based charging of PHEVs from the smart grid with dynamic pricing | |
CN103499792B (zh) | 电动汽车动力电池集群可用容量的预测方法 | |
CN205970910U (zh) | 紧凑型分布式充换储电站 | |
CN107169273A (zh) | 计及延时和v2g充电模式的电动汽车充电功率预测方法 | |
CN103580215A (zh) | 一种电动汽车提供辅助服务的经济性分析方法 | |
Yu et al. | The impact of charging battery electric vehicles on the load profile in the presence of renewable energy | |
CN105160151A (zh) | 一种基于模糊K-means算法的电动汽车应急供电方法 | |
CN106407726A (zh) | 一种计及对潮流影响的电动汽车充电站电气接入点的选择方法 | |
CN103414201A (zh) | 电动公交车动力电池集群参与海岛微网运行的调控方法 | |
CN102855527A (zh) | 一种快换式电动汽车充电站经济运行优化策略 | |
CN107391899A (zh) | 一种电动汽车集群负荷响应能力评估方法 | |
CN110861508B (zh) | 居民区直流充电机共享充电控制方法、系统及存储介质 | |
He et al. | Optimal charging strategy of electric vehicles customers in a smart electrical car park | |
CN105956743A (zh) | 一种电动汽车充换电站的规划系统 | |
Martinsen | A business model for an EV charging station with battery energy storage | |
Huang et al. | Using electric vehicle fleet as responsive demand for power system frequency support | |
Wu et al. | Electric vehicle load characteristic analysis and impact of regional power grid | |
Jing et al. | Modeling for electric taxi load and optimization model for charging/swapping facilities of electric taxi | |
Dicorato et al. | Optimal operation and reserve provision planning for an EV-oriented DC microgrid | |
Thakre et al. | Potentially affect of a vehicle to grid on the electricity system | |
Li et al. | Modeling and Controllability Evaluation of EV Charging Facilities Changed from Gas Stations with Renewable Energy Sources |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20191205 Address after: 313000 No.5-8, Changhe Road, Huaxi street, Changxing County, Huzhou City, Zhejiang Province Patentee after: Zhejiang Changxing green battery technology Co.,Ltd. Address before: 313000 Room 1403, 14th Floor, Building B, Freeport, Headquarters 1188 District Fulu Road, Wuxing District, Huzhou City, Zhejiang Province Patentee before: Zhejiang creation Intellectual Property Service Co.,Ltd. Effective date of registration: 20191205 Address after: 313000 Room 1403, 14th Floor, Building B, Freeport, Headquarters 1188 District Fulu Road, Wuxing District, Huzhou City, Zhejiang Province Patentee after: Zhejiang creation Intellectual Property Service Co.,Ltd. Address before: 310014 Hangzhou city in the lower reaches of the city of Zhejiang Wang Road, No. 18 Patentee before: Zhejiang University of Technology |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20201030 Address after: 313000 no.55-9 Huyan South Road, Shuanglin Town, Nanxun District, Huzhou City, Zhejiang Province (self declaration) Patentee after: Huzhou Duxin Technology Co.,Ltd. Address before: 313000 No.5-8, Changhe Road, Huaxi street, Changxing County, Huzhou City, Zhejiang Province Patentee before: Zhejiang Changxing green battery technology Co.,Ltd. |
|
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230809 Address after: 516300 Liantangbian Factory Building, Zengguang Community, Pingshan Street, Huidong County, Huizhou City, Guangdong Province Patentee after: GUANGDONG SHIHE TECHNOLOGY Co.,Ltd. Address before: 313000 no.55-9 Huyan South Road, Shuanglin Town, Nanxun District, Huzhou City, Zhejiang Province (self declaration) Patentee before: Huzhou Duxin Technology Co.,Ltd. |
|
TR01 | Transfer of patent right |