CN103603678A - One-step pouring type steel mould trolley and pouring method for concealed channels in deserts - Google Patents

One-step pouring type steel mould trolley and pouring method for concealed channels in deserts Download PDF

Info

Publication number
CN103603678A
CN103603678A CN201310605485.2A CN201310605485A CN103603678A CN 103603678 A CN103603678 A CN 103603678A CN 201310605485 A CN201310605485 A CN 201310605485A CN 103603678 A CN103603678 A CN 103603678A
Authority
CN
China
Prior art keywords
template
interior
mould
truss
external mold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310605485.2A
Other languages
Chinese (zh)
Other versions
CN103603678B (en
Inventor
韩立炜
徐存东
张先起
王燕
张宏洋
贾广钰
刘慧卿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China University of Water Resources and Electric Power
Original Assignee
North China University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China University of Water Resources and Electric Power filed Critical North China University of Water Resources and Electric Power
Priority to CN201310605485.2A priority Critical patent/CN103603678B/en
Publication of CN103603678A publication Critical patent/CN103603678A/en
Application granted granted Critical
Publication of CN103603678B publication Critical patent/CN103603678B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a one-step pouring type steel mould trolley and a pouring method for concealed channels in deserts. The one-step pouring type steel mould trolley comprises outer mould plates, a support of the outer mould plates, inner mould plates and a support of the inner mould plates; outer track wheels and outer tracks are respectively arranged at the lower ends of outer traveling frames and the lower ends of inner traveling frames; outer side mould plates, an outer top mould plate, inner side mould plates and an inner top mould plate form a 'square' pouring channel in an enclosing manner; vibrators are fixed onto outer mould trusses and inner mould support plates; feed inlets are respectively formed in the outer side mould plates, the outer top mould plate and an inner bottom mould plate. The one-step pouring type steel mould trolley and the pouring method have the advantages that the outer mould trusses and an outer mould form an inverted-U-shaped semi-closed protective cover, operation such as reinforcing steel bar tying and foundation construction can be completed in the inverted-U-shaped semi-closed protective cover, the one-step pouring type steel mould trolley and the pouring method are favorable for protecting workers against severe weather such as sandstorm, a sunshade space can be provided for the workers, the comfortable degree of the work space can be increased, sun exposure protection for newly built concrete layers of foundations can be advantageously improved, and accordingly construction progress can be prevented from being interrupted by influence of weather change factors.

Description

Desert secret tunnel one-time-concreting formula steel form carrier and casting method
Technical field
The invention belongs to the road construction field of Desert Control, be specifically related to a kind of desert secret tunnel one-time-concreting formula steel form carrier and casting method.
Background technology
Conquering desert, march the important content that desert is development of the West Regions, is also that 21 century people thirst for one of problem solving.Along with the steady enforcement of strategy to develop western regions, large quantities of engineerings will be built in desert area, need to be by heavy mechanical equipment.Desert secret tunnel can provide sufficient water source for each large-engineering, is a kind of important transfer passage.Yet because desert is unfavorable for the special circumstances of transporting, desert secret tunnel is difficult for realizing by prefabricated and transportation, need in desert, carry out secret tunnel construction, and this is a concrete construction engineering in large scale.In desert, carry out concrete construction and be different from land construction, arid, sweltering heat and dust storm feature in desert, need to carry out sunshade to concrete, paste preservative film and sand-proof processing, once run into dusty wind weather, must stop work and need to take necessary safeguard measure.Cause efficiency of construction very slow, construction intensity is large, of poor quality.
Summary of the invention
The object of this invention is to provide a kind of applicable desert rapid construction, not affected by bad weather, concrete is there is to desert secret tunnel one-time-concreting formula steel form carrier and the casting method of protective effect.
For achieving the above object, the technical solution adopted in the present invention is as follows: a kind of desert secret tunnel one-time-concreting formula steel form carrier and casting method, comprise exterior sheathing and support thereof, inner formword and support thereof, described exterior sheathing support comprises two external mold truss that be arranged in parallel and the pull bar at top; The pull bar at top is fixed on the upside of two external mold truss; The lower end of each external mold truss arranges respectively outer walker, between external mold truss and outer walker, elevating mechanism is set; The lower end of each outer walker arranges respectively outside track wheel and outside track; The medial surface of two external mold truss is connected with outboard template by governor motion respectively, and pull bar below is fixed with outer top template, and two outboard templates and outer top template surround inverted U-shaped; Described internal mould supporter comprises a rectangular frame being surrounded by internal mold supporting plate, in the surrounding of rectangular frame, is connected with two inner side template and an interior top template, an interior soffit formwork respectively by governor motion; Described inner side template, interior top template and interior soffit formwork surround " mouth " font semi-closed structure; Outboard template, outer top template and inner side template, interior top template and interior soffit formwork surround " mouth " font builds passage; The two ends that passage built in " mouth " font are respectively arranged with Side Template and template connecting piece; In the bottom of described interior soffit formwork, be vertically arranged with slip steel pipe; In described rectangular frame, be at least provided with four interior supporting legs, in each, side and the top of supporting leg are fixed together by connecting rod and rectangular frame; In each, the bottom of supporting leg is provided with sleeve pipe, between interior supporting leg and sleeve bottom, is provided with jack; Adjacent interior supporting leg top is connected and fixed by crossbeam; On described external mold truss and internal mold supporting plate, be fixed with vibrator respectively; Respectively at outboard template.On outer top template and interior soffit formwork, be provided with charging aperture.
On the butt joint between described inner side template and interior top template, between inner side template and interior soffit formwork, be provided with flexible cushion.
Described governor motion is between external mold truss and outboard template, be provided with adjusting bolt and guiding support bar and sleeve pipe between internal mold supporting plate and inner side template, guiding support bar is vertically fixed on the back side of outboard template or inner side template, sleeve pipe is fixed on external mold truss or internal mold supporting plate, and guiding support bar coupling is set in corresponding sleeve pipe.Described elevating mechanism is adjustable bolt, or is jack.Between the top of internal mold supporting plate and interior supporting leg, be provided with the height fine-adjustment mechanism of controlling internal mold supporting plate height change.Between the top of internal mold supporting plate and interior supporting leg, be provided with the center line governor motion that can make the left and right translation of internal mold bracket.This center line governor motion is to be provided with horizontal flat groove on interior supporting leg top, and flat groove sidewall is provided with adjusting knob, and the connecting rod bottom fixing with internal mold supporting plate top is set in this flat groove, and adjusting knob docks with described connecting rod sidewall.
A kind of desert secret tunnel one-time-concreting method, first, in desert, lay two parallel outer guides, walking truss outside is installed on every outer guide, each outer walking truss upside arranges external mold truss, and each external mold truss upside is fixed and formed rock-steady structure by pull bar; And in the inner side of external mold truss and the downside of each pull bar be provided with exterior sheathing; Secondly, in exterior sheathing inner side, carry out reinforcing bar and prick frame operation, form " mouth " font reinforcing bar and prick frame; Then, internal mold walker is moved to the bottom surface upside that " mouth " font reinforcing bar is pricked frame; Described internal mold walker is a rectangular frame, and the surrounding of this rectangular frame arranges respectively two inner side template, an interior top template and an interior soffit formwork; Between interior soffit formwork and the bottom surface of " mouth " font reinforcing bar bundle frame, the face that is slidably matched is set; By surrounding " mouth " font after exterior sheathing and the combination of each inner formword, build passage, and on exterior sheathing or inner formword, charging aperture is set, on external mold truss and internal mold bracket, vibrator is set; Then, the two ends of building passage at " mouth " font arrange end mould fixing, form the inner chamber of building of sealing; From each charging aperture concrete perfusion constantly internal external mold, vibrate successively from bottom to top one-time-concreting moulding " mouth " font secret tunnel; Wait build finish and solidify up to standard after, remove two Side Templates, each inner formword is inwardly shunk, exterior sheathing outwards expands, and reaches stripping result; Finally, pull out internal mold walker; Monitor and determine " mouth " font secret tunnel qualified after by adventitia truss along outside track forward translation carry out hypomere pouring construction.
Be respectively arranged with the governor motion to exterior sheathing and inner formword transverse translation.Also be provided with the elevating mechanism of controlling external mold depth of truss, control the elevating mechanism of internal mold supporting plate height.
Tool of the present invention has the following advantages:
1, the invention provides a kind of portable desert secret tunnel and build scheme, utilize external mold truss and external mold to form inverted U-shaped semiclosed protective cover, the operation such as binding reinforcing bars and foundation construction all completes in inverted U-shaped semiclosed protective cover, form " mouth " font reinforcing bar and prick frame, at " mouth " font reinforcing bar, prick after frame completes and again inner-film plate assembly is fed into along track and is tied up in rear steel ring, can disposablely complete concreting work.Thereby outer membrane module and interior membrane module all need not be dismantled or establishment again, and efficiency of construction is very high.Be conducive to the bad weathers such as sand-proof, also for workman provides sunshade space, improve working space comfort level, the ground layer of concrete being also conducive to newly building improves insolation proof protection.Thereby make construction progress be unlikely to interrupt because of the impact of Changes in weather factor.
2, utilize parallel orbit, outer membrane module is constantly pushed ahead as sand-proof guard shield and exterior sheathing double action, can carry out necessary protection to equipment and personnel.
3, in work progress, dismantle after partial lateral template, external mold truss also can be used as the operating platform of binding reinforcing bars operation, does not need to prepare in addition the facilities such as scaffold.
4, between external mold truss and internal mold supporting plate and template, be all provided with elevating mechanism and governor motion, so that the demoulding and group mould.The flexible cushion arranging on butt joint between inner side template and interior top template can provide compressive deformation, and in the situation that guaranteeing not leak material, making has certain adjustment width between inner side template and inner membrance supporting plate, thereby is conducive to the demoulding of inner formword.
Accompanying drawing explanation
Fig. 1 is the structural representation of desert of the present invention secret tunnel one-time-concreting formula steel form carrier;
Fig. 2 is the A portion structure for amplifying schematic diagram of Fig. 1;
Fig. 3 is the B portion structure for amplifying schematic diagram of Fig. 1.
In figure, number 1 for pull bar, 2 is external mold truss, 3 is outboard template, 4 is outer top template, 5 is outer walker, 6 is outside track wheel, 7 is outside track, 8 is internal mold supporting plate, 9 is inner side template, 10 is interior top template, 11 is interior soffit formwork, 12 is sleeve pipe, 13 is interior supporting leg, 14 is crossbeam, 15 is jack, 16 is connecting rod, 17 is slip steel pipe, 18 is that " mouth " font reinforcing bar is pricked frame, 19 is embedded bar, 20 is adjusting nut, 21 is charging aperture, 22 is vibrator, 23 is joint steel pipe, 24 is adjusting knob, 25 is flexible material layer, 26 is elevating mechanism, 27 is adjusting bolt, 28 is guiding support bar, 29 is sleeve pipe.
The specific embodiment
Embodiment 1: a kind of desert secret tunnel one-time-concreting formula steel form carrier, referring to Fig. 1, exterior sheathing support comprises the pull bar 1 at two external mold truss 2 that be arranged in parallel and some tops.The upper end of two external mold truss 2 is fixed together by pull bar 1, also can between two external mold truss 2 and the pull bar 1 at top, arrange and slide and locking mechanism.
The lower end of two external mold truss 2 arranges respectively outer walker 5, between external mold truss 2 and outer walker 5, elevating mechanism is set; This elevating mechanism 26 is adjustable bolt, or is jack.
The lower end of two outer walkers 5 arranges respectively outside track wheel 6 and outside track 7.Thereby exterior sheathing and assembly thereof can be along track 7 translations forward.
Exterior sheathing comprises two outboard templates 3 and an outer top template 4.Two outboard templates 3 are connected on the medial surface of two external mold truss 2 by governor motion respectively, two outboard template 3 keeping parallelisms.Outer top template 4 is fixed on the below of pull bar 1.Two outboard templates 3 surround inverted U-shaped with outer top template 4.
Described internal mould supporter comprises a rectangular frame being surrounded by internal mold supporting plate, in the surrounding of rectangular frame, is connected with two inner side template 9 and interior top template 10, an interior soffit formwork 11 respectively by governor motion.Described inner side template 9, interior top template 10 and interior soffit formwork 11 surround " mouth " font semi-closed structure.
Outboard template 3, outer top template 4 surrounds with inner side template 9, interior top template 10 and interior soffit formwork 30 " mouth " font builds passage; " mouth " font is built setting " mouth " font reinforcing bar in passage and is pricked frame 18.
The two ends that passage built in " mouth " font are respectively arranged with Side Template and template connecting piece, form sealing and build chamber.
In the bottom of described interior soffit formwork, be vertically arranged with slip steel pipe; Slip steel pipe is positioned at " mouth " font reinforcing bar and pricks frame 18 upsides, and can make rectangular frame carry the longitudinally slip together of inner formword assembly.
In described rectangular frame, be at least provided with four interior supporting legs 13, in each, the side of supporting leg 13 and top are fixed together by connecting rod 16 and rectangular frame; In each, the bottom of supporting leg 13 is provided with sleeve pipe 12, between interior supporting leg 13 and sleeve pipe 12 bottoms, is provided with jack 15; Adjacent interior supporting leg top is connected and fixed by crossbeam 14.
The two ends that passage built in " mouth " font are respectively arranged with Side Template and template connecting piece, form hermetically-sealed construction.On outboard template 3, outer top template 4 and interior soffit formwork 11, be provided with charging aperture 21 respectively.On described external mold truss 2 and internal mold supporting plate 8, be fixed with vibrator 22 respectively.
Between described inner side template 9 and interior top template 10, on butt joint, be provided with flexible cushion 25.
Referring to Fig. 2 and Fig. 3, governor motion is between external mold truss 2 and outboard template 3, be provided with adjusting bolt 27 and guiding support bar 28 and sleeve pipe 29 between internal mold supporting plate 8 and inner side template 9, guiding support bar 28 is vertically fixed on the back side of outboard template 3 or inner side template 9, sleeve pipe 29 is fixed on external mold truss 2 or internal mold supporting plate 8, and guiding support bar 28 couplings are set in corresponding sleeve pipe 29.
Embodiment 2: referring to Fig. 1, content is substantially the same manner as Example 1, and something in common does not repeat, different: between the top of internal mold supporting plate 8 and interior supporting leg 13, be provided with the height fine-adjustment mechanism of controlling internal mold supporting plate height change.On the top of internal mold supporting plate and the connecting rod between interior supporting leg, adjusting nut 20 is set, for regulating the height of connecting rod.
Embodiment 3: referring to Fig. 1, content is substantially the same manner as Example 1, and something in common does not repeat, different: between the top of internal mold supporting plate 8 and interior supporting leg 13, be provided with the center line governor motion that can make the left and right translation of internal mold bracket.This center line governor motion is to be provided with horizontal flat groove on interior supporting leg top, and flat groove sidewall is provided with adjusting knob 24, and the connecting rod bottom fixing with internal mold supporting plate top is set in this flat groove, and adjusting knob docks with described connecting rod sidewall.
Embodiment 4: a kind of desert secret tunnel one-time-concreting method, first, in desert, lay two parallel outer guides, walking truss outside is installed on every outer guide, each outer walking truss upside arranges external mold truss, and each external mold truss upside is fixed and formed rock-steady structure by pull bar; And in the inner side of external mold truss and the downside of each pull bar be provided with exterior sheathing; Secondly, in exterior sheathing inner side, carry out reinforcing bar and prick frame operation, form " mouth " font reinforcing bar and prick frame; Then, internal mold walker is moved to the bottom surface upside that " mouth " font reinforcing bar is pricked frame; Described internal mold walker is a rectangular frame, and the surrounding of this rectangular frame arranges respectively two inner side template, an interior top template and an interior soffit formwork; Between interior soffit formwork and the bottom surface of " mouth " font reinforcing bar bundle frame, the face that is slidably matched is set; By surrounding " mouth " font after exterior sheathing and the combination of each inner formword, build passage, and on exterior sheathing or inner formword, charging aperture is set, on external mold truss and internal mold bracket, vibrator is set; Then, the two ends of building passage at " mouth " font arrange end mould fixing, form the inner chamber of building of sealing; From each charging aperture concrete perfusion constantly internal external mold, vibrate successively from bottom to top one-time-concreting moulding " mouth " font secret tunnel; Wait build finish and solidify up to standard after, remove two Side Templates, each inner formword is inwardly shunk, exterior sheathing outwards expands, and reaches stripping result; Finally, pull out internal mold walker; Monitor and determine " mouth " font secret tunnel qualified after by adventitia truss along outside track forward translation carry out hypomere pouring construction.
Be respectively arranged with the governor motion to exterior sheathing and inner formword transverse translation.Also be provided with the elevating mechanism of controlling external mold depth of truss, control the elevating mechanism of internal mold supporting plate height.

Claims (10)

1. a desert secret tunnel one-time-concreting formula steel form carrier, comprises exterior sheathing and support thereof, inner formword and support thereof, and described exterior sheathing support comprises two external mold truss that be arranged in parallel and the pull bar at top; The pull bar at top is fixed on the upside of two external mold truss; The lower end of each external mold truss arranges respectively outer walker, between external mold truss and outer walker, elevating mechanism is set; The lower end of each outer walker arranges respectively outside track wheel and outside track; The medial surface of two external mold truss is connected with outboard template by governor motion respectively, and pull bar below is fixed with outer top template, and two outboard templates and outer top template surround inverted U-shaped; Described internal mould supporter comprises a rectangular frame being surrounded by internal mold supporting plate, in the surrounding of rectangular frame, is connected with two inner side template and an interior top template, an interior soffit formwork respectively by governor motion; Described inner side template, interior top template and interior soffit formwork surround " mouth " font semi-closed structure; Outboard template, outer top template and inner side template, interior top template and interior soffit formwork surround " mouth " font builds passage; The two ends that passage built in " mouth " font are respectively arranged with Side Template and template connecting piece; In the bottom of described interior soffit formwork, be vertically arranged with slip steel pipe; In described rectangular frame, be at least provided with four interior supporting legs, in each, side and the top of supporting leg are fixed together by connecting rod and rectangular frame; In each, the bottom of supporting leg is provided with sleeve pipe, between interior supporting leg and sleeve bottom, is provided with jack; Adjacent interior supporting leg top is connected and fixed by crossbeam; On described external mold truss and internal mold supporting plate, be fixed with vibrator respectively; On outboard template, outer top template and interior soffit formwork, be provided with charging aperture respectively.
2. desert according to claim 1 secret tunnel one-time-concreting formula steel form carrier, is characterized in that: on the butt joint between described inner side template and interior top template, between inner side template and interior soffit formwork, be provided with flexible cushion.
3. desert according to claim 1 secret tunnel one-time-concreting formula steel form carrier, it is characterized in that: described governor motion is between external mold truss and outboard template, be provided with adjusting bolt and guiding support bar and sleeve pipe between internal mold supporting plate and inner side template, guiding support bar is vertically fixed on the back side of outboard template or inner side template, sleeve pipe is fixed on external mold truss or internal mold supporting plate, and guiding support bar coupling is set in corresponding sleeve pipe.
4. desert according to claim 1 secret tunnel one-time-concreting formula steel form carrier, is characterized in that: described elevating mechanism is adjustable bolt, or is jack.
5. desert according to claim 1 secret tunnel one-time-concreting formula steel form carrier, is characterized in that: between the top of internal mold supporting plate and interior supporting leg, be provided with the height fine-adjustment mechanism of controlling internal mold supporting plate height change.
6. desert according to claim 1 secret tunnel one-time-concreting formula steel form carrier, is characterized in that: between the top of internal mold supporting plate and interior supporting leg, be provided with the center line governor motion that can make the left and right translation of internal mold bracket.
7. desert according to claim 6 secret tunnel one-time-concreting formula steel form carrier, it is characterized in that: described center line governor motion is to be provided with horizontal flat groove on interior supporting leg top, flat groove sidewall is provided with adjusting knob, the connecting rod bottom fixing with internal mold supporting plate top is set in this flat groove, and adjusting knob docks with described connecting rod sidewall.
8. a desert secret tunnel one-time-concreting method, it is characterized in that: first, in desert, lay two parallel outer guides, walking truss outside is installed on every outer guide, each outer walking truss upside arranges external mold truss, and each external mold truss upside is fixed and formed rock-steady structure by pull bar; And in the inner side of external mold truss and the downside of each pull bar be provided with exterior sheathing; Secondly, in exterior sheathing inner side, carry out reinforcing bar and prick frame operation, form " mouth " font reinforcing bar and prick frame; Then, internal mold walker is moved to the bottom surface upside that " mouth " font reinforcing bar is pricked frame; Described internal mold walker is a rectangular frame, and the surrounding of this rectangular frame arranges respectively two inner side template, an interior top template and an interior soffit formwork; Between interior soffit formwork and the bottom surface of " mouth " font reinforcing bar bundle frame, the face that is slidably matched is set; By surrounding " mouth " font after exterior sheathing and the combination of each inner formword, build passage, and on exterior sheathing or inner formword, charging aperture is set, on external mold truss and internal mold bracket, vibrator is set; Then, the two ends of building passage at " mouth " font arrange end mould fixing, form the inner chamber of building of sealing; From each charging aperture concrete perfusion constantly internal external mold, vibrate successively from bottom to top one-time-concreting moulding " mouth " font secret tunnel; Wait build finish and solidify up to standard after, remove two Side Templates, each inner formword is inwardly shunk, exterior sheathing outwards expands, and reaches stripping result; Finally, pull out internal mold walker; Monitor and determine " mouth " font secret tunnel qualified after by adventitia truss along outside track forward translation carry out hypomere pouring construction.
9. desert according to claim 1 secret tunnel one-time-concreting method, is characterized in that: be respectively arranged with the governor motion to exterior sheathing and inner formword transverse translation.
10. desert according to claim 1 secret tunnel one-time-concreting method, is characterized in that: be also provided with the elevating mechanism of controlling external mold depth of truss, control the elevating mechanism of internal mold supporting plate height.
CN201310605485.2A 2013-11-26 2013-11-26 Desert secret tunnel one-time-concreting formula steel form carrier and casting method Expired - Fee Related CN103603678B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310605485.2A CN103603678B (en) 2013-11-26 2013-11-26 Desert secret tunnel one-time-concreting formula steel form carrier and casting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310605485.2A CN103603678B (en) 2013-11-26 2013-11-26 Desert secret tunnel one-time-concreting formula steel form carrier and casting method

Publications (2)

Publication Number Publication Date
CN103603678A true CN103603678A (en) 2014-02-26
CN103603678B CN103603678B (en) 2016-02-24

Family

ID=50121930

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310605485.2A Expired - Fee Related CN103603678B (en) 2013-11-26 2013-11-26 Desert secret tunnel one-time-concreting formula steel form carrier and casting method

Country Status (1)

Country Link
CN (1) CN103603678B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358576A (en) * 2014-10-30 2015-02-18 山西三元煤业股份有限公司 Automatic sliding mode device of mine laneway and use method
CN104895584A (en) * 2015-04-28 2015-09-09 金中天集团港航有限公司 Modularization steel die trolley and construction process thereof
CN105221166A (en) * 2015-10-23 2016-01-06 中铁五局集团第一工程有限责任公司 Upstriker large span contains tunnel outer mould liner platform building cart
CN105538484A (en) * 2015-12-11 2016-05-04 上海建工材料工程有限公司 U-beam mold used for preventing damage of tensioning and releasing tensile stress and U-beam manufacturing method
CN105538488A (en) * 2016-01-09 2016-05-04 安徽水利开发股份有限公司 Pipe gallery box culvert pouring mould
CN107559022A (en) * 2017-09-14 2018-01-09 成都利拓机械租赁有限公司 A kind of cast-in-place cast outer mold structure, cast-in-place external mold equipment and construction method
CN108060930A (en) * 2017-10-23 2018-05-22 苏玉明 A kind of concrete wall placing installation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3690470A (en) * 1970-02-24 1972-09-12 John R Tabor Tunneling machine with concrete form transfer apparatus
CN1448255A (en) * 2003-04-25 2003-10-15 广东水电二局股份有限公司 Construction method of in-situ concrete prestressed round pipe
CN103133011A (en) * 2011-11-28 2013-06-05 中建七局安装工程有限公司 Construction device and construction method of hydraulic pressure steel mould trolley monolithic conduit pipe body
CN203626850U (en) * 2013-11-26 2014-06-04 华北水利水电大学 One-time casting type steel mould trolley for covered way in desert

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3690470A (en) * 1970-02-24 1972-09-12 John R Tabor Tunneling machine with concrete form transfer apparatus
CN1448255A (en) * 2003-04-25 2003-10-15 广东水电二局股份有限公司 Construction method of in-situ concrete prestressed round pipe
CN103133011A (en) * 2011-11-28 2013-06-05 中建七局安装工程有限公司 Construction device and construction method of hydraulic pressure steel mould trolley monolithic conduit pipe body
CN203626850U (en) * 2013-11-26 2014-06-04 华北水利水电大学 One-time casting type steel mould trolley for covered way in desert

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
尉兴龙: "箱型暗渠一次浇筑成型的技术研究与应用", 《中国农村水利水电》 *
徐春泰: "沙漠区箱形暗渠钢模台车施工技术应用", 《水利建设与管理》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104358576A (en) * 2014-10-30 2015-02-18 山西三元煤业股份有限公司 Automatic sliding mode device of mine laneway and use method
CN104895584A (en) * 2015-04-28 2015-09-09 金中天集团港航有限公司 Modularization steel die trolley and construction process thereof
CN105221166A (en) * 2015-10-23 2016-01-06 中铁五局集团第一工程有限责任公司 Upstriker large span contains tunnel outer mould liner platform building cart
CN105538484A (en) * 2015-12-11 2016-05-04 上海建工材料工程有限公司 U-beam mold used for preventing damage of tensioning and releasing tensile stress and U-beam manufacturing method
CN105538488A (en) * 2016-01-09 2016-05-04 安徽水利开发股份有限公司 Pipe gallery box culvert pouring mould
CN107559022A (en) * 2017-09-14 2018-01-09 成都利拓机械租赁有限公司 A kind of cast-in-place cast outer mold structure, cast-in-place external mold equipment and construction method
CN107559022B (en) * 2017-09-14 2023-12-22 成都利拓机械租赁有限公司 Cast-in-situ external mold structure, cast-in-situ external mold equipment and construction method
CN108060930A (en) * 2017-10-23 2018-05-22 苏玉明 A kind of concrete wall placing installation
CN108060930B (en) * 2017-10-23 2023-07-21 苏玉明 Concrete wall pouring equipment

Also Published As

Publication number Publication date
CN103603678B (en) 2016-02-24

Similar Documents

Publication Publication Date Title
CN103603678B (en) Desert secret tunnel one-time-concreting formula steel form carrier and casting method
CN103615264B (en) Desert conduit two-casting type steel form trolley and casting method
CN104895584B (en) A kind of modularization steel form carrier and construction technology thereof
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN204609906U (en) A kind of modularization steel form carrier
CN208343136U (en) A kind of voluntarily prefabricated immersed tube template of tunneling boring
CN103541744A (en) Tire walking full-hydraulic lining trolley
CN107584650A (en) Using the bridge prefabrication devices and methods therefor of self-propelled continuous productive process
CN105350454A (en) Steel arch rib outer wrapped concrete construction method for steel trussed arch bridge
CN103938534A (en) Overhead rail transit station integrated bridge structure and application method thereof
CN206385565U (en) A kind of piping lane gate-type is from traveling hydraulic pressure exterior sheathing system and device
CN203626850U (en) One-time casting type steel mould trolley for covered way in desert
CN109372547A (en) Narrow-bore tunnel rail-mounted lining trolley and lining methods
CN110145341A (en) A kind of gang form system for circular tunnel concreting
CN203625929U (en) Two-time casting type steel mould trolley for covered way in desert
CN202718678U (en) Whole-circle tunnel needle beam trolley
CN205823300U (en) A kind of construction equipment of ditch cable trench in double track tunnel
CN102518010B (en) Combined device for laying and grouting ballastless track board
CN206173899U (en) Trapezoidal ditch of slipform method template
CN203702178U (en) Bottom end supercharged type small-height tunnel lining trolley
CN203603928U (en) Rubber-tyred walking full-hydraulic lining trolley
CN203022010U (en) Side slope lining trolley
CN107060831A (en) One kind is used for tunnel groove constructing device
WO2023173797A1 (en) Sliding-form construction system and method for spraying concrete in tbm tunnel
CN107100648B (en) Auxiliary facility and method for tunnel plain concrete lining construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160224

Termination date: 20161126

CF01 Termination of patent right due to non-payment of annual fee